Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

Tiago de Souza Coelho; Auro de Jesus Cardoso Correia

DOI: 10.22167/2675-6528-202603815

Article derived from a Final Course Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

1. Introduction

In the contemporary corporate scenario, the evolution of technological systems has transformed the way organizations manage their operations. The implementation of platforms such as Enterprise Resource Planning (ERP) offers essential resources for task management and data integration between different departments, aiming to optimize resources and improve communication (Yusuf et al., 2004).

Historically, the concept of management systems integration gained momentum from the 1970s onwards, with the emergence of material requirements planning (MRP) and manufacturing resource planning (MRP II) systems. The founding of the German company SAP and the launch of its first products drove the global diffusion of ERP systems in the 1990s, allowing companies to replace legacy systems with more reliable and integrated tools (Caiçara Junior, 2015).

However, the implementation of these resources requires caution, with the mapping of risks and the prediction of the acceptance of changes in organizational procedures. It is crucial to avoid parallel controls and data decentralization. The organizational change associated with the adoption of new systems demands significant effort from the organization and continuous education of the teams (L’yarfi et al., 2025). Although the use of a centralized data system facilitates assertive communication, the growing increase in internal demands can lead organizations to settle for pre-existing routines and the use of parallel tools, requiring rigorous planning to implement new methods (Yusuf et al., 2004; L’yarfi et al., 2025).

In medium-sized companies, especially those that deliver customized projects, the evolution of ERP systems must consider the existing architecture and processes. The market often does not offer ready-made commercial solutions, making customization necessary to align with the company’s processes and team routines (Oliveira et al., 2017). Project sizing, with the objective of optimizing resources during execution, depends on efficient communication between stakeholders and rigorous control of task management. A well-parameterized project management system can be a facilitator, but generalized data can generate internal overload and divert collaborators’ focus from their main objectives (Oliveira et al., 2017).

The difficulties in change management, the need for parameterization, and the risk of generalized data demonstrate that the success of an integrated system lies in its ability to continuously adapt to the company’s routines. In this context, the application of agile management, through frameworks such as Scrum or Kanban, has proven fundamental to increasing the effectiveness in implementing improvements, highlighting bottlenecks, and prioritizing incremental development (Alexandre and Almeida Junior, 2020). Therefore, centralized task management and communication represent a constant challenge, with teams frequently preferring parallel tools, such as spreadsheets or instant messaging resources, due to the lack of resources or systems to centralize data. The correct use and management of tasks through an ERP can be a competitive differentiator, improving project quality, increasing productivity, and channeling communication assertively (Oliveira et al., 2017).

Faced with this dilemma, the central question of this study is: In what way can the centralization of communication and operational control in integrated software mitigate the lack of productivity and the risks of errors in projects of a medium-sized engineering company? The present study aims to analyze practical evidence of the optimization of communication and operational control in a medium-sized engineering company, proposing improvements that maximize productivity and minimize internal workload. To this end, it seeks to identify the main failures in the task management and communication process after the system implementation, as well as to map employee routines to detect redundant demands and the use of parallel tools.

2. Material and Methods

The present study adopted an applied nature, with a qualitative-quantitative approach, configuring itself as a single case study. The central objective was to analyze practical evidence of the optimization of communication and operational control in a medium-sized engineering company, aiming to propose improvements that would maximize productivity and minimize internal workload. The research sought to collect and analyze real data from an organization to answer the research problem (Gil, 2022).

The methodological strategy employed was the single case study, which allowed the extraction of real data from an existing management system in the organization. This approach enabled the identification of patterns and the analysis of records related to task controls and internal communication. The focus was on cases that allowed exploring new concepts to increase the efficiency and quality of projects, mitigating impacts on execution schedules (Yin, 2005). The unit of analysis consisted of the Customer Relationship Management (CRM) modules and the engineering task management of the Bitrix24 software, implemented in a medium-sized company in the mechanical engineering sector.

Data collection was primarily carried out through documentary research, a technique that involved examining records related to task controls and internal communication. The documents were extracted directly from the Bitrix24 management software, a CRM/ERP platform used by the company studied. The documentary analysis focused on the operational metadata of the task management software, without the need to expose sensitive financial or contractual data of the organization, ensuring the confidentiality of the information.

For the survey, primary internal data were extracted from the Bitrix24 system. This included the history of task records by period, with dates of opening, status change, and closing, and the functional categorization of tasks. This categorization distinguished productive activities, routine operational tasks, support calls, and test records or those with no practical function. Additionally, the number of collaborators allocated per department, with their access profiles over time, and identifiers of the demand origin were collected, differentiating tasks generated automatically via CRM workflows from tasks created manually by users.

The historical data analyzed covered a period of approximately two years, specifically from May 2023 to February 2026, according to the records available in the system. The Bitrix24 software was the main platform used for extracting this data. For the organization and visualization of information, an interactive dashboard was employed, developed based on a Business Intelligence system (Power BI), which allowed for the segregation and cross-referencing of data by responsible person, project, and activity status.

The data analysis technique involved the extraction and filtering of historical task records from the Bitrix24 software. A statistical correlation analysis was performed between the workload and the allocated team. The cross-referencing of operational metadata enabled the identification of communication bottlenecks and system redundancies. For data processing, the Excel software was used, which assisted in the screening and debugging of the extracted records, quantifying valid tasks and eliminating duplicates or records without practical function.

Following the analysis and diagnosis of the failures and inconsistencies identified in the task management and communication processes, an action plan was developed. This plan was structured using the 5W2H management tool, with the purpose of mitigating database pollution, communication bottlenecks, and lack of systemic integration. The development of the plan aimed to provide guidelines for the implementation of improvements in the Bitrix24 software, ensuring the feasibility and budget for the execution of the proposed actions.

3. Results and Discussion

The analysis of the mechanical engineering company’s data revealed an operational structure that relies on two main modules of the Bitrix24 software: the Commercial CRM and the engineering department’s task management system. It was observed that, although the CRM is fundamental for tracking customer history and prospecting new opportunities, the transition from the negotiated scope to project execution in engineering occurs manually. This absence of automated integration in the “handover of work” represents a significant bottleneck, according to the identified workflow, which requires manual insertion of demands into the engineering system, contrary to the principles of integrated systems (Alexandre and Almeida Junior, 2020).

In the CRM module, the volume of requests executed by collaborators, which encompasses all systemic interactions and proposal movements, showed fluctuations throughout the analyzed period. The quantification of these requests is crucial for measuring operational effort, and the importance of monitoring these metrics is highlighted by Caiçara Junior (2015) and Oliveira et al. (2017), who emphasize the need for reliable performance indicators for managerial decision-making. The evaluation of workload and the sizing of the sales team revealed a trend line with a coefficient of determination (R²) of 0.34, indicating that 34% of the variation in the number of people was explained by the quantity of tasks, with a Pearson correlation coefficient of 0.58, suggesting a positive association between the volume of tasks and the number of collaborators.

Task management in the engineering department, in turn, showed that the creation of demands occurs strictly manually after commercial negotiation. This process involves filling out a task list and directing it to collaborators, with defined deadlines. Although the organization has developed an interactive dashboard, based on Business Intelligence (Power BI), to monitor tasks, allowing filters by responsible person, project, and status, a deep analysis of the data revealed a critical gap in the quality of the registered information.

Initially, the dashboard reports indicated that 90.7% of tasks were completed and 9.3% pending. However, after a rigorous verification of the raw data and classification of valid tasks, it was found that a significant portion of 54.4% of the registered tasks consisted of duplicate, test, or functionally irrelevant entries. This finding is central to understanding the organization’s real productivity, as it demonstrates that more than half of the demands did not represent effective productive activities, but rather inconsistent data that polluted the database and masked operational capacity.

This database pollution has a direct negative impact on operational productivity, as collaborators are forced to spend time and effort sifting through irrelevant information, diverting focus from activities that truly add value to projects. This scenario corroborates the studies by Oliveira et al. (2017), which indicate that rework in control routines, outside the company’s main activity, consumes team efficiency and harms operations. The distortion of productivity metrics, as warned by Alexandre and Almeida Junior (2020), can lead leadership to mistaken analyses and ineffective managerial decisions.

The identified systemic disorganization also generates a considerable strategic risk for the company. Although the raw data might suggest a high rate of delivery delays, the analysis after data cleaning revealed that most of the accounted tasks did not correspond to real productive effort. This discrepancy can lead leadership to diagnose a false workload, justifying hiring or layoffs based on unrealistic metrics. This context reinforces the premise of Caiçara Junior (2015), who emphasizes how the lack of information integrity and poor software parameterization compromise the organization’s planning and decision-making.

The root cause investigation demonstrated that the manual creation of test tasks and the high volume of redundant information are direct consequences of the absence of automation and the lack of systemic integration between the commercial CRM and the engineering task management module. This systemic gap results in a misalignment with the effectively sold scope, which can lead to substantial financial losses, such as the supply of equipment or inputs outside the commercial agreement. Information fragmentation and the need for manual demand entry generate a significant volume of rework, increasing the risk of human errors and hindering decision-making (Oliveira et al., 2017; Alexandre and Almeida Junior, 2020).

Another critical parameter identified was the failure to restrict data access by specific users or groups within each department. This lack of control represents a serious operational risk, as it enables the improper sharing of confidential information and exposes employees to data irrelevant to their routines. Such a situation intensifies cognitive overload and operational workflow inefficiency, contradicting good data governance practices. Caiçara Junior (2015) highlights that the distribution of information without defined criteria for accessibility and confidentiality not only exposes data but also makes the volume of information excessive, negatively impacting productivity.

The historical survey of monthly activities allowed for an understanding of the temporal evolution of demands and an assessment of the engineering department’s actual workload. The identification of seasonalities or abnormalities in the workflow is crucial for strategic resource planning. However, the interpretation of this panorama requires an integral and debugged database, as the absence of data treatment exposes senior management to the risk of making structural decisions based on unrealistic volumes of productive effort (Caiçara Junior, 2015).

The analysis of the behavior and evolution of activities over time, even with historical monitoring, reinforced the need for a prior process of cleaning and treatment of raw records. The presence of inconsistent information substantially distorts the results, potentially leading leadership to dimension the team incorrectly, generating undue hiring and unnecessary operational costs. This context corroborates the literature that points out that the lack of information integrity and inadequate data management severely hinder planning and decision-making (Caiçara Junior, 2015; Oliveira et al., 2017).

The statistical results confirmed that the increase in staff only partially accompanied the volume of tasks. This finding suggests that the continuous growth of the team largely served to absorb systemic inefficiencies and the overload generated by database pollution. This finding demonstrates, in practice, how the lack of information integrity hinders the optimization of organizational resources, validating the premises defended by Caiçara Junior (2015) regarding the importance of data governance.

To mitigate database pollution, communication bottlenecks, and lack of systemic integration, a structured intervention plan is proposed, using the 5W2H management tool. This plan covers several stages, starting with mapping and extracting data from CRM and task management platforms, aiming to identify and quantify inconsistencies and redundancies, with a budget of twelve thousand reais and a deadline until February 2026. Subsequently, the screening and debugging of the extracted records, at a cost of five thousand reais and a deadline until March 2026, will eliminate duplicate, obsolete, or corrupted records, establishing a reliable basis for measuring the real efficiency of the flows.

The consulting phase, budgeted at thirty thousand reais and with a deadline until August 2026, foresees the contracting of specialized services for the development and monitoring of the project, ensuring the execution of the programming within the ERP system. In parallel, the ERP data integration architecture, unifying the CRM and task management modules, will be planned and approved, with a cost of thirteen thousand reais and a deadline until August 2026, blocking the decentralized manual insertion of information. The development and standardization of task templates, parameterized via integration with the CRM and automatically generated, with a cost of eight thousand reais and a deadline until September 2026, will establish systemic locks to mitigate redundancies and ensure standardized operational flows.

The plan also includes the development and automation of key performance indicators (KPIs) for measuring the volume of demands and the team’s occupancy level, with a cost of thirteen thousand reais and a deadline of September 2026, allowing for an individual performance evaluation and employee rebalancing. The structuring of a periodic system audit schedule, encompassing technological trend prospecting and benchmarking, with a cost of seven thousand reais and a deadline of October 2026, will ensure the platform’s sustainability and longevity. Finally, the mapping and structuring of the system access profile matrix, defining permissions by departmental scope, with a cost of five thousand reais and a deadline of November 2026, and the parameterization and approval of access profiles and security restrictions in the ERP task management module, with a cost of eight thousand reais and a deadline of December 2026, will prevent undue access and optimize employee cognitive load.

In summary, the results showed that the lack of systemic integration between the commercial and engineering modules of the Bitrix24 software, combined with manual task insertion and the absence of data governance, generated a significant volume of inefficient records, compromising productivity and the accuracy of management information. The observed correlation between the increase in staff and the volume of ineffective tasks reinforces the urgent need for automation and native integration between the modules. The proposed action plan, structured in phases of mapping, screening, consulting, architecture, standardization, KPI monitoring, auditing, and access management, offers a practical roadmap to mitigate these operational and financial risks, aligning the company with integrated management principles and optimizing operational communication and control.

4. Conclusion

This study analyzed practical evidence of communication optimization and operational control in a medium-sized engineering company, seeking to identify flaws and propose improvements to maximize productivity and minimize internal workload. It was found that the absence of native integration between the commercial and task management modules of the Bitrix24 software resulted in a strictly manual “work handover” process. This operational bottleneck led to significant database pollution, with 54.4% of registered tasks consisting of duplicate, test, or practically useless entries. It was observed that the increase in the sales team linearly accompanied the growth of these inefficient tasks, masking the organization’s real productive capacity and compromising the accuracy of management metrics. The study’s main contribution lies in the development of an action plan structured around the 5W2H tool, which provides guidelines to mitigate database pollution, communication bottlenecks, and the lack of systemic integration, offering a replicable roadmap for data governance in small and medium-sized enterprises.

As a limitation of this research, the use of data restricted to a single organization stands out, which prevents the generalization of findings to other corporate environments without additional validation. For future studies, it is recommended to apply the proposed action plan in practice, followed by the measurement of team performance indicators to assess the effectiveness of improvements. It is also suggested to replicate this study in large companies for comparison purposes, in addition to applying non-parametric statistical tools, such as the Friedman Test, to objectively rank the priorities of improvement actions based on the perception of managers and operators, maximizing efficiency in practical implementation.

Bibliographic References

Alexandre, T.M.; Almeida Junior, J.R. 2020. Gestão do desenvolvimento de software com o uso de quadro virtual Kanban. Brazilian Journal of Development 6(12): 103726-103749.

Caiçara Junior, C. 2015. Sistemas integrados de gestão – ERP: uma abordagem gerencial. 2ed. InterSaberes, Curitiba, PR, Brasil.

Gil, A.C. 2022. Como elaborar projetos de pesquisa. Atlas, Rio de Janeiro, RJ, Brasil.

L’yarfi, H.; Motaki, N.; Derrhi, M.; Lahlou, I. 2025. Towards a Decision-Making Framework for Successful ERP Project Implementation: A Qualitative Study. Production Engineering Archives 31(1): 91-105.

Oliveira, E.V.; Lima, G.A.M.V.; Souza, S.A.C.; Marcondes, R.C.; Rodrigues, M.P.L.; Pereira, G.R. 2017. Gestão de projetos de arquitetura e engenharia com o ERP/CRM customizado – Cubo Plan. Práticas em Contabilidade e Gestão 5(1): 90-107.

Yin, R.K. 2005. Estudo de caso: planejamento e métodos. 3ed. Bookman, Porto Alegre, RS, Brasil.

Yusuf, Y.; Gunasekaran, A.; Abthorpe, M.S. 2004. Enterprise information systems project implementation: A case study of ERP in Rolls-Royce. International Journal of Production Economics 87(3): 251–266.

Article originating from the Final Course Work of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving the independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated the automated reading of files, the organization of curves into current-potential matrices, the generation of the potential map, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed by device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of the results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Project Management

November 19, 2026

Strategic Revitalization as a Vector for Competitive Repositioning in Urban Shopping Centers

The transformation of the shopping center sector, driven by the digitalization of retail and changes in consumer behavior, required the adoption of adaptation and competitive differentiation strategies. This study evaluated how strategic revitalization can act as a vector for competitive repositioning in a medium-sized urban shopping center located in the city of São Paulo. The research was applied in nature, with a quali-quantitative approach, using a single case study complemented by a field survey. The process was structured around the DMAIC cycle, encompassing the Define, Measure, Analyze, Improve, and Control phases. Bibliographic research, document analysis, semi-structured interviews were conducted, and a questionnaire was applied to 19 consumers to measure the perception of attractiveness, experience, and return intention. The results revealed gaps between the perceived and desired positioning, notably in the food court’s location (median 2.5) and the variety of gastronomic options (median 2.7). Revitalization opportunities were identified, focusing on the repositioning of the food court, the review of the tenant mix, and operational modernization. It was concluded that strategic revitalization has the potential to positively impact the development’s attractiveness and competitiveness indicators, provided that the proposed interventions in the Improve and Control phases of the DMAIC cycle are implemented.

Keywords: DMAIC Cycle; Competitive repositioning; Strategic revitalization; Shopping center; Tenant mix.

Project Management

November 19, 2026

Application of Project Practices in the Management of Personal Goals and Life Projects

The application of project management practices in personal life planning is still limited, despite many individual goals possessing project characteristics. This study analyzed the feasibility and relevance of adapting project management practices to personal life planning, focusing on early adulthood, and proposed a practical approach to organize, prioritize, and review individual goals. An exploratory survey was conducted through an electronic questionnaire with 90 participants, and the data were analyzed with the support of bibliographies on project management, portfolio, agile methods, risk management, and personal planning. The results indicated that most respondents defined personal goals but informally tracked them, and a significant portion abandoned important goals due to a lack of organization or planning. A positive receptiveness to applying project management concepts in personal life was observed, especially among participants under 35 years old. It was concluded that the adaptation of these practices is relevant and feasible, considering human and contextual particularities. As a practical contribution, a Personal Portfolio Management Framework was proposed to support the identification, categorization, prioritization, planning, tracking, and continuous review of individual goals.

Keywords: Self-management; Individual Planning; Prioritization.

Project Management

November 19, 2026

Optimization of sequencing in cell and gene therapies: an architecture of predictive and deterministic models

The challenge of production planning and sequencing in autologous cell and gene therapies, with an emphasis on the vein-to-vein cycle of CAR-T therapies, was analyzed. The study aimed to evaluate whether a hybrid architecture, composed of a predictive Machine Learning engine and a deterministic optimization engine, could improve planning robustness in the face of biological variability and GxP environment compliance constraints. To this end, an exploratory literature review guided by PRISMA 2020, validation of the main technical references, and a computational simulation with synthetic data were used. In the simulation, a Random Forest estimated processing times from synthetic biomarkers, and a deterministic model, equivalent to a MILP formulation, solved the batch sequencing on parallel resources with cleaning/setup time. The results indicated that the hybrid policy reduced the weighted average delay penalty to 18.67 penalty points, compared to 21.84 in static MILP and 75.25 in FIFO. It was concluded that the hybrid architecture contributed to optimizing production sequencing, showing favorable performance in extreme scenarios. The findings were interpreted as conceptual validation, not as clinical or industrial proof, due to the use of synthetic data and the influence of factors such as plant layout and real demand flow. The main contribution was to indicate, in a simulated and conceptual way, that the use of predictive estimates improves decision-making compared to deterministic models.

Keywords: CAR-T; Artificial Intelligence; Production Planning; Pharma 4.0; Gene Therapy.

Project Management

November 06, 2026

Technical-economic Feasibility of Two Automation Levels in the Transition of an Industrial System

The study analyzed the technical-economic justification of medium and long-term investments in industrial systems automation, focusing on plastic industry factories that still maintain a significant part of their operations in manual routines. In these environments, the investment decision is complex, as production already generates revenue, even with losses, rework, low traceability, and unreliable data. The objective was to compare the implementation of Human-Machine Interface (HMI) and supervisory systems at different production scales. The methodological approach was mixed and applied, developed from a project management perspective, considering cost, risk, operational safety, raw material quality, traceability, data governance, production continuity, and decision-making support. Four reference cases were compared: HMI on one line, HMI on seven lines, supervisory on one line, and supervisory on seven lines. The results indicated that the HMI contributed to organizing and standardizing local operations, while the supervisory system expanded the capacity to record information, track histories, generate reports, support audits, and investigate bottlenecks. It was concluded that the investment justification should not be limited to immediate returns but should consider the reduction of uncertainties, losses, operational risks, and costs that accumulate over time.

Keywords: Data governance; Risk management; Traceability; Supervisory; Decision making.