Management Tools in Clinical Research: Process Optimization and Multiregional Expansion
Luísa Capana Guimarães; Gilberto Marassi de Loiola Leite
DOI: 10.22167/2675-6528-202601121
Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.
Summary
The growing complexity and expansion of clinical research centers in Brazil demanded greater organization and control of operational processes to ensure the quality of studies and the safety of participants. The study aimed to analyze how the application of project management tools, based on a predictive approach, favored the maintenance of quality in conducting clinical studies at a research center undergoing multi-regional expansion. The research was developed through a single case study, with a qualitative approach, based on the analysis of institutional documents, operational indicators, and participant observation. Tools such as the Work Breakdown Structure (WBS), RACI matrix, risk and quality matrix, PDCA cycle, and Gantt Chart were applied, integrated into a data-driven management model. The results showed that the use of these tools allowed for greater standardization of processes, early identification of risks, improved communication between teams, and greater agility in implementing corrective actions. It was also observed that predictive planning contributed to anticipating operational demands, supporting strategic decisions related to the expansion of units. It was concluded that the structured application of project management practices favored the organization, predictability, and scalability of operations, contributing to the maintenance of quality in a growing clinical research center.
Keywords: Project management; Performance indicators; Continuous improvement; Operational quality.
1. Introduction
Global clinical research has experienced remarkable advances since 2014, consolidating itself as a strategic pillar for scientific and economic development in various nations. In Brazil, this sector has gained significant momentum, especially after the enactment of Law No. 14.874/2024, which aligned national regulations with international practices and expanded the country’s potential as a global player. This scenario is favored by a genetically diverse population, a constantly growing research infrastructure, and the presence of highly qualified professionals (Interfarma, 2025). However, the conduct of clinical studies occurs in an intrinsically complex and highly regulated environment, where ensuring high quality standards is imperative. This requirement is not limited to the credibility of the generated data but primarily extends to the protection and safety of participants (Sampaio and Mancini, 2007). The accelerated growth and multi-regional expansion of clinical research centers in Brazil, although promising, bring considerable operational challenges, such as the need for process standardization and efficient resource management in different geographical contexts. The unequal distribution of research centers and regional logistical particularities, for example, pose additional obstacles to the effective management of studies (Riffel et al., 2024).
In this context of growing complexity and expansion, project management emerges as a fundamental discipline for optimizing operations and ensuring quality. The PMBOK Guide (PMI, 2021) offers a robust set of practices and knowledge that, when applied, can structure and enhance the conduct of complex initiatives. A predictive approach, a central characteristic of traditional project management, is particularly relevant in highly regulated environments such as clinical research. It emphasizes detailed planning, clear scope definition, and sequential execution, allowing for proactive risk anticipation and response planning. Specific tools, such as the Work Breakdown Structure (WBS), are essential for decomposing work into manageable packages, providing clarity and organization. The RACI matrix defines roles and responsibilities, optimizing communication and coordination among teams. The risk and quality matrix, in turn, allows for the identification, analysis, and planning of responses to potential deviations, while the PDCA (Plan-Do-Check-Act) cycle promotes continuous process improvement. The Gantt Chart complements these tools by providing a visual representation of the schedule, facilitating temporal planning and resource allocation. The integration of these tools configures a data-driven management model capable of offering predictability and control in dynamic scenarios.
Despite the recognized relevance of project management in various sectors and the demonstration of its effectiveness in higher education clinical research institutions (Espírito Santo et al., 2022), a gap is observed in the literature regarding the structured application of these practices in private clinical research centers in Brazil, especially those in a phase of multi-regional expansion. The absence of predictive and integrated management models can result in operational inefficiencies, communication failures between geographically dispersed teams, delays in study conduct, and, consequently, compromise the quality and safety of participants. Expansion to new units, with their regional particularities and logistical demands, requires robust organizational capacity to replicate standardized processes without losing local adaptability. The lack of a predictive and systematic management framework can hinder the early identification of bottlenecks, risk mitigation, and strategic decision-making, directly impacting the scalability and sustainability of operations.
Given the growing complexity and the need to maintain operational excellence in a multi-regional expansion scenario, this study is justified by the urgency to understand and optimize management practices in clinical research centers. Thus, the present work aims to analyze how the structured application of project management tools, based on a predictive approach, can sustain quality and predictability in conducting clinical studies in a clinical research center undergoing multi-regional expansion in Brazil.
2. Material and Methods
The present study adopted a single case study methodological approach, characterized by its qualitative, applied, and exploratory nature. This choice allowed for an in-depth and contextualized investigation of project management practices in a real clinical research environment. The qualitative approach was fundamental to understanding the complexity of operational processes and human interactions involved in managing clinical studies, while the applied nature aimed at the implementation and evaluation of specific managerial tools.
The research was developed in a private clinical research center, located in the city of São Paulo, Brazil, which was undergoing an active process of multi-regional expansion to four other Brazilian states. The period of collection and analysis of operational data covered the months of January to March 2026, with a focus on studies in the areas of Cardiology and Endocrinology. The unit of analysis focused on management practices and internal operational processes of the center, and not on clinical data or study participants.
The unit of analysis was the clinical research center itself, with the “sample” consisting of institutional documents, operational records, and the researcher’s participant observation. There was no population of clinical research participants directly involved in this methodological study, as the focus was on process management. The selection criteria for the documents included their relevance to understanding project management practices and their availability in the center’s internal systems, ensuring fidelity to operational reality.
The data were collected through the analysis of internal documents from the research center, which included standard operating procedures (SOPs), audit reports, clinical study timelines, and internal control systems. Additionally, the researcher engaged in participant observation in the management of the analyzed processes, which provided an in-depth and contextualized understanding of the operational reality. This combination of documentary and observational sources allowed for a comprehensive view of the project management practices in use.
The Work Breakdown Structure (WBS), according to the PMBOK Guide (PMI, 2021), was adopted as a central tool to organize the scope and deliverables of clinical studies. The WBS allowed for the hierarchical decomposition of activities, from the broadest stages to operational details, structuring phases such as “startup”, recruitment, patient screening, study visits, data management, monitoring, regulatory aspects, administrative management, and closure. This structuring facilitated the standardization and replication of processes across different studies and units.
The WBS organization was complemented by the RACI matrix, which defined the Responsible, Accountable, Consulted, and Informed parties for each activity, optimizing communication and reducing operational ambiguities. The risk and quality matrix (PMI, 2021) was applied to identify, classify, and monitor risks that could affect data integrity or operational compliance. Indicators such as the number of “leads”, “screen fail” rate, percentage of visits outside the window, number of incomplete visits, average data entry time in the eCRF, number of open “queries”, serious adverse events not reported, IP reconciliation percentage, and percentage of outdated documents in the Investigator’s File were collected monthly.
The Gantt Chart was developed based on historical data and recruitment projections, allowing for the visualization of study overlap and the anticipation of operational impacts, such as team and infrastructure demands. The PDCA (Plan-Do-Check-Act) cycle was applied as a governance mechanism for continuous process improvement. It utilized the indicators and data generated by the other tools to promote continuous adjustments, ensuring that decisions were guided by objective data and that corrective actions were implemented systematically.
The application of the tools occurred in an integrated manner, configuring a structured management system. The WBS (Work Breakdown Structure) mapped the processes, the RACI matrix defined responsibilities, the risk and quality matrix monitored performance with indicators, and the Plan-Do-Check-Act cycle promoted continuous improvement. Within the scope of this work, the risk and quality matrix was updated monthly for the São Paulo and Manaus units. Data from Manaus were incorporated starting in February 2026, while the Salvador and Rio de Janeiro units were not included, as they had not yet begun conducting studies.
The treatment and analysis of the data were intrinsic to the application of project management tools. Standardized operational indicators, organized into categories such as recruitment, screening, visits, data, safety, Investigational Product, and regulatory, were continuously measured to identify deviations and monitor performance. Participant observation complemented this quantitative analysis, allowing for a qualitative interpretation of processes and the identification of optimization opportunities. The tools, in their integration, served as the very framework for evaluating operational quality and predictability.
