Development of a Predictive Solution for the Reduction of Labor Contingencies: An Analysis of Schedule Management

Development of a Predictive Solution for the Reduction of Labor Contingencies: an Analysis of Schedule Management

Milene Tavares Ferreira; Thaís de Marchi Soares

DOI: 10.22167/2675-6528-202603301

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The growing complexity of labor demands in Brazil and the financial impact of litigation have driven the search for predictive technological solutions. Artificial intelligence has emerged as a strategic tool for corporate legal analysis. This study was applied, qualitative, and descriptive in nature, and it analyzed schedule management in an innovation project to develop an artificial intelligence solution for analyzing labor lawsuits in a large organization. The research applied and analyzed the schedule management processes outlined in the PMBOK® Guide (PMI, 2017), evaluating their contribution to meeting a strict institutional deadline of four months. Action research was used, with the researcher acting as Product Manager and analyzing institutional documents. The project was delivered functionally within the established 16-week deadline. The adoption of robust schedule planning, monitoring, and control practices, including the proactive application of the compression technique (crashing), mitigated operational risks, coordinated stakeholders, and supported the execution of interdependent activities. The results demonstrated that structured time management is a determining factor in enabling AI-based innovation projects, especially in contexts of high temporal pressure and the need for multidisciplinary integration, offering subsidies for risk classification and legal decision-making.

Keywords: Predictive analysis; Legal automation; Labor contingencies; Project schedule; Time management.

1. Introduction

The intensification of the judicialization of labor relations in Brazil has been widely observed within the institutional sphere, with relevant impacts for the legal management of companies, especially in controlling labor risks and budgetary predictability. According to data from the National Council of Justice (CNJ, 2024), more than four million lawsuits were filed in the Labor Courts in the country in 2024 alone.

Labor litigation constitutes one of the main sources of legal contingencies for organizations, demanding specific provisions and directly impacting their economic-financial situation. Accounting standards, such as Technical Pronouncement CPC 25, issued by the Committee of Accounting Pronouncements (CPC, 2009), treat obligations arising from labor lawsuits as liabilities, whose measurement and disclosure influence the accuracy of balance sheets and the perception of risk by stakeholders. Within labor doctrine, it is noteworthy that labor liabilities represent a relevant risk to the operational sustainability of companies, given the recurrence and economic potential of claims (Delgado, 2025). Studies in accounting and finance, such as Santos (2012), corroborate this perspective by demonstrating that labor contingencies can significantly alter the results and capital structure of organizations, reinforcing their nature as strategic legal-financial liabilities.

In this context, the incorporation of emerging technologies, especially artificial intelligence-based solutions, has been progressively adopted in the corporate legal context as a mechanism to enhance analytical efficiency and qualify decision-making support. The use of artificial intelligence in the legal field enables the systematic analysis of large databases, the detection of recurrences in judicial decisions, and the construction of estimates about possible procedural outcomes. This use contributes to the development of Legal Operations models, as a functional area of legal departments, with more strategic models based on technology, process automation, and advanced data use for decision-making support (Katz and Bommarito, 2021; Susskind, 2023).

The organization addressed in this work sought to develop a legal innovation project based on machine learning with the objective of expanding the predictive analysis capacity of labor lawsuits. However, the initial market assessment stage revealed that solutions capable of meeting the project’s initial expectations presented development timelines exceeding nine months, incompatible with the company’s strategic urgency. Faced with this gap, the directive was established to internally develop a customized solution, oriented towards delivering a minimally operational product, functional enough to generate predictive forecasts, within a maximum timeframe of four months. This temporal limit increased the level of complexity, risk, and the need for coordination among the involved areas.

