Project management in the integration planning between warehouse, purchasing, and quality assurance

Andrei Itajahy Secundo de Souza; Marianna Cardi Peccinelli

DOI: 10.22167/2675-6528-202600553

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The growing complexity of processes and regulatory demands in the veterinary pharmaceutical industry require structured approaches to ensure operational effectiveness and compliance. This study aimed to analyze and structure the planning of an organizational restructuring project, focused on the integration between the warehouse, purchasing, and quality assurance sectors in a company in the sector. For this, a qualitative approach was used, based on a case study, with documentary analysis, direct observation of processes, and application of project management practices according to the PMBOK Guide. Initial weaknesses were identified, such as undefined responsibilities, lack of inter-sectoral integration, and associated operational and regulatory risks. Based on these findings, detailed project planning was developed, which included defining the scope, the Project Breakdown Structure, the implementation of new roles, the development of an integrated process flow, and the implementation of formal communication and governance mechanisms. The proposal demonstrated potential to improve activity standardization, information traceability, and reduction of operational risks. It was concluded that structured project management was fundamental to organizing the restructuring actions, highlighting its strategic role in the pursuit of greater organizational efficiency and integration.

Keywords: Regulatory compliance; Process management; Veterinary pharmaceutical industry; Traceability; Organizational restructuring.

1. Introduction

The veterinary pharmaceutical industry is crucial for global food production chains and animal health. Global population growth drives demand for animal-derived foods, requiring intensified production systems and sustainable strategies for animal health, food safety, and loss reduction (Food and Agriculture Organization et al., 2023). In Brazil, the sector holds significant economic relevance, being one of the largest producers and exporters of animal proteins and a major global market for animal health products (Ministério da Agricultura, Pecuária e Abastecimento, 2023; BRASIL, 2004).

The global animal health scenario highlights the importance of vaccines and biological products in disease prevention and sanitary risk control, essential for healthy herds and sector competitiveness (World Organization for Animal Health, 2025). Scientific advancements, such as the development of recombinant vaccines and functional microbial products, have increased the technical complexity of industrial plants, requiring controlled environments, continuous process validation, rigorous raw material traceability, and robust control systems (Martin, 2024). Regulatory requirements and Good Manufacturing Practices impose high levels of governance, operational standardization, and interdepartmental integration to ensure compliance and competitiveness (Ministry of Agriculture, Livestock and Supply, 2023).

The ability to structure efficient, integrated, and transparent internal processes is critical for the productivity, reliability, and sustainability of operations (Bacun, 2018). Organizational restructuring projects in veterinary pharmaceutical industries require careful planning, especially for internal processes such as receiving, checking, and storing essential materials. The regulatory and operational complexity of these environments makes integrated project management fundamental, which includes standardization of procedures, risk control, document traceability, and effective communication between areas (Project Management Institute, 2017; Too and Weaver, 2019).

Despite the strategic importance of these processes, the literature on organizational governance and interfunctional integration indicates that coordination failures, lack of clear definition of responsibilities, and deficiencies in internal communication are causes of operational inefficiencies in change projects, especially in highly regulated sectors (Joslin and Müller, 2016; Too and Weaver, 2019). Pharmaceutical supply chains face vulnerabilities such as flow disruptions and integration difficulties, which can lead to delays, documentation problems, and operational risks. Integrated structures are proposed to mitigate these disruptions (Goswami et al., 2024). In the veterinary sector, inadequate inventory management compromises product quality and efficacy (Mekonen et al., 2024), and deficient controls and integration impact operational performance (Mechal and Boche, 2025). Inefficient communication and integration increase complexity and impair product availability and compliance (Pyatt et al., 2025).

The operational and regulatory complexity of the veterinary pharmaceutical sector demands a more robust internal organization of processes. The adoption of structured approaches strengthens governance, defines responsibilities, and improves control mechanisms, being relevant practices for increasing regulatory compliance in companies in the sector (Project Management Institute, 2017; Too and Weaver, 2019). Given this context, the existence of deficiencies in defining responsibilities, standardizing processes, and coordinating activities between sectors compromises operational efficiency and increases regulatory risks. Thus, this work is justified by the need to address these gaps and aimed to analyze and structure the planning of an organizational restructuring project in a veterinary pharmaceutical industry company, aiming to improve integration between the warehouse, purchasing, and quality assurance departments.

2. Material and Methods

The research was conducted with a qualitative, descriptive approach, structured as an applied case study. This design allowed for a detailed analysis of organizational processes in their real context, in a regulated industrial environment. The objective was to understand the internal dynamics and identify opportunities for improvement.

The study was conducted in a medium-sized veterinary pharmaceutical company, located in the interior of São Paulo. The organization operates in the development, production, and commercialization of vaccines and probiotics for production animals, with a focus on poultry farming. It has its own industrial and laboratory units, serving national and international markets.

The unit of analysis focused on the processes of receiving, checking, and controlling raw materials. These processes involve the interaction between the warehousing, purchasing, and quality assurance departments, being crucial for the company’s regulatory compliance and operational efficiency.

The study’s conduction was based on the project management practices described in the PMBOK Guide (Project Management Institute, 2017), with an emphasis on planning processes. The methodological activities were organized sequentially to systematize the organizational restructuring approach.

The steps included diagnosing the current scenario, preliminary definition of the project scope, and identification of stakeholders. The elaboration of the Work Breakdown Structure (WBS) and the formalization of the definition of responsibilities through a RACI matrix were carried out. Process flows were developed and a communication plan was structured.

These actions allowed the consolidation of a systematized planning for the organizational restructuring proposal, establishing a solid base for the improvement of integration between sectors. The focus was to create a concrete and structured action plan based on the identified needs.

Data collection occurred from November 2025 to March 2026, using multiple sources of evidence. Internal documents (standard operating procedures, non-conformity records, process flows, supplier qualification, material receiving and control) and records of planning and alignment meetings between departments were analyzed.

Additionally, direct observation of the processes was carried out, characterized as participant observation, due to the researcher’s involvement in the organizational environment. This approach allowed for immersion in the company’s reality, focusing on the analysis of intersectoral interactions, identification of flaws in operational flows, and verification of activity execution.

The decision-making points in the process of receiving and checking raw materials were examined. The data were recorded through structured annotations and on the Trello platform, a collaborative digital environment. Spreadsheets and other supporting documents were also used to consolidate the data, facilitating analysis and traceability.

The data analysis was performed using a descriptive qualitative approach, focusing on the identification of operational patterns, process failures, and inconsistencies in the definition of responsibilities, as well as weaknesses in the integration between the evaluated sectors. The consolidation of information from different sources of evidence enabled a comparison between the current scenario and the proposed restructuring model.

From this analysis process, the main project planning artifacts were developed, including the WBS (Work Breakdown Structure), the RACI matrix, and the process flows. These documents supported the proposition of organizational restructuring, providing a technical basis for improvements.

Regarding ethical considerations, the study used internal organizational data, obtained with institutional authorization. Sensitive information was treated confidentially, with anonymization of the materials presented to preserve the identity of the company and those involved. The simultaneous role of the researcher as Project Manager and study lead characterized participant observation. To mitigate biases, the analysis was based on documentary records, observable evidence, and structured systematization.

3. Results and Discussion

The analysis of organizational restructuring planning in the veterinary pharmaceutical industry revealed an initial scenario of significant weaknesses, which directly impacted operational efficiency and regulatory compliance. The study focused on the integration between the warehouse, purchasing, and quality assurance sectors, identifying gaps in the definition of responsibilities, process standardization, and interdepartmental coordination. The structured project management approach, according to the PMBOK Guide, was applied to diagnose these deficiencies and subsequently develop a detailed planning proposal, aiming to improve integration and governance.

Diagnosis of the current process of receiving and checking raw materials

The diagnosis of the current process for receiving and checking raw materials revealed significant weaknesses in the integration between the warehouse, purchasing, and quality assurance departments. It was observed that the operational flow presented ambiguities regarding formal responsibilities, resulting in the execution of activities by areas distinct from those originally related to their functional nature. This condition generated disorganization and potential conflicts, compromising the fluidity of operations and the clarity of each department’s roles.

It was verified that the warehouse sector was responsible for the physical receipt of materials and for the reconciliation between the invoice and the purchase order. However, crucial preceding steps, such as supplier qualification and initial documentary verification, were conducted by quality assurance. This overlap of functions and the lack of clear delineation of roles and responsibilities constituted a significant functional misalignment between the involved sectors, a factor frequently associated with reduced organizational efficiency in cross-functional projects and processes (Joslin and Müller, 2016).

The absence of formal decision points throughout the workflow was also identified, especially in the stages of document validation, material release, and deviation handling. This deficiency increased the possibility of operational failures, such as inadequate receipt of inputs or the use of raw materials without proper formal release. Such procedural inconsistencies resulted in rework and compromised operational governance and process reliability in controlled environments, as pointed out by Too and Weaver (2019).

Additionally, an overlap of activities between sectors and an excessive reliance on informal practices for the execution of critical tasks were observed. The absence of formally designated collaborators for certain routines favored the dispersion of responsibilities and increased operational variability. This scenario hindered effective communication between areas, reducing process predictability and expanding the risk of failures in departmental interfaces, which is critical in a regulated environment.

In the regulatory scope, a high possibility of failure was found in information traceability, document control, and non-conformity management. Internal records of the organization already indicated occurrences related to the misuse of materials and inconsistencies in receiving, reinforcing the urgency of a procedural restructuring. Organizational factors, such as clarity of responsibilities and coordination between areas, directly influence the performance and success of improvement initiatives, as highlighted by Santos et al. (2019).

Thus, the initial diagnosis showed that the identified weaknesses were not limited to isolated operational aspects, but reflected structural deficiencies in integration, governance, and procedural standardization. This finding justified the proposal of a formal organizational restructuring plan, aligned with best practices in project management to mitigate risks and optimize the efficiency of raw material receiving and verification processes in the company.

Project planning structure

After the initial diagnosis was carried out, the project planning was structured with the objective of systematically organizing the actions necessary for the proposed restructuring. For this, a digital collaborative environment was used to support activity management, which allowed for the centralization of information, meeting minutes, responsible parties, deadlines, and project-related documents, facilitating coordination and monitoring.

The use of this digital tool favored the consolidation of practices associated with project integration management, providing greater visibility of the progress of activities and continuous monitoring of planned deliverables. The centralization of information reduced the dispersion of records and contributed to greater traceability of decisions made throughout the planning process. According to the Project Management Institute (2017), integrated management processes are essential for alignment between the involved areas and for the coordinated control of project deliverables.

In the elaborated plan, the objective, initial scope, main stakeholders involved, and responsibilities related to project execution were preliminarily defined. This structuring allowed for a clear direction to be established for all participants, reducing ambiguities regarding organizational expectations and priorities. In internal change projects, adequate identification of stakeholders is a critical factor for institutional engagement and for mitigating resistance to implementation (Project Management Institute, 2017).

It was also found that the formal organization of activities into planning, monitoring, and control stages favored the prioritization of critical actions and the logical sequence of deliverables. This aspect was relevant in the studied context, where multiple sectors participated in interdependent decisions and had simultaneous operational demands. In complex organizational environments, the absence of coordination tends to compromise deadlines, communication, and strategic alignment (Too and Weaver, 2019).

As a consequence of this structuring, a Project Charter was developed, which formalized the initiative and recorded initial premises, objectives, and drivers. The adoption of this instrument reinforced the project’s governance, establishing a formal basis for subsequent planning stages. The initial structuring of the project demonstrated that the application of formal management practices contributed not only to the organization of activities but also to strengthening communication, integration among stakeholders, and the coordination capacity necessary for the organizational restructuring proposal.

Scope decomposition and responsibilities definition

Based on the weaknesses identified in the initial diagnosis, the project scope was decomposed by developing a Work Breakdown Structure (WBS). This tool allowed the restructuring proposal to be organized into logically structured work packages, covering the main fronts necessary for the initiative’s development, from general project management to the consolidation of the final planning.

The WBS was organized into components related to general project management, organizational restructuring planning, definition of new roles, structuring of communications, and consolidation of the final plan. This decomposition favored the systemic visualization of the necessary deliverables and allowed broad objectives to be transformed into manageable activities, with greater execution predictability. According to the Project Management Institute (2017), the WBS is a central element of Scope Management, as it organizes the total project work into controllable components.

The use of this resource also reduced ambiguities regarding the initiative’s boundaries, a relevant aspect in organizational change projects. In contexts where multiple areas participate simultaneously, the absence of a structured scope definition tends to generate rework, misalignments, and conflicting expectations. In the case studied, the decomposition allowed for the identification of specific deliverables, such as mapping the current process, proposing the new organizational model, redefining operational interfaces, and formalizing responsibilities between sectors.

As a development of the structural analysis of the work, the need to create two new positions focused on strengthening the process was verified. The first was directed to the purchasing sector, with responsibilities related to supplier qualification, documentary analysis, and information management regarding raw materials. The second was proposed for the quality assurance area, focusing on regulatory supervision, conformity assessment, and non-conformity treatment. This functional redistribution sought to eliminate previously identified overlaps and expand the specialization of critical activities.

To complement the definition of responsibilities, a RACI matrix was developed, which allowed for the formal distribution of assignments among the warehouse, purchasing, and quality assurance departments, establishing those responsible for the execution, approval, consultation, and communication of activities. The formalization of roles and responsibilities represents a relevant practice for strengthening governance and organizational accountability, especially in cross-functional processes (Too and Weaver, 2019).

The combination of scope decomposition and structured definition of responsibilities contributed to greater organizational clarity, reduction of operational conflicts, and strengthening of coordination mechanisms between sectors. In regulated environments, where interface errors can generate significant operational and documentary impacts, such mechanisms tend to increase process reliability and managerial control capacity, ensuring greater adherence to industry standards and requirements.

Redesign of the integrated process between sectors

Based on the fragilities identified in the initial diagnosis and the structuring of the project planning, a new flow was proposed for the process of receiving and checking raw materials. The objective was to promote greater integration between the warehouse, purchasing, and quality assurance sectors, establishing clearer interfaces between the areas and formalizing the critical stages of the process, which aligns with the need for greater efficiency and compliance.

In the new workflow, the explicit definition of each sector’s responsibilities was observed, eliminating previously identified overlaps. The purchasing sector began to concentrate activities related to supplier qualification and contractual management, while quality assurance took responsibility for documentary evaluation, inspection, and non-conformity treatment. The warehouse remained responsible for operational activities, including physical receiving, material verification, and storage. This functional redistribution contributed to greater specialization of activities and more effective alignment between organizational competencies and responsibilities.

Additionally, formal decision points were incorporated throughout the process, especially in the stages of document validation, material approval, and deviation handling. The inclusion of these decision points allowed for the establishment of clear criteria for the continuity or interruption of the workflow, reducing the probability of operational failures and promoting greater control over activities. In organizational projects and processes, the formalization of decisions represents an essential element for governance and risk mitigation (Too and Weaver, 2019), which is particularly critical in the veterinary pharmaceutical industry.

The proposed flow also began to include structured communication mechanisms between departments and with suppliers, favoring information alignment and standardization of interactions. The formalization of these channels contributed to the reduction of communication noise, an aspect frequently associated with failures in interdepartmental processes (Project Management Institute, 2017). Improved communication is vital to ensure that all stakeholders are aware of expectations and regulatory requirements.

Another relevant aspect was the incorporation of traceability and document control mechanisms throughout the process, allowing for greater reliability in information management and support for the sector’s regulatory requirements. In pharmaceutical environments, traceability is a critical requirement to ensure product quality and compliance with current standards, being directly impacted by the organization of internal processes. The redesign of the process, in an integrated manner, showed potential for reducing operational and regulatory risks, improving the standardization of activities, and increasing efficiency in raw material management.

The clear definition of responsibilities, associated with the formalization of flows and decision points, contributed to the strengthening of operational governance and to the increased predictability of the process. Thus, the proposed model demonstrated that the structured application of project management practices can act as a facilitating element in the reorganization of interfunctional processes, promoting greater integration between areas and contributing to the improvement of organizational performance in regulated environments, meeting the central objective of the study.

Project Communications Management

The project’s communications management was structured with the objective of ensuring an adequate flow of information among the stakeholders involved in the organizational restructuring proposal. To this end, formal interaction channels were defined, including periodic alignment meetings, systematized records of decisions, and continuous monitoring of activities planned in the management plan. This formalization is crucial to keep everyone involved informed and engaged in the change management process.

The formalization of communications contributed to greater transparency in the decision-making process and to the reduction of uncertainties among the participating sectors. In initiatives involving multiple functional areas, the absence of structured communication tends to favor divergent interpretations, delivery delays, and operational conflicts. According to the Project Management Institute (2017), Communications Management is an essential area for ensuring that the correct information reaches stakeholders at the opportune moment, minimizing failures and optimizing collaboration.

The use of a digital collaborative environment also favored the centralization of project records, allowing for the documentation of meetings, designation of responsible parties, monitoring of deadlines, and maintenance of a history of deliberations. This mechanism strengthened the traceability of decisions and expanded the managerial oversight capacity throughout the planning stages, providing a clear view of progress and pending issues. This control is fundamental for effective project governance.

Another relevant aspect was the continuous alignment between the warehouse, purchasing, and quality assurance departments, which reduced departmental barriers previously observed in the initial diagnosis. Structured communication favored greater integration between interdependent areas, an aspect frequently related to the success of organizational projects and the improvement of internal coordination (Joslin and Müller, 2016). Thus, formal communications management acted not only as administrative support for the project but as a strategic mechanism for strengthening governance, stakeholder engagement, and sustaining the organizational restructuring proposal.

Limitations of the study and practical implications

The present study focused exclusively on the planning stage of an organizational restructuring project, not including the operational implementation of the proposed actions. Thus, the results presented refer to the methodological structuring of the initiative, the identification of current scenario weaknesses, and the proposition of organizational improvements, without measuring the impacts arising from its execution. This delimitation is important to contextualize the scope of the findings.

Another limitation was related to the qualitative nature of the study, based on documentary analysis, participant observation, and contextual interpretation of internal processes. Although this design allowed for an in-depth understanding of the company’s organizational reality, the findings remained conditioned by its specific characteristics, such as structure, size, and level of managerial maturity. Consequently, direct generalizations to other organizations with different profiles are restricted, requiring caution in the application of the results.

Additionally, the researcher’s simultaneous role as the organization’s Project Manager and the person responsible for conducting the study may have influenced the interpretation of certain findings. To mitigate this potential bias, mechanisms such as the use of multiple sources of evidence, formal records, and the systematization of collected information were adopted, seeking to ground the analysis in objective and observable data, according to the methodology. This transparency in the approach reinforces the credibility of the results.

Despite these limitations inherent to the scope and methodology, the study presented relevant practical implications by demonstrating that the structured application of project management concepts and tools can significantly contribute to the reorganization of interfunctional processes in regulated environments. The proposition of formal governance mechanisms, the clear definition of responsibilities, structured communication, and the redesign of operational flows showed potential to support managerial decisions and strengthen the organization’s internal controls.

From an applied perspective, the developed planning model can serve as a reference for other companies in the veterinary pharmaceutical sector and for organizations subject to high regulatory requirements, especially those facing integration difficulties between administrative, operational, and quality areas. The proposed structure offers a path to improve activity standardization, information traceability, and the reduction of operational risks, crucial elements for compliance and efficiency. In summary, the research showed that structured project management is a strategic pillar for organizing restructuring actions, promoting greater organizational efficiency and integration in complex and regulated contexts.

4. Conclusion

The present study aimed to analyze and structure the planning of an organizational restructuring project in a company in the veterinary pharmaceutical industry, focusing on the integration between the warehouse, purchasing, and quality assurance departments. It was found that the initial scenario presented significant weaknesses, such as undefined responsibilities, overlapping functions, and absence of formal communication, which compromised operational efficiency and increased regulatory risks. The application of project management practices, according to the PMBOK Guide, allowed for the development of detailed planning. This included defining the scope through a Work Breakdown Structure, proposing new positions for activity specialization, redesigning an integrated process flow, and formalizing communication and governance mechanisms. The proposal demonstrates potential to improve activity standardization, information traceability, and the reduction of operational and regulatory risks, highlighting the strategic role of structured project management in the pursuit of greater organizational efficiency and integration.

However, the study focused exclusively on the planning stage, not encompassing the operational implementation of the proposed actions nor the measurement of their impacts. The qualitative nature and the case study design limit the direct generalization of the findings to other organizations with distinct profiles. Additionally, the researcher’s role as Project Manager of the organization may have introduced biases, mitigated by the use of multiple sources of evidence and systematization of information. Despite these limitations, the research offers a practical contribution by presenting a planning model that can serve as a reference for companies in the veterinary pharmaceutical sector and other highly regulated organizations. It is suggested that future studies follow the implementation of the proposed actions and evaluate objective performance indicators, such as processing time and incidence of non-conformities, to quantitatively validate the estimated benefits.

Bibliographic References

Bacun, D. 2018. Coordination in multi-project construction environment. International Journal of Innovation, Management and Technology, 9(1).

BRASIL. 2004. Decreto nº 5.053, de 22 de abril de 2004. Regulamenta dispositivos da Lei nº 6.799/1979 referentes à inspeção e fiscalização de produtos veterinários, suas matérias-primas, substâncias e medicamentos veterinários. Disponível em: <https://www.planalto.gov.br/ccivil_03/ato2004-2006/2004/decreto/d5053.htm>. Acesso em: 01 janeiro 2026.

Food and Agriculture Organization [FAO]; International Fund for Agricultural Development [IFAD]; World Food Programme [WFP]. 2023. The State of Food Security and Nutrition in the World 2023. Disponível em: <https://openknowledge.fao.org/server/api/core/bitstreams/e612e779-ec47-44c2-a3e0-499569c3422d/content>. Acesso em: 02 janeiro 2026.

Goswami, A.; Baveja, A.; Ding, X.; Melamed, B.; Roberts, F. 2024. An integrated framework for modeling pharmaceutical supply chains with disruptions and risk mitigation. Annals of Operations Research. Disponível em: <https://link.springer.com/article/10.1007/s10479-024-06381-y>. Data de acesso: 07 janeiro 2026.

Joslin, R.; Muller, R. 2016. Relationship between a project management methodology and project success. International Journal of Project Management 34(4): 613-627.

Martin, G. B. 2024. Perspective: science and the future livestock industries. Frontiers in Veterinary Science, 11(11):1359247.

Mechal, D.; Boche, B. 2025. The effect of supply chain risks management practices on operational performance of pharmaceutical manufacturing companies in Addis Ababa, Ethiopia: Analytical cross-sectional study. PLOS One, 20(5): e0321311.

Mekonen, A. W.; Sintayehu, T.; Woldeyohanins, Al. E.; Mekasha, Y. T.; Atsbeha, B. W. 2024. Assessment of veterinary pharmaceutical warehouse management practices and its associated challenges in four selected zones and Bahir Dar city of Amhara regional state, Ethiopia. Frontiers in Veterinary Science, 11:1336660.

Ministério da Agricultura, Pecuária e Abastecimento [MAPA]. 2023. Instrução Normativa Nº 13, de 3 de outubro de 2003. Disponível em: <https://www.gov.br/agricultura/pt-br/assuntos/insumos-agropecuarios/insumos-pecuarios/produtos-veterinarios/legislacao-1/instrucoes-normativas/instrucao-normativa-mapa-no-13-de-3-10-2003.pdf>. Acesso em: 01 janeiro 2026.

Project Management Institute [PMI]. 2017. Guia do conhecimento em gerenciamento de projetos. 6. ed. Project Management Institute. Newtown Square, PA, EUA.

Pyatt, A. Z.; Eckford, S.; Joseph, N.; Borriello, S. P.; Oyati, O. 2025. Veterinary medicinal product regulation in sub-Saharan Africa: identifying barriers and opportunities for enhancing VMP regulatory systems. Frontiers in Veterinary Science, 12:1532098.

Santos, I. A. M.; Barriga, G. D. C.; Jugend, D.; Cauchik-Miguel, P. A. 2019. Organizational factors influencing project success: an assessment in the automotive industry. Production, 29(e20180108).

Too, E. G.; Weaver, P. 2019. The management of project management: a conceptual framework for governance. International Journal of Project Management 37(6): 852-866.

World Organization For Animal Health [WOAH]. 2025. The state of the world’s animal health 2025 report. Disponível em: <https://www.woah.org/app/uploads/2025/05/the-state-of-the-worlds-animal-health-2025.pdf>. Acesso em: 03 janeiro 2026.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.