Ethical procedures were rigorously observed, ensuring the confidentiality of all institutional and administrative information analyzed. The study focused exclusively on managerial and operational aspects, without involving research participant data or clinical results, fully respecting the ethical principles of clinical research and good clinical practices. As a methodological limitation, it should be noted that the analysis was based on a single case study, with data predominantly from the São Paulo unit and, initially, from Manaus, which restricts the generalization of findings to other contexts.
3. Results and Discussion
The results presented in this single case study, of a qualitative and exploratory nature, provide an in-depth analysis of the application of project management tools in a multiregional expanding clinical research center. The tools employed — Work Breakdown Structure (WBS), RACI Matrix, Risk and Quality Matrix, Gantt Chart, and PDCA cycle — were not used in isolation, but rather integrated into a cohesive management system. This systemic approach proved crucial for the standardization, predictability, and scalability of operations, elements essential for maintaining quality in an environment as dynamic and regulated as clinical research (PMI, 2021; ICH, 2016). The integration of these tools allowed the research center not only to react to deviations but also to anticipate challenges and implement corrective and preventive actions proactively.
The Work Breakdown Structure (WBS) emerged as the organizational backbone, outlining all necessary steps and deliverables throughout the clinical studies lifecycle. Its application allowed for a hierarchical decomposition of activities, from broader phases, such as “startup” and recruitment, to the operational details of each visit and data management. This granularity in scope structuring is fundamental in clinical research, where the complexity of protocols and the need for regulatory compliance demand clarity and precision in every task (Espírito Santo et al., 2022). The WBS, by standardizing activity organization, facilitated the replication of processes across different studies and units, ensuring operational consistency that is vital for data integrity and participant safety. Project management literature, such as the PMBOK Guide (PMI, 2021), corroborates the importance of the WBS as a tool for defining project scope, but in this context, its relevance extends to creating a solid foundation for quality management in a research environment.
The integration of the WBS (Work Breakdown Structure) with the RACI matrix (Responsible, Accountable, Consulted, and Informed) amplified its effectiveness by assigning clear responsibilities for each work package. This explicit definition of roles and responsibilities is a cornerstone for effective communication and the reduction of operational ambiguities, which are common sources of delays and errors in complex projects (PMI, 2021). Participant observation revealed that this alignment was particularly beneficial in the critical phases of operational preparation, screening, and conducting visits, where coordination among multidisciplinary teams is intense. The clarity provided by the RACI matrix, in conjunction with the WBS, not only optimized daily routines but also served as an effective training tool for new collaborators, allowing them to quickly understand the study flow and their specific assignments. This is especially relevant in a scenario of multi-regional expansion, where the dissemination of standardized practices and the training of teams in different locations are crucial challenges (Riffel et al., 2024).
The Risk and Quality Matrix, applied to monitor the main operational risks in the São Paulo and Manaus units, provided a detailed view of the performance and challenges faced. The indicators collected monthly, covering areas such as recruitment, screening, visits, data, safety, Investigational Product (IP), and regulatory, allowed for the identification of critical points and the making of objective data-driven managerial decisions. This predictive and reactive approach, at the same time, is fundamental for quality management in clinical research, where regulatory compliance and patient safety are imperatives (Sampaio and Mancini, 2007).
Regarding recruitment, a significant difference was observed in the number of “leads” between São Paulo and Manaus. In São Paulo, with a higher population density and a greater number of active studies (17 in SP versus 2 in AM), the reach of recruitment strategies was naturally greater. This disparity underscores the importance of adapting recruitment strategies to regional characteristics, a finding that resonates with literature highlighting regional inequalities in clinical research infrastructure in Brazil (Riffel et al., 2024). In Manaus, the medical referral strategy proved particularly effective, not only in capturing eligible patients but also in retention, due to the higher level of trust generated by the referring physician’s indication. This suggests that, in regions with a lower volume of studies or distinct population characteristics, building collaboration networks with the local medical community can be a strategic differentiator for recruitment success.
