Organization of the creative process in interior “design” through agile methodology
Organization of the Creative Process in Interior “Design” through Agile Methodology
Ryan Ikeda; Paula Regina Fortes
DOI: 10.22167/2675-6528-202601412
Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.
Summary
The development of interior design projects frequently faced challenges related to time control and rework occurrence, driven by progressive decisions and constant revisions. Faced with this scenario, the aim was to structure the conceptualization and development process of interior projects, adapting principles of the Scrum methodology to optimize time control and mitigate rework. To this end, a qualitative approach was adopted, of an applied nature and descriptive-exploratory character, using the single case study method in a small-sized company in the sector, located in São Paulo (SP). Data collection involved documentary analysis, direct observation, and secondary data collection from previous projects, which allowed for the identification of operational patterns and bottlenecks. The analysis revealed that the main problems stemmed from the absence of structured validations and informal change control, resulting in frequent revisions, rework, and low predictability. Based on this diagnosis, a reorganization of the process was proposed, based on short cycles, progressive validation, and structured change control, incorporating elements such as “backlog”, “sprints”, and formal validation checkpoints. It was concluded that the proposal demonstrated potential to improve the organization of the creative process, offering greater control and predictability in the development of interior projects, while maintaining the flexibility inherent to the activity, theoretically contributing to the management of the decision-making flow in creative contexts.
Keywords: Project management; Predictability; Rework; Scrum; Project validation.
1. Introduction
The interior design sector, intrinsically linked to creative expression and environment personalization, faces significant challenges in managing its projects. The complexity of this area stems from the articulation of multiple dimensions, encompassing technical, functional, and aesthetic aspects, requiring intense and continuous client interaction (PMI, 2021). This dynamic, characterized by progressive decisions and the emergence of new information, frequently results in constant revisions, scope changes, and consequently, rework (Brown, 2019). Such problems not only compromise operational efficiency but also impact the predictability of deadlines and costs, crucial for business sustainability. Ineffective change management is one of the main causes of project failures, leading to significant cost increases and delays (Kerzner, 2022). The absence of formal mechanisms to control these variables in creative environments, where subjectivity is high, amplifies the difficulty in maintaining alignment of expectations.
Specialized literature indicates that, in projects with a high degree of uncertainty and dependence on client participation, the definition of the problem and solution tends to evolve iteratively, not linearly (Lawson, 2017). However, traditional management approaches, based on sequential models, prove inadequate for dealing with this dynamic nature. In these models, changes made in later stages can trigger the “cascade effect”, where small initial modifications amplify and generate disproportionate impacts on multiple interdependent elements, requiring extensive and costly revisions (Cooper, 2015). The lack of structured validations and informal change control contribute to this vulnerability, resulting in a vicious cycle of revisions and rework that hinders decision consolidation and schedule maintenance. The client’s perception, which solidifies as the project’s visual representations become more realistic, often drives significant changes in advanced stages, when the cost of alteration is substantially higher (Liedtka, 2018).
Faced with these challenges, agile methodologies emerge as a promising alternative for project management in complex and highly variable environments. Unlike predictive approaches, agile methodologies prioritize short development cycles, incremental deliveries, and continuous validation, promoting greater flexibility, adaptability, and control (Denning, 2018). Among them, Scrum stands out for its light and adaptable structure, which organizes work into “sprints” and uses a prioritized “backlog” to manage demands, favoring transparency, collaboration, and progress tracking (Schwaber and Sutherland, 2020). Although widely disseminated in sectors such as information technology, the application of agile methodologies in creative contexts, such as interior design, is still limited and requires careful adaptation of its principles. The challenge lies not in a literal application, but in adjusting agile fundamentals to the particularities of the creative process, which involves subjective decisions, constant interaction with the client, and high interdependence between stages (Rigby et al., 2016). The ability to anticipate the effects of changes and formalize scope control is fundamental to success in any project (PMI, 2021).
