This study evaluates the application of Machine Learning techniques, with an emphasis on multiple regression, to define statistical control levels for piezometers and water level meters in sediment and tailings dams. The research develops a method that uses historical instrumentation data and environmental variables to generate dynamic and automated control limits, overcoming the limitations of traditional methods. It analyzes how model predictions can support geotechnical engineers’ decision-making, improving the monitoring and safety of structures. The approach aims for a robust and adaptive alert system for early anomaly detection and disaster prevention.

Dam safety has become a priority in Brazilian geotechnical engineering after the collapses in Fundão and Brumadinho, which highlighted the need for rigorous and continuous monitoring. Geotechnical instrumentation is fundamental, allowing the identification of anomalies that indicate risks to stability. According to De Freitas (2022), the effectiveness of monitoring depends on the systematic acquisition, recording, and processing of data from instruments installed in the dam. The analysis of this data allows for tracking the structure’s behavior and comparing it with design assumptions, serving as the basis for safety management.

Traditionally, anomaly identification uses deterministic control levels, such as the “Risk Chart”, to verify if parameters are within safety limits (Reis et al., 2024). However, the approach has limitations. ZORZAL et al. (2016) point out that these limits are generated from scenarios of extreme groundwater table conditions, which can lead to inadequate results, such as the simulation of downstream slope saturation. Such scenarios, even with safety factors that meet regulatory limits, can mask susceptibility to failure mechanisms like retrogressive erosion (piping), making the safety factor unrepresentative of the real risk.

Given the deficiencies of deterministic models, statistical approaches emerged as an alternative. Fusaro (2007) pioneered the proposal of defining control levels based on statistical analyses of historical data, aiming to generate automatic alerts for changes in the time series behavior of an instrument. He established consistency ranges for pore pressure data through linear regressions that related piezometric levels with the reservoir water level. Despite the advancement, these techniques still rely on individual analyses and require manual procedures for excluding anomalous points, limiting the speed and scalability of data interpretation.

Computational advancement and the popularization of machine learning have created opportunities to improve the analysis of instrumentation data. Supervised models, such as multiple regression, can identify complex patterns and predict behaviors with greater accuracy. Multiple regression estimates the relationship between a dependent variable and multiple independent variables. According to Montgomery, Peck, and Vining (2012), the method is applied in engineering to evaluate the impact of variables such as precipitation and seasonality on piezometric readings. Although it may be less accurate than methods like ARIMA for very short-term forecasting, its advantage is to elucidate the influence of external factors, aiding in the distinction between normal variations and anomalies. This research proposes a more robust and adaptive approach for effective monitoring.

The methodology is quantitative and experimental, based on the analysis of historical data from earth dams for the disposal of tailings and sediments, whose identities were omitted for confidentiality. The research combined three procedures: bibliographic research to support machine learning and monitoring techniques; experimental research with the application of multiple regression models; and a case study focused on the analysis of data from a piezometer (sediment dam) and a water level meter (tailings dam).

The dataset was prepared for modeling, treating the absence of readings on days as Sundays and holidays. To ensure continuity, the data were organized into a daily series, and missing values were filled by linear interpolation. The predictor variables (independent) included daily rainfall, limnimeter readings (when available), and seasonality, captured by transforming the “month” variable into indicator (dummy) variables. Additionally, accumulated rainfall variables were created in moving windows of 5, 10, 15, 20, 25, and 30 days to model the delayed response of the instruments to rainfall events, influenced by the soil’s water infiltration time.

To optimize the models, transformations were applied to the response variable. The data were standardized using the z-score method and then subjected to a Yeo-Johnson transformation, according to Weisberg (2001). The choice of this transformation was motivated by the limitation of Box-Cox, which requires positive values and presented numerical instability in the case. The Yeo-Johnson transformation, which accepts positive and negative values (Riani et al., 2023), proved more suitable for stabilizing variance and improving the normality of residuals. For the selection of the most relevant variables, the automated Stepwise procedure was employed, which sequentially removes variables with low statistical significance (p-value > 0.05), simplifying the model and avoiding overfitting.

Six models were evaluated for the piezometer and four for the water level meter (models with accumulated ruler were not applied to this one due to data unavailability). The fitted models were used to calculate the control limits, defined as the 95% confidence intervals for the predicted values. Performance was compared based on the adjusted R², which measures the variability explained by the model, and the log-likelihood (Log-Likelihood), which assesses the fit to the data (Fávero et al., 2017). The Breusch-Pagan Test was performed to check for heteroscedasticity in the residuals. Finally, the results were compared with the monthly control limits of Fusaro’s methodology (2007), based on the mean and two standard deviations of the readings for each month.

The initial analysis by Fusaro’s (2007) methodology revealed seasonal behavior for both instruments. The monthly control limits, calculated based on the mean and two standard deviations, showed cyclical variation throughout the year, justified by factors such as rainfall and reservoir level. The descriptive statistics of the raw data corroborated this observation, showing a wide range of values for the readings and for rainfall, which varied from 0 to 141 mm daily.