The “screen fail” rate in São Paulo, which reached 54.3% in January 2026, initially indicated possible failures in pre-screening. However, a more in-depth analysis revealed that the active protocols had more restrictive inclusion criteria, which directly impacts this indicator. Nevertheless, the identification of approximately 15% of avoidable failures led to the implementation of improvements in the prior review of criteria and the qualification of collected information. In the following months, the rate showed a slight reduction, despite a temporary increase in February due to the Carnival holiday, demonstrating the effectiveness of corrective actions. In Manaus, the “screen fail” rate showed an initial reduction of 15.8%, but with a potential for increase due to delays in the availability of exams. This finding highlights the need for a contextual analysis of indicators, considering external factors and local infrastructure, and reinforces the importance of predictive planning that includes logistics and resource availability at each unit.
Table 1. Risk and Quality Matrix – Cardiometabolic Studies São Paulo
|
Category |
Current risks |
Probability |
Impact |
Severity |
Mitigation |
Contingency |
Indicator |
January |
February |
March |
|
Recruitment |
Low “lead” rate |
2 |
2 |
4 |
Review campaigns weekly |
Activate partner doctors |
N° of “leads” |
10000 |
12600 |
14384 |
|
Recruitment |
High rate of “screen fail” |
2 |
3 |
6 |
“Checklist” of prior documentation criteria before the first visit |
Principal Investigator Review |
% of “screen fail” (total studies with open recruitment) |
54,30% |
51,80% |
51,9% |
|
Screening |
Criteria not adequately reviewed |
1 |
3 |
3 |
Double review of the criteria before randomization |
Medical reassessment |
% of eligibility errors (total – studies with open recruitment) |
0 |
0 |
0 |
|
Screening |
Pending Consent Term |
1 |
3 |
3 |
Double check before patient release |
Contact with patient for correction |
Pending Consent Agreement |
0 |
0 |
1 |
|
Visits |
Visits outside the window |
2 |
2 |
4 |
Automatic alerts |
Quick rescheduling |
Out-of-window visits |
20 |
22 |
16 |
|
Visits |
Procedures not performed during the visit |
1 |
3 |
3 |
Checklist per visit |
Patient return |
Incomplete visits |
6 |
0 |
0 |
|
Data |
eCRF completion delay |
2 |
2 |
4 |
Entry in 48h |
Data Mobilization |
Average entry time (days) |
2 |
2 |
1 |
|
Data |
Query response delay |
2 |
3 |
6 |
Coordinator’s supervision |
Query Marathon |
Number of open “queries” for + 10 days |
15 |
20 |
24 |
|
Security |
Use of prohibited medication |
1 |
3 |
3 |
Review of concomitants in every visit |
Medical evaluation |
Number of violations |
0 |
0 |
0 |
|
IP |
IP dispensing error |
1 |
3 |
3 |
Double conferral |
Internal audit |
IP dispensing errors |
0 |
0 |
0 |
|
IP |
Exams not evaluated in a timely manner |
2 |
3 |
6 |
Automatic alerts |
Weekly review of pending exams |
Exams not evaluated within 7 days |
9 |
0 |
0 |
|
IP |
SAE not reported in 24h |
1 |
3 |
3 |
Automatic training and alerts |
Report as soon as possible and preventive action for the root cause |
SAEs not reported in 24h in the last month |
3 |
0 |
0 |
|
IP |
“Gaps” in the “accountability log” |
2 |
2 |
4 |
Monthly conference |
Internal audit |
% reconciliation in the last month |
30% |
21% |
19% |
|
Regulatory |
Outdated documents in ISF |
2 |
2 |
4 |
Monthly conference |
Internal audit |
% outdated documents |
25% |
18% |
5% |
Source: Original Research Results
In the screening, a pending case related to the Informed Consent Form (TCLE) in São Paulo, arising from the absence of the participant’s final signature, highlighted an operational failure associated with team overload. This incident underscores the critical importance of process standardization and balanced workload distribution, especially during high-demand phases. As a corrective action, the implementation of mandatory double-checking of the TCLE before patient release and adjustments in appointment scheduling were crucial. This event reinforces the need for robust preventive mechanisms in operational routine, reducing reliance on individual checks and strengthening the quality culture, as recommended by best practices (ICH, 2016). The literature on quality management in healthcare frequently points to workload overload as a risk factor for errors, and the solution found demonstrates the effectiveness of procedural interventions in mitigating such risks.
Regarding visits, the São Paulo unit registered 20 out-of-window visits and 6 incomplete visits in January. The analysis revealed that the main cause of window deviations was related to participant unavailability, not team failures. This led to the implementation of engagement strategies and reinforcement of patient guidance, aiming to improve adherence to schedules. Although February showed a slight increase to 22 cases due to the Carnival holiday, the reduction to 16 in March suggests a positive effect of the implemented actions. Incomplete visits were eliminated after reinforcement training and the adoption of a mandatory final chart review. In Manaus, although the absolute indicators were lower, the analysis proportional to the volume of services (600/month in SP versus 30/month in AM) revealed similar performance between the units (rates close to 3% in SP and 2.5% in AM). This consistency in operational quality between units with such distinct service volumes is a testament to the effectiveness of process standardization and the application of management tools.
Table 2. Risk and Quality Matrix – Cardiometabolic Studies Manaus
|
Category |
Current risks |
Probability |
Impact |
Severity |
Mitigation |
Contingency |
Indicator |
February |
March |
|
Recruitment |
Low “lead” rate |
2 |
2 |
4 |
Review campaigns weekly |
Activate partner doctors |
N° of “leads” |
98 |
126 |
|
Recruitment |
High rate of “screen fail” |
2 |
3 |
6 |
Checklist of prior documentation criteria before the first visit |
Principal Investigator Review |
% of “screen fail” (total studies with open recruitment) |
65% |
54,7% |
|
Screening |
Criteria not adequately reviewed |
1 |
3 |
3 |
Double review of the criteria before randomization |
Medical reassessment |
% of eligibility errors (total – studies with open recruitment) |
0 |
0 |
|
Screening |
Pending Consent Term |
1 |
3 |
3 |
Double check before patient release |
Contact with patient for correction |
Pending Consent Agreement |
0 |
0 |
|
Visits |
Visits outside the window |
2 |
2 |
4 |
Automatic alerts |
Quick rescheduling |
Out-of-window visits |
0 |
2 |
|
Visits |
Procedures not performed during the visit |
1 |
3 |
3 |
Checklist per visit |
Patient return |
Incomplete visits |
0 |
0 |
|
Data |
eCRF completion delay |
2 |
2 |
4 |
Entry in 48h |
Data Mobilization |
Average entry time (days) |
1 |
1 |
|
Data |
Query response delay |
2 |
3 |
6 |
Coordinator’s supervision |
Query Marathon |
Number of open “queries” for + 10 days |
5 |
8 |
|
Security |
Use of prohibited medication |
1 |
3 |
3 |
Review of concomitants in every visit |
Medical evaluation |
Number of violations |
0 |
0 |
|
Security |
IP dispensing error |
1 |
3 |
3 |
Double conferral |
Internal audit |
IP dispensing errors |
0 |
0 |
|
Security |
Exams not evaluated in a timely manner |
2 |
3 |
6 |
Automatic alerts |
Weekly review of pending exams |
Exams not evaluated within 7 days |
3 |
0 |
|
Security |
SAE not reported in 24h |
1 |
3 |
3 |
Automatic training and alerts |
Report as soon as possible and preventive action for the root cause |
SAEs not reported in 24h in the last month |
0 |
0 |
|
IP |
“Gaps” in the “accountability log” |
2 |
2 |
4 |
Monthly conference |
Internal audit |
% reconciliation in the last month |
10% |
10% |
|
Regulatory |
Outdated documents in ISF |
2 |
2 |
4 |
Monthly conference |
Internal audit |
% outdated documents |
30% |
12% |
Source: Original Research Results
Regarding data management, the average data entry time remained within expectations (2 days in SP and 1 day in AM). However, a progressive increase was observed in the number of pending “queries” for more than 10 days, even after retraining the team. The analysis indicated that the main cause was related to delays in sponsor guidance, especially in newly initiated studies. This finding highlights the influence of external factors on operational performance and reinforces the importance of continuous monitoring and proactive alignment with all *stakeholders*. Data management in clinical research is a critical component for the integrity and reliability of results, and the identification of external bottlenecks allows the research center to develop more effective communication and escalation strategies with sponsors, mitigating negative impacts on the study’s quality and timeline.
Patient safety is a non-negotiable pillar in clinical research. No violations related to the dispensing of Investigational Product (IP) or the use of prohibited medications were identified. However, three Serious Adverse Events (SAEs) were not reported within the 24-hour deadline, with the identified cause being out-of-hours registration without immediate communication to the responsible team. As a corrective action, retraining of the medical team and reinforcement of communication flows were carried out, resulting in the absence of new cases after the interventions. Furthermore, there was a significant improvement in the time for exam evaluation in São Paulo, reducing from 9 cases in January to zero in the following months, a result associated with the improvement of internal controls. These results demonstrate the management system’s ability to identify critical failures, implement effective corrective actions, and strengthen the culture of safety and compliance, which are essential for good clinical practices (ICH, 2016).
In the scope of IP and regulatory matters, the São Paulo unit presented relevant pending issues in IP reconciliation (30%) and Investigator’s Study File (ISF) update (25%) in January. The inconsistencies were mainly attributed to the absence of records and verification failures. The implementation of systematic monthly reviews resulted in significant improvement, with pending issues reduced to 19% (IP) and 5% (ISF) in March. In Manaus, although no changes were observed in IP, there was an expressive reduction in the rate of outdated documents (from 30% to 12%). These results demonstrate that the risk and quality matrix, when integrated with the PDCA cycle, acts as an effective instrument for continuous monitoring, allowing the identification of operational deviations, the direction of corrective actions, and support for data-driven decisions. Regulatory compliance and rigorous IP management are crucial aspects for the integrity of the study and the credibility of the data, and the structured application of these tools has proven to be a differentiator for achieving and maintaining high quality standards.
The PDCA (Plan-Do-Check-Act) cycle was incorporated into the clinical study management routine as a structured mechanism for continuous improvement. Unlike a merely descriptive approach, PDCA was implemented based on the objective indicators defined in the risk and quality matrix, ensuring that all decisions were guided by concrete data. The “Plan” stage involved the monthly review of operational goals and the identification of recurring failures, based on indicators, culminating in targeted retraining. The “Do” phase consisted of the continuous execution of operational activities and the daily recording of data, visits, and procedures, feeding subsequent indicators. The “Check” stage was characterized by weekly meetings between management and the board to review the risk matrix indicators, identify deviations, and bottlenecks from the previous week. Finally, the “Act” phase involved weekly interdepartmental meetings to define corrective actions, workflow adjustments, and the immediate implementation of operational improvements. This cyclical dynamic favored not only the correction of specific failures but also the progressive enhancement of processes, contributing to greater operational predictability, standardization across units, and the strengthening of a quality culture in the research center. The systematic application of PDCA, fueled by objective data, aligns with best quality management practices, promoting an environment of continuous learning and adaptation (PMI, 2021).
The Gantt Chart, in turn, played a fundamental strategic and predictive role in the temporal planning of the studies. Developed based on historical data and recruitment projections, this tool provided an integrated view of the studies conducted simultaneously in the Cardiometabolism sector between 2026 and 2031. This visualization allowed for the anticipation of operational demands related to patient flow, team sizing, infrastructure needs, and resource allocation, directly supporting strategic decision-making. The ability to predict study overlap and critical recruitment windows is a competitive advantage, allowing the Project Manager to act proactively in mitigating potential negative impacts.
Source: Original research results
Figure 1. Gantt chart of the “Cardiometabolism” sector
As presented in Figure 1, the Gantt chart illustrates the timeline of several studies, with the number of active or estimated patients at the end of each bar, allowing for a simultaneous analysis of the schedule and operational load. The analysis highlighted periods of greater study concentration, especially between 2027 and 2029, as well as critical recruitment windows that would require team reinforcement, considering the overlap of protocols with similar patient profiles. The period of January 2027 stands out, when the sector would reach the highest number of active participants, representing a critical point for capacity management. This early identification allowed for the planning of mitigation actions, such as hiring new employees and initiating structural work at the research center, aiming to support the simultaneous increase in studies. These decisions highlight the role of the Gantt Chart as a strategic tool in the center’s expansion, allowing for the alignment of operational growth with quality maintenance. The diagram remains a dynamic management instrument, being continuously updated as new studies are initiated, ensuring adherence to operational reality and continuous support for decision-making. The use of predictive planning tools, such as Gantt, is widely recognized in project management literature as essential for efficient resource allocation and schedule management in complex environments (PMI, 2021).
More broadly, the results obtained from the integrated application of all tools allow for an in-depth reflection on the challenges and implications of the research center’s multi-regional expansion. The replication of processes in different regions requires not only standardization but also continuous operational alignment, systematic training, and monitoring through comparable indicators. The São Paulo unit, by presenting a larger volume of studies and a more consolidated structure, functions as a reference model for the other units. However, the implementation in Manaus highlighted the importance of adapting operational strategies to regional characteristics, especially regarding patient recruitment, logistics, and medical team availability. For example, the medical referral strategy in Manaus, which proved more effective, is a reflection of this necessary adaptation.
The standardization of tools allowed for a reduction in variability between units, ensuring that, even with structural and volume differences, quality indicators remained at similar levels. This result reinforces the potential of structured project management practices to sustain the scalability of clinical research centers without compromising operational quality. In a scenario of accelerated growth in clinical research in Brazil, driven by regulatory milestones such as Law No. 14.874/2024 (Interfarma, 2025), the ability to expand operations while maintaining quality is a strategic differentiator. The predictive approach, early risk identification, and agile response to operational demands, facilitated by these tools, are crucial for the center’s sustainability and competitiveness. The organizational culture based on continuous improvement and evidence-based decision-making, promoted by the PDCA cycle and the risk matrix data analysis, contributes to the consolidation of more efficient and robust practices in conducting clinical studies.
4. Conclusion
It is concluded that the objective was achieved, demonstrating how the structured application of project management tools, with a predictive approach, can sustain quality and predictability in conducting clinical studies in a multiregional expanding research center in Brazil. The integration of the Work Breakdown Structure (WBS), RACI Matrix, Risk and Quality Matrix, PDCA cycle, and Gantt Chart proved fundamental. These tools allowed for robust standardization of operational processes, early identification of risks, and agile implementation of corrective actions. Predictive planning, in particular, supported crucial strategic decisions for the expansion of units, ensuring the maintenance of operational excellence even in the face of growing complexity and volume of studies.
However, this study presents important limitations. The analysis was performed based on a single case study, focusing predominantly on data from the São Paulo unit and, initially, from the Manaus unit. This particularity restricts the generalization of findings to other contexts or research centers with different expansion profiles. For future studies, it is suggested to expand the analysis to include other units of the center in question, as well as research in different clinical research centers in Brazil. This would allow for broader results and validation of the management model in more diverse scenarios. The application of these tools represents a strategic differential, promoting not only quality but also the scalability of operations in a dynamic and competitive environment.
Bibliographic References
Espírito Santo, P.P.P.; Ferreira, E.P.; Goecks, L.S. 2022. Estratégias do Guia PMBOK para a gestão de projetos de pesquisa em instituições de ensino superior. Revista CIATEC-UPF 14(2): 22-35.
Interfarma. 2025. Panorama da Pesquisa Clínica no Brasil e no Mundo. Disponível em: <https://www.interfarma.org.br>. Acesso em: 10 out. 2025.
International Council for Harmonisation of Technical Requirements for Pharmaceuticals for Human Use [ICH]. 2016. Integrated Addendum to ICH E6(R1): Guideline for Good Clinical Practice E6(R2). Disponível em: <https://database.ich.org/sites/default/files/E6_R2_Addendum.pdf>. Acesso em: 03 fev. 2026.
Project Management Institute [PMI]. 2021. Um Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK®). 7ed. Project Management Institute, Newtown Square, PA, EUA.
Riffel, M.; Padua, S.I.D.; Ribeiro, L.R.B.; Coelho, E.B. 2024. Mapeamento de Centros de Pesquisa Clínica. Inova Saúde 14(6): 45-60.
Sampaio, R.F.; Mancini, M.C. 2007. Estudos de revisão sistemática: um guia para síntese criteriosa da evidência científica. Revista Brasileira de Fisioterapia 11(1): 83-89.
Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform