Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The growing need for organizational efficiency improvement has driven companies to structure continuous improvement initiatives with greater methodological rigor and strategic alignment. However, in many contexts, such initiatives were conducted in a scattered manner, with poorly defined criteria for selection, monitoring, and validation of results, compromising value generation and delivery reliability. In this scenario, the study aimed to analyze the application of a governance model for the portfolio of continuous improvement projects in an organization. To this end, an action research of a descriptive nature and qualitative approach was carried out in a large company in the mining sector in the Southeast region of Brazil. Data collection occurred through documentary analysis and participant observation. The application of the structured model allowed for the organization of the governance of the portfolio of initiatives, establishing criteria for classification and selection of projects, defining return pillars, structuring mechanisms for validating gains, and standardizing monitoring methodologies. The results indicated relevant improvements in the organization and monitoring of initiatives, as well as significant gains in operational efficiency and productivity in different processes. It was concluded that the application of structured project management practices strengthened the governance of continuous improvement initiatives and increased the reliability in validating the obtained results.

Keywords: Organizational performance; Operational efficiency; Portfolio.

1. Introduction

The growing organizational competitiveness has demanded from companies a greater capacity for adaptation and improvement of their internal processes, seeking greater operational efficiency and better strategic results. In this context, continuous improvement initiatives have been widely adopted as a way to promote systematic adjustments in organizational processes, allowing for progressive performance gains.

For these initiatives to produce consistent results, it becomes necessary to structure them in an organized manner and aligned with the principles of project management, which offers methods and practices capable of guiding the planning, execution, and control of implemented changes (PMI, 2021). Project management is recognized as an important tool for transforming strategic objectives into concrete results within organizations. Projects constitute temporary efforts aimed at creating specific products, services, or improvements, being conducted through structured processes that involve planning, resource coordination, and continuous performance monitoring (Kerzner, 2022).

In the contemporary organizational environment, continuous improvement projects have assumed a relevant role in supporting initiatives aimed at process optimization, waste reduction, and increased operational quality. Continuous improvement represents a systematic approach focused on the progressive enhancement of organizational activities, based on problem identification, root cause analysis, and the implementation of solutions that elevate efficiency and performance levels (Slack et al., 2019). Among the most widespread methodologies for conducting improvements is the Plan, Do, Check, and Act (PDCA) cycle, developed by Deming (1986), which proposes a structured sequence of steps for the continuous refinement of processes. The execution of continuous improvement projects also requires effective monitoring and control mechanisms, which constitute essential project management processes, involving the collection and analysis of information related to activity performance (PMI, 2021).

Another essential element in conducting organizational initiatives is related to the structuring of governance mechanisms that allow for the adequate selection, prioritization, and monitoring of the projects that make up the portfolio. In the context of portfolio management, decisions are not restricted to the individual execution of projects, but involve the integrated analysis of initiatives, considering strategic criteria, resource availability, and the potential for value generation for the organization (Archer and Ghasemzadeh, 1999). Portfolio management involves the centralized coordination of projects and programs, focusing on maximizing organizational value, strategic alignment, and efficient use of available resources (PMI, 2021).

However, in many organizational contexts, continuous improvement initiatives are conducted in a scattered manner, with poorly defined criteria for selecting, monitoring, and validating the results obtained. This fragility can compromise value generation and the reliability of the deliveries made. Given this scenario, the research problem that guided this study questions how the use of structured portfolio management practices can contribute to improving the monitoring and prioritization of continuous improvement initiatives, strengthening governance and organizational value generation.

Thus, the justification for this work lies in the need to improve the management of continuous improvement initiatives, seeking greater organization and monitoring capacity of the results obtained. Based on this issue, the objective of this work was to analyze the application of a governance model for the portfolio of continuous improvement projects of the organization.

2. Material and Methods

To achieve the objective of analyzing the application of a governance model for the continuous improvement project portfolio, a descriptive action-research with a qualitative approach was conducted. This design was considered adequate for investigating organizational phenomena and, simultaneously, promoting structured interventions in the analyzed reality, as advocated by Thiollent (2011).

The action research was characterized by the active participation of the researcher in the investigated context, allowing for the simultaneous conduct of analysis and intervention on the studied reality. Coughlan and Coghlan (2002) highlight the relevance of this method in organizational studies and process improvement initiatives, as it enables the understanding of complex phenomena in their real environment and the promotion of practical changes.

The study was classified as descriptive regarding its objectives, seeking to characterize the structuring process of management and governance of a portfolio of continuous improvement projects. According to Gil (2019), descriptive research aims to describe characteristics of phenomena or processes. A qualitative approach was adopted for an in-depth understanding of organizational practices and management processes, according to Creswell and Poth (2018).

The unit of analysis consisted of applying a governance model to the portfolio of continuous improvement projects. The research was conducted in a large company in the mining and mineral processing sector, with relevant operations in the national and international market, located in the Southeast region of Brazil. The organization integrates the production chain for processing and exporting mineral commodities.

The project was developed between July 2023 and December 2024. The team responsible for structuring the governance model and monitoring the initiatives was composed of three analysts, with the author being one of them. The author’s participation as a management analyst allowed for direct observation of activities and processes.

Data collection occurred through documentary analysis and participant observation. The documentary analysis involved the examination of internal documents related to the continuous improvement program and the organization’s project portfolio management, including planning materials, monitoring reports, performance indicators, and institutional records (Cellard, 2008).

Participant observation, stemming from the author’s role as a management analyst, allowed for direct monitoring of activities related to the structuring of portfolio governance, the definition of initiative selection criteria, and the monitoring of project execution (Flick, 2009; Yin, 2015).

The research was structured in five sequential and interdependent stages, aligned with the logic of action research and project management practices. The first stage consisted of defining criteria for classifying, selecting, and directing the initiatives of the continuous improvement portfolio, based on a survey of existing initiatives.

In this first stage, a classificatory logic was built to differentiate initiatives, considering the nature of the problem, the degree of complexity, the need for investment, the level of knowledge available for the solution, and the type of expected return. Decision criteria were established such as nature of the demand, implementation complexity, investment need, degree of technical uncertainty, availability of internal knowledge, return potential, proposal maturity, and scalability/replicability.

The second stage involved defining the project return pillars, encompassing financial, Environmental, Social, and Governance (ESG) dimensions, and risks and compliance. These pillars were established to standardize the analysis of results generated by the initiatives, reflecting the different forms of value produced by the projects.

The third stage focused on structuring the criteria for financial validation of the gains generated by continuous improvement initiatives. Types of eligible financial gains were defined, such as reduction of operational costs, increase in productivity, avoided loss, and increase in production. Methodological criteria for calculation were established, including the definition of the “baseline”, the calculation methodology, documentary evidence, and managerial validation.

The fourth stage consisted of selecting the most appropriate methodologies for monitoring the projects, considering their nature and complexity. Three main methodologies were selected: the Plan, Do, Check, and Act (PDCA) cycle for initiatives of lower complexity, the Define, Measure, Analyze, Improve, and Control (DMAIC) method for projects with greater analytical rigor, and the principles of “Lean Office” for optimizing administrative flows.

Finally, the fifth stage involved defining formal criteria for approving the methodological stages, establishing validation milestones to monitor the evolution of initiatives. These milestones functioned as formal checkpoints for project progress, ensuring that each stage was duly completed before the start of the next phase, encompassing problem diagnosis, cause analysis, solution definition, solution implementation, and control and standardization.

The monitoring of initiatives was carried out through corporate systems for managing action plans and indicators. Additionally, management dashboards were developed using a data visualization tool, allowing for the registration, monitoring, and control of activities throughout the project development, aligning with the monitoring and controlling practices proposed by PMI (2021).

3. Results and Discussion

The project analyzed was developed between July 2023 and December 2024, in the context of an organizational program focused on structuring the management and governance of the continuous improvement project portfolio. The initiative arose from the identification of gaps in the monitoring of existing initiatives, characterized by the absence of standardized criteria for project selection, monitoring difficulties, and a low level of maturity in management processes. The analyzed organization operates in the mineral industrial sector, with integrated operations covering large-scale extraction, processing, and logistics activities, demanding a high level of coordination between technical, operational, and administrative areas.

The company adopts structured management practices focused on operational efficiency, process reliability, and integration among its different areas of operation. Despite the existence of continuous improvement programs, the need for greater structuring in how such actions were organized, prioritized, and monitored was observed, especially regarding integrated portfolio management. The author joined the team as a management analyst, participating in the stages of problem diagnosis, definition of governance criteria, structuring of monitoring methodologies, and consolidation of the results obtained.

Step 1: Classification and Selection of Portfolio Initiatives

The first stage of the project focused on structuring the criteria for classifying, selecting, and directing the initiatives that would compose the organization’s continuous improvement portfolio. The initial scenario was marked by the existence of scattered actions across different areas, without conceptual standardization, homogeneous prioritization criteria, or clear definition of the nature of the initiatives (continuous improvement, capital project, innovation, or development). Proposals of distinct natures were frequently treated under the same management logic, compromising the quality of analyses and resource allocation.

This initial diagnosis revealed a fragility typical of environments with low maturity in portfolio governance, where not all organizational demand is correctly framed before its execution. According to PMI (2021) and Kerzner (2022), the adequate selection of initiatives is essential to ensure strategic alignment, rational use of resources, and coherence between corporate objectives and projects. Archer and Ghasemzadeh (1999) add that portfolio management depends on explicit evaluation and prioritization criteria, without which the organization disperses efforts on low-value or misaligned actions.

The initial survey of existing or potential initiatives revealed records with heterogeneous formats, different levels of detail, and subjective relevance criteria. Initiatives were often registered as “improvement”, even when involving capital investments, technological uncertainty, or experimental studies, or, conversely, simple corrective actions. To organize this scenario, a classificatory logic was built that transformed diffuse perceptions into objective decision parameters.

The main weaknesses identified in the initial scenario included the absence of standardized classification, resulting in difficulty in defining monitoring and approval rites. The lack of formal selection criteria generated a risk of subjective prioritization and strategic misalignment. The heterogeneity in the level of detail of the proposals reduced comparability between initiatives, and the mixture of improvement, innovation, and capital led to methodological inadequacy and rework in project execution.

Additionally, the low visibility of the portfolio limited leadership decision-making, and the absence of criteria for proposal maturity resulted in inefficient prioritization and approval difficulties. These weaknesses reinforced the arguments of Archer and Ghasemzadeh (1999), demonstrating that the absence of formal selection criteria tends to generate dispersion of efforts and strategic misalignment. Before the intervention, the portfolio operated without a structured prioritization logic, compromising its ability to consistently generate value.

Based on this diagnosis, a screening and classification model was structured, guided by key questions related to the nature of the problem, the degree of complexity, the need for investment, the level of knowledge available for solution, and the type of expected return. This model started from a “Problem/Opportunity” and led to different decision-making paths until the initiative was framed within a specific portfolio, such as “Value Ideas”, “Continuous Improvement”, “R&D”, “CAPEX”, or “PDAI”, with the possibility of “Parking” for non-prioritized initiatives.

The operationalization of this model occurred through the translation of conceptual elements into objective analysis criteria. The level of solution complexity, the degree of technical uncertainty, the existence of available knowledge within the organization, the magnitude of the required investment, and adherence to the initiative’s purpose were considered. Thus, a set of decision criteria was established, applicable at the time of proposal submission or review, defining the initial purpose of the initiative and differentiating simple actions from structured projects.

The criteria included the nature of the demand (operational problem, opportunity, regulatory requirement, or innovation), implementation complexity (number of areas, interdependencies, coordination), investment need (significant financial contribution), degree of technical uncertainty (known solution or investigation), and availability of internal knowledge. Also considered were the return potential (financial, ESG, risk/compliance), proposal maturity (idea, structured proposal, project in execution), and scalability and replicability (possibility of benefit expansion).

The application of these criteria allowed the organization to stop treating the portfolio as an undifferentiated grouping of actions, starting to operate with distinct managerial categories. Five main frameworks were consolidated: Value Ideas, Continuous Improvement, R&D, CAPEX, and PDAI, in addition to the possibility of Parking for immature initiatives. This categorization guided the subsequent flow of the portfolio, the proposal analysis method, and the level of documentary and methodological requirements for each initiative.

Value Ideas represented low-maturity suggestions, without robustness for immediate entry. Continuous Improvement initiatives were incremental improvement actions, with a defined problem, a viable short/medium-term solution, and driven by methodologies such as PDCA, DMAIC, or “Lean Office”. R&D Projects involved high uncertainty, technical research, and development. CAPEX Projects demanded relevant investment in assets/infrastructure. PDAI was for technological development or process automation/optimization. Non-prioritized initiatives were directed to Parking.

The consolidation of these categories brought a relevant gain in conceptual clarity and organizational discipline. Before, it was common for areas to send incipient proposals to central governance. After the model, it became possible to separate what was an initiative ready for execution from what still required maturation. This filter increased the quality of portfolio input, reduced unproductive discussions, and facilitated dialogue between the demanding areas and the management team.

Beyond classification, stage 1 incorporated a preliminary selection dimension, creating a basis for deciding which initiatives deserved to advance with priority. The analysis criteria functioned as elements of eligibility and attractiveness. Initiatives with greater strategic alignment, clearer return, and more consistent viability tended to advance more quickly. Proposals with low maturity, undefined return, or inadequate framing were redirected, restructured, or temporarily parked.

The decision logic applied in the preliminary selection of initiatives established that mature proposals, aligned with the strategy and with a defined category, entered the portfolio for structuring and monitoring. Proposals with potential, but insufficient detail, returned to the area for information completion. Ideas without robustness were registered as Value Idea or Parking Lot. Proposals requiring significant investment were directed to the CAPEX flow, and those with high technical uncertainty, to R&D or a related flow.

From an analytical perspective, the results of this stage indicated that the greatest advance was in the institutionalization of a governance logic for the entry of initiatives, functioning as a “qualified entry door” for the portfolio. This advance was consistent with Kerzner (2022), who argues that good governance depends on explicit decision criteria, and with PMI (2021), which emphasizes the strategic alignment of the portfolio through consistent selection and prioritization processes.