Cluster analysis with the k-means algorithm (k=4) grouped the data into four periods with similar behaviors. For the piezometer, cluster 0 corresponded to the months of January to March (maximum rainfall), while cluster 1 (July to September) represented the dry season. The periods of highest and lowest rainfall did not coincide with the maximum and minimum readings, suggesting a lagged response. In the water level meter, the period of highest readings (cluster 0) was consistently preceded by that of highest rainfall (cluster 1), reinforcing the hypothesis of a response time. This analysis validated the importance of including seasonal and accumulated rainfall variables in the models.

The comparative evaluation of the multiple regression models showed that Model 4, which incorporated accumulated rainfall and underwent standardization and Yeo-Johnson transformation, presented the best performance for both instruments. It achieved the highest Log-Likelihood value (-2228.39 for the piezometer and -1776.66 for the water level meter). The models that used the Yeo-Johnson transformation exhibited a significant gain in Log-Likelihood, indicating a better fit. The adjusted R² values, ranging from 0.42 to 0.51, were considered satisfactory for the study’s objective, which was to create a tool for defining control bands, not to maximize predictive capacity.

The Stepwise variable selection procedure revealed the dynamics of each instrument. For the piezometer, in models with readings from the staff gauge, daily rainfall was removed due to lack of statistical significance, indicating that the staff gauge already captured the effect of precipitation. Only the 20-day accumulated rainfall was kept, suggesting a longer response time. For the water level meter, Stepwise kept the 5-day and 30-day accumulated rainfall, indicating a response with both short-term and long-term effects. The removal of certain monthly dummies (such as “month 2”) suggests that the behavior in February was similar to that of the reference month (January).

The comparison between the average monthly control limits of Model 4 and those of Fusaro’s method (2007) demonstrated proximity. For the piezometer, the largest difference between the upper limits was 0.76 meters (month 12), and for the water level meter, 1.68 meters (month 3). This similarity validates multiple regression as a consistent alternative to the traditional approach. The main advantage of the regression model, however, is its dynamic nature: instead of a fixed monthly limit, it generates a daily control limit, adjusted based on rainfall and reservoir level conditions, providing more granular and sensitive monitoring.

The Breusch-Pagan tests confirmed the presence of heteroscedasticity in the residuals of all models, meaning that the variance of the errors is not constant. Although this violates a premise of linear regression for statistical inference, it does not compromise the validity of the application for the practical objective of this study: the definition of control intervals. The model remains robust for identifying points that deviate from expected behavior, even with non-constant variance. The choice of multiple regression over models such as ARIMA was

References:
BRAZIL. 2022. Resolution nº 95, of February 7, 2022. Consolidates the normative acts that provide on safety of mining dams. Official Gazette of the Union, Brasília, DF, Feb. 08, 2022.
De Freitas, Isabela Vasconcelos Leite et al. 2022. Methodological review for the analysis of monitoring and instrumentation of tailings dams. In: XX Brazilian Congress of Soil Mechanics and Geotechnical Engineering – COBRAMSEG, 2022, Campinas, SP
Fávero, L. P.; Belfiore, P. 2017. Data analysis manual: statistics and multivariate modeling with Excel®, SPSS® and Stata®. Elsevier Brasil, Rio de Janeiro, RJ, Brazil.
Fusaro, T. C. 2007. Statistical Analysis Applied to the Control of Geotechnical Instrumentation in Earth Dams. Doctoral Thesis in Engineering, University of São Paulo (USP), São Paulo, SP, Brazil.
Koh, Eun-Hee; Lee, Eunhee; Lee, Kang-Kun. Application of geographically weighted regression models to predict spatial characteristics of nitrate contamination: Implications for an effective groundwater management strategy. Journal of environmental management, v. 268, p. 110646, 2020.
Montgomery, D. C.; Peck, E. A.; Vining, G. G. 2012. Introduction to Linear Regression Analysis. John Wiley & Sons, Hoboken, NJ, USA.
Reis, Custódio Junio et al. 2024. Proposal for definition of control levels in structures with restricted access. In: Brazilian Congress of Soil Mechanics and Geotechnical Engineering – COBRAMSEG, 2024, Balneário Camboriu, SC, Brazil.
Riani, M.; Atkinson, A. C.; Corbellini, A. 2023. Automatic robust Box–Cox and extended Yeo–Johnson transformations in regression. Statistical Methods & Applications, v. 32, n. 1, p. 75-102.
Weisberg, S. 2001. Yeo-Johnson power transformations. Department of Applied Statistics, University of Minnesota, Minneapolis, MN, USA.
Zorzal, R.; Santos, R.; Elian, L.; Ribeiro, L.; Dias, M. 2016. Proposal of a methodology for the elaboration of a risk map for earth and rockfill dams. In: Brazilian Congress of Soil Mechanics and Geotechnical Engineering – COBRAMSEG, 2016, Belo Horizonte, MG, Brazil.


Executive summary from the Final Course Work of the Specialization in Data Science and Analytics of the MBA USP/Esalq

Learn more about the course; click here:

Who edited this article

Most recent

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving the independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated the automated reading of files, the organization of curves into current-potential matrices, the generation of the potential map, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed by device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of the results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.