The relevance of this study lies in the need to develop more efficient ways to organize the creative process in interior design, capable of mitigating rework, optimizing time control, and increasing the predictability of deliverables. By exploring the adaptation of principles from agile methodologies to this context, the research contributes to improving project management in personalized service companies, offering a model that balances the flexibility inherent in creativity with managerial discipline. Theoretically, the work expands the discussion on the applicability of agile approaches in non-traditional domains, enriching the knowledge about decision flow management in creative contexts. Thus, the present work seeks to structure the conceptualization and development process of interior design projects, adapting principles of the Scrum methodology, with the objective of optimizing time control and mitigating the occurrence of rework.
2. Material and Methods
This research was characterized as applied in nature, seeking to offer a practical solution to a problem identified in the professional context of interior design. According to Gil’s (2022) classification, applied studies aim at the generation of knowledge directly focused on practice, aligning with the purpose of optimizing the management of creative projects. The approach adopted was predominantly qualitative, allowing for an in-depth understanding of the complex and subjective phenomena inherent in the design process.
Regarding the objectives, the study presented a descriptive and exploratory character. The descriptive nature sought to detail the functioning of the current interior design project development process, identifying its stages and dynamics. The exploratory character, in turn, investigated the applicability of an approach still little disseminated in this sector, which consisted of adapting agile methodologies to the creative process, as suggested by Prodanov and Freitas (2013). This combination allowed not only to describe a reality but also to deepen the understanding of a phenomenon and propose improvements.
The study’s context was a small interior design firm located in the city of São Paulo, in the state of São Paulo. The company’s operations focused on the development of residential projects, characterized by high client interaction and a dynamic creative process. The research was conducted during the period of the Final Course Project’s development, which extended until the year 2026, encompassing the analysis of recent company projects and processes.
The central unit of analysis was the organizational process of conceptualization and development of interior design projects of the selected company. The single case study method was adopted, a choice justified by the need to investigate a contemporary phenomenon in its real environment, where there is a significant interdependence between the object of study and the context in which it manifests (Yin, 2017). This method allowed for an in-depth analysis of the particularities of the workflow and the interactions involved.
The company’s selection for the case study was based on convenience, given the accessibility and relevance of its operational context to the research objectives. There was no population or sample in the statistical sense, as the focus was on an in-depth analysis of a single case. The selection criteria were operating in the interior design sector, the company’s size (small), and its willingness to collaborate with the investigation of its creative and project management process.
Data collection was carried out through three complementary techniques, aiming at triangulation and obtaining a comprehensive understanding of the process. The first technique was documentary analysis, which involved reviewing existing materials within the company, such as service provision contracts, previous project schedules, and operational records. According to Marconi and Lakatos (2021), this approach is fundamental for understanding the formal structure of processes and identifying patterns of organization and execution.
The second technique employed was direct observation of the process’s functioning in practice. This observation focused on the dynamics of project development, continuous interaction with clients, review points, and the occurrence of rework. According to Flick (2019), direct observation is a valuable tool in qualitative research, as it allows for the capture of aspects of organizational behavior that are not always formalized in written documents or procedures, revealing operational reality.
Complementarily, secondary data was collected, obtained from the analysis of projects previously executed by the company. This data included information related to delivery times, number of revisions, scope changes, and operational difficulties faced. The information was gathered through informal records, such as notes and project histories, allowing for the identification of recurring patterns and the understanding of the causes of operational bottlenecks.
The research execution steps began with a phase of in-depth diagnosis of the current interior design project development process at the company. During this stage, the aim was to identify the main operational bottlenecks, weaknesses in change management, and the occurrence of rework. This initial analysis was crucial for understanding the causes of time control and predictability issues, as per the established research problem.
The analysis of the collected data was conducted through a qualitative approach, focusing on the interpretation of observed phenomena and the identification of relationships between the variables involved in the creative process. According to Creswell and Creswell (2022), qualitative research is particularly indicated for understanding complex processes embedded in specific contexts, especially those involving subjective factors and human interactions, as is the case with interior design.
The findings of the analysis were interpreted in light of the specialized literature in project management, with emphasis on scope management, change control, and predictability (PMI, 2021; Kerzner, 2022). This interpretation allowed for the consolidation of a precise diagnosis of the current process’s weaknesses, highlighting the absence of structured validations and informal change control as key factors for the occurrence of frequent revisions and rework.
Based on the detailed diagnosis, the adaptation of the principles of the agile methodology Scrum to the context of interior design was proposed. The objective was to structure the creative process in order to optimize time control and mitigate rework. It should be noted that this was not a literal application of Scrum, but rather an adaptation of its fundamentals, recognizing that Scrum is an adaptable framework whose effectiveness depends on its suitability to the application environment (Schwaber and Sutherland, 2020).
The developed proposal, a result of the research, was systematized through the integration between the empirical evidence gathered and the theoretical foundation. This approach allowed for the construction of a structured model for managing the creative process, which aimed to promote greater organization, reduce rework, and improve the predictability of deliverables, while maintaining the flexibility necessary for the development of creative projects, in accordance with the study’s objectives.
In accordance with institutional guidelines, ethical care was taken to preserve the confidentiality of the analyzed data. No information that could allow the identification of the company or the clients involved in the study was disclosed. Additionally, as it did not involve the collection of data directly from human participants, there was no need to submit the project to the Research Ethics Committee (CEP), simplifying the approval process.
The research presented some methodological limitations that should be considered. The absence of structured quantitative data in the company’s original process limited the objective measurement of operational impacts, restricting the analysis to qualitative aspects. Furthermore, as it is a single case study, the results obtained have a contextual character, not being directly generalizable to other companies or contexts in the interior design sector.
3. Results and Discussion
The analysis of the interior design project development process in the studied company revealed a formally defined sequential structure, which began with the client’s needs assessment and culminated in the delivery of the complete executive project. This formalization, evidenced in contractual documents and operational records, outlined four main stages: “briefing”, preliminary study and preliminary design, executive project, and final presentation. The clarity in the description of activities and deliverables for each phase, as presented in the documentation, suggested an initial level of organization that, in theory, should facilitate workflow control. However, in-depth investigation revealed that this formal structure did not translate into consistent operational efficiency, especially regarding change management and predictability.
Source: Original research results
Figure 1. Contractual structure of the project stages
Figure 1, which details the contractual structure of the project stages, illustrates the logical sequence and expected deliverables in each phase. The “briefing” stage, for example, was characterized by the collection of essential information, such as client expectations, aesthetic references, and metric survey. This initial phase, due to its exploratory and alignment nature, presented a low incidence of conceptual failures and rework, which is consistent with the recommendations of the Project Management Institute (PMI, 2021) on the importance of a robust scope definition in the initial phases to mitigate future uncertainties. Project management literature frequently emphasizes that clarity in the initiation phase is a pillar for project stability, as it establishes the foundation for all subsequent decisions (Kerzner, 2022). The company, in this aspect, demonstrated an aligned practice, although the effectiveness of this practice was compromised by deficiencies in later stages.
The preliminary study and the preliminary design, subsequent phases, focused on defining crucial elements such as layout, materials, colors, and volumetry, with visual presentations like “moodboards” and initial 3D images. This moment constituted the first formal point of project validation, but also the stage with the greatest intensity of interaction and adjustments. Brown (2019) argues that creative processes are intrinsically iterative, and the higher incidence of revisions in this phase is expected, as the client’s understanding of the project evolves as visual representations become more concrete. However, the absence of objective and formalized criteria for consolidating these decisions, as observed, transformed this natural iterativity into a source of instability, prolonging discussions and delaying progress to the technical phases. The lack of a robust mechanism to manage this decision-making evolution turned flexibility into vulnerability.
The executive design phase, in turn, represented the stage of greatest technical complexity, encompassing the detailing of carpentry, stonework, lighting, electrical systems, and tiling layout. The interdependence between these technical elements made this phase particularly sensitive to changes. Any modification in previous stages, or even during this phase, generated a cascading effect, requiring the revision of multiple project components. This phenomenon, described by Cooper (2015) as the amplification of small initial changes along the workflow, was a constant in the analyzed process. The final presentation, which consolidated the technical drawings, rendered images, and purchasing guide, frequently faced last-minute revisions, indicating that decisions were not fully consolidated in the previous stages.
For a clearer visualization of the operational sequence and the identified critical points, Figure 2 presents the flow of the analyzed process.
Source: Original research results
Figure 2. Current flow of the interior project development process
Figure 2 illustrates the linear logic of the process, with sequential advancement between stages, but without the explicit presence of structured return cycles or formalized intermediate validations. Although this linear structure may seem organized, it proved limited in an environment of high variability and dependence on progressive decisions, such as interior design. Kerzner (2022) warns that linear management models are more susceptible to rework when there are no formal change control mechanisms throughout the process. The absence of progressive validations and structured change control between stages was a crucial factor that compromised project predictability and operational efficiency. The contractual deadline, for example, was frequently adjusted reactively, without formal performance indicators for each stage, which hindered proactive management of time and resources.
The detailed analysis of the operational results, obtained through direct observation and the survey of secondary data from previous projects, evidenced an unstructured iterative behavior. This pattern was characterized by successive revisions throughout the stages, not necessarily arising from initial technical failures, but rather from the evolution of the client’s perception and decisions throughout the project development. Brown (2019) and Lawson (2017) corroborate this observation, arguing that in creative project activities, the definition of the problem and solution evolves progressively, making initial decisions susceptible to revisions. However, the absence of structured validation mechanisms to track this evolution resulted in a significant increase in the operational impact of these changes.
The collected data indicated that rework intensified after the presentation of more realistic visual representations, such as rendered images. At this point, the client, by visualizing the project more concretely, tended to request significant changes, which reinforces Liedtka’s (2018) idea that progressive visualization of solutions provokes cognitive revisions. This finding is crucial, as it suggests that decision instability should not be interpreted as an error by the client or the creative process itself, but as an inherent characteristic of it. The problem lay in the analyzed process’s inability to absorb this variability in a controlled manner, without generating disproportionate impacts in terms of time and cost.
Table 1, which synthesizes the main operational problems identified, their characteristics, causes, and impacts, offers a consolidated view of the process’s weaknesses.
Table 1. Main operational problems identified in the process
|
Problem |
Characterization |
Predominant cause |
Impact on the process |
|
Frequent Reviews |
Multiple changes throughout the stages |
Unconsolidated decision |
Increase in runtime |
|
Late changes |
Changes after previous validations |
Evolution of customer perception |
Significant rework |
|
Rework |
Re-execution of already developed steps |
Changes in advanced stages |
Loss of efficiency |
|
Low predictability |
Difficulty in estimating deadlines |
Absence of structured control |
Recurring delays |
|
Lack of change control |
Unregistered changes |
Informal validation process |
Disorganization of the flow |
Source: Original research results
Table 1 demonstrates that the problems of frequent revisions, late changes, rework, low predictability, and lack of change control were not isolated, but interconnected, forming a system of weaknesses. Frequent revisions, for example, were caused by the un-consolidated decision, leading to increased execution time. Late changes, in turn, resulted from the evolution of the client’s perception after previous validations, generating significant rework. Rework itself was a direct consequence of changes in advanced stages, resulting in loss of efficiency. Low predictability was attributed to the absence of structured control and the difficulty in estimating deadlines, culminating in recurring delays. Finally, the lack of change control, characterized by unregistered changes, disorganized the workflow.
This problem system converges with the project management literature, which points to the absence of structured scope and change control as key factors for increased rework and loss of operational efficiency (PMI, 2021; Kerzner, 2022). However, the analyzed case presented a specificity: the rework did not primarily stem from technical failures or initial assessment, but rather from the evolution of the client’s perception. This distinction is fundamental, as it suggests that the solution should not focus solely on technical improvements, but on mechanisms that manage the subjectivity and iterativity of the creative process.
The absence of formalization in change control was another relevant outcome. Changes requested by the client were incorporated reactively, without systematic registration or impact analysis. Meredith et al. (2021) emphasize that the lack of formal control processes reduces project management capability, making it more susceptible to schedule deviations and rework. In the studied context, time management was done through successive adjustments, rather than structured control, which compromised predictability. Furthermore, the impact of changes was not linear, but progressive. Alterations in advanced stages generated amplified effects due to the interdependence between project components, a behavior consistent with the concept of systemic interdependence (Ulrich and Eppinger, 2019). This characteristic was particularly evident in three-dimensional modeling and executive design, phases of high technical density.
From a critical point of view, the analyzed process presented a structural contradiction: although organized in sequential steps, it operated with an implicit iterative logic, but without formal mechanisms to manage this iterativity. This misalignment between the formal structure and the real dynamics of the process was one of the main explanatory factors for the identified problems. Flexibility, although it allowed continuous adaptation to client needs and contributed to the customization of solutions, occurred at the expense of operational efficiency, highlighting the absence of a balance between adaptation and control. In summary, the operational problems did not stem from a lack of process definition, but from the absence of management mechanisms compatible with the dynamic and iterative nature of interior design.
Given this diagnosis, the research proposed a restructuring of the creative process through the adaptation of the principles of the agile methodology Scrum. The central objective was to organize the creative process, reduce the incidence of rework, and improve time control, without compromising the flexibility inherent in this activity. It is crucial to emphasize that this was not a literal application of Scrum, but rather an adaptation of its fundamentals to the specific context of interior design, recognizing that Scrum is an adaptable framework whose effectiveness depends on its suitability to the application environment (Schwaber and Sutherland, 2020). The proposal was structured into three main dimensions: organization of activities and decisions, definition of development cycles, and establishment of formal validation mechanisms.
The operational structure of the proposed model reorganized the current process, replacing the linear sequential logic with a controlled incremental and iterative structure, aligned with the principles of Agile methodologies. This restructuring sought to directly address the identified weaknesses, especially the absence of structured validations and informal change control. In this new model, project development began to be organized into short work cycles, called “sprints”, each with clearly defined objectives, specific deliverables, and formal validation criteria. This approach aims to structure the creative process without eliminating its iterative nature, but by introducing mechanisms capable of organizing and controlling it.
The division of labor into short cycles, as proposed by Schwaber and Sutherland (2020), allows for greater control over project progress and enables continuous adjustments with less operational impact. This logic is theoretically adequate for the analyzed context, where the main problem was the occurrence of late changes and rework in advanced stages. Furthermore, the proposed structure incorporated the concept of “backlog”, understood as a prioritized set of decisions, activities, and deliverables necessary for project development. Unlike the current model, where decisions were diffusely distributed, the “backlog” allows for the prior organization of project elements, promoting greater clarity and control over the workflow, as highlighted by Sutherland (2014) as a means to reduce uncertainties.
Source: Original research results
Figure 3. Proposed process structure with adaptation of the “Scrum” methodology
Figure 3, which presents the structured flow of the proposal, highlights the incorporation of formal validation points at the end of each cycle, configuring mandatory checkpoints before advancing to the next stage. The main objective of this mechanism is to ensure the consolidation of decisions throughout the process, reducing the probability of late revisions. From an agile management perspective, these checkpoints are interpreted as moments of inspection and adaptation, where the produced result is evaluated and adjusted before the continuation of the work. Denning (2018) emphasizes that this continuous validation cycle is fundamental to reducing risks in environments of high uncertainty, a striking characteristic of interior design.
The proposed structure also redefined the project’s advancement logic. While the previous model followed a linear sequence with punctual and unsystematized validations, the proposed model makes advancement dependent on formal approval of the deliverables of each “sprint”, introducing a control mechanism that did not exist before. Another relevant aspect is the delimitation of scope in each cycle. By segmenting the project into smaller, progressive parts, the proposal reduces decision complexity and facilitates alignment with the client. Highsmith (2009) argues that fragmenting work into smaller units makes the process more adaptable and increases responsiveness to change. This segmentation is particularly relevant in the conceptualization phase, identified as a critical point for rework. By structuring this stage into a specific “sprint” with formal validation, the model seeks to ensure that the concept is consolidated before technical development, reducing the main source of rework.
The proposal introduces a logic of incremental progression, where each stage builds and validates a part of the project before moving forward, reducing the accumulation of unconsolidated decisions and preventing inconsistencies from being carried over to later stages, where their impact would be greater. This principle aligns with the incremental development of agile literature (Rigby et al., 2016). Furthermore, the proposal increases process transparency, with clear definition of stages, deliverables, and validation moments, facilitating communication between the professional and the client and reducing ambiguities. Serrador and Pinto (2015) highlight transparency as a factor that contributes to increased performance in agile projects. The proposed structure, therefore, introduces greater discipline without compromising flexibility, creating a balance between adaptation and control, essential in creative environments.
The validation checkpoints, introduced at the end of each “sprint”, were defined as mandatory steps for the continuity of the process, requiring explicit client approval. This formalization represents a significant change compared to the previous model, where approvals were diffuse and implicit. By establishing clear decision milestones, the model ensures that each stage is completed with the due level of consolidation. The progressive chaining of validations is directly related to problems of late changes and rework in advanced stages, seeking to avoid the dispersion of decisions and promote greater stability. PMI (2021) and Kerzner (2022) emphasize the importance of formal approval milestones for managing scope and avoiding the accumulation of uncertainties.
Checkpoints also organize the client’s decision-making, defining specific moments for validation and reducing continuous, unstructured adjustments. Liedtka (2018) argues that structuring formal evaluation moments improves decision quality in contexts with multiple subjective variables. Clarity in approval criteria enhances communication and aligns expectations, making the process more transparent, according to Serrador and Pinto (2015). Additionally, checkpoints introduce greater discipline into the workflow, balancing flexibility and control. However, the effectiveness of this mechanism directly depends on the client’s active engagement, as the absence of feedback can compromise the proposed dynamic. Analytically, checkpoints directly address the main weakness of the current process: the lack of control over decision evolution.
Another central element of the proposal is the structured control of changes, with the objective of organizing, registering, and evaluating all alterations requested throughout the project development. This component addresses the fragility of the current process, which incorporated changes informally and reactively. In the proposed model, any alteration requested after the validation of a stage is formally registered, analyzed, and, when pertinent, incorporated into the “backlog” as a new activity or adjustment. This logic introduces a structured decision flow, replacing the previous dynamic characterized by continuous and uncontrolled adjustments.
Structured change control allows for the evaluation of the impacts of alterations before implementation, avoiding disproportionate effects on the project’s schedule and quality. Kerzner (2022) highlights that the absence of structured change control is one of the main causes of rework and loss of efficiency. The introduction of this mechanism is particularly relevant due to the high incidence of late revisions identified in the analysis, seeking to reduce the occurrence of impulsive changes. Furthermore, it contributes to improved predictability, making the impact of each alteration explicit and allowing for more realistic adjustments to deadlines and expectations (Meredith et al., 2021). Change control also organizes the decision-making flow, reducing overlapping decisions and increasing the coherence of project development.
Additionally, this component increases the transparency of the process, creating a history of changes and their justifications, facilitating follow-up and communication with the client (Serrador and Pinto, 2015). It is important to note that change control does not aim to restrict the flexibility of the creative process, but rather to organize it. The proposal recognizes that changes are inherent to interior design, but seeks to establish conditions for them to be incorporated consciously and in a controlled manner (Highsmith, 2009). In general, the introduction of structured change control represents a significant advance, transforming a reactive process into an organized decision-making system, contributing to a more predictable, efficient model aligned with good project management practices.
Table 2, which relates the problems identified in the current process to the structuring elements of the proposed model, demonstrates the coherence between the diagnosis and the solution.
Table 2. Relationship between identified problems and elements of the proposed model
|
Identified problem |
observable artifacts |
Element of the proposed model |
Expected effect |
|
Frequent Reviews |
Successive changes throughout the stages |
Validation checkpoints |
Progressive consolidation of decisions |
|
Late changes |
Changes after 3D modeling and rendering |
Structured change control |
Reduction of impacts in advanced stages |
|
Rework |
Re-execution of technical activities |
“Sprints” with a defined scope |
Reduction of rework |
|
Low predictability |
Constant deadline adjustments |
Planning by cycles (“sprints”) |
Greater schedule control |
|
Lack of change control |
Unregistered changes |
Integration with “backlog” |
Decision Flow Organization |
Source: Original research results
Table 2 shows that the proposal was built in direct alignment with the problems identified in the process analysis, establishing a clear correspondence between operational weaknesses and management mechanisms incorporated into the model. Each element of the proposal was directed at a specific critical point, reinforcing the coherence between diagnosis and solution. For example, frequent revisions, caused by successive changes throughout the stages, are mitigated by validation checkpoints, which aim at the progressive consolidation of decisions. Late changes, resulting from alterations after 3D modeling and rendering, are addressed by structured change control, with the expected effect of reducing impacts in advanced stages. Rework, arising from the re-execution of technical activities, is combated by “sprints” with a delimited scope, aiming to reduce rework. Low predictability, associated with constant deadline adjustments, is improved by cycle planning (“sprints”), which seeks greater schedule control. Finally, the lack of change control, characterized by undocumented changes, is resolved by integration with the “backlog”, promoting the organization of the decision-making flow. This relationship strengthens the theoretical consistency of the model, which is not based on a generic application of Scrum, but on an adaptation oriented by the needs of the analyzed context.
To consolidate the differences between the current process and the proposed model, Table 3 presents a detailed comparison.
Table 3. Comparison between the current process and the proposed model
|
Criterion |
Current process |
Proposed Model |
|
Structure |
Straight-line |
Controlled iteration |
|
Validation |
Casual |
Step-by-step formal |
|
Change control |
Non-existent |
Structured |
|
Rework |
High |
Expected reduction |
|
Predictability |
Low |
Greater control |
|
Organization |
Reactive |
Planned |
Source: Original research results
Table 3 illustrates the main structural and operational differences between the approaches. The current process, characterized by a linear structure, informal validation, non-existent change control, high rework, low predictability, and reactive organization, contrasts significantly with the proposed model. The proposed model adopts a controlled iterative structure, formal step-by-step validation, structured change control, expected reduction in rework, greater control, and planned organization. This comparison highlights that the proposal did not alter the fundamental stages of the process but modified its management logic, replacing a linear and reactive approach with an iterative and controlled one. In the current model, advancement between stages occurred continuously, without formal validations, which favored the propagation of unconfirmed decisions. In the proposed model, progression depends on the approval of deliverables in each cycle, incorporating control mechanisms aligned with project management best practices (PMI, 2021).
The absence of structured change control in the current process contributed to late revisions and rework, while the proposal introduces a formal flow for recording, analyzing, and incorporating changes. This structure has the potential to reduce operational impacts, as highlighted by Kerzner (2022). The organization into “sprints” and the introduction of validation checkpoints act as preventive mechanisms, favoring the early identification of inconsistencies (Rigby et al., 2016). Another expected gain is predictability, since the definition of deliverables and validation criteria contributes to greater control of project progress (Serrador and Pinto, 2015). In parallel, the use of “backlog” and the structuring of cycles promote greater organization of the decision-making flow, reducing the reactive nature of the process (Highsmith, 2009).
From a critical perspective, the main contribution of the proposal lies not in redefining activities, but in introducing management mechanisms capable of organizing their execution. This finding reinforces that the identified weaknesses were more associated with the process management than with its intrinsic structure. The proposal demonstrates adherence to the principles of agile methodologies, especially in contexts of high uncertainty and progressive decisions, such as in interior design (Rigby et al., 2016). Nevertheless, the discussed effects are theoretical, as the model was not implemented, and future empirical validation is necessary to confirm the expected benefits. In summary, the proposal is consistent with the diagnosis made and with the literature, offering a structured and potentially more adequate approach to the iterative nature of the creative process, by introducing validation, control, and organization mechanisms.
4. Conclusion
It is concluded that the objective was achieved by structuring an organizational model for the conceptualization and development process of interior design projects, adapting principles from the Scrum methodology. The proposal demonstrated potential to optimize time control and mitigate rework, addressing identified weaknesses in the current process, such as the absence of structured validations and informal change control. The restructuring into short cycles, with progressive validations and structured change control, offers a path to manage the iterative and subjective nature of interior design in a more disciplined and predictable way, without compromising the flexibility inherent in creativity.
However, this study has important limitations. The main one lies in the theoretical nature of the proposal, which was not implemented or empirically validated in a real context. The absence of structured quantitative data also restricted the objective measurement of operational impacts, and the single case study gives the results a contextual character. For future research, it is suggested to implement the proposed model in real projects in order to evaluate its concrete impacts on time control, rework reduction, and delivery predictability improvement. This empirical validation will be crucial to confirm the expected benefits and refine the adaptation of agile principles to the sector.
Bibliographic References
Brown, T. 2019. Change by Design: How Design Thinking Creates New Alternatives for Business and Society. HarperCollins, New York, NY, USA.
Cooper, R.G. 2015. The Stage-Gate Idea-to-Launch System. Journal of Product Innovation Management 36(2): 1-18.
Creswell, J.W.; Creswell, J.D. 2022. Research Design: Qualitative, Quantitative, and Mixed Methods Approaches. 6ed. SAGE Publications, Thousand Oaks, CA, USA.
Denning, S. 2018. The Age of Agile. AMACOM, New York, NY, USA.
Flick, U. 2019. An Introduction to Qualitative Research. 6ed. SAGE Publications, London, UK.
Gil, A.C. 2022. Como Elaborar Projetos de Pesquisa. 7ed. Atlas, São Paulo, SP, Brasil.
Highsmith, J. 2010. Agile project management: Creating innovative products. 2nd ed. Addison-Wesley. New York, NY
Kerzner, 2022 [Referência completa não encontrada no documento original]
Lawson, B. 2017. How Designers Think: The Design Process Demystified. 4ed. Architectural Press, Oxford, UK.
Liedtka, J. 2018. Exploring the Impact of Design Thinking in Action. Design Management Review 29(2): 36-43.
Marconi, M.A.; Lakatos, E.M. 2021. Metodologia do Trabalho Científico. 9ed. Atlas, São Paulo, SP, Brasil.
PMI, 2021 [Referência completa não encontrada no documento original]
Prodanov, C.C.; Freitas, E.C. 2013. Metodologia do Trabalho Científico: Métodos e Técnicas da Pesquisa e do Trabalho Acadêmico. 2ed. Feevale, Novo Hamburgo, RS, Brasil.
Rigby, D.K.; Sutherland, J.; Takeuchi, H. 2016. Embracing Agile. Harvard Business Review 94(5): 40-50.
Schwaber, K.; Sutherland, J. 2020. The Scrum Guide: The Definitive Guide to Scrum. Scrum.org. Disponível em: https://scrumguides.org. Acesso em: 10 mar. 2026.
Sutherland, 2014 [Referência completa não encontrada no documento original]
Yin, R. K. 2017. Case study research and applications: design and methods. 6th ed. Sage. Thousand Oaks, CA, Estados Unidos.
Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform