Intersubject standardization of schistocyte research with KPI-driven Medical Affairs governance

Ariadne Pinheiro Nazario; Bruna Maria Montesano

DOI: 10.22167/2675-6528-202600580

Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.

Summary

The accurate detection of schistocytes in peripheral smears has proven critical for the diagnosis and monitoring of thrombotic microangiopathies, but the literature has shown inter-observer variability due to pre-analytical, analytical, and standardization gaps, impacting safety, time to diagnosis, and costs. The study aimed to plan and initiate the implementation of an inter-institutional Working Group, under the governance of Medical Affairs in Rare Disease Diagnostics, to standardize processes, train teams, and establish a measurement system to improve the accuracy of schistocyte research. An applied mixed-methods design was employed, focusing on the initiation and planning phases of the project lifecycle in project management, anchored in the PMBOK, Project Model Canvas, WBS with acceptance criteria, and workflow management by Kanban, in addition to ICSH technical guidelines and laboratory quality practices. The planning produced the Project Charter, the 5W2H synthesis in the PM Canvas, the scope decomposition, the definition of KPIs, the data dictionary, the governance architecture (RACI, cadence), the inclusion criteria for eight to ten laboratories, and a technical protocol aligned with ICSH with checklists and simulated audits. Goals and readiness criteria were defined, including kappa ≥0.70, compliance ≥90%, and a 15% reduction in median TAT, as well as training with certification for ≥90% of the teams. It was concluded that the Charter-Canvas-WBS-Kanban integration, combined with auditable SOPs and KPIs, established a robust and replicable baseline for reducing variability and supporting evidence-based go-no-go decisions.

Keywords: Diagnostic accuracy; Project management; Data governance; Laboratory quality.

1. Introduction

The accurate detection of schistocytes in peripheral blood smears is a critical component of the complete blood count, essential for the diagnosis and monitoring of thrombotic microangiopathies and other hemolytic conditions. However, the scientific literature has shown significant inter-observer variability, arising from gaps in the pre-analytical, analytical, and post-analytical phases. Such inconsistencies, coupled with differences in training, standardization of morphological criteria, and use of quality controls, compromise the reproducibility and sensitivity of the test, directly impacting patient safety, time to diagnosis, and healthcare costs due to repeated tests and prolonged hospitalizations (Zini et al., 2021; Zini et al., 2012; Lippi & Favaloro, 2017).

In this context, the Medical Affairs area in pharmaceutical industries acts as a technical-scientific bridge between health institutions, aiming to shorten the patient’s diagnostic journey. The scope of work includes needs mapping, tactical plan implementation, articulation of multidisciplinary teams, and education of health professionals on diagnostic algorithms and test interpretation. The team drives five strategic pillars of diagnosis: “Awareness” (clinical utility), “Adoption” (rapid test adoption), “Access” (broad access), “Availability” (availability through local solutions), and “Accuracy” (accuracy assured by quality support), ensuring appropriate and reliable diagnostic solutions.

Despite international recommendations for standardizing schistocyte counting, such as the guidelines from the International Council for Standardization in Haematology (ICSH), its systematic and monitored implementation in diagnostic services still presents operational and governance gaps. This fragility is particularly evident when multiple institutions, with different levels of laboratory maturity, are involved, limiting the comparability of results and diagnostic reliability (Lippi & Favaloro, 2017; Zini et al., 2012).

The justification for this research lies in multiple aspects. Clinically, the presence of schistocytes, often in percentages equal to or greater than one percent in the appropriate context, is a finding that prioritizes diagnosis and can trigger therapeutic actions in thrombotic microangiopathies. Delays or errors in their identification negatively impact patient outcomes (Zini et al., 2021). From a technical point of view, inter-observer variability and gaps in the standardization of counting and reporting limit the comparability of results. The ICSH guidelines propose criteria and practices that, when implemented with quality control, increase the reliability of the tests (Zini et al., 2012; Zini et al., 2021; Pradella, 2025).

From a managerial perspective, structuring projects with clear governance, visual work management, and systematic measurement tends to increase the predictability, productivity, and sustainability of process changes. For Medical Affairs teams, historically focused on generating and disseminating evidence, adopting a project management model with Key Performance Indicators (KPIs) represents an organizational innovation. This approach enhances the scientific and operational value delivered to healthcare systems, fostering a data-driven decision-making culture (PMI, 2021; Kerzner, 2019). The novel nature of this project lies in the formal adoption of management practices and the explicit definition of KPIs, goals, and a clinical-operational impact measurement architecture, aiming to reduce variability and strengthen compliance with ICSH guidelines.

Thus, this work presents the initiation and planning plan of a project to implement an interinstitutional Working Group, under the governance of the Medical Affairs team for Rare Diseases Diagnostics, with the objective of increasing the accuracy of schistocyte research in blood counts through technical standardization, training, and a measurement system with defined goals and schedule, based on project management tools.

2. Material and Methods

The present study was characterized as an applied research with a mixed design, combining qualitative and quantitative approaches. Additionally, a descriptive character with an action-research component was employed. The methodological focus fell on the initiation and planning phases of the project management lifecycle, according to the guidelines of the Project Management Institute (PMI, 2021).

The empirical object of the research was the implementation of an interinstitutional Working Group, aiming to improve the accuracy of schistocyte research in complete blood counts. The governance and conduct of the plan were carried out by a Rare Disease Diagnostics Medical Affairs team, belonging to a pharmaceutical industry, in collaboration with participating clinical laboratories.

The project was developed by a team of Medical Affairs specialized in rare disease diagnostics, with scientific experience and knowledge. This team sought to innovate the way projects are conceived and conducted, adopting data-driven management tools. The application scenario involved resolving diagnostic gaps in laboratory services located in medium and large cities in the five regions of Brazil.

The project planning time horizon was set at six months, starting from the approval of the Project Charter. For execution, the technical environment of the participating institutions was considered, including the availability of optical microscopy with a 100x objective (oil immersion), slides, and routine hematological stains.

Additionally, institutions should have laboratory information systems (LIS) capable of extracting aggregated data and a repository for project documents. For workflow management, collaboration software and a digital Kanban board were used, aiming for visual activity management.

The population involved in the project planning included the entirety of the Medical Affairs team, encompassing the field team, field management, and strategic management. The institutional sample was intentionally defined, comprising eight to ten institutions selected based on specific criteria.

The inclusion criteria for the institutions were: minimum monthly volume of complete blood counts with schistocyte search, minimum infrastructure for preparation and microscopic reading, availability of technical and managerial focal points, agreement with the data collection protocol, and adherence to training and audits. Institutions without microscopic reading capacity or without the possibility of extracting minimum data from the LIS were excluded.

The quantitative data sample covered historical and prospective series of exam volume, response times (Turn Around Time – TAT), rework, and non-conformities. Also included were the results of interobserver agreement exercises on control slide panels, defined by expert consensus. The baseline for this data used information from the three to six months prior to institutional adherence, when available.

The qualitative sample consisted of key professionals from the institutions, such as biomedical scientists, hematologists, technical managers, and quality professionals. These participants were conveniently invited for semi-structured interviews, aiming to identify barriers, facilitators, criteria, and training needs.

Data collection combined secondary and primary sources. Secondary sources encompassed aggregated extractions from LIS, including exam volume, TAT, and rework. Current operational documents, such as Standard Operating Procedures (SOPs), and quality records from participating institutions were also analyzed.

Primary data sources included process audits, conducted with structured observation, both on-site and remotely. For these audits, compliance checklists based on the recommendations of the International Council for Standardization in Haematology (ICSH) were used. Standardized reading exercises of reference slides were also performed to estimate inter-observer agreement, recording the presence or absence of schistocytes and their percentage ranges.

Semi-structured interviews with key professionals were conducted to identify barriers and facilitators, as well as to understand training criteria and needs. After the training sessions, electronic semi-structured questionnaires were applied to assess the teams’ reaction and learning.

The project management followed the initiation and planning process groups of the PMBOK (PMI, 2021). The steps included the elaboration of the Project Charter, the identification and analysis of stakeholders, the definition of the Working Group’s governance, and the scope planning, which comprised the scope statement, the Work Breakdown Structure (WBS), and the data dictionary.

The planning also addressed the schedule, quality, risks, communications, resources, and stakeholder engagement. The Project Model Canvas tool was used to synthesize the scope through the 5W2H logic, and the digital Kanban orchestrated the workflow, with columns for backlog, work in progress (WIP), review, and completion. Laboratory quality control routines and ICSH guidelines were adopted for standardization of technical criteria and checklists.

The data analysis was of a mixed nature. For quantitative data, descriptive statistics such as means, medians, proportions, and measures of dispersion were applied. Pre-post comparisons were performed, considering the three to six months prior as the baseline and the initial implementation phase as post-implementation, with analyses by institution and overall, respecting the limitations of a single-group quasi-experimental design.

Interobserver agreement was estimated using the kappa coefficient for presence/absence and/or percentage categories of schistocytes, with interpretation based on usual conventions. The average kappa agreement was reported by institution, cycle, and profile, with a confidence interval, and the proportion of observers with kappa equal to or greater than 0.70 in each institution and overall. Pre- and post-training estimates were compared with the agreed-upon targets.

For the qualitative data, from the interviews, an inductive-deductive thematic analysis was performed. The findings were triangulated with the quantitative results to feed back into the technical protocol and the training plan, in addition to verifying the satisfaction level with the trainings and the project. The SMART goals and Key Performance Indicators (KPIs) defined in the planning, such as protocol compliance, kappa, TAT, rework, non-conformities, and training adherence, guided the judgment of the plan’s success.

Ethical considerations included submission to institutional review, when required. The exclusive use of aggregated and deidentified data, anonymization of any slide images, and obtaining free and informed consent for interviews with professionals were ensured. Data traceability was ensured by a data dictionary, spreadsheet versioning, and decision logs.

3. Results and Discussion

This Course Completion Work focused on the initiation and planning phases of a project, producing the main management artifacts recommended by the PMBOK, such as the Project Charter, the PM Canvas, the Work Breakdown Structure (WBS), and the Kanban flow. Additionally, scope definitions, a macro schedule, risk identification, key performance indicators (KPIs), and readiness criteria were established. Although the focus was on planning, essential elements already defined for future execution, detailed in the methodology, were incorporated to ensure methodological continuity and traceability between planning and subsequent project phases. The results presented below refer to the documentary products and decisions made during the planning process, accompanied by a critical analysis of their internal coherence, potential benefits, and limitations for the future execution of the project to improve the accuracy of schistocyte research. The discussion triangulated these findings with project management literature (PMI, 2017; PMI, 2021; Kerzner, 2019) and with technical-scientific recommendations in laboratory hematology and quality (Zini et al., 2012; Zini et al., 2021; Pradella, 2025).

Vision and purpose of the Charter

The Project Charter constituted the founding artifact that conferred formal mandate to the project, aligning its objectives and delimiting the planning scope. This document followed the best practices described by the PMBOK (PMI, 2017; PMI, 2021) and served as the main reference for decisions made during the initiation and planning phases. For a Medical Affairs team executing its first structured project, the Charter functioned as a “social contract” between the team, the project manager, and key stakeholders, contributing to reduce ambiguities and anchor the expected clinical-operational value (Kerzner, 2019).

The Charter construction steps involved gathering critical inputs, which consolidated technical-scientific evidence on the variability in the study of schistocytes and the ICSH recommendations, combined with internal team requirements, such as the imperatives “Awareness”, “Adoption”, “Access”, “Availability”, and “Accuracy”, in addition to deadline and resource constraints. This material provided the basis for the project justification and the expected benefits (Zini et al., 2012; Zini et al., 2021; Pradella, 2025; PMI, 2021). The definition of objectives and success criteria formalized SMART goals for a six-month horizon, including active governance, protocols and checklists aligned with the ICSH, training, KPI dashboard, kappa targets ≥0.70, compliance ≥90%, and a 15% reduction in Turn Around Time (TAT). These criteria were formulated as measurable “benefit hypotheses” to guide scope and prioritization decisions.

The scope and project boundaries were explicitly defined in the Charter, specifying what was in scope (initiation and planning) and out of scope (broad rollout, structural changes in LIS, equipment acquisition). This clarity was crucial for reducing the risk of scope creep and protecting schedule predictability (PMI, 2017). Governance and roles were established, designating the sponsor in Medical Affairs, the project manager, the technical lead (hematology/diagnostics), and regional Medical Affairs field team representatives, in addition to institutional focal points. An authority and escalation matrix was attached to the Charter to expedite decisions.

The mapping and analysis of stakeholders, considering their interest and influence, guided the engagement strategy, focusing on laboratory leadership, quality teams, IT/LIS, and hematology consultants. Initial conversations with these groups calibrated expectations and adherence risks. The document also recorded high-level constraints, assumptions, and risks, such as deadline limitations (six months), exclusive use of aggregated and de-identified data, and technological heterogeneity among laboratories. Assumptions included adherence to ICSH criteria, LIS data availability, and minimal participation in training and audits. A high-level risk matrix was included with preliminary responses, such as mitigations via SOPs, checklists, and PDSA cycles (Langley et al., 2009; Pradella, 2025).

During the Charter’s development process, significant challenges were faced. Reconciling clinical and managerial priorities, translating the need for accuracy (ICSH) into feasible operational goals within six months, required negotiation between ambition and viability. The solution found was to slice deliveries into milestones with objective acceptance criteria, maintaining focus on planning. The heterogeneity of maturity among institutions, with differences in infrastructure and processes, created the risk of asymmetric goals. The Charter mitigated this risk by defining inclusion criteria, providing standardized training, and adopting comparable metrics. Data alignment and privacy were also challenges, given the variation in LIS extraction availability and quality. The Charter anticipated the creation of a data dictionary and anonymization practices, in addition to providing for institutional/ethical approval when applicable. Finally, sponsorship and decision-making time, this being the team’s first structured project, resulted in longer approval cycles. To overcome this, the Charter included a governance rites calendar and escalation criteria, reducing future bottlenecks (Kerzner, 2019).

The gains and value generated by the Charter were substantial. By clarifying goals and boundaries, the Charter reduced ambiguity and provided coherence to subsequent artifacts, such as the PM Canvas, the WBS, and Kanban, strengthening the traceability between objectives, deliverables, and metrics (PMI, 2017). Formal sponsor endorsement granted the project manager authority to prioritize activities, negotiate with stakeholders, and establish the work cadence, an essential condition for cross-functional teams in Medical Affairs. From a clinical-operational integration perspective, the Charter connected technical recommendations from the ICSH and laboratory quality practices, such as audits, internal/external control, and kappa coefficient, to management mechanisms like KPIs, PDSA, and Kanban, creating a replicable and auditable framework (Zini et al., 2012; Pradella, 2025). The explicit statement of high-level constraints, assumptions, and risks, with preliminary responses, reduced uncertainty and guided the detailed planning of scope, schedule, and engagement, increasing plan predictability (PMI, 2021). The Project Charter anchored the PM Canvas as a strategic synthesis, guided scope decomposition into the WBS with acceptance criteria, and informed the flow design in Kanban. This top-down coherence is central to avoiding typical misalignments in interinstitutional projects and supports the ability to measure impact during execution.

PM Canvas as strategic synthesis and integration to the Project Charter

The use of the PM Canvas aimed to synthesize, in a unique and easily communicable representation, the central elements of the project structured in the Project Charter, organizing them according to the 5W2H logic (why, what, who, how, when, and how much). Methodologically, the Canvas operated as an artifact for rapid alignment among stakeholders, reducing initial ambiguities and accelerating requirements gathering before the technical decomposition of the scope into the WBS (Work Breakdown Structure). This approach is in line with the recommendation to combine high-level visual instruments with the formal initiation and planning processes of the PMBOK (PMI, 2017; PMI, 2021; Finocchio Jr., 2013).

The construction of the PM Canvas was based on the content consolidated in the Charter. In the “Why” block, the clinical, technical, and managerial justifications were transposed, addressing inter-observer variability, standardization gaps, and the need for governance with metrics. The SMART objectives for the six-month period and the expected benefits, covering clinical, operational, technical, and organizational aspects, were also included. Next, in the “What” block, the project’s product was described, which consisted of an operational interinstitutional Working Group, a standardized protocol aligned with the ICSH, a training and certification program, a KPI panel, and agreed-upon goals. Delivery requirements included formal governance, minimum technical capacity, standardized data, quality, training, operation with visual management, and ethical compliance.

The “Who” block registered external stakeholders, such as participating laboratories, institutional leadership, multidisciplinary teams (MDT), Quality/Regulatory teams, and hematology specialists, and the project team, composed of the sponsor, project manager, Medical Affairs field team, and local speakers. In the “How” block, premises were consolidated, such as adherence to ICSH criteria, data availability, and participation in training, in addition to the engagement and governance of the internal Medical Affairs team. Restrictions included the six-month deadline, the need for de-identified data, technological heterogeneity, limited resources, and the scope of the Medical Affairs team. The deliverables group was aligned with the WBS (Work Breakdown Structure), covering GT governance, protocol, training, data/KPIs, quality and risks, and operation via Kanban.

Finally, in the “When and How Much” blocks, the Canvas incorporated the monthly timeline previously agreed upon in the Charter, with milestones by months (from M1 to M6). It also included a macro view of costs for the production of educational material and content, and operational costs to enable training. The foreseen risks, such as adherence, data, technical heterogeneity, and agenda availability, were also recorded. This transposition ensured top-down consistency, preserving the language of objectives and benefits from the Charter, and each Canvas block pointed directly to the work packages, which were subsequently detailed in the WBS and the schedule.

The main methodological challenge during synthesis in the PM Canvas consisted of balancing conciseness and completeness. The Canvas, by its nature, requires synthesis, but the project’s complexity, with LIS data dependencies, specific ICSH technical requirements, and multiprofessional governance, tends to expand the number of premises, constraints, and requirements. To mitigate the risk of underspecification, the decision was made to anchor each Canvas block in explicit references to the Charter and to link the “What” and “How” items to the WBS (Work Breakdown Structure) packages with acceptance criteria. Another challenge was the terminological harmonization between the strategic imperatives of the Medical Affairs team, such as “Awareness, Adoption, Access, Availability, Accuracy,” and the Canvas categories. This alignment was achieved by positioning the imperatives as benefits and guiding criteria in the “Why” and “What” blocks, avoiding the dispersion of objectives. The heterogeneity of maturity among institutions demanded caution in defining premises, with the Canvas explicitly stating critical dependencies, such as access to aggregated data, designated focal points, and adherence to audits, reducing expectation asymmetries and preparing the ground for risk management in the management plan.

The adoption of the PM Canvas generated three main benefits for planning. Firstly, communicability was enhanced, as the one-page summary was used in stakeholder interactions to explain the project’s purpose, scope, and value, reducing the cognitive effort associated with extensive documents. Secondly, there was an improvement in prioritization and coherence, as the Canvas explicitly stated justifications, objectives, and benefits, guiding scope choices and allowing for quick verification of each deliverable’s adherence to the desired outcomes, such as the direct relationship between the ICSH protocol, training, and the kappa, conformity, and TAT KPIs. Thirdly, integration with formal artifacts was strengthened, with the Canvas acting as a bridge between the Charter and the WBS (Work Breakdown Structure), ensuring that all high-level elements had operational counterparts in the work decomposition and Kanban flow, as recommended by the literature on benefit-oriented management and process integration (PMI, 2017; Kerzner, 2019). This chaining is particularly relevant in laboratory quality improvement projects, where clarity on the “why” and the “what” is empirically associated with better adherence to protocols, consistent measurement, and more predictable results (Zini et al., 2012; Zini et al., 2021; Pradella, 2025).

The use of the PM Canvas in conjunction with the Project Charter aligns with the best practices of incremental planning advocated by the PMBOK, which recognize the value of high-level artifacts to guide requirements gathering and scope decomposition (PMI, 2017; PMI, 2021). In parallel, the explicit statement of technical requirements of the ICSH and quality metrics in the Canvas dialogues with evidence that methodological standardization and systematic measurement are determinants for reducing variability in the detection of schistocytes and increasing inter-laboratory reproducibility (Zini et al., 2012; Zini et al., 2021). The main limitation of the Canvas, recognized in the literature and observed in this work, is its inability to capture complex operational nuances. This limitation was mitigated by the linkage with the WBS (Work Breakdown Structure) and the data dictionary/KPIs. In summary, in the context of a Medical Affairs team conducting its first structured project, the PM Canvas demonstrated utility as a mechanism for strategic alignment and integration between the clinical-operational purpose and project management discipline, contributing to the robustness of planning and to the readiness assessed on the timeline.

WBS and dictionary: scope decomposition and acceptance criteria

The Work Breakdown Structure (WBS) was developed to translate the high-level scope, synthesized in the Project Charter and the PM Canvas, into manageable work packages with objective acceptance criteria, deadlines, and responsibilities, as recommended by the PMBOK for the creation of the scope baseline (PMI, 2017; PMI, 2021). The consolidated WBS was presented in a tabular format and a hierarchical organizational chart, with four main branches: Planning; Content and Materials Creation; Capacity Building and Training Plan; and Governance and Evaluation. Each branch was decomposed into level two or three deliverables, with a “definition of done” linked to the project’s SMART goals (kappa ≥0.70; ≥90% compliance; -15% TAT) and to the technical recommendations of ICSH and laboratory quality (Zini et al., 2012; Zini et al., 2021; Pradella, 2025).

In the Planning branch, deliveries 1.1.1 to 1.1.11 involved the formalization of the Project Charter, the definition of the scope, the elaboration of the PM Canvas (5W2H), the creation of the WBS (Work Breakdown Structure) itself, the macro schedule, the risk register, the milestone line, the definition of KPIs, the governance of the GT (including RACI matrix), the meeting cadence (Kanban), the selection of institutions, and the agreement on inclusion/exclusion criteria and terms of commitment. The schedule, with the timeline and associated milestones, indicated progress in the activities, all with planned start and end dates. This data, although preliminary, evidenced the coherence between the scope decomposition and the timeline, with the foundational deliverables (Charter, Scope, WBS) appearing as predecessors to subsequent milestones, reinforcing the recommended chaining to establish the scope and schedule baseline (PMI, 2017).

As an acceptance criterion, it was defined, for example, that delivery 1.1.9 (GT Governance – RACI) would only be considered complete when roles and responsibilities were approved by the sponsor and disclosed to all focal points, with the rites agenda published. To support the WBS (Work Breakdown Structure), a WBS dictionary was created, with the definition of participants, responsible parties, predecessors, the “definition of done”, evidence, and deadline for each work package. The Content and Materials Creation branch (1.2) concentrated the activities necessary for the production of the technical protocol and training inputs. Tasks 1.2.1 (Bibliographic Survey), 1.2.2 (Definition of ICSH Criteria in the Protocol), 1.2.3 (Definition of speakers), and 1.2.4 (Speaker training) were scheduled for month three. The incorporation of ICSH criteria into the protocol is closely linked to the creation of KPIs and was linked to specific Acceptance Criteria, such as the presence of compliance checklists consistent with ICSH, a data dictionary with operational definition of each indicator (LIS source, periodicity, calculation, and target), and technical validation by independent specialists. This approach is supported by the literature, which indicates that the effectiveness of laboratory improvement programs depends on the existence of well-defined and auditable indicators, as well as adherence to protocols that mitigate inter-observer variability (Zini et al., 2012; Sciacovelli et al., 2017).

The Training and Development Plan branch (1.3) was structured to ensure the transfer of the protocol to practice through local workshops in the selected institutions. Activities 1.3.1 (Organization of training in each institution), subdivided into 1.3.1.1 (Date), 1.3.1.2 (Location), and 1.3.1.3 (Speaker), were followed by 1.3.2 (Estimate of Duration and Resources), 1.3.3 (Engagement Strategies per Group), and 1.3.4 (Execution of Training), planned to start in the fourth month and end at the end of the fifth month. The primary acceptance criterion established in this branch is to achieve ≥90% of certified staff per institution, measured by a standardized post-training evaluation. Additionally, a concordance exercise (kappa) with a slide panel is required after training to verify applied learning. Literature reinforces that training with formal evaluation, combined with concordance exercises, is crucial for increasing reproducibility in morphological counts (Zini et al., 2021) and for sustaining improvement cycles via PDSA (Langley et al., 2009).

Finally, the Governance and Evaluation branch (1.4) organizes the monitoring and improvement mechanisms. Tasks 1.4.1 (NPS Questionnaire), 1.4.2 (Simulated Audit), 1.4.3 (Continuous Improvement Plan – PDSA) and 1.4.4 (Status Reports and KPI Dashboard) are planned for month six, reflecting the moment when the data dashboard transitions from beta version to operational. Acceptance criteria include the publication of the KPI dashboard with baseline data and initial cycle, status reports with trend analysis and recorded corrective actions, and a PDSA plan with at least one adjustment cycle of the SOP and/or training, should kappa and compliance targets not be met in the initial cycle. The integration of these mechanisms into the Kanban flow, with WIP limits and entry/exit criteria, was defined as an operational requirement to ensure predictability and visibility (PMI, 2021), and aligns with recommended laboratory quality control practices (Pradella, 2025).

The critical analysis of the WBS (Work Breakdown Structure) decomposition process indicated three positive points. First, traceability, where each work package is clearly derived from Charter/Canvas objectives and requirements, with acceptance criteria that mirror SMART goals and ICSH requirements, minimizing the risk of implicit scope. Second, integration with the schedule, with the planning spreadsheet showing logical precedences, such as the schedule (1.1.5) being a successor to the WBS (1.1.4), which reduces the probability of costly replanning. Third, built-in measurement, with packages linking delivery to indicators, favoring results-based governance. Among the limitations, the need for greater data maturity, dependent on LIS extractions and the quality of records, and the risk of excessive granularity in environments with limited team availability stand out. Both risks were mitigated by WIP policies and by prioritizing critical packages in the meeting cadence.

Compared to the literature, the constructed WBS meets the principle of “sufficient decomposition” for control, without incurring in micromanagement, a practice recommended by Kerzner (2019) and the PMBOK (PMI, 2017) when forming the scope baseline. From a technical standpoint, the explicit anchoring in ICSH guidelines and quality control methods, such as checklists, audits, and kappa coefficient, converges with the evidence that standardization and systematic measurement are necessary conditions to reduce inter-laboratory variability in the study of schistocytes (Zini et al., 2012; Zini et al., 2021; Sciacovelli et al., 2017). Thus, the WBS and its criteria dictionary represent a structuring advance, by connecting clinical-operational objectives to verifiable deliverables, providing a concrete basis for the schedule, risk management, and monitoring by KPIs.

Kanban Flow Planning: WIP policies, cadence, and visibility

The organization of work through a Kanban board sought to provide predictability to the planning delivery flow, increase transparency for stakeholders, and anticipate blockages, in line with the principles of visual management and limiting work in progress described in the project and operations management literature (PMI, 2021; Kerzner, 2019). The template adopted for this project was configured with columns that reflect explicit flow states and objective entry and exit criteria, with WIP limits calibrated to team availability and dependencies between WBS packages. The Kanban board was structured with the columns Pending (ready to start), In Progress – Waiting (in preparation/depends on third party), In Progress – Doing (active execution), Completed, and Backlog (ideas and unprioritized items). For each column, entry/exit policies (“Definition of Ready” and operational “Definition of Done”) were defined: an item only enters Pending when it has a description, owner, deadline, and resolved predecessors; it moves to Waiting after confirming inputs and scheduling with stakeholders; it enters Doing when there is declared availability within the WIP limit; and it is only moved to Completed with attached documentary evidence, such as an approved SOP version or meeting minutes for KPI agreement.

WIP limits were set conservatively by role and by column, allowing up to two simultaneous items per person in the Doing column and an aggregate limit per track, such as Technical Content, Enablement, and Governance, to reduce multitasking and waiting times. The adoption of explicit entry and exit policies and low WIP is consistent with the literature, which associates such practices with reduced cycle time and improved quality through focus and completion before starting new tasks (PMI, 2021). Each level two or three WBS package is represented by a card on the Kanban board, referencing its ID, which allows the visual progress on the board to directly reflect the scope baseline progress. Furthermore, governance rituals were coupled with the board, including weekly capacity planning, bi-weekly review for inspection of blockers and reprioritization, and monthly retrospective to evaluate WIP policies, lead time by work type, and adherence to the “Definitions of Done”. Decisions and deviations are recorded on the card itself and in minutes, facilitating auditing and organizational learning.

Three challenges stood out during the setup and initial use of the Kanban board. The first was cultural adoption, as the transition from diffuse communications to the disciplined use of Kanban required guidance and reinforcement, especially to ensure evidence attachment before moving to Done. The second challenge was priority alignment, since external dependencies, such as the availability of specialists to validate the SOP or LIS extraction windows, required adjusting item sequencing and reserving visual “buffers” for tasks with high uncertainty, avoiding violation of WIP limits due to schedule pressure. The third challenge was heterogeneity of availability, as the focal points of different institutions had distinct schedules. As a mitigation, WIP limits per track and the existence of the “Waiting” column made explicit the queues and causes of waiting, allowing managerial action, such as escalation or redesignation.

Despite the challenges, the use of Kanban provided substantial gains in the planning phase. Predictability increased, measured by the reduction of partially initiated items and the higher completion rate according to the agreed cadence. Early detection of bottlenecks occurred due to the visibility of cards in “Waiting” for more than one cycle, which allowed for interventions or redefinition of assumptions. Communication discipline improved, with the reduction of parallel channels and the centralization of decisions and evidence in the corresponding card. By integrating Kanban with the WBS and rituals, the project brought visual governance closer to SMART goals, such as items linked to the ICSH Protocol (1.2.2) and the KPI Dashboard (1.4.3), creating a practical mechanism for results-based management. This approach is consistent with PMBOK recommendations on flow control and communication, and with laboratory quality literature that emphasizes stable processes, acceptance criteria, and traceable documentation as pillars of continuous improvement (PMI, 2021; Pradella, 2025). As a limitation, the effectiveness of Kanban depends on maintaining WIP limits and adherence to entry/exit policies. In contexts with demand peaks or low specialist availability, there is a risk of bypassing the Kanban board. To mitigate this, escalation criteria and monthly policy reviews were defined, in addition to linking movement to objective evidence. In future execution, the same discipline should be applied to operational items, such as training, audits, and kappa exercises, reinforcing the connection between workflow and quality outcomes.

Integration between artifacts: Charter-Canvas-WBS-Kanban and timeline

The integration of planning artifacts was conceived in a top-down manner, ensuring a logical chain between purpose, scope, work breakdown, and visual execution of the flow. The Project Charter defined the purpose and success criteria within six months, including active governance, ICSH-aligned protocol, training, KPI dashboard, kappa targets ≥0.70, compliance ≥90%, and a 15% reduction in TAT median. The PM Canvas translated these elements into a 5W2H synthesis, specifying the product and requirements, stakeholders, assumptions and constraints, risks, timeline, and costs. The WBS (Work Breakdown Structure), in turn, broke down the scope into level two or three packages with objective acceptance criteria, and the Kanban operationalized the flow of these packages through columns and WIP policies, sustaining the governance cadence. The timeline anchored monthly milestones that reflect this linkage, preserving traceability between “what” needs to be delivered and “when” each delivery reaches “done when.”

The evidence of coherence between artifacts and goals is observable in three layers. Firstly, goal coherence: the technical and operational goals established in the Charter, such as kappa, compliance, and TAT, are mirrored in the Canvas as benefits and in the data dictionary as KPIs with operational definition, LIS source, formula, dimensions, and goals/thresholds. This meets the PMBOK recommendation to align project objectives with verifiable metrics (PMI, 2017; PMI, 2021). Secondly, scope and package coherence: the WBS (Work Breakdown Structure) includes packages directly linked to these goals, such as the definition of ICSH Criteria in the Protocol (1.2.2), the execution of Trainings (1.3.4), and the Status Reports and KPI Dashboard (1.4.4). The acceptance criteria for these packages codify the goals, for example, the acceptance of 1.2.2 requires SOPs and checklists reviewed by specialists, that of 1.3.4 requires post-training evaluation and certified staff ratio, and that of 1.4.4 requires the publication of the dashboard with indicators of average kappa per institution, proportion of observers with kappa ≥0.70, compliance ≥90%, and TAT with a 15% reduction.

Third, temporal and flow coherence: the timeline positions foundational deliverables, such as Charter, Scope, WBS (Work Breakdown Structure), Schedule, and Risks, in months one and two; protocol and materials development and validation in month three; training and concordance exercise in months four and five; and TAT verification and readiness in month six. This sequence is reflected in the Kanban, where each level two or three WBS (Work Breakdown Structure) package is represented by a card with an ID, owner, and mandatory evidence for column transition, preventing advancement without supporting documentation (“Definition of Done”). The adoption of WIP limits per track reinforces the prioritization of packages critical to meeting milestones. Integration mitigated typical risks of interinstitutional projects. The risk of “scope creep” was reduced by anchoring the Canvas and WBS (Work Breakdown Structure) to the Charter, with new demands being incorporated only if linked to goals and through formal replanning, a practice aligned with PMBOK’s integrated change control (PMI, 2017). The risk of misalignment between fronts, such as technical, data, and training, was mitigated by traceability between Charter, Canvas, WBS (Work Breakdown Structure), and Kanban. Any delay in packages, such as the protocol (1.2.2) or training (1.3.4), appears visually on the board, allowing for capacity adjustments, decision escalation, and reprioritization.

The risk of rework, frequent in environments with process variability, was mitigated by “strong” acceptance criteria linked to evidence, such as expert-validated SOP, published ICSH checklist, archived learning assessment, kappa calculation per observer/institution, and data dictionary with validation and anonymization. These mechanisms dialogue with the technical-scientific literature, which associates standardization, training with assessment, and systematic monitoring with the reduction of inter-observer variability and improvement of reproducibility (Zini et al., 2012; Zini et al., 2021; Pradella, 2025). From a critical point of view, the integration also revealed sensitive dependencies, such as the quality of LIS extractions and the availability of specialists for SOP validation, which are potential bottlenecks. Nevertheless, the presence of a common data dictionary, Kanban entry/exit policies, and bi-weekly progress reviews provides a governance framework compatible with the project’s complexity. In summary, the coherence between Charter, Canvas, WBS, Kanban, and timeline not only confers internal consistency to the planning but also establishes the conditions for an evidence-based readiness/go-no-go decision, as advocated by the best practices in project management and laboratory quality (PMI, 2021; Kerzner, 2019; Pradella, 2025).

Metrics and readiness: definition of KPIs and data dictionary

The measurement was structured from a set of KPIs aligned with SMART goals and technical-scientific recommendations for laboratory standardization and quality. The consolidated data dictionary defines, for each indicator, the axis, operational definition, purpose, data source, calculation formula, dimensions/strata, goals/thresholds, responsible parties, and compliance/privacy. On the technical quality axis, the following were defined: inter-observer agreement, reported as average kappa per institution (with confidence interval) and the proportion of observers with kappa ≥ 0.70, obtained in standardized reading exercises with panels of reference slides; compliance with the protocol (SOP/checklist), calculated as the proportion of reports/processes adhering to the critical items of the ICSH checklist in a simulated audit; and accuracy in panels/consensus (when feasible), estimated by sensitivity and specificity versus criterion truth established by specialists.

On the operational axis, the following were defined: response time (TAT), preferably measured by the median between milestones defined in the LIS, such as sample registration to report release, with agreed stratifications; rework, as the proportion of slides redone per hundred reports; and non-conformities per hundred reports. On the adoption/process axis, the following were defined: training adherence, as the proportion of certified staff; participant satisfaction, measured by NPS; and planning flow productivity, such as lead time and card aging in Kanban, the latter as a management maturity metric. The explicit definition of formulas, sources, and dimensions in the dictionary responds to data governance best practices and avoids ambiguity in collection and interpretation (PMI, 2017; PMI, 2021). From a technical point of view, the choice of the kappa coefficient for reproducibility and compliance checklists is consistent with the ICSH literature and with laboratory quality control principles that recommend clear standards, internal audits, and objective agreement assessment (Zini et al., 2012; Zini et al., 2021; Pradella, 2025; Sciacovelli et al., 2017).

Future execution: baseline preparation, goals, and readiness criteria

A baseline will be planned with aggregated LIS extractions, referring to the three to six months prior to enrollment, and with an initial round of simulated audit and panel agreement exercise. For TAT, the median will be adopted as the primary measure, with interquartile range and agreed stratifications. For compliance, an ICSH checklist with critical weighted items will be defined. For the kappa coefficient, calculation per observer and aggregation per institution will be foreseen. Based on this data, targets will be established per institution and for the whole, in line with the plan’s objective: average kappa ≥ 0.70 and at least 80% of observers with kappa ≥ 0.70; compliance ≥ 90% in the simulated audit; relative reduction of 15% in the median TAT in the sample; and ≥ 90% of the certified staff. These targets are consistent with the evidence that structured interventions, such as SOPs, training with evaluation and quality control, improve the reproducibility and effectiveness of laboratory processes, even though the exact magnitude of the gain may vary between institutions (Zini et al., 2012; Zini et al., 2021; Pradella, 2025; Gruber; Hausch; Mueller, 2024).

The go-no-go decision readiness criteria at the end of planning incorporate these KPIs and require: SOPs and checklists validated by experts with compliance ≥ 90%; average kappa ≥ 0.70 per institution and ≥ 80% of observers with kappa ≥ 0.70; 15% reduction in median TAT in the sample; active KPI panel, with validated monthly updates; and governance documentation, including Charter, RACI, cadence, and WBS/dictionary, in effect. The presence of explicit criteria and documentary evidence reduces uncertainty and supports an informed decision, as recommended by the PMBOK for “gate decisions” and integrated change control (PMI, 2017; Kerzner, 2019).

Expected value in execution: monitoring and data-driven decision

The indicator and readiness architecture designed during planning creates the conditions for systematic monitoring and informed decision-making during execution. Operationally, the combination of the KPI dashboard with the Kanban flow allows for performance visibility by institution and comparison with goals, diagnosis of deviation causes, such as recurring non-compliance items in the checklist, and activation of structured responses, such as PDSA cycles, training reinforcement, and SOP adjustments. In terms of governance, the traceability between the Charter objectives, the WBS packages, and the Kanban cards enables results-based management: critical path items are prioritized, and movement between columns depends on “ready when” evidence, minimizing rework. From a clinical-operational standpoint, the expectation supported by the literature is that standardization according to ICSH, combined with training with evaluation and internal/external quality controls, results in greater reproducibility of schistocyte detection and in processes with more predictable TAT (Zini et al., 2012; Zini et al., 2021; Pradella, 2025).

An organizational gain is also anticipated: the institutionalization of a data dictionary and an auditable dashboard strengthens the data-driven culture and facilitates the expansion of the model to other projects and contexts within the Medical Affairs team. Limitations are acknowledged, such as dependence on LIS data quality, technical heterogeneity among laboratories, and the risk of variable adherence to governance rites. These points were incorporated into the risk register with triggers and responses, for example, a sample B plan, technical mentoring, and sponsorship escalation. In summary, the definition of KPIs, baseline, and readiness/go-no-go criteria provides robustness to planning and increases the probability of evidence-based execution, in line with best practices in project management and laboratory quality (PMI, 2021; Sciacovelli et al., 2017).

Importance of applying Project Management in Medical Affairs

The explicit adoption of Project Management methods in Medical Affairs has proven strategic for transforming technical-clinical needs into measurable results. By anchoring the plan in Charter, Canvas, WBS (Work Breakdown Structure), Kanban, and KPIs, a higher probability of achieving compliance with ICSH guidelines, increasing accuracy through training with evaluation (kappa), and reducing TAT by standardizing processes and data governance was observed. Organizationally, the project introduced formal governance, common language, and a data-driven culture, creating replicable artifacts that can be reused in new diagnostic areas. The main limitations of the planning stem from external dependencies, heterogeneity of technical maturity among institutions/laboratories, and risks of adherence to governance rites. As mitigators, the plan incorporated inclusion criteria, a data dictionary with validations, anonymization policies, a cadence of rites, and PDSA cycles for rapid adjustments. In summary, project discipline adds predictability and reproducibility to an inter-institutional initiative in which technical and organizational variability is intrinsic. Similarly, structured project management is particularly relevant in the context of Medical Affairs, whose routine is intensive and multitasking, as it creates explicit prioritization, governance cadence, and flow rules that allow this project to be reconciled with other demands of the functional scope, without loss of quality or traceability, preserving the coherence between clinical purpose and management discipline.

The planning process showed some successes, such as the PM Canvas which facilitated rapid alignment of justifications, objectives, and benefits. The WBS (Work Breakdown Structure), with “ready when” acceptance criteria, increased traceability between goals and deliverables. Kanban, with limited WIP and entry/exit criteria, improved visibility and reduced multitasking. Continuous attention is required for the availability and quality of LIS data, stakeholder engagement, and consistency in adopting framework policies. For execution, it is recommended to prioritize a controlled pilot with explicit readiness goals and criteria; institutionalize the KPI dashboard with monthly updates; formalize an SOP change control plan; and maintain quarterly PDSA cycles. For other projects in Medical Affairs, it is recommended to reuse the Charter-Canvas-WBS (Work Breakdown Structure)-Kanban framework, always starting with a data dictionary and a minimum set of KPIs aligned with the clinical problem. This work demonstrates consistent and well-structured planning, which aligned the clinical problem of accuracy in the search for schistocytes with project management tools, coherently integrating Project Charter, PM Canvas, WBS (Work Breakdown Structure), and Kanban, in addition to defining auditable KPIs and explicit readiness criteria. Thus, the study fulfills its objective of delivering a viable, measurable, and replicable plan, capable of supporting evidence-based decisions, and with relevant potential to impact diagnostic quality.

4. Conclusion

This study aimed to plan and initiate the implementation of an interinstitutional Working Group, under the governance of Medical Affairs, with the purpose of increasing the accuracy of schistocyte research in blood counts through technical standardization, training, and a measurement system with defined goals and schedule, anchored in project management tools. It was found that the planning produced robust artifacts, such as the Project Charter, the PM Canvas, the Work Breakdown Structure (WBS), and the Kanban flow, which established a coherent and traceable baseline. The integration of these instruments demonstrated the ability to translate the need for diagnostic accuracy into measurable operational goals, such as inter-observer agreement (kappa equal to or greater than 0.70), protocol compliance (equal to or greater than 90%), and response time reduction (15% in the median TAT), with explicit readiness criteria for execution.

The main contribution of this work lies in demonstrating that the explicit adoption of project management methods in Medical Affairs is strategic for transforming technical-clinical challenges into measurable results, promoting formal governance, common language, and a data-driven culture. It was observed that the developed framework is replicable and can be reused in other diagnostic areas, adding predictability and reproducibility to interinstitutional initiatives. However, the planning identified limitations, such as dependence on the quality of data from the Laboratory Information System (LIS), the heterogeneity of technical maturity among participating institutions, and the risk of variable adherence to governance rites. To mitigate these points, the plan incorporated inclusion criteria, a data dictionary with validations, anonymization policies, cadence of rites, and PDSA cycles for rapid adjustments. For the execution phase, it is recommended to prioritize a controlled pilot, institutionalize the KPI dashboard, and maintain continuous improvement cycles.

Bibliographic References

Finocchio Junior, J. 2020. Project Model Canvas. 2.ed. Saraiva Educação, São Paulo, SP, Brasil. 216 p.

Gruber, L.; Hausch, A.; Mueller, T. 2024. Internal quality controls in the medical laboratory: a narrative review of the basic principles of an appropriate quality control plan. Diagnostics 14(19): e2223.

Kerzner, H. 2019. Project management: a systems approach to planning, scheduling, and controlling. 12.ed. Wiley, Hoboken, NJ, EUA.

Langley, G.J.; Moen, R.; Nolan, K.M.; Nolan, T.W.; Norman, C.L.; Provost, L.P. 2009. The improvement guide: a practical approach to enhancing organizational performance. 2.ed. Jossey-Bass, San Francisco, CA, EUA.

Lippi, G.; Favaloro, E.J. 2017. Preanalytical issues in hemostasis and thrombosis testing. Methods in Molecular Biology 1646: 29-42.

Pradella, M. 2025. Internal quality control in medical laboratories: Westgard and the others. Laboratories 2: 15.

Project Management Institute [PMI]. 2017. Um guia do conhecimento em gerenciamento de projetos (Guia PMBOK). 6.ed. Project Management Institute, Newtown Square, PA, EUA.

Project Management Institute [PMI]. 2021. A guide to the project management body of knowledge (PMBOK Guide). 7.ed. Project Management Institute, Newtown Square, PA, EUA.

Sciacovelli, L.; et al. 2017. Defining a roadmap for harmonizing quality indicators in laboratory medicine: a consensus statement on behalf of the IFCC Working Group “Laboratory Error and Patient Safety” and EFLM Task and Finish Group “Performance specifications for the extra-analytical phases”. Clinical Chemistry and Laboratory Medicine 55(10): 1478-1488.

Zini, G.; Bain, B.J.; et al. 2021. Schistocytes in peripheral blood films: between recommendations and practice. International Journal of Laboratory Hematology 43(S1): 21-29.

Zini, G.; d’Onofrio, G.; Briggs, C.; et al. 2012. ICSH recommendations for identification, diagnostic value, and quantitation of schistocytes. International Journal of Laboratory Hematology 34(2): 107-116.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.