Archer and Ghasemzadeh (1999) reinforce that portfolio selection should not be limited to isolated financial evaluation, but should consider multiple criteria of value, risk, and organizational adherence, an aspect compatible with the logic adopted in the project. In organizational practice, this stage produced relevant effects on how areas formulated and presented their demands, with greater objectivity in the description of problems, clarity in the expected return, and in the type of effort required.

This maturation of the portfolio entry favored the following stages, such as the definition of return pillars, the financial validation of gains, and the choice of monitoring methodology, since such definitions were built on a more consistent classificatory base. Another important result was the strengthening of decision-making transparency, as with formal criteria, the process began to have more objective justifications, contributing to greater legitimacy of governance and better acceptance by the involved areas.

In summary, the first stage constituted the structuring basis of the entire project, transforming a dispersed set of demands into a governable portfolio, with defined criteria, standardized categories, and a selection logic consistent with the organizational strategy. By establishing clear parameters for classifying and entering initiatives, this stage elevated the maturity of the continuous improvement program and created conditions for the subsequent phases to be developed with greater methodological and managerial consistency.

Step 2: Definition of the Return Pillars

After consolidating the structure for classifying and selecting portfolio initiatives, the second stage of the project focused on defining the return pillars used to evaluate the results generated by continuous improvement projects. This stage was essential for strengthening portfolio governance, as the initial scenario showed a lack of standardized criteria for measuring initiative benefits. Results were often presented heterogeneously, without common validation parameters, hindering comparison and compromising the reliability of management analyses.

From a project management perspective, the clear definition of expected benefits is fundamental to ensuring the strategic alignment of initiatives. The PMI (2021) highlights that projects should be evaluated by their ability to generate value for the organization, not just by operational execution. Kerzner (2022) emphasizes that continuous improvement programs require objective criteria for measuring results to verify the achievement of planned benefits.

The lack of standardization in the initial scenario also represented an obstacle to prioritizing initiatives. Without clear return parameters, different areas tended to emphasize only the most visible benefits in their local context, such as operational improvements or financial gains, without considering broader impacts related to sustainability, governance, or risk mitigation. According to Archer and Ghasemzadeh (1999), portfolio evaluation should consider multiple dimensions of value, as purely financial criteria can underestimate relevant initiatives.

Given this context, the second stage sought to structure an evaluation model that standardized the analysis of results, establishing return categories that reflected the different forms of value. After analyzing organizational practices and management needs, three main return pillars were defined: financial, ESG, and risks/compliance. This definition broadened the perspective of project evaluation, incorporating strategic dimensions relevant to the organization.

The results of this stage reinforce the multidimensional evaluation approach advocated by Archer and Ghasemzadeh (1999), in which portfolio analysis is not restricted to financial criteria. The inclusion of ESG pillars and risks and compliance demonstrates an expansion of the concept of organizational value, aligning the adopted model with contemporary portfolio management practices, which consider different strategic dimensions in prioritizing initiatives.

The financial pillar was defined as the main mechanism for evaluating economic benefits, considering gains such as operational cost reduction, avoided loss, productivity increase, and production increase. These benefits were measured by financial or operational indicators convertible into monetary value, ensuring greater objectivity and quantitatively demonstrating the impact of initiatives on the organization’s economic performance.

Beyond financial return, the ESG pillar was incorporated to assess impacts related to environmental sustainability, social responsibility, and corporate governance. This dimension was considered relevant due to the sector’s exposure to environmental and social issues. Initiatives to reduce environmental impacts, improve safety, strengthen governance, or enhance community relations were recognized as projects capable of generating strategic value, even without direct short-term financial return.

The third pillar, risks and compliance, considered initiatives aimed at mitigating operational risks, meeting regulatory requirements, and improving operational safety and reliability standards. In complex industrial environments, many initiatives are implemented to reduce risks, prevent operational failures, or ensure compliance, rather than for immediate financial return. The inclusion of this pillar recognized the importance of these initiatives in the continuous improvement portfolio.

The definition of the return pillars allowed for the establishment of a standardized logic for project evaluation. Each initiative began to be analyzed according to its main contribution, potentially showing predominant return in one or more pillars. Benefits associated with the financial pillar included reduction of operational costs, avoided losses, increased productivity, and increased production. For the ESG pillar, examples included reduction of environmental impacts, improved safety, and strengthening of governance practices.

In the risks and compliance pillar, the associated benefits included prevention of operational failures, adherence to technical standards, and reduction of incidents. The adoption of these pillars improved the quality of managerial discussions, as projects were previously evaluated by subjective perception or local impact. With the definition of the pillars, initiatives were presented with greater clarity regarding the type of return expected, facilitating decision-making and increasing transparency.

Another observed benefit was the possibility of a more structured comparison between projects of distinct natures. Projects with a strong financial impact were compared within the financial pillar, while initiatives for risk mitigation or sustainability were evaluated in their respective value contexts. This approach reduced distortions, preventing relevant initiatives from being underestimated by being evaluated solely from an economic perspective.

Furthermore, the definition of the return pillars contributed to strengthening the integration between the subsequent stages of the project. With the standardization of evaluation criteria, it became possible to move forward to the definition of financial validation mechanisms for the gains. In this way, the pillars served as an initial reference to identify the type of benefit generated by the initiatives, while the following stages structured the mechanisms for measuring and validating these results.

In summary, the second stage of the project consolidated a structured model for results evaluation, expanding the organization’s capacity to recognize different forms of value generated by continuous improvement projects. By establishing clear return pillars, the project strengthened portfolio governance, improved the quality of managerial analyses, and created conditions for initiatives to be evaluated more consistently and aligned with the organization’s strategic objectives.

Step 3: Financial Validation of Gains

After defining the return pillars, the third stage focused on structuring the criteria for financial validation of the gains generated by continuous improvement initiatives. This stage was essential to consolidate the program’s credibility, as the initial scenario indicated weaknesses in the measurement and proof of financial benefits. Before the model, financial results were often estimated heterogeneously, with distinct premises and without standardized calculation criteria.

In some cases, gains were reported based solely on initial area estimates, without formal validation by specialized areas or consistent methodology. This situation hindered the consolidation of program results and reduced the reliability of information for managerial decision-making. According to Kerzner (2022), adequate measurement of benefits is fundamental to objectively demonstrate the value generated. PMI (2021) highlights that project results should be accompanied by measurable indicators and clear validation criteria.

Given this context, the third stage sought to structure a standardized process for measuring and validating financial gains, establishing clear criteria for calculation and defining responsibilities in information verification. The standardization of this process aimed to ensure that the results were consistent, comparable, and reliable, strengthening the governance of the continuous improvement program. The results of this stage demonstrate an advance in value measurement capability, an essential aspect highlighted by Archer and Ghasemzadeh (1999) for decision-making support.

The standardization of financial validation criteria contributed to reducing uncertainties and increasing the reliability of analyses, allowing the portfolio to be managed based on more robust and comparable evidence. The first step in this stage was the definition of the types of financial gains eligible for accounting. This definition was necessary to avoid reporting distortions and ensure that the benefits represented relevant economic impacts for the organization.

Eligible for financial validation were gains primarily related to the reduction of operational costs (direct reduction in the budget for services, materials, and supplies, such as consumption of inputs or maintenance hours), increased productivity (increase in hours for an activity, such as workforce reduction), avoided loss (guarantee of production plan, quality, and budget, such as reduction in input consumption exceeding the budget), and increased production (direct impact on the volume of pellets and/or concentrate).

In addition to defining the types of eligible gains, methodological criteria were established for calculating financial benefits, ensuring that the presented values were based on consistent and verifiable premises. These criteria guided the development of financial analyses, defining parameters for identifying the baseline, estimating projected gains, and validating the results obtained after the implementation of improvements.

The baseline was defined as the historical reference used for comparison of the results obtained after the implementation of the improvement, and could be composed of historical operational indicators, cost records, or process performance data. The definition of the “baseline” was fundamental to ensure that the reported gains were effectively derived from the implemented improvements and not from natural process variations.

The methodological criteria for calculating and validating gains included the definition of the “baseline” (identification of historical performance for scenario comparison), the definition of the calculation methodology (establishment of the formula to measure gain and ensure consistency), documentary evidence (presentation of data or records to ensure reliability), and managerial validation (review of analyses by financial control areas to confirm calculation consistency).

Another important element introduced at this stage was the definition of responsibilities in the financial gains validation process. For greater reliability, reported gains should be submitted to a validation process conducted by areas responsible for financial control or for the management of the improvement program. This validation aimed to verify the consistency of the premises, the adequacy of the calculations, and to ensure that the benefits reflected real impacts.

The formalization of this process strengthened the credibility of the continuous improvement program, ensuring that the reported results were supported by consistent and verifiable analyses. The standardization of validation criteria allowed for the consolidation of portfolio results into more robust management reports, used by leadership to monitor the performance of initiatives. This stage also promoted greater integration among the involved areas, encouraging interaction between operational teams and financial analysis areas, improving the quality of analyses and methodological rigor.

In summary, the third stage of the project structured a standardized model for measuring and validating financial gains, increasing the reliability of results analyses and strengthening the governance of the continuous improvement program. The standardization of calculation criteria, the definition of the “baseline”, and the institutionalization of the financial validation process represented relevant advances for monitoring initiatives, allowing for a more consistent demonstration of the value generated by the projects.

Step 4: Definition of Monitoring Methodologies

After defining the criteria for financial validation of gains, the fourth stage of the project focused on selecting the most appropriate methodologies for monitoring continuous improvement initiatives. This stage was fundamental to ensure that the portfolio projects were conducted through structured approaches, capable of guiding the activities of diagnosis, analysis, solution implementation, and results monitoring.

The initial scenario in the organization indicated that improvement initiatives were conducted heterogeneously across different areas, without methodological standardization. Teams used their own approaches or informally adapted ones, which made it difficult to compare projects, reduced the consistency of analyses, and compromised systematic monitoring. According to Deming (1986) and Werkema (2012), continuous improvement programs become more effective when structured by methodologies that guide the process of problem identification, cause analysis, solution implementation, and results control.

Given this context, the fourth stage defined a set of standardized methodologies for conducting and monitoring initiatives, allowing each project to be conducted by an approach compatible with its complexity and nature. After analyzing the practices and characteristics of the initiatives, three main methodologies were selected: PDCA, DMAIC, and “Lean Office”. The choice sought to balance simplicity of application, analytical robustness, and adherence to the organizational context.

Werkema (2012) highlights that different types of organizational problems require distinct levels of analytical depth, making it necessary to select methodologies that offer the appropriate degree of structuring for each situation. Thus, the developed model allowed each initiative to be directed towards the most appropriate methodological approach. The PDCA cycle was selected for initiatives of lower complexity and faster implementation, structuring the stages of planning, execution, verification, and standardization of improvements.

For initiatives that required greater analytical rigor or in-depth data analysis, the DMAIC method was adopted, widely used in the “Lean Six Sigma” approach. Werkema (2012) describes DMAIC as a detailed methodological framework for identifying and analyzing the causes of problems, allowing for data-driven investigations and systematic implementation of solutions. This methodology was primarily used in projects involving the analysis of process variability or complex causes.

In addition to these two approaches, the project incorporated principles of “Lean Office”, a methodology focused on applying “Lean” thinking concepts in administrative environments. Womack and Jones (2003) state that “Lean” thinking seeks to eliminate waste and optimize workflows, concentrating efforts on activities that effectively add value to the customer. The choice of these methodologies allowed for the structuring of a flexible monitoring model, directing each initiative to the approach best suited to its complexity, the nature of the problem, and data availability.

The selected methodologies and their application types were: PDCA, with a cyclical structure of planning, execution, verification, and corrective action, for incremental improvements and rapid implementation; DMAIC, a structured method for in-depth problem analysis and variability reduction, for projects requiring detailed data analysis; and “Lean Office”, application of “Lean” thinking in administrative processes, for optimization of administrative and organizational flows.

The standardization of methodologies brought relevant benefits to the monitoring of initiatives. Firstly, it established a common language between areas, facilitating the sharing of experiences and the dissemination of best practices. Secondly, it made it possible to better structure the development stages of initiatives, ensuring greater consistency in analyses and greater clarity in defining improvement actions. There was also an improvement in managerial monitoring capacity, with more consistent progress reports.

The definition of methodologies contributed to strengthening organizational learning capacity, as the systematic use of structured approaches allowed for the recording of analyses, solutions, and results, creating a knowledge base for future initiatives. Another important outcome was the better alignment between the type of problem and the methodology used, reducing misalignment where simple initiatives were conducted with excessive complexity or structural problems were superficially addressed.

The results observed in this stage indicate that methodological standardization acted as a support mechanism for portfolio governance, increasing consistency in the execution of initiatives. Although Archer and Ghasemzadeh (1999) primarily emphasize selection and prioritization aspects, the findings of this study demonstrate that portfolio effectiveness also depends on the adequacy of execution methodologies, highlighting the importance of integration between governance and operational practices.

In summary, the fourth stage of the project consolidated a structured model for monitoring continuous improvement initiatives, based on the application of methodologies recognized in the literature of quality management and process improvement. The standardization of methodological approaches contributed to increasing consistency in project execution, strengthening the managerial monitoring process, and expanding the organization’s capacity to generate learning from the implemented initiatives.

Step 5: Approval Criteria for Methodological Stages

After defining the methodologies used, the fifth stage focused on structuring the approval criteria for the methodological stages of the projects, aiming to ensure greater control over the evolution of the initiatives. This stage was fundamental to strengthening portfolio governance, establishing clear parameters for progress evaluation and ensuring that initiatives advanced to subsequent stages only after meeting previously defined requirements.

In the initial scenario observed, many improvement initiatives were conducted continuously and informally, without clear definition of checkpoints or intermediate validation criteria. Consequently, some projects advanced to implementation stages without the diagnosis or analysis phases being duly consolidated, which increased the risk of rework or adoption of inadequate solutions. The PMI (2021) highlights that monitoring project progress requires the definition of control gates (“stage gates”) to assess whether requirements have been met before continuing activities.

These milestones function as formal checkpoints for project progress, ensuring that the analyses performed and the proposed solutions meet the criteria established in the planning. In this context, the fifth stage of the project structured a model for approving methodological phases, establishing criteria to evaluate the progress of the initiatives. These criteria began to function as formal checkpoints for project advancement, ensuring that each stage was duly completed before the start of the next phase.

The implementation of validation milestones reinforces the principles of portfolio control and governance by establishing formal decision points throughout the lifecycle of initiatives. This outcome aligns with the logic advocated by Archer and Ghasemzadeh (1999), in which effective portfolio management depends not only on initial selection but also on continuous monitoring and reassessment of initiatives throughout their execution.

To operationalize this model, validation milestones were defined associated with the main stages of the methodologies used in project monitoring. As the initiatives could be conducted through the PDCA, DMAIC, or “Lean Office” methodologies, the approval criteria were structured to contemplate the corresponding phases of these approaches. The general structure of the validation milestones included Problem Diagnosis (clearly defined problem), Cause Analysis (structured identification of causes), Solution Definition (technically validated improvement proposal), Solution Implementation (actions executed according to plan), and Control and Standardization (monitored results and consolidated improvement).

The expected evidence for each stage was: problem description and initial process analysis for diagnosis; analysis tools (e.g., Ishikawa, data analysis) for cause analysis; action plan or improvement proposal for solution definition; record of actions taken for implementation; and performance indicators and solution documentation for control and standardization. The definition of these milestones allowed for the creation of a structured process for monitoring project progress, periodically analyzing the fulfillment of the criteria necessary for stage advancement.

This approach contributed to increasing methodological discipline in conducting initiatives and reducing the risk of implementing solutions without adequate analysis of the causes of the problems. Another relevant benefit of this structure was greater transparency in the project monitoring process. The definition of explicit criteria for stage approval allowed those responsible for the initiatives to clearly understand what requirements needed to be met before the project’s continuity, improving the quality of analyses and reducing divergent interpretations.

The main benefits observed with the implementation of the approval criteria for the methodological stages included greater methodological discipline (projects followed structured steps), reduction of rework (problems analyzed in greater depth), better managerial monitoring (evolution of initiatives more visible to leadership), greater clarity for the teams (understanding of the requirements of each stage), and strengthening of portfolio governance (more structured approval process).

Another important result of this stage was the integration between the approval criteria for the methodological stages and the portfolio monitoring mechanisms. The validation milestones served as a reference for management reports, allowing for the consolidation of information on the development stage of each project. This integration expanded the organization’s capacity to track the progress of initiatives and identify needs for support or adjustments, in addition to improving the quality of information used in reports and monitoring dashboards.

In summary, the fifth stage of the project consolidated a structured model for approving the methodological stages of the projects, strengthening the governance process of the organization’s continuous improvement portfolio. This approach ensured that initiatives advanced in a controlled and evidence-based manner, contributing to the overall effectiveness of the program.

Synthesis of Results

After the implementation of the portfolio governance structuring steps, which included defining the return pillars, standardizing financial validation criteria, and establishing monitoring methodologies, it became possible to consolidate the results obtained by the initiatives conducted in the organization’s continuous improvement program. The analysis of these results allowed for the evaluation of the impact of the implemented management practices on the operational and managerial performance of organizational processes.

In general, it was observed that the adoption of a formal governance structure contributed to significantly increasing the organization’s capacity to identify, prioritize, and track improvement initiatives. Before the model’s implementation, initiatives were conducted in a scattered manner across different areas, with little integration and limited managerial visibility. With the structuring of the portfolio, initiatives began to be systematically recorded, tracked, and evaluated, allowing for greater control over progress and greater consistency in validating results.

From an operational point of view, several projects conducted within the program produced relevant gains in terms of efficiency and productivity. Among the main observed results, improvements in administrative, operational, and support processes stood out, directly reflecting in the reduction of execution times, increased productivity, and optimization of organizational resources. These results demonstrate the potential of continuous improvement initiatives when conducted by structured methodologies and accompanied by adequate governance mechanisms.

The synthesis of the main results obtained evidenced significant impacts. In the Ombudsman process, the service lead time indicator, which was previously high, was reduced by 49%, resulting in increased efficiency and improved service. In Access Control (gatehouses), the waiting time, characterized by queues and congestion, was reduced by 50%, promoting greater operational and logistical fluidity.

In the industrial process (piping), the high incidence of failures that demanded corrective maintenance was reduced by 14 hours of interventions, increasing operational reliability. Finally, in the recoverable product process, productivity, which was previously low, saw an expansion of capacity by 3,310%, resulting in better utilization of productive resources. These data demonstrate the effectiveness of the governance model in generating tangible value for the organization.

Among the most relevant results, the reduction of approximately 49% in the ombuds office process “lead time” resulted from the restructuring of the demand treatment flow and the standardization of analysis and response steps. This improvement reduced the average time for processing requests, increasing the efficiency and quality of service. Another significant result was the reduction of approximately 50% in the waiting time at the entrances, achieved by reviewing access control procedures and optimizing the flow of people and vehicles entering.

This improvement contributed to reducing congestion and increasing the fluidity of logistics operations. Relevant gains were also observed in industrial processes, such as the reduction of approximately 14 hours of corrective maintenance on pulp pipelines, resulting from the implementation of improvements in monitoring and preventive maintenance procedures. This reduction in corrective interventions increased operational reliability and reduced the risk of interruptions in the production process.

One of the most significant results of the program was the approximately 3,310% increase in the productivity of the recoverable product process, resulting from the review of operational procedures and the implementation of improvements in the treatment flow of this material. The restructuring of the process significantly expanded the recovery capacity of previously underutilized material, contributing to increased production efficiency and better utilization of available resources.

In summary, the application of a governance model for the continuous improvement project portfolio, through the definition of classification criteria, return pillars, financial validation, monitoring methodologies, and stage approval criteria, allowed the organization to overcome initial weaknesses. The results demonstrate that the structuring of governance strengthened the capacity for monitoring and validating results, generating significant gains in operational efficiency and productivity, and consolidating a more robust and transparent process for managing continuous improvement initiatives.

4. Conclusion

The present study analyzed the application of a governance model for the continuous improvement project portfolio in an organization, seeking to enhance the management and monitoring of these initiatives. It was found that the implementation of a formal governance structure, which included the definition of classification and selection criteria, the structuring of return pillars (financial, ESG, and risks/compliance), the creation of financial validation mechanisms for gains, the selection of standardized monitoring methodologies (PDCA, DMAIC, and Lean Office), and the establishment of approval criteria for methodological stages, transformed a dispersed set of demands into an organized and manageable portfolio. This approach resulted in significant gains in operational efficiency and productivity, such as a 49% reduction in the lead time of the ombudsman process, a 50% decrease in waiting time at reception desks, a reduction of 14 hours in corrective maintenance of industrial piping, and a 3,310% increase in the productivity of the recoverable product process. The main contribution lies in strengthening the governance of continuous improvement initiatives and increasing reliability in the validation of obtained results, generating tangible value and greater managerial transparency.

However, the study presented some limitations, such as restricted access to certain organizational data and the research being conducted in a single organization, which may limit the generalization of the results. Furthermore, the analyzed period corresponded to a specific phase of the continuous improvement program implementation. For future studies, it is recommended to broaden the analysis to different organizations and contexts, as well as to investigate the evolution of these initiatives over more extensive periods, in order to deepen the understanding of the long-term impacts and the adaptability of the model in diverse scenarios.

Bibliographic References

Archer, N. P.; Ghasemzadeh, F. (1999). An integrated framework for project portfolio selection. International Journal of Project Management. 17(4): 207-216.

Cellard, A. (2008). A análise documental. In: Poupart, J.; Deslauriers, J.; Groulx, L.; Laperrière, A.; Mayer, R.; Pires, A. A pesquisa qualitativa: enfoques epistemológicos e metodológicos. 2. ed. Vozes, Petrópolis, RJ, Brasil.

Coughlan, P.; Coghlan, D. (2002). Action research for operations management. International Journal of Operations & Production Management. 22(2): 220-240.

Creswell, J. W.; Poth, C. N. (2018). Qualitative inquiry and research design: choosing among five approaches. 4. ed. SAGE Publications, Thousand Oaks, CA, United States.

Deming, W. E. (1986). Out of the crisis. 1. ed. Massachusetts Institute of Technology Press, Cambridge, MA, United States.

Flick, U. (2009). An introduction to qualitative research. 4. ed. SAGE Publications, London, England, United Kingdom.

Gil, A. C. (2019). Métodos e técnicas de pesquisa social. 7. ed. Atlas, São Paulo, SP, Brasil.

Kerzner, H. (2022). Project management: a systems approach to planning, scheduling, and controlling. 13. ed. John Wiley & Sons, Hoboken, NJ, United States.

Project Management Institute [PMI]. (2021). A guide to the project management body of knowledge (PMBOK® Guide). 7. ed. Project Management Institute, Newtown Square, PA, United States.

Slack, N.; Brandon-Jones, A.; Burgess, N. (2019). Operations management. 9. ed. Pearson Education, Harlow, England, United Kingdom.

Thiollent, M. (2011). Metodologia da pesquisa-ação. 18. ed. Cortez, São Paulo, SP, Brasil.

Werkema, M. C. C. (2012). Lean Seis Sigma: introdução às ferramentas do Lean Manufacturing. 2. ed. Elsevier, Rio de Janeiro, RJ, Brasil.

Womack, J. P.; Jones, D. T. (2003). Lean thinking: banish waste and create wealth in your corporation. Revised ed. Free Press, New York, NY, United States.

Yin, R. K. (2015). Case study research: design and methods. 5. ed. SAGE Publications, Thousand Oaks, CA, United States.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.