Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.
Summary
The economic feasibility of projects in the oil and gas industry is strongly impacted by oil price volatility, with traditional deterministic evaluations underestimating risks and failing to capture economic dynamics. A data-driven economic analysis methodology was proposed to integrate uncertainties into project evaluation. The approach was organized into three stages: (i) characterization of the economic variable (Brent price) through historical data analysis; (ii) probabilistic representation of uncertainties, using the t-Student distribution for logarithmic returns; and (iii) economic evaluation under risk, employing Monte Carlo simulation to propagate uncertainties to the Net Present Value (NPV). Exploratory analysis revealed high variability and low predictability of oil prices, with the t-Student distribution being the most suitable for modeling the characteristics of the variations. The hypothetical project analyzed presented an expected NPV of US$ 2.8 billion, but with significant variability in potential outcomes and a 10% probability of economic losses, with a Value at Risk (VaR) of US$ -0.58 billion and a Conditional VaR (CVaR) of US$ -1.22 billion. The approach allowed for a comprehensive risk-return assessment, incorporating market uncertainty and providing a more robust analytical basis for investment decisions, surpassing deterministic analyses. Historical data added relevant information to the analytical process.
Keywords: Economic Evaluation; Data Science; Monte Carlo; Time Series.
1. Introduction
The economic evaluation of projects is an essential step in the capital allocation decision-making process of companies, being fundamental to the success of an undertaking, as pointed out by Müller and Antonik (2012). In the Oil and Gas sector, characterized by large financial contributions and long-term return projects, economic analysis faces a particularly challenging context. Uncertainties of different natures inherent to this industry add significant complexity to the calculation process of economic indicators, as highlighted by Mutruc (2018).
Even in a scenario of high volatility and technical uncertainties, it is common practice in the industry to adopt a deterministic approach to economic analysis. However, point estimates of the complex dynamics of projects can generate a false sense of precision, as expressed by Pergler and Freeman (2008). This traditional methodology can thus weaken the decision-making process by underestimating the real impact of risks.
In an attempt to incorporate uncertainties, a complementary analysis is sometimes performed, in which risk is assessed in stages after the economic analysis, through qualitative assessments or sensitivity studies. However, it is often observed a disconnection between the available data, the modeling of uncertainties, and the decision-making process itself. Fabianová et al. (2023) corroborate this observation, emphasizing the importance of risk assessment strategies to mitigate unpredictability in large investment projects.
In contrast, advances in Data Science and Analysis techniques offer new possibilities. The current scenario allows the application of analytical tools to vast amounts of historical data, deepening the understanding of project variables and enabling the incorporation of uncertainties into economic analysis. In the context of the oil and gas sector, recent studies such as those by Kwas and Rubaszek (2021), Ariyanti and Yusnitasari (2023), Ziółkowski (2024), and Alshammari et al. (2025) employ statistical and machine learning algorithms to predict short-term oil prices. However, these works focus on prediction rather than on the evaluation of long-horizon projects.
Other studies, such as those by Mutruc (2018) and Karnavas (2024), highlight the importance of probabilistic evaluation of economic indicators, using Monte Carlo simulations to build stochastic scenarios and integrate uncertainties. Fabianová et al. (2023) also propose a methodology for investment project analysis that uses forecasting techniques to optimize project design. Despite these advances, a deeper integration between the diagnosis of historical data and the modeling of uncertainties for decision-making in investment projects is not yet observed.
In this context, the present research is justified by the need for a more robust approach to the economic evaluation of projects in the oil and gas sector, which integrates the understanding of market uncertainty dynamics with the decision-making process. The objective of this work was to propose and apply a data-driven approach for the probabilistic economic evaluation of a hypothetical project representative of the oil and gas sector, using historical data to characterize the key economic variable and its uncertainty profile, serving as input for risk-based economic analysis, and thus, supporting the decision-making process based on the understanding of observed behavior, rather than relying solely on arbitrary assumptions.
2. Material and Methods
This work was designed as an applied research, with a quantitative approach, and exploratory and descriptive objectives. The research strategy adopted consisted of a case study, in which Data Science and Analysis techniques were applied to address an economic problem. The methodology was structured in three main stages, aiming at the integration of uncertainties in the economic evaluation of projects.
The unit of analysis was a hypothetical project representative of the oil and gas sector, specifically the development of an offshore oil field in Brazilian territory. This project considered a Floating, Production, Storage and Offloading (FPSO) unit, with a processing capacity of 120,000 barrels per day, operating under the concession fiscal regime.
The total project horizon was 25 years, comprising 4 years for infrastructure development and implementation, 20 years of production, and 1 year for the abandonment and decommissioning of the UEP. Field production was simplified into three stages: gradual increase (ramp-up), production at maximum capacity, and decline. The cost structure included capital expenditures (CAPEX), operational expenditures (OPEX), and abandonment expenditures (ABEX).
Capital expenditures (CAPEX) were estimated at US$ 6 billion, distributed over nine years, starting four years before the operation. Operational expenditures (OPEX) were modeled as 90% of total CAPEX, approximately US$ 5.4 billion, distributed according to the production level. Decommissioning expenditures (ABEX) were considered in the last year of the project, with an estimated value of 10% of CAPEX, i.e., US$ 600 million.
The concession tax regime implied a 10% royalty on gross revenue (Brazil, 1997, art. 47) and a Special Participation of 25% on net revenue (National Agency of Petroleum, Natural Gas and Biofuels, 2022). The income tax and social contribution rate on net profit was 34%. The economic metric selected for the feasibility assessment was the Net Present Value (NPV), calculated with a Minimum Attractiveness Rate (MAR) of 10% per year, according to Mutruc (2018).
The proposed approach was organized into three sequential stages. The first stage consisted of characterizing the key economic variable, the Brent oil price, through the analysis of historical data. The second stage focused on the probabilistic representation of the uncertainties observed in the data. Finally, the third stage involved economic evaluation under risk, integrating the modeled uncertainties into the NPV calculation.
In the first stage, historical data for the Brent price (DCOILBRENTEU) was collected from the Federal Reserve Bank of St. Louis (FRED, 2026), originally released by the U.S. Energy Information Administration (EIA). The data was obtained in .csv format, expressed in dollars per barrel (US$/bbl), and the analysis period was restricted from January 2006 to December 2025, with monthly frequency, aggregating daily values by the period’s average.
Data preprocessing included checking for missing values, outliers, and inconsistencies, as well as format adjustments for temporal analysis, such as indexing and sorting by date. Subsequently, exploratory data analysis (EDA) was performed, which comprised visual interpretation of the time series, calculation of descriptive statistics and shape metrics, and evaluation of dynamic properties.
To mitigate limitations of the price level series, transformations were applied to the variable of interest. Firstly, logarithmic transformation was performed, followed by differencing, resulting in logarithmic returns. Hypothesis tests, such as the Augmented Dickey-Fuller (ADF), were conducted to verify the stationarity of the series. Autocorrelation (ACF) and partial autocorrelation (PACF) functions were also analyzed to understand temporal dependence.
The second stage, of probabilistic representation of uncertainties, used the series of logarithmic returns to model the uncertainty of the economic context. Three distributions were considered for probabilistic modeling: Normal, t-Student, and Empirical (Gaussian Kernel Density Estimation). The choice of distribution was based on coherence with the data, the ability to represent heavy tails, and adherence to the economic decision-making objective under risk. Complementary tests, such as Jarque-Bera and the log-likelihood and AIC metrics, were employed to evaluate the fit of the distributions.
The third stage, of economic evaluation and decision under risk, integrated the modeled uncertainty into the economic evaluation process. The uncertainty was propagated to the NPV through Monte Carlo simulation (Brandimarte, 2014; Herzog et al., 2024), generating 100,000 return scenarios over the 12-month horizon. It was assumed that the log-returns were independent and identically distributed (i.i.d.) as a simplifying hypothesis.
For each scenario, the average annual price was calculated by aggregating the log-returns and reintegrating them to the price level. To avoid numerical instabilities, a truncation was applied to the reintegrated average prices, limiting them to 10% above the maximum and 10% below the minimum price observed in the historical series. At the end of the process, return and risk metrics were extracted, such as expected NPV, median NPV, standard deviation, probability of negative NPV, Value at Risk (VaR) at 5%, and Conditional VaR (CVaR) at 5% (Costa, 2023).
The implementation of the approach was carried out using the Python programming language (version 3.12.7). The Pandas, Numpy, SciPy, and Statsmodels libraries were employed for data analysis, statistical modeling, and time series analysis. For data visualization, Matplotlib and Seaborn libraries were used. The development and execution of the codes occurred in the Jupyter notebook environment, using the Anaconda distribution.
3. Results and Discussion
The analysis of the results began with a data-driven characterization of the economic variable, Brent oil price, identified as the main factor of uncertainty for project evaluation in the oil and gas sector. Historical data, extracted from sources such as the Federal Reserve Economic Data (FRED) and the U.S. Energy Information Administration (EIA), covered the period from January 2006 to December 2025, with monthly frequency. This time series visually revealed a market dynamic marked by distinct regimes and relevant shocks, indicating significant structural uncertainty. A clear alternation was observed between periods of high prices, abrupt drops, and recovery phases, with visible impacts from events such as the 2008 financial crisis, the supply and demand imbalance between 2014 and 2016, the COVID-19 pandemic in 2020, and the war between Russia and Ukraine in 2022. This behavior of moving levels is typical of commodities, and no indications of significant seasonality in the series were detected.
The descriptive statistics of the Brent price time series corroborated the visual interpretation, showing high variability. The average price was US$76.84/bbl, with a minimum of US$18.38/bbl and a maximum of US$132.72/bbl. The standard deviation of US$23.64/bbl and the coefficient of variation of approximately 30.77% confirmed the high dispersion profile of the values. The shape measures indicated a right-skewed distribution (0.2455), slightly positive, and a negative kurtosis (-0.6770). The frequency distribution showed a main peak in the US$60 to US$80/bbl range, but with a secondary peak at higher price levels, reflecting the occurrence of different market regimes over time. The application of the z-score and IQR statistical criteria confirmed the absence of statistical outliers in the analyzed period, reinforcing that the extreme events observed are structural components of the economic uncertainty in the oil market and should be incorporated into the modeling.
Given the complexity of the price-level series, which exhibited high amplitude, asymmetries, and multiple regimes, indicating non-stationarity and level-dependent variance, transformations were performed to mitigate these limitations. The logarithmic transformation was applied first, resulting in a reduction of variance and making relative variations more homogeneous. Subsequently, differencing was applied, generating the logarithmic returns. This series of logarithmic returns demonstrated more suitable properties for stochastic modeling, with a mean close to zero, indicating stability over time, but without a predictable direction for Brent variations. The high kurtosis (7.4163) highlighted the frequent occurrence of extreme events, while the negative skewness (-1.1490) suggested that price drops were more severe than price increases. This transformed series managed to capture important and interpretable aspects of oil price dynamics, being statistically more stable.
To formally verify the stationarity of the series, the Augmented Dickey-Fuller (ADF) test was performed. The results indicated that the series at price level and with logarithmic transformation showed evidence of stationarity at the 5% level, but with borderline behavior, suggesting the need for additional transformations. In contrast, the log-returns series demonstrated strong evidence of stationarity, with ADF statistics significantly below critical values and a p-value close to zero. This finding confirmed that differencing is fundamental to remove the non-stationarity associated with the random walk behavior of Brent prices. From this observation, subsequent analyses focused on the price level series (as the original series) and log-returns (as it better approximates a stationary series), allowing for a deeper understanding of the data structure.
The temporal dependence analysis, performed through autocorrelation (ACF) and partial autocorrelation (PACF) functions, revealed that the price series at the level presented significant temporal persistence, with a slow decay of the ACF, indicating an inertia of variation with short-term memory. In contrast, in the space of logarithmic returns, the ACF showed weak autocorrelation, with most values approaching zero. Moving statistics, calculated in sliding windows of 12 months, evidenced the occurrence of distinct regimes in the price level series and significant volatility. For log-returns, it was confirmed that the means remained around zero, while volatility showed notable variations. This behavior is characteristic of the volatility clustering phenomenon, which arises from the occurrence of economic and geopolitical shocks that affect the dynamics of oil prices.
The data-driven characterization stage allowed for diagnosing the project’s context from an empirical perspective, answering the central question about Brent’s price behavior and its predictability. It was evident that Brent’s price exhibits high variability, structural level changes, and distinct risk regimes. The analysis of price variation rate revealed no preferred direction for changes, but that drops have been sharper than increases, and extreme variation events are frequent. From a statistical standpoint, the price level series is non-stationary, while logarithmic returns approximate a stationary series with a mean close to zero and low temporal dependence. However, the volatility of log-returns shows strong persistence and volatility clusters, indicating that while it is possible to statistically characterize the distribution of variations and the intensity of uncertainty, the predictive capacity for future price trajectory is limited, with the direction of price variations remaining essentially random. Attempts at predictive modeling with statistical models (SARIMA) and machine learning (XGBoost) compared to Random Walk, as detailed in the Annex, showed low prediction performance, reinforcing the limitation of predictability for these models. Thus, the extracted information served to qualify the uncertainty of the project’s economic context, rather than for point price value predictions.
Step 2: Probabilistic Representation of Uncertainties
Having understood the behavior of the Brent price variable, the second stage focused on transforming the observed empirical variability into a probabilistic distribution of the economic environment, qualifying the uncertainty that impacts economic indicators. The series of logarithmic returns was selected to represent this uncertainty, due to its more stable statistical characteristics, ability to capture tails and volatility, and for being economically interpretable as the percentage variation in prices. This choice was justified by presenting more adequate statistical properties and by continuing to represent the probabilistic dynamics of oil prices, according to the literature (Mutruc, 2018).
For the probabilistic modeling of uncertainty, three distributions were considered: the Normal, as a starting point; the t-Student, due to its ability to capture the presence of heavy tails observed in the data; and the Empirical, as a robustness test, preserving the format of the historical sample. The parameters adjusted for the construction of the probability density functions (PDF) were: for the Normal, mean close to zero and standard deviation of 0.105; for the t-Student, 3.225 degrees of freedom, location parameter of 0.010 and scale of 0.066; and for the Empirical, Gaussian Kernel Density estimation was used. Visual comparison of the PDF curves indicated that the t-Student distribution better represented the historical data, especially in capturing extreme events.
The analysis of extreme quantiles confirmed that the Normal distribution could underestimate economic losses and overestimate gains, not adequately representing the reality of oil price shocks. In contrast, the t-Student distribution demonstrated a better ability to represent the left tail, which is crucial for the assessment of adverse economic risks. Although t-Student still overestimates the positive tail, it was the parametric distribution that best fit the real data. To complement this analysis, the Jarque-Bera test on the series of logarithmic returns resulted in a p-value very close to zero, rejecting the hypothesis of normality of the series, a result corroborated by the Q-Q plot, which showed the extreme values diverging from the normal distribution.
The comparison of log-likelihood and AIC metrics for the Normal and t-Student distributions reinforced the conclusion that the t-Student presented a superior fit to the historical data. The t-Student obtained a log-likelihood value of 231.3, higher than the Normal’s 198.6, and an AIC value of -456.5, lower than the Normal’s -393.2. These results confirmed the greater adherence of the t-Student to the empirical data and its ability to capture extreme events. Thus, the uncertainty of the economic scenario was better represented in terms of the percentage variations in the Brent price, and the t-Student distribution was chosen for modeling, with the caveat that its use would require special care to avoid exploding results in the next step, as Brandimarte (2014) and Herzog et al. (2024) point out regarding Monte Carlo simulations.
Step 3: Economic Evaluation and Decision Making under Risk
The third stage of the approach integrated uncertainty into the economic evaluation process, aiming to analyze the project’s performance from a risk perspective. For this purpose, 100,000 probabilistic scenarios were generated using Monte Carlo simulation, with returns over a 12-month horizon. For each scenario, the average annual price was calculated according to the methodology. Monte Carlo simulation implicitly assumes that log-returns are independent and identically distributed (i.i.d.). However, the prior exploratory analysis indicated the presence of volatility clusters and short-term dependence, meaning that the variance of returns is not constant. Despite this simplification of the real market dynamics, the approximation was adopted because it is suitable for the study’s objectives and feasible for representing economic uncertainty.
Initially, the attempt to create long-term log-return trajectories via Monte Carlo simulation and reintegrate them at the Brent price level resulted in statistical instabilities and price explosions, generating economically unviable scenarios. Given this, the strategy was modified: for each scenario, return trajectories were created over a one-year horizon and then aggregated. These aggregated log-returns were reintegrated at the price level, allowing for price recomposition with less potential for numerical instability. The average price in the scenario, P(s), was obtained by the formula P(s) = P0 * e^(Σ r(s)/H), where P0 is the initial price, r(s) is the average return of scenario s over horizon H, and H is the draw horizon (12 months). This value was interpreted as an average annual price consistent with the stochastic dynamics observed in historical data, and was applied throughout the project’s entire lifespan for the calculation of the Net Present Value [NPV]. Thus, each scenario represented an average price regime over the project horizon, synthesized by an equivalent annual return.
The t-Student distribution, chosen for its ability to represent extreme events, required additional treatment to avoid explosions in the average price. A truncation of the reintegrated average prices was adopted, limiting extremes to 10% above the historical maximum observed price and 10% below the historical minimum price. This measure was implemented for economic plausibility, serving as a proxy for structural market distributions and ensuring that the generated scenarios were reasonable. The distribution of simulated average price scenarios resulted in relatively well-behaved behavior, without explosions that would make economic interpretation unfeasible. The 50th percentile (P50) of the distribution was close to the current price, while the 5% and 95% percentiles represented adverse and favorable environments, respectively, without unrealistic trajectories, allowing for a project representation that considers a set of plausible environments with quantified risks.
The average annual price scenarios were then used to calculate the NPV of each probabilistic scenario, resulting in an NPV distribution. Return and risk indicators were extracted from this distribution. The expected (average) NPV of the project was US$ 2.80 billion, with a median of US$ 2.44 billion. The standard deviation of US$ 2.47 billion highlighted the significant variability of potential outcomes. The observed positive skewness, with the mean higher than the median, indicated the presence of scenarios with significant gains, associated with higher oil price levels, as Müller and Antonik (2012) and Assaf Neto (2024) highlight regarding the importance of NPV.
Regarding the risks, the probability of financial loss (negative NPV) was approximately 9.94%. The analysis of the distribution tails revealed the existence of relevant adverse scenarios. The 5% Value at Risk (VaR) indicated a loss of US$ -0.58 billion, while the 5% Conditional VaR (CVaR) showed that, in an adverse scenario, the expected loss of the project would be US$ -1.22 billion. These indicators, as Costa (2023) explains, provide a quantitative measure of financial risk. The high standard deviation of US$ 2.47 billion reinforced that the project is exposed to high variability in results, being strongly influenced by the dynamics of oil prices. This uncertainty regarding the return level is significant and may impact the project’s priority in defining the company’s portfolio, depending on the risk-return analysis of other competing projects.
The proposed approach provided robust elements to answer the question about the project’s risk and return profile and the solidity of the economic decision. The project presents an attractive risk-return profile, with a positive expected NPV, but with the possibility of significant losses in adverse scenarios. The significant exposure to oil price volatility, evidenced by the results, reinforces the importance of a probabilistic approach in economic evaluation, overcoming the limitations of deterministic analyses that underestimate risks and do not capture the market’s economic dynamics, as pointed out by Pergler and Freeman (2008). Historical data, therefore, added relevant information to the investment project’s analytical process, allowing for a more transparent and consistent understanding of the relationship between risk and return.
4. Conclusion
The study sought to propose and apply a data-driven approach for the probabilistic economic evaluation of a hypothetical project in the oil and gas sector, using historical data to characterize the key economic variable and its uncertainty profile, supporting the decision-making process. It was found that Brent crude oil price exhibits high variability, structural level changes, and distinct risk regimes, with low long-term predictability. The analysis of logarithmic returns revealed a more stable series, with a mean close to zero, negative skewness indicating more severe drops, and high kurtosis, evidencing frequent extreme events. The t-Student distribution proved to be the most suitable for modeling this uncertainty, capturing the heavy tails of historical data. Through Monte Carlo simulation, an expected Net Present Value of US$ 2.80 billion was obtained, with a median of US$ 2.44 billion and a standard deviation of US$ 2.47 billion, indicating significant dispersion. The probability of financial loss was 9.94%, with a Value at Risk of US$ -0.58 billion and a Conditional VaR of US$ -1.22 billion, quantifying the risks of losses in adverse scenarios.
The main contribution of the work lies in demonstrating that historical data can be used to understand the dynamics of economic variables, support the representation of uncertainty, and improve the quality of information for decision-making. This approach surpassed deterministic analyses, which tend to underestimate risks and do not capture market complexity, offering a more robust analytical basis for capital investments. However, some limitations were identified. The application occurred in a hypothetical project, with simplified economic assumptions and considering Brent oil price as the sole source of uncertainty. The synthesis of each scenario into a single average annual price, maintained throughout the project’s life, while controlling for instabilities, eliminated the temporal dimension of uncertainty, failing to capture the effects of the sequence and duration of price shocks. Furthermore, the hypothesis of independent and identically distributed returns did not fully represent the observed volatility clustering. For future studies, it is suggested to develop more dynamic annual price trajectories, incorporate volatility models such as GARCH, mean reversion mechanisms, and other technical and economic uncertainties, as well as apply the approach to real projects and portfolios.
Bibliographic References
Agência Nacional do Petróleo, Gás Natural e Biocombustíveis [ANP]. 2022. Resolução ANP n° 870, de 24 de março de 2022. Estabelece os procedimentos para a apuração, pelos concessionários das atividades de produção de petróleo e gás natural, da participação especial prevista no art.50 da Lei nº 9.478, de 6 de agosto de 1997, em complementação ao Capítulo VII do Decreto nº 2.705, de 3 de agosto de 1998. Diário Oficial da União, Brasília, 25 mar. 2022. Seção 1, p. 184-187.
Alshammari, F.; Aljojo, N.; Alshammari, M.; Alsayed, A.; Almalki, M. 2025. Comparative analysis of Al models for crude oil price forecasting: ARIMA, SARIMAX, and LSTM. Romanian Journal of Information Technology and Automatic Control 35 (4): 7-20.
Ariyanti, V. P.; Yusnitasari, T. 2023. Comparison of ARIMA and SARIMA for Forecasting Crude Oil Prices. Jurnal Resti 7(2): 405 – 413.
Assaf Neto, A. 2024. Matemática Financeira e Suas Aplicações. 15ed. Atlas, Barueri, SP, Brasil.
Brandimarte, P. 2014. Handbook in Monte Carlo Simulation: Applications in Financial Engineering, Risk Management, and Economics. 1ed. John Wiley & Sons, Hoboken, NJ, Estados Unidos.
Brasil. 1997. Lei nº 9.478, de 6 de agosto de 1997. Dispõe sobre a política energética nacional, as atividades relativas ao monopólio de petróleo, institui o Conselho Nacional de Política Energética e a Agência Nacional do Petróleo e dá outras providências. Diário Oficial da União, Brasília, 7 ago. 1997. Seção 1, p. 16925.
Costa, T. R. C. C. 2023. Otimização de Portfólio com pré-seleção de ativos usando Machine Learning: uma aplicação no contexto dos mercados emergentes. Dissertação em Economia. Instituto Brasileiro de Ensino, Desenvolvimento e Pesquisa, Brasília, DF, Brasil.
Fabianová, J.; Janeková, J.; Fedorko, G.; Molnár, V. A. 2023. Comprehensive Methodology for Investment Project Assessment Based on Monte Carlo Simulation. Applied Science 13 (6103).
Federal Reserve Bank of St. Louis [FRED]. 2026. Crude Oil Prices: Brent Europe [DCOILBRENTEU]. Disponível em: <https://fred.stlouisfed.org/series/DCOILBRENTEU>. Acesso em: 02 mar. 2026.
Herzog, L. P.; da Silva, E. J. G.; Weymar, G. J. 2024. Simulação com Método Monte Carlo: Uma ferramenta para análise de risco no gerenciamento de projetos. Revista de Gestão e Projetos (GeP) 15(3): 542-565.
Karnavas, C. I. 2024. Stochastic Analysis in Investment Project Appraisal. International Journal of Engineering Inventions 13(3): 16-22.
Kwas, M.; Rubaszek, M. 2021. Forecasting Commodity Prices: Looking for a Benchmark. Forecasting 3: 447–459.
Mutruc, C. 2018. Probabilistic Evaluation of the Net Present Value of an Oil and Gas project through Monte Carlo Simulation. Dissertação de Mestrado. Politecnico di Torino. Turim, Itália.
Müller, A.N.; Antonik, L. R. 2012. Matemática Financeira: Instrumentos financeiros para a tomada de decisão em Administração, Economia e Contabilidade. Editora Saraiva, São Paulo, SP, Brasil.
Pergler, M.; Freeman, A. 2008. McKinsey Working Papers on Risk: Probabilistic modeling as an exploratory decision-making toll. McKinsey & Company.
Ziółkowski, K. 2024. Forecasting WTI & Brent Crude Oil Price Using LSTM, Prophet and XGBoost – Comparative Analysis. Recent Challenges in Intelligent Information and Database Systems. Springer: 171 – 181.
Article originating from the Final Course Project of the Specialization in Data Science and Analytics of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform