Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Taynara Lopes Fernandes Diniz; Lucas Zanovello Tahara

DOI: 10.22167/2675-6528-202603811

Article derived from a Final Course Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Stock accuracy; DMAIC; Visual management.

1. Introduction

In a dynamic and competitive business scenario, organizations face the constant challenge of improving their productive and operational processes to maintain market relevance. The pursuit of greater productivity, quality, and waste reduction has driven the adoption of management methodologies. In this context, the Lean Six Sigma methodology emerges as an integrated approach, capable of promoting sustainable improvements in processes, combining principles of waste elimination and variability reduction to increase organizational efficiency and competitiveness.

Lean Manufacturing, one of the pillars of Lean Six Sigma, originated in the Toyota Production System (TPS), developed by Taiichi Ohno in the 1950s. This management philosophy focuses on optimizing production processes, aiming to reduce and ideally eliminate all waste in manufacturing activities (Lima, 2022). The seven types of waste to be eliminated include overproduction, waiting time, transportation, processing, inventory, defects, and motion. Furthermore, Lean seeks to generate customer value, reduce costs, and increase the quality and speed of product delivery (Werkema, 2011).

The other pillar, Six Sigma, developed in the 1980s by Motorola and consolidated by companies such as General Electric, is a disciplined and highly quantitative management methodology. Its objective is to increase the performance and profitability of companies by reducing process variability and defects based on statistical data (Werkema, 2011). This systematic approach is seen as an evolution of classic quality approaches, such as Statistical Process Control and Total Quality Management (Almeida, 2022). The implementation of Six Sigma involves phases such as Define, Measure, Analyze, Improve, and Control, which organize the conduct of projects in a disciplined manner.

By integrating the best of both methodologies, Lean Six Sigma can be applied in various organizational areas to generate customer value and improve the quality of products and processes. In materials management, this tool makes the company more productive and efficient (Gonçalves, 2010). A well-planned materials management offers competitive advantages, such as cost reduction, minimization of inventory investment, favorable purchase agreements, and increased consumer satisfaction (Gonçalves, 2010). Materials administration encompasses activities such as flow planning, scheduling, purchasing, receiving, storage, internal movement, and transportation (Costa and Franco, 2018).

In this context, the opportunity arose to apply these methodologies in a company in the paper industry, a manufacturer of pneumatic hoses. The need to improve the inventory management of inputs for the assembly of these hoses was observed, a product with high financial return and growing demand. However, inventory management was hindered by systemic and operational problems, such as the withdrawal of parts without notice, lack of standardization in system deductions, creation of unused reserves, and inconsistent units of measure. These issues generated uncertainty in physical and systemic quantities, potentially causing material shortages and delays in customer delivery. An initial analysis revealed an inventory accuracy of only 28% for some items, with discrepancies between systemic and physical records totaling R$ 134,335.53 in excess materials. Furthermore, visual storage management was ineffective, and the lack of standardization in material withdrawal records, incomplete annotations, and inconsistent entries contributed to the low reliability of inventory information (Accioly et al., 2008).

The low accuracy and lack of standardization in inventory management processes compromise operational efficiency, information reliability, and increase logistics costs, potentially leading to stockouts and lost sales. Given this problem, the application of Lean Six Sigma is justified by its ability to improve operational efficiency, information reliability, and standardization of input inventory management procedures, resulting in greater material availability and improved performance indicators. Thus, this work aims to increase the accuracy in the quantity of physical and systemic parts and improve the visual management of parts storage.

2. Material and Methods

This research was characterized as a single case study, of an applied nature, developed in a paper industry company, a manufacturer of pneumatic hoses. A quali-quantitative approach was adopted, which integrated qualitative data, obtained through the observation of processes and operational analysis, with quantitative data, from indicators and measurements related to inventory accuracy. The study was conducted through the application of the Lean Six Sigma methodology, using the DMAIC cycle, and was configured as an action research, given the researcher’s participation in the implementation of improvement actions and monitoring of results.

The empirical object of the study focused on the inventory management of materials consumed in the assembly of pneumatic hoses, used in suction rolls of paper machines. Data collection covered a period of three fiscal years, corresponding to the months of October 2022 to September 2025. For the use of operational information and internal company data, formal authorization was obtained from the company through a Term of Agreement, signed by the sector manager, ensuring the use of data exclusively for academic purposes and the preservation of confidential information.

For the understanding and measurement of the studied process, data was extracted from the ERP system (SAP) used by the company. Complementarily, information was obtained by manually counting the parts present in the warehouse during a specific period. 23 different items, known as Stock Keeping Units (SKUs), which represent the input materials for pneumatic hoses, were analyzed.

The SAP system transactions used for data collection included MB51, to obtain the history of movements (inflows and outflows) and the monthly demand for materials; MMBE, to verify the system quantity in stock at a specific moment; MM03, to access material master data, such as safety stock, reorder point, and lead time; ME2M, to consult the order history and lead time with suppliers; and MB52, to verify the stock cost of certain materials.

To assist in mapping and visualizing the processes that add value to the organization, the SIPOC (Suppliers, Inputs, Process, Outputs, Customers) tool was used. This tool allowed for the organization of information regarding the material withdrawal operation, identifying operators as suppliers of the specifications necessary for hose assembly, raw materials as inputs, pneumatic hose assembly as the process, withdrawn materials as outputs, and the final customer as the consumer.

In order to seek a better understanding of the problem, the Ishikawa Diagram, also known as the Cause and Effect Diagram, was employed. This tool was used to identify the root causes of the problem, based on the analysis of the various factors involved in the process. Possible causes were raised through a Brainstorming session and organized according to the 6 M’s (Manpower, Method, Machine, Measurement, Environment, and Material) of the Cause and Effect Diagram.

Subsequently, to deepen the analysis of the main cause identified in the Ishikawa Diagram, the 5 Whys method was applied. This approach consisted of successively questioning “why” until understanding the origin of the problem, allowing for a detailed investigation into the roots of the discrepancies in the quantities of physical and systemic materials, as well as the manual method of recording write-offs.

As a proposal for improvement, a Digital Kanban system was implemented, using the Planner application (Microsoft 365) and Power Automate. Operators filled out an online form via smartphone with material withdrawal data, which, through an automated flow, generated a task in Planner. This task was assigned to the storekeeper for the systemic input of supplies, with a completion deadline of five days, and allowed for tracking the status of withdrawals and identifying problems in the input process.

Additionally, to improve the visual management of parts storage, the Two-Bin System was adapted to a Three-Bin System. This system consisted of storing materials in three bins, each with the colors green, yellow, and red, sized based on monthly consumption, replenishment time, and safety stock. Withdrawal began with Bin A (green), followed by Bin B (yellow), and if necessary, Bin C (red), which acted as safety stock.

To ensure the standardization of input inventory management procedures, a Standard Operating Procedure (SOP) was created for both operators and the storekeeper. This document provided detailed guidance on the information for material withdrawal for hose assembly and the entry of components into the corresponding services via SAP. Furthermore, a weekly follow-up was established by the inventory coordinator with the storekeeper to verify that the write-offs were completed within the deadline and to resolve any difficulties in the entry process.

3. Results and Discussion

The analysis of the collected data, extracted from the company’s ERP system for the period from October 2022 to September 2025, initially revealed several inconsistencies in inventory management. It was observed that, in certain months, especially in the first year of the study, material write-offs occurred that were significantly higher than the monthly average. Upon consultation with those responsible, it was found that these discrepancies were mostly associated with periods preceding internal inventories, during which retroactive write-offs were made to adjust system quantities to physical ones. This practice, although it attempted to correct the imbalance, did not address the root cause of the problem, indicating a fundamental flaw in the material registration and control processes.

A critical inconsistency identified was the divergence in measurement units for the registration of certain materials, such as raw hoses. Items registered in millimeters (mm) were frequently entered into the system in meters (m), without proper conversion. For example, an entry of 20 mm for a T19ES pneumatic hose, which physically corresponded to 20 meters, should have been recorded as 20,000 mm. This conversion failure generated a systemic underestimation of actual quantities, compromising data accuracy and the ability for automated and reliable inventory management.

Data collection on suppliers and their respective replenishment times also highlighted a significant risk factor. It was found that 74% of items (17 SKUs) were imported, with a replenishment time of four months, while only 26% (six SKUs) were of national origin, with a replenishment time of one month. The predominance of imported materials, with considerably longer delivery times, intensified the need for efficient inventory management. Errors in control could, therefore, result in prolonged material shortages, directly impacting production and customer service, as highlighted by Gonçalves (2010) on the importance of materials management.

The initial stock accuracy, which represents the correspondence between physical and systemic quantities, presented alarming rates. Some items, such as the 22×2.5 synthetic rubber hose, showed an accuracy of only 28%, 44%, and 55%, indicating that the physical quantity was substantially lower than that recorded in the SAP system. This discrepancy resulted in an excess inventory cost, as a quantity greater than what actually existed was maintained and accounted for. In the most recent calculation, the total raw material inventory cost for assembling pneumatic hoses was R$ 574,514.72, of which R$ 134,335.53 (equivalent to 23%) corresponded to excess materials, not properly written off or accounted for.

In contrast, other items presented accuracy greater than 100%, reaching 155%, 227%, and even 360% for the straight outer join SDSC-L 12xG1/2A,TYPE*. This meant that the physical quantity was greater than that recorded in the system. Although this situation did not generate a direct cost of excess inventory, as the systemic was less than the physical, it prevented adequate system monitoring and the implementation of future automations. In general, only four out of the 23 materials analyzed had accuracy greater than 90% (and less than 100%), representing about 17% of the total SKUs. This low overall accuracy, according to Accioly et al. (2008), compromised the quality and reliability of information, hindering raw material planning and increasing the risk of stockouts.

The analysis of the material withdrawal and release operation revealed a series of procedural problems. A lack of standardization was observed in the recording of withdrawn materials, with each operator noting the information differently. The notes were often incomplete, lacking the service order or the exact quantity of the material. The frequency of entries in the SAP system was random, and there was a possibility of duplicate entries, creating doubts for the storekeeper. Additionally, the high turnover of those responsible for the storeroom (two replacements in three years) contributed to the discontinuity and lack of consolidation of procedures, worsening data inconsistency.

Visual inventory management, which used a color system (green, yellow, and red) in acrylic boxes to indicate stock levels, proved ineffective. The intention was for the colors to signal decreasing quantities, but for low-consumption materials, filling the acrylic boxes would mean maintaining an excess of supplies, increasing inventory costs. This approach, although visually intuitive, did not align with the consumption reality of all items, generating waste and inefficiency, one of the principles that Lean Manufacturing seeks to eliminate, as described by Lima (2022).

To deepen the understanding of the problem and identify its root causes, the Ishikawa Diagram was used, as proposed by Costa and Mendes (2018). Possible causes were raised through Brainstorming, a technique that stimulates the generation of ideas and insights, according to Garcia (2025). The causes were organized according to the 6 M’s (Manpower, Method, Machine, Measurement, Mother Nature, Material). The “Manpower” group presented the largest number of causes, with “Part of the low is done manually” standing out as the main one to be investigated.

The application of the 5 Whys method, developed by Taiichi Ohno, allowed for the investigation of the root cause of low manual [inventory adjustments]. The sequence of questions revealed that the divergence in physical and systemic quantities occurred because part of the adjustments were manual. This happened because the production order was not created at the time of assembly, and the hose assembly was anticipated before the release of the parts list. The reason for this anticipation was to optimize the process and the roller maintenance time in the factory, while the parts list was still being issued. This practice, although aimed at production efficiency, generated a mismatch in records and inventory management.

Given the identified problems, one of the improvement proposals was the implementation of a Digital Kanban system, aiming to operationalize the pulled supply of materials. The Planner application (Microsoft 365) was used to create an automated flow via Power Automate. Operators began to fill out an online form via smartphone with essential data such as SAP material code, quantity, service order, customer, operator name, and pickup date. This form generated a task in Planner, automatically assigned to the storekeeper, with a five-day deadline, for the systemic release of materials.

The Digital Kanban organized tasks into stages such as “Materials withdrawn”, “Materials downloaded”, and “Problem in launch”. The storekeeper received email notifications and, weekly, checked the tasks to perform the downloads in the system. In case of systemic problems, the task was reallocated to the “Problem in launch” stage and assigned to the stock coordinator for assistance. This system aimed to pull the systemic launch stage, ensuring that the quantities withdrawn were recorded more quickly and accurately, reducing the dependence on manual notes and the occurrence of retroactive downloads.

Before the full implementation of Digital Kanban, a corrective action was necessary to regularize inventory balances. Adjustments were made through retroactive write-offs for materials that showed a systemic balance greater than the physical one. Although this measure re-established the initial reliability of the information, it was recognized as a rectifying action and not as the definitive solution for the root cause of the problem. This stage was crucial for creating a more reliable database, essential for the effectiveness of the digital Kanban and the other proposed control mechanisms.

After two months of implementing the Digital Kanban, a new inventory was conducted to re-evaluate the accuracy of materials. The results showed a significant improvement, with the lowest accuracy rate increasing from 28% to 80%. Furthermore, the percentage of SKUs with accuracy above 90% (and below 100%) doubled, from 17% to 34% of the total materials analyzed. Although the 95% rate for all SKUs has not yet been achieved, the evolution was notable, indicating the initial effectiveness of the implemented improvements in the reliability of stock information.

To complement the improvements, a Standard Operating Procedure (SOP) was developed for both operators and the storekeeper. The SOP provided detailed guidance on recording the withdrawal of materials for hose assembly and entering components into the SAP system. This document was fundamental in standardizing annotations, which were previously inconsistent and incomplete, and in ensuring that important data, such as the project’s WBS, were always included. For the storekeeper, the SOP reinforced the need for increased attention, especially in converting units of measure (meters and millimeters) during entries.

Additionally, weekly follow-up was established with the stock coordinator and the storekeeper. The objective was to verify if the stock reductions were being carried out within the maximum period of five days and to identify any difficulties in the recording process, seeking to resolve them as quickly as possible. The persistence of some discrepancies, even after the initial actions, led to the conclusion that the application of cyclical inventories for the most critical and high-movement items would be an effective strategy to monitor and correct errors. This practice, according to Drohomeretski and Favaretto (2013), allows for periodic tracking of inconsistencies and the adoption of corrective measures.

As a second proposal for improvement in visual inventory management, the Two-Bin System was adapted to a Three-Bin System. This three-bin system (green, yellow, and red) was sized based on monthly consumption, replenishment time, and safety stock. Bin A (green) and Bin B (yellow) were designed to accommodate consumption during the replenishment time, while Bin C (red) was designated for safety stock. Material withdrawal begins with Bin A and, when it is depleted, moves to Bin B. When Bin B is used, the storekeeper issues a purchase requisition, and the new batch is expected to arrive before Bin B is depleted, thus avoiding the need to use Bin C.

The Three-Bin system not only enhances visual material management but also serves as a tool to support operational control and continuous improvement of logistics processes. It highlights the need for stock replenishment based on actual material consumption, promoting a pull supply. This methodology contributes to reducing stockouts, as the last bin acts as safety stock, absorbing supplier delays and minimizing production interruptions. Furthermore, sizing the bins based on actual consumption optimizes inventory turnover and prevents material excess, aligning with Lean principles of waste elimination.

The application of the Lean Six Sigma methodology, through the DMAIC cycle, has proven to be an effective approach for improving inventory management in the paper industry. The tools used, such as SIPOC, Ishikawa Diagram, and 5 Whys, allowed for the identification of the root causes of accuracy and visual management problems. The improvement proposals, including the Digital Kanban, the SOP, weekly monitoring, and the implementation of the Three-Bin System, contributed to process standardization, improved inventory information reliability, and optimization of operational efficiency. The observed results, such as the increase in minimum accuracy from 28% to 80%, demonstrate the positive impact of these interventions on materials management and the strengthening of the organization’s operational management.

4. Conclusion

The present study sought to increase the accuracy between physical and systemic inventories and to improve the visual management of parts storage in a paper industry manufacturing pneumatic hoses. Initially, low inventory accuracy was observed, with rates reaching 28% for some items, and discrepancies between systemic and physical records totaling R$ 134,335.53 in excess materials were detected. It was identified that management was hindered by inconsistencies in measurement units, long replenishment times for imported items, and, mainly, by the lack of standardization in material withdrawal and release procedures, with incomplete annotations and manual entries. The application of the Lean Six Sigma methodology, through the DMAIC cycle and tools such as the Ishikawa Diagram and the 5 Whys, allowed for the identification of the root cause in the anticipation of hose assembly without the proper creation of the production order, which led to manual and inconsistent records. As improvement proposals, a Digital Kanban system was implemented to optimize information flow, a Standard Operating Procedure was developed to standardize operations, and the Two-Bin system was adapted to a Three-Bin System, aiming for more efficient visual management. The results demonstrated a significant improvement in accuracy, raising the lowest rate from 28% to 80%, and doubling the percentage of SKUs with accuracy above 90%. The intervention contributed to increased inventory information reliability, improved material control processes, and strengthened the organization’s operational management.

Despite the advances, the study faced the limitation of the lack of adherence from some operation and stock coordinators, which hindered the full evolution of the proposed improvements and the consolidation of the importance of correct materials management. It was observed that the root cause of the anticipation of assembly, although it optimizes maintenance time, can impact strategic operational decisions and delivery deadlines if the flow is corrected to a strict sequence. For future studies, it is suggested to investigate the implementation of barcode readers for automatic material entry into the ERP system, which would allow for instant calculation of real consumption and automatic replenishment management. It is also recommended more direct and close supervision of production and stock coordinators to ensure correct recording of withdrawals and adequate management of inputs, in addition to the possibility of studying the hiring of a dedicated storekeeper to centralize operations. This work reinforces that the structured conduction of continuous improvement projects, based on planning and data analysis, generates relevant results for organizational efficiency and competitiveness.

Bibliographic References

Accioly, F; Ayres, A. P. S; Sucupira, C. 2008. Gestão de Estoque. 1ed. Editora FGV. Rio de Janeiro. RJ. Brasil.

Almeida, G. M. 2022. Aplicação da Metodologia DMAIC para aumentar a eficiência da máquina de envase em uma indústria de laticínios. Dissertação de Mestrado Profissional em Inovação Tecnológica. Universidade Federal do Triângulo Mineiro, Uberaba, MG, Brasil.

Costa e Mendes, 2018 [Referência completa não encontrada no documento original]

Costa, R. C. G; Franco, J. O. B. 2018. Administração de Materiais: Um Estudo de Caso em um Almoxarifado de uma Fábrica da Cidade de Maringá-PR. Revista Ensino e Pesquisa em Administração e Engenharia 4(1).

Drohomeretski, E; Favaretto, F. 2013. O impacto da contagem cíclica na acuracidade de estoque: múltiplos casos em indústria do Paraná. Revista Científica eletrônica de Engenharia de Produção 13 (2): 655-676.

Garcia, 2025 [Referência completa não encontrada no documento original]

Gonçalves, P. S. 2010. Administração de Materiais. 3ed. Elsevier Editora Ltda. Rio de Janeiro, RJ, Brasil.

Lima, E. 2022. Abordagem Lean aplicada à Transformação Digital na Administração Pública. Fundação Nacional de Administração Pública, 2022, Brasília, DF, Brasil.

Werkema, C. 2011. Lean Seis Sigma – Introdução às Ferramentas do Lean Manufacturing. GEN Atlas. Rio de Janeiro, RJ, Brasil. Disponível em: <https://app.minhabiblioteca.com.br/reader/books/9788595158214/>. Acesso em: 02 nov. 2025.

Article originating from the Final Course Work of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving the independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated the automated reading of files, the organization of curves into current-potential matrices, the generation of the potential map, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed by device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of the results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 06, 2026

Technical-economic Feasibility of Two Automation Levels in the Transition of an Industrial System

The study analyzed the technical-economic justification of medium and long-term investments in industrial systems automation, focusing on plastic industry factories that still maintain a significant part of their operations in manual routines. In these environments, the investment decision is complex, as production already generates revenue, even with losses, rework, low traceability, and unreliable data. The objective was to compare the implementation of Human-Machine Interface (HMI) and supervisory systems at different production scales. The methodological approach was mixed and applied, developed from a project management perspective, considering cost, risk, operational safety, raw material quality, traceability, data governance, production continuity, and decision-making support. Four reference cases were compared: HMI on one line, HMI on seven lines, supervisory on one line, and supervisory on seven lines. The results indicated that the HMI contributed to organizing and standardizing local operations, while the supervisory system expanded the capacity to record information, track histories, generate reports, support audits, and investigate bottlenecks. It was concluded that the investment justification should not be limited to immediate returns but should consider the reduction of uncertainties, losses, operational risks, and costs that accumulate over time.

Keywords: Data governance; Risk management; Traceability; Supervisory; Decision making.