In projects involving high operational complexity, the organization of deadlines ceases to be a merely instrumental activity and begins to directly influence the stability of the execution process. Studies on project planning and control highlight that environments with multiple stakeholders, task interdependencies, and severe time constraints amplify the schedule’s sensitivity to estimation errors and coordination failures (Vanhoucke, 2014; Titarenko and Camara, 2025). In these contexts, limitations in defining the chaining of activities, as well as the absence of systematic monitoring of temporal deviations, tend to generate chained impacts on costs, scope, quality standards, and governance mechanisms (Kerzner, 2017). Thus, schedule management assumes a strategic character by functioning as an instrument for articulating operational predictability, aligning organizational efforts, and reducing risks throughout execution.

Considering this context, the present work was developed within the scope of Schedule Management, an area of project management adopted as the research’s analytical scope. Its relevance lies in demonstrating how structured time management practices can support innovation projects conducted under strong deadline constraints. In this sense, we sought to answer the following question: how can the application of structured schedule management practices enable the delivery of a predictive solution based on artificial intelligence for the analysis of labor lawsuits in a high temporal restriction context? Thus, the objective of this study was to apply and analyze the schedule management processes foreseen in the PMBOK® Guide (PMI, 2017) in the development of this solution, evaluating its contribution to meeting the established institutional deadline.

2. Material and Methods

The research developed was characterized by its applied nature, qualitative in nature and with a descriptive objective, as outlined in the introduction. The central purpose was to apply and analyze the schedule management processes foreseen in the PMBOK® Guide (PMI, 2017) in the development of an artificial intelligence solution for the analysis of labor processes, evaluating its contribution to meeting a restricted institutional deadline.

The methodological design adopted followed the principles of action research, as proposed by Thiollent (2011). The researcher integrated directly into the planning and execution process of the project schedule, acting in a role equivalent to Product Manager. This integration provided direct access to planning decisions, operational constraints, interdependencies between activities, and monitoring mechanisms.

The study was conducted in the context of a large-scale organization, located in the Southeast region of Brazil. The identity of the organization and its collaborators was preserved through anonymization, and all records used were treated confidentially, in accordance with the company’s internal regulations. The project aimed to internally develop a predictive solution based on machine learning within a maximum timeframe of four months.

Data collection began with the survey of project requirements, premises, and constraints. This stage was carried out through Design Thinking sessions and meetings with stakeholders, which included the participation of 11 professionals from the legal team. During this phase, maps of the labor process flow, critical point identification charts, organizational needs records, operational constraint lists, and initial improvement proposals were produced.

Subsequently, four meetings were held with internal stakeholders, covering the legal, digital transformation, innovation, and technology areas. The objective of these meetings was to validate the findings of the initial diagnosis, confirm premises, align expectations, and define the initial responsibilities among the involved areas, recording inter-area dependencies and operational restrictions.

Still in the requirements gathering phase, an exploratory and subsidiary market investigation was conducted. This investigation sought to identify and evaluate available suppliers and technological solutions for the development of the predictive tool, providing input for refining the technological feasibility premises and the initial temporal references of the project.

With the artificial intelligence solution delimited as a predictive model based on machine learning techniques, the project deliverables were structured through the Work Breakdown Structure (WBS). This process organized the scope into 20 work packages, which were subsequently broken down into 61 detailed analytical activities.

For planning and schedule control purposes, the 61 analytical activities were subjected to an operational consolidation process. Related activities, iterative in nature or with low individual impact, were grouped, resulting in a set of 34 consolidated activities, which served as the basis for organizing the project schedule.

The sequencing of activities was carried out using the Precedence Diagramming Method (PDM), in which the dependencies between activities were determined, including finish-to-start (FS) and start-to-start (SS) relationships, according to the project’s technical logic and operational constraints (PMI, 2017).

The estimation of the duration of activities was based on a combination of analogous estimates, grounded in market deadlines for similar projects, and productivity-based estimates, adjusted by the practical experience of an information technology analyst and the expert judgment of the professionals involved.

With the estimated durations and defined dependencies, the project schedule was consolidated into a single temporal structure. The Critical Path Method (CPM) was applied to analyze the impact of activities on the overall project deadline, identifying those with the greatest temporal sensitivity (Kerzner, 2017; Vanhoucke, 2009).

Considering the maximum deadline of four months established by the organization, the schedule compression technique, specifically crashing, was adopted. This strategy was incorporated from the planning phase, through the targeted allocation of additional resources and the structuring of parallel work fronts, aiming to enable execution within the temporal restriction.

Schedule monitoring was conducted continuously, comparing planned versus actual progress, using tracking logs, meeting minutes, and formal communications. Weekly meetings were held with the supplier and bi-weekly with key stakeholders, in addition to meetings three times a week with the internal team, to assess activity progress.

The data analysis adopted a qualitative approach, based on the interpretation of institutional documents and records produced throughout the project execution. The documentary corpus comprised minutes of planning and monitoring meetings, project schedules (planned and updated versions), action plans, and formal monitoring records.

The documents were examined through qualitative documentary analysis, with the objective of understanding how schedule management was conducted (Creswell, 2014). Complementarily, quantitative elements were incorporated into the analysis of temporal performance metrics, such as duration deviations and schedule progress indicators, without constituting an in-depth statistical study.

To ensure compliance with internal confidentiality standards, the organization’s name and that of its collaborators were not disclosed. All records used were treated anonymously, guaranteeing data protection and the privacy of those involved in the project.

3. Results and Discussion

The initial phase of the project, marked by the application of Design Thinking sessions, revealed a set of operational challenges that guided subsequent planning. 27 instances of inefficiency in labor workflows were identified, which, after consolidation by similarity and impact, resulted in five priority problems. These included excessive time spent on report generation, the prevalence of manual tasks for data entry, the absence of automation in document reading, the lack of statistical prediction about processes, and the absence of a corporate content management system. The identification of these critical points was fundamental to defining the project’s direction and anticipating relevant characteristics of the activities, directly impacting the schedule planning.

The participation of multiple stakeholders in subsequent meetings was crucial to validate the initial diagnosis, align expectations, and define responsibilities. This collaboration allowed for the anticipation of potential risks, such as interfunctional dependencies and the need for technical and legal validations, which could compromise the project’s progress. Considering these constraints from the initial phases of schedule planning was essential for the project’s temporal organization, as highlighted by project management literature emphasizing scope clarity as a critical factor for performance (Zwikael and Smyrk, 2015).

The definition of the project solution culminated in the development of a predictive model based on machine learning, focused on the analysis of labor lawsuits filed and the estimation of judicial outcomes from internal historical data. This solution would integrate automated document reading, structured information filling in a legal management system, and results prediction. However, a market survey revealed that external solutions capable of meeting the project’s functional requirements, especially in predictive analysis and artificial intelligence recommendation, required development times between nine and twelve months, incompatible with the institutional deadline of four months.

This comparative analysis highlighted a significant trade-off between the delivery time horizon and the analytical complexity of the available solutions. None of the market alternatives simultaneously met the functional requirements and the temporal restriction imposed by the organization. Given this scenario, the strategic decision was to develop a customized solution internally, with a minimally operational scope, focused exclusively on internal historical data, to ensure delivery within the four-month deadline. The choice of a supplier with greater adherence to temporal premises and iterative and agile work capacity was a determining factor, aligning with studies that highlight the influence of external partners’ organizational maturity on meeting deadlines (Rabechini Jr. et al., 2010).

The development of the Work Breakdown Structure (WBS) represented the first step in the systematic organization of work, translating the scope into delimited deliverables. The WBS was structured hierarchically into three levels: the project, the macro-deliverables, and the intermediate work packages. The project was organized into five main macro-deliverables, reflecting the heterogeneity of the work fronts involved and the distinct technical competencies and resources required. This clear structure of the areas of action served as the basis for the subsequent stages of defining activities and temporal organization of the work.

From the twenty work packages of the WBS (Work Breakdown Structure), 61 analytical activities were identified and detailed. For scheduling and control purposes, these activities underwent an operational consolidation process, resulting in a set of 34 grouped activities. This grouping considered related activities, iterative in nature, or with low individual impact on temporal monitoring, and distinguished execution responsibilities between the internal team and the technological supplier. This approach facilitated schedule control, allowing greater focus on activities with an effective impact on the deadline and aligning the level of detail with the governance exercised by project management.

The sequencing of activities was carried out using the Precedence Diagramming Method (PDM), which allowed for the determination of dependencies between them. The initial activities, related to understanding the process and analytical preparation, showed a predominantly sequential chaining, with finish-to-start (FS) relationships, reflecting the need for progressive knowledge consolidation. However, parallelism was introduced from the early stages, with some activities starting concurrently (start-to-start – SS relationships), allowing for the anticipation of tasks that depended on a minimum level of definition, such as the definition of extraction fields and the consolidation of the database.

For activities under the external supplier’s responsibility, the sequencing was structured in two main fronts: data capture and predictive model development, both conducted in parallel through start-to-start (SS) relationships. This configuration optimized the utilization of the supplier’s resources and allowed for the simultaneous execution of distinct technical tasks. The sequencing analysis revealed a hybrid structure, combining sequential relationships in the analytical and validation stages with parallel relationships in the preparation and technical execution stages, which favored the compression of the total project time without compromising control over deliverables.

The estimation of the duration of activities was conducted with the premise of a four-month deadline, aiming for the feasibility of execution within the available time interval. The project schedule, distributed over approximately sixteen weeks, showed an initial concentration of activities in defining premises, with shorter durations and linear execution. As the project progressed, a growing overlap of activities was observed, indicating the adoption of a parallelization strategy to meet the established deadline and optimize resource utilization.

The activities under the supplier’s responsibility were continuously distributed throughout the schedule, acting on multiple simultaneous fronts, especially in data capture and technical development. In contrast, the predictive model development activities showed a longer duration and a lower degree of overlap, concentrating on a more continuous sequence, which reflected the iterative nature of validation and refinement. In the final stages, parallelism was again observed in deployment, user training, and solution monitoring activities, demonstrating a temporal optimization strategy in the project’s closing phase.

The critical path analysis of the project revealed that the highest criticality was concentrated in the predictive model development and validation stages, especially in the sequence of activities that included model training, performance evaluation, error identification, refinement, and validation. This set of activities presented strong sequential chaining, longer relative duration, and absence of parallelism, making it highly sensitive to deadline variations. Any delay in these activities would directly impact subsequent stages, amplifying the effect on the total project schedule.

In contrast, the initial activities and those related to data capture and extraction, although essential, demonstrated greater temporal flexibility and possibility of parallel execution, exerting less direct influence on the final deadline. The low slack in the schedule, evidenced by the critical path that encompassed a significant portion of the activities, reinforced the need for rigorous control in the stages of greater duration and chaining. This finding directed the application of schedule compression techniques to ensure the project’s feasibility.

Given the high sensitivity of the schedule, especially in the predictive model development and validation activities, the compression technique (crashing) was proactively adopted since the planning phase. The objective was not to shorten an already estimated deadline, but rather to make the schedule feasible within the previously established four-month time constraint. The application of crashing occurred both at the organizational level, with prior alignments and advanced validation criteria to reduce rework, and at the operational level, with the expansion of resources and parallel work by supplier teams.

It was found that crashing acted as an essential mechanism to reconcile project complexity with the time constraint. Although the literature associates crashing with potential increases in cost and risks (PMI, 2017), in this context, no significant financial impacts were observed, as the selected supplier presented a proposal compatible with the budget. The main challenges of schedule compression manifested in the intensification of monitoring activities, the need for frequent alignments between stakeholders, and the management of interfaces between parallel work fronts, indicating a trade-off predominantly in the dimensions of coordination and governance.

The schedule monitoring was continuous, based on the comparison between planned and actual progress, using tracking records, meeting minutes, and formal communications. Project governance integrated technical and business perspectives, with the joint action of a technology analyst, an innovation analyst, and a legal specialist. Follow-up meetings occurred weekly with the supplier and the internal team, and bi-weekly with stakeholders, focusing on delivery validation, activity prioritization, and decision-making, directing greater attention to activities with the greatest impact on the deadline.

From a quantitative point of view, the bi-weekly monitoring of temporal performance indicators revealed that, out of 34 consolidated activities, 33 were completed, with 29 within the planned deadline, representing 87.9% adherence. Four delayed activities were identified (A20, A24, A27, and A34), with an average delay of 2.75 weeks per activity. However, activity A34, related to post-go-live monitoring, did not compromise the functional delivery milestone of the solution, which occurred in the 16th week, characterizing the additional weeks as a post-implementation stabilization and monitoring period.

The main divergence observed was in the database sanitation activity (A15), which, although estimated at five weeks, was impacted by technical limitations and the complexity of the historical database, and was not completed within the planned timeframe. This divergence predominantly affected the model’s accuracy but did not compromise the project’s continuity. Another activity with a relevant deviation was the registration monitoring (A34), extending from three weeks to approximately two months, due to the absence of a more detailed scope definition, resulting in review and rework cycles.

Despite occasional deviations, the other activities showed performance aligned with the schedule. The validation and adjustment activities for the predictive model, initially planned as sequential, evolved into a continuous refinement process, with the planned milestones being met. Additional evaluation and refinement iterations were performed after formal completion, reflecting the dynamic nature of the predictive model development, without causing delays to the established final deadline. The essential functionality of the BI dashboard, for example, was available from the early weeks, without compromising the main objectives.

The predictive model developed, implemented with the XGBoost algorithm (XGBClassifier), demonstrated 64% accuracy for first-instance predictions and 79% for second-instance processes. These results were considered sufficient to characterize the solution as a minimally operational product, capable of supporting procedural risk analyses and providing subsidies for legal decision-making. The quality and level of cleaning of the historical data used directly influenced the performance obtained, reinforcing the relevance of data preparation and database treatment activities in the project timeline.

The findings show that the effectiveness of schedule management was directly associated with the ability to coherently integrate the planning, execution, and control stages. The prioritization of enabling activities, the identification of the critical path oriented towards the development of the predictive model, and the application of schedule compression strategies were decisive for enabling the project within the defined temporal guideline. Structured monitoring, supported by periodic cycles and continuous communication between teams, enabled the identification and treatment of deviations during execution.

In practical terms, the predictive model developed offers significant organizational benefits, such as the ability to estimate the probability of success or failure in labor lawsuits, providing additional subsidies for legal decision-making. This risk classification capability can enhance accounting provisioning processes, offering an additional source of information for evaluating labor contingencies (CPC, 2009). Additionally, the early identification of lawsuits with a higher probability of condemnation supports the prioritization of negotiation strategies and the celebration of agreements at more appropriate procedural moments, aligning with the organization’s internal guidelines for optimizing contingency management.

In summary, the structured schedule management, which combined adequate scope decomposition, strategic sequencing, critical path identification, proactive compression, and continuous monitoring, proved to be a determining factor for the successful delivery of the artificial intelligence-based predictive solution. This approach allowed the project to be completed within the institutional timeframe of four months, despite the inherent complexity and time constraints, reinforcing the strategic role of time management in legal innovation projects.

4. Conclusion

This study sought to apply and analyze the schedule management processes, according to the PMBOK® Guide, in the development of an artificial intelligence solution for the analysis of labor lawsuits, evaluating its contribution to meeting a restricted institutional deadline of four months. It was found that the predictive solution was delivered functionally within the established deadline of sixteen weeks, demonstrating the effectiveness of structured time management. The adoption of robust schedule planning, monitoring, and control practices, including the proactive application of the schedule compression technique (crashing), was decisive in mitigating operational risks, coordinating multiple stakeholders, and sustaining the execution of interdependent activities in a highly complex environment. It was observed that, although some activities, such as data cleansing and post-go-live monitoring, presented temporal deviations, these did not compromise the functional delivery milestone of the solution, which proved to be minimally operational with an accuracy of 64% for first-instance predictions and 79% for second-instance.

The main contribution of this work lies in the practical demonstