Geotechnical risk management is crucial for the safety and sustainability of mining ventures, which face operational, environmental, and social threats. This study aimed to map, identify, and analyze the five main geotechnical risks in mining. To this end, a bibliographic and documentary survey was conducted, identifying risks in mine slopes, tailings dams, waste rock piles, and dry stack tailings, associated infrastructures, and foundation and support soils, organized into a three-level Risk Breakdown Structure (RBS). Subsequently, a questionnaire was applied to 20 industry professionals to weigh the Probability (P) and Severity (S) of the risks, resulting in the proposal of a Risk Matrix. The results revealed that tailings dams presented the highest criticality (P x S = 0.81, critical class), followed by waste rock and dry stack tailings piles and foundation conditions (P x S = 0.49, high class). Mine slopes were classified as moderate risk (P x S = 0.35), and associated infrastructures as low risk (P x S = 0.25). Suggested mitigation measures included continuous monitoring, efficient drainage, geotechnical characterization, and technical training. It was concluded that the RBS and the Risk Matrix are valuable tools for strengthening the management of geotechnical threats, promoting safety, sustainability, and operational efficiency through the continuous integration of design, monitoring, and operation.

Keywords: Risk assessment; Risk management tools; Threat management; Operational safety; Sustainability.

1. Introduction

Mining plays a strategic role in global economic and technological development, being fundamental to various production chains, from civil construction to high-tech industry. The demand for mineral resources drives mining activity, making it essential for the world economy. However, this sector is intrinsically associated with significant risks that can compromise operational safety, the environment, and surrounding communities (Mendes, 2008).

In the Brazilian context, the history of mining has been marked by events that highlighted serious flaws in safety systems, such as the tragedies of Mariana (2015) and Brumadinho (2018), both related to deficiencies in geotechnical monitoring and management. Such occurrences shook public confidence and reinforced the urgency for more effective prevention and control measures. Consequently, risk management ceased to be seen merely as a legal requirement, becoming recognized as a strategic component for the sustainability and continuity of mining operations (Araújo, 2022).

Risk management is understood as a systematic process that involves the identification, analysis, response planning, and monitoring of events that can impact a project (PMI, 2017; PMI, 2021; Sugui and Cardoso, 2026). In the mining sector, this approach is particularly relevant due to geological and operational complexity. The activity is, by nature, subject to high levels of risk, influenced by geological uncertainties, economic fluctuations, and political conditions (Baraldi, 2010).

Geotechnical risks, in particular, represent a critical category of threats in mining ventures. They can compromise the stability of structures such as mine slopes, tailings dams, waste rock piles, and dry tailings, associated infrastructures, and the conditions of foundations and supporting soils. The occurrence of failures in these structures can result in operational disruptions, substantial economic losses, and severe socio-environmental impacts, requiring robust integration between planning, decision-making, and continuous control (Palady, 2004).

To mitigate these challenges, technical standards and international guidelines have been developed. The “Project Management Book of Knowledge” (PMBOK) Guide (PMI, 2017; PMI, 2021) and the ISO 31000 standard (ABNT, 2018) are consolidated references that provide a systematic and structured approach to risk management. The application of these standards allows mining companies to identify, assess, and mitigate risks with greater precision, strengthening operational safety and promoting more sustainable practices (Guimarães, 2012).

Despite the existence of theoretical and normative frameworks, gaps still persist in the practical application and effective integration of geotechnical risk management in the strategic planning of operations. The effectiveness of preventive and corrective actions depends on the ability to adapt to the particularities of each project, considering the type of deposit, mine stage, and socio-environmental conditions (Galante, 2015). Often, risk management is developed to meet legal or audit requirements, without its results being consistently incorporated into operational and monitoring routines.

This disconnect between theory and practice can lead to reactive risk management, with a reduced capacity to anticipate complex failures and support strategic decisions in geotechnical uncertainty scenarios. The need for a deep understanding of geotechnical risks and for tools that aid in their assessment and prioritization is, therefore, pressing to strengthen the culture of prevention and ensure safety and sustainability in the mining sector. Given this scenario, the present study is justified by the relevance of proposing a structured approach for the assessment of geotechnical risks, aiming to improve management and safety practices in mining ventures. Thus, this work aimed to map, identify, and analyze five geotechnical risks in mining projects.

2. Material and Methods

This study was characterized as an applied research, with a mixed methodological approach, combining qualitative, quantitative, and descriptive elements. This strategy was considered adequate for the objectives of mapping, identifying, and analyzing geotechnical risks in mining ventures. The quantitative dimension involved the analysis of numerical data, while the qualitative one prioritized the understanding of complex phenomena and perceptions (Gil, 2002).

The research development was structured in four sequential phases. Phase 1, Planning, defined the problem, objectives, and methodological classification. In Phase 2, Data Collection, the literature review and empirical collection were carried out. Phase 3, Data Analysis, focused on the treatment and interpretation of information. Finally, Phase 4, Work Consolidation, integrated the results and culminated in the final writing.

For the mapping of geotechnical risks, a comprehensive bibliographic and documentary review was carried out. Technical papers, standards, institutional reports, and case studies were consulted, focusing on geotechnical accidents in mining. This stage allowed for the identification of recurring failure patterns and weaknesses in risk management processes, underpinning the understanding of the research problem.

Five main geotechnical risks were identified: mine slopes, tailings dams, waste and dry tailings piles, associated infrastructures, and foundation and support soil conditions. These risks were organized into a three-level Risk Breakdown Structure (RBS) (PMI, 2017; Sugui and Cardoso, 2026). The RBS, built based on the theoretical framework, allowed for an integrated understanding of risk exposure.

Based on the risks identified and organized by the EAR, a Risk Matrix was developed. This tool was used to support the mapping, classification, and prioritization of geotechnical risks, according to the guidelines of the PMBOK Guide (PMI, 2017; PMI, 2021; Sugui and Cardoso, 2026). The Matrix considered the Probability (P) and Severity (S) of the risks.

For the collection of empirical data, a virtual questionnaire was applied to 20 professionals working in the mining sector. Participant selection was by convenience, including geologists, mining, civil, environmental, and geotechnical engineers with experience in mining projects. The questionnaire was developed on the Google Forms platform and was available for responses from 11/06/2025 to 12/06/2025.

The questionnaire was organized into three blocks. Block 1 focused on the characterization of respondents, addressing education, experience, and types of mining structures. Block 2 dealt with the assessment of geotechnical risks, requesting the weighting of Probability (P) and Severity (S) of occurrence for each risk. Block 3 sought professionals’ perceptions on the challenges for improving risk management.

In the questions of Block 2, qualitative classification categories were used for Probability and Severity, ranging from very low to very high. Numerical values of 0.10; 0.30; 0.50; 0.70; and 0.90 were assigned to each category, respectively. Professionals indicated the recommended mitigation actions for each risk, based on their professional experience.

The collected data were treated and organized for the construction of the Risk Matrix. The Probability and Severity of each risk were defined from the most recurrent classification among the participants. The risk level was calculated by multiplying the values of P by S, generating a numerical index for each structure.

The risk levels were classified into criticality ranges: 0.00 to 0.15 as Very Low, 0.16 to 0.29 as Low, 0.30 to 0.49 as Medium, 0.50 to 0.74 as High, and 0.75 to 1.00 as Very High or Critical. This classification allowed for the prioritization of geotechnical risks, according to the technical perception of the respondents (PMI, 2017; Sugui and Cardoso, 2026).

Ethical considerations were rigorously observed. All participants completed and agreed to the Informed Consent Form (ICF), available in Appendix A. The research followed the guidelines of Resolutions No. 466/2012 and 510/2016 of the National Health Council (CNS), and the General Personal Data Protection Law (Law No. 13.709/2018) (Brazil, 2018).

The non-submission to the Research Ethics Committee (CEP) occurred due to the anonymous conduct of the investigation, without the collection of sensitive data or identification of participants. Participation was voluntary, with a guarantee of confidentiality of information, adhering to the principles of autonomy, privacy, and non-maleficence provided for in the resolutions and legislation.

3. Results and Discussion

The analysis of the research results began with the structuring of geotechnical risks identified through a bibliographic and documentary review, culminating in the proposal of a Risk Breakdown Structure (RBS). This process allowed mapping the main adverse events associated with geotechnical structures in mining ventures, establishing a conceptual basis for the empirical stage of the study. The RBS, developed in hierarchical levels, enabled the detailed identification of failure mechanisms that compose each risk category, according to project management guidelines (PMI, 2017; PMI, 2021).

Based on the RBS, a questionnaire was applied to 20 professionals in the mining sector to capture their technical perceptions regarding the probability of occurrence (P) and the severity (S) of the identified risks. The collected responses supported the development of a Risk Matrix, which consolidated the information and allowed for the establishment of a risk index for each geotechnical structure analyzed, calculated by multiplying P by S. This methodology enabled the comparison of criticality levels and the prioritization of structures that require greater attention in geotechnical risk management, in addition to relating the classifications with the mitigation actions suggested by the professionals.

Proposal for EAR in the context of geotechnical risks in mining projects

The Risk Breakdown Structure (RBS) was developed in three levels to organize and systematize geotechnical risks in mining projects, according to technical literature. At Level 0, the general category of geotechnical risks associated with mining activities was established, covering adverse events that can impact the safety, operation, and sustainability of the undertaking. This broad view served as a starting point for decomposing risks into more specific categories, facilitating understanding and management.

At Level 1, risks were grouped into five main categories, representing the most relevant geotechnical systems and structures in mining. These categories included mine slopes, tailings dams, waste and dry stack tailings piles, associated infrastructures, and foundation and supporting soils. This organization allowed risks to be directly related to the physical elements of the project, facilitating a specific analysis for each structure and the direction of more effective control actions, aligned with risk management practices (PMI, 2017).

Level 2 of the EAR detailed the specific failure mechanisms for each identified risk group. For mine slopes, risks such as planar, circular, and wedge instability, gully and sheet erosion, overload and vibration from blasting, post-blasting cracks, localized settlements, mineralogical alteration, accelerated weathering, and monitoring failures were considered. These factors reflect the complexity of the geological, geometric, and hydrogeological conditions that influence the stability of excavated rock masses throughout the mine’s life cycle (Wyllie, 2004; Stacey, 2009; Read and Stacey, 2023; Brasil, 2024).

For tailings dams, the risks detailed in Level 2 included static or dynamic liquefaction, overtopping, piping and internal erosion, failures in drains and filters, differential settlement and lateral deformation, loss of contact between slope and foundation, overload from successive raises, instrumentation or continuous monitoring failure, and failures in the secondary containment system. These high-criticality risks require systematic monitoring and rigorous management due to the potential for significant impacts in case of rupture (Ribeiro, 2024; ICOLD, 2020; Bowker, 2015; Chambers, 2015).

The stacks of dry sterile material and tailings, treated together due to the similarity of failure mechanisms, presented risks such as sliding due to poor drainage, saturation and local collapse, intense surface erosion, instability due to irregular stacking, presence of reactive materials (acid drainage), compaction failure, access ramp instabilities, and instability at the interface with the natural foundation. The variability of the filtered tailings’ characteristics and the stacking and drainage conditions compromise the stability of these structures (Davies, 2001; Fell et al., 2014; Vick, 1990).

Associated infrastructures, such as internal roads, accesses, and operational platforms, had detailed risks, including erosion and rupture of drainage channels, instability in road and cut slopes, settlements under foundations and industrial buildings, settlements in buried pipelines, instability in dikes and containment basins, and impacts of extreme events (rains, earthquakes, mine vibrations). Although the literature treats these risks more superficially, they impact logistics and operational safety (Jacinto and Leal, 2025).

Finally, the risks related to foundation conditions and supporting soils included differential settlements and excessive deformations, foundation collapse due to saturation or underpressure, internal erosion by percolation, global instability due to rupture at the foundation/mass interface, presence of soft, expansive, or collapsible soils, and foundation contamination by acid drainage. These factors are transversal to all risks and reinforce the need for detailed geotechnical studies and their integration into planning to ensure the global stability of structures (Recuperação Engenharia Consultoria, 2024).

Compliance with technical legislation and standards, such as ISO 31000 (ABNT, 2018), is fundamental for the safety of mining ventures. The EAR, by hierarchically organizing risks, allowed for an integrated and in-depth understanding of exposure to adverse events, serving as a basis for the application of the Risk Matrix and the proposal of treatment strategies. This systematic approach is crucial for mining companies to implement robust risk management systems, with continuous monitoring and periodic reviews, going beyond simple legal compliance.

Respondent characterization

The analysis of the profile of the 20 professionals who participated in the survey revealed a predominance of backgrounds directly related to the mineral and geotechnical sector. Half of the respondents (50%) were geologists, followed by mining engineers (20%). Geological and environmental engineers represented 10% each, while civil and geotechnical engineers accounted for 5% each. This sample composition ensured that perceptions of geotechnical risks were based on specialized technical knowledge and relevant practical experience in the sector.

Regarding the years of experience in the sector, the research identified that the largest concentration of professionals (35%) had more than 20 years of practice. The ranges of up to five years and between five and ten years accounted for 25% of participants each, while 15% had between ten and 20 years of experience. This scenario demonstrated the presence of experienced professionals, while also including participants at different career stages, providing a comprehensive view of risk management.

The respondents’ experience in different mining structures showed a strong concentration in open-pit mines, with 85% of participants indicating involvement in this type of venture. Waste dumps were cited by 60% of professionals, and tailings dams by 45%. Experience in underground mining was reported by 30%, and dry tailings disposal by 25%. The possibility of selecting multiple options highlighted the diversity of the group’s experiences, with a greater focus on structures typical of open-pit mining, which reinforces the relevance of the collected perceptions for the study.

The professionals’ perception of risk management in mining ventures was validated by the last question of Block 1 of the questionnaire. There was a clear consensus among respondents regarding the importance of more effective risk management. They highlighted that a well-structured approach significantly contributes to people’s safety, promotes safer work environments, and optimizes costs by avoiding capital losses and inefficient resource use, aligning with good management practices (PMI, 2017; PMI, 2021).

Suggestion of Risk Matrix elaborated from the professionals’ responses

The Risk Matrix was built from the professionals’ responses, who classified the probability (P) and severity (S) of geotechnical risks occurring on a five-level scale: very low, low, medium, high, and very high. Each level was assigned numerical values of 0.10, 0.30, 0.50, 0.70, and 0.90, respectively. The risk level was calculated by multiplying P by S, generating a numerical index for each analyzed structure, which allowed for the classification of risks into criticality ranges, according to predefined intervals.

The classification criteria of the Risk Matrix established that a risk level between 0.75 and 1.00 would be considered “Very High (critical)”. Values between 0.50 and 0.74 were classified as “High”, while the range of 0.30 to 0.49 corresponded to “Medium”. Risks with a level between 0.16 and 0.29 were categorized as “Low”, and those between 0.00 and 0.15 as “Very Low”. This standardization allowed for clear interpretation and effective prioritization of identified risks, according to risk management guidelines (PMI, 2017; Sugui and Cardoso, 2026).

Tailings dams presented the highest risk score, with a level of 0.81, classifying as “Critical”. This result stemmed from the combination of a probability of 0.90 and a severity of 0.90, reflecting the high potential for environmental, social, and economic damage in case of failure. The high criticality attributed to these structures is in line with the recent history of accidents in the mining sector, which has broadened the perception of risk and reinforces the need for intensive monitoring and robust preventive measures.

The stacks of dry overburden and tailings, along with the risks related to the foundation and supporting soils, obtained a risk level of 0.49, being classified as “High”. Although these indices are lower than those of the dams, both are associated with high severity (0.70) and moderate probability (0.70), indicating that, should failures occur, the impacts can be significant. These results highlight the need for continuous attention to aspects such as the efficiency of drainage systems, the geometry of the structures, and the behavior of materials and the foundation, which influence stability throughout the project’s lifespan.

Mine slopes presented a risk level of 0.35, classified as “Moderate”. Although the severity of events associated with slope instabilities is high (0.70), the probability of occurrence was considered moderate (0.50). This suggests that, in many cases, problems tend to be more localized and manageable through monitoring and specific interventions. However, the value obtained indicates that these risks should not be neglected, especially in contexts of geometric changes or adverse climatic conditions.

The associated infrastructures registered the lowest risk score, with a level of 0.25, classifying as “Low”. This result reflects a combination of moderate probability (0.50) and moderate severity (0.50), indicating more restricted impacts when compared to the main structures of the undertaking. Despite the lower criticality, adequate management of these infrastructures is essential, as localized failures can compromise operation and, in certain cases, amplify other geotechnical risks, requiring continuous attention.

Proposals and suggestions for mitigation actions for the risks mapped and weighted according to the respondents

The mitigation actions suggested by the consulted professionals converged on three central axes: project adequacy, continuous monitoring, and operational control. These strategies were recurrent in the responses and were directly associated with the geotechnical structures prioritized in the Risk Matrix, reinforcing the coherence between the specialists’ perception and the criticality of the events. The importance of continuous geotechnical monitoring, efficient drainage, and project adequacy to local conditions was highlighted as fundamental for risk mitigation in mining ventures (PMI, 2021).

For tailings dams, mitigation suggestions focused on continuous and systematic monitoring, using geotechnical instrumentation, regular inspections, and real-time tracking technologies. Improvements in drainage systems, structural reinforcements, and the support of specialized technical teams were also indicated. These measures reflect the high criticality attributed to these structures, aiming for early detection of anomalies and prevention of failures with potentially catastrophic impacts.

In the case of mine slopes, professionals’ contributions emphasized the need for an adequate definition of geometry, the performance of prior geotechnical studies, and the implementation of monitoring systems associated with field inspections. Additionally, actions related to drainage control, blasting management, and structural interventions in situations of instability were mentioned. These strategies aim to ensure the stability of excavated masses and operational safety throughout the mine’s lifespan.

For the stacks of sterile material and dry tailings, mitigation suggestions included geometric control, efficient drainage, and continuous topographic and geotechnical monitoring. The maintenance of drainage systems and the monitoring of the structures’ behavior were pointed out as crucial elements for failure prevention. These actions are essential to mitigate risks such as landslides, saturation, and instabilities arising from inadequate stacking, ensuring the stability of these material disposal structures.

The technical qualification of the teams and the rapid response capacity to anomalies were identified as essential factors for the effectiveness of the proposed actions. This indicates that the mitigation of geotechnical risks is not restricted solely to technical solutions, but also involves organizational and operational aspects, such as professional training and team experience. Specialized training and experience are crucial for the adequate interpretation of instrumentation data and decision-making in risk scenarios, as pointed out by professionals.

In summary, the research findings indicated that the mitigation of geotechnical risks depends on continuous integration between design, monitoring, and operation throughout the entire lifecycle of the mining project. Although the Risk Matrix is a valuable tool to support decision-making, its practical application in the mining sector often does not reflect the ideal preventive nature of good project management practices. Effective geotechnical risk management requires a well-structured design, adequate geological and geotechnical characterization, continuous monitoring, and qualified technical action in all phases of the project, ensuring safety, environmental protection, and sustainability.

4. Conclusion

The present study aimed to map, identify, and analyze the five main geotechnical risks in mining ventures. To this end, a three-level Risk Breakdown Structure (RBS) was developed, organizing risks associated with mine slopes, tailings dams, waste rock piles, associated infrastructures, and foundation and support soil conditions. Based on the perception of 20 industry professionals, the probability and severity of these risks were weighed, culminating in the proposal of a Risk Matrix. It was found that tailings dams presented the highest criticality, classified as “Critical” (0.81), followed by waste rock and dry tailings piles, and by foundation and support soil conditions, both with “High” risk (0.49). Mine slopes were classified with “Moderate” risk (0.35), and associated infrastructures with “Low” risk (0.25). The mitigation measures suggested by the experts converged on the need for continuous monitoring, efficient drainage, adequate geotechnical characterization, and technical training of teams. The proposed RBS and Risk Matrix constitute valuable tools for strengthening the management of geotechnical threats, promoting safety, sustainability, and operational efficiency through the continuous integration of design, monitoring, and operation.

However, the study presented limitations, such as the reduced sample of 20 professionals and the absence of historical monitoring data, which restricts the generalization of the results. For future research, it is suggested to increase the number of participants and diversify their profiles, as well as integrate the EAR and the Risk Matrix with real instrumentation data and more advanced probabilistic analyses. It is also recommended to explore the practical application of these tools in specific ventures, monitoring their use throughout the project lifecycle. Such an approach would allow evaluating the effectiveness of classic project management tools as instruments for supporting preventive management, bringing theory closer to practice and contributing to the evolution of good practices in the mining sector.

Bibliographic References

Araújo. K.F.M.; Costa, L.F.; Gonçalves, A.L. 2022. Impactos Psicossociais dos Desastres da Mineração em Mariana e Brumadinho: uma revisão integrativa. Psicologia, Saúde e Debate, 8(1): 221-237.

Associação Brasileira de Normas Técnicas [ABNT]. 2018. Gestão de Riscos – Diretrizes. ISO 3100. ABNT, Rio de Janeiro, RJ, Brasil.

Baraldi, P. 2010. Gerenciamento de riscos empresariais. 1ed. Elsevier, Rio de Janeiro, RJ, Brasil.

Bowker, L.N.; Chambers, D.M. 2015. The Risk, Public Liability, & Economics of Tailings Storage Facility Failures. In: Northern Latitudes Mining Reclamation Workshop, 2015, Whitehorse, YT, Canadá. Anais… Disponível em: <https://emrlibrary.gov.yk.ca/Northern%20Latitudes%20Mining%20Reclamation%20Workshop/2015/Chambers%2

Brasil, A.C.S. 2024. Classificação de riscos geotécnicos em taludes industriais de uma mina de ferro utilizando a metodologia FMEA. Tecnol. Metal Mater Min., 2024(21): e3099.

Brasil. Lei nº 13.709, de 14 de agosto de 2018. Lei Geral de Proteção de Dados Pessoais [LGPD]. Dispõe sobre o tratamento de dados pessoais, inclusive nos meios digitais, por pessoa natural ou por pessoa jurídica de direito público ou privado. Diário Oficial da União, Brasília, 15 ago. 2018. Seção 1.

Galante, R.A. 2015. Princípios de gestão de riscos. 1ed. Appris, Curitiba, PR, Brasil.

Gil, 2002 [Referência completa não encontrada no documento original]

Guimarães, R.P. 2012.; Desenvolvimento de um método para o processo de gestão de riscos no planejamento do fechamento de minas. Tese de Doutorado em Geotecnia. Universidade Federal de Ouro Preto, Ouro Preto, MG, Brasil.

International Commission on Large Dams [ICOLD]. 2020. Tailings Dam Safety Guidelines. Bulletin. Paris, França: International Commission on Large Dams. Disponível em: <https://pt.scribd.com/document/830240783/JSPEM20210223-Tailings-Dam-Safety-Bulletin-Francisco-Sanchez>. Acesso em 02 abr. 2026.

Mendes, M.B. 2008.; Comportamento geotécnico de uma barragem de rejeito alteada para montante. Dissertação de Mestrado em Engenharia de Estruturas e Geotécnica. Escola Politécnica da Universidade de São Paulo, São Paulo, SP, Brasil.

Palady, O. 2004.; Towards and educational production funcition. 1ed. Iman, São Paulo, SP, Brasil.

Project Management Institute [PMI]. 2017. Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK). 6ed. PMI Inc., Newtown Square, PA, USA.

Project Management Institute [PMI]. 2021. Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK). 7ed. PMI Inc., Newtown Square, PA, USA.

Read, J.; Stacey, P. 2023. Guidelines for Open Pit Slope Design. 2ed. CSIRO Publishing, Melbourne, Australia.

Ribeiro, A.H. 2024. Principais fatores de risco e critérios de segurança nas obras de descaracterização de barragens de montante em Minas Gerais. Artigo Científico – Programa de Pós-Graduação em Segurança de Barragens: Aspectos Técnicos e Legais. Universidade Federal da Bahia, Belo Horizonte, MG, Brasil.

Sugui, V.R.; Cardoso, J.M.M. 2026. Gestão de riscos em projetos de “Reducing Emissions from Deforestation and Forest Degradation” [REDD+]. Trabalho de Conclusão de Curso – MBA em Gestão de Projetos. Escola Superior de Agricultura ‘Luiz de Queiroz’, Universidade de São Paulo, Piracicaba, SP, Brasil.

Wyllie, D.C.; Mah, C.W. 2004. Rock Slope Engineering. 4ed. Spon Press, London, England.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving the independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated the automated reading of files, the organization of curves into current-potential matrices, the generation of the potential map, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed by device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of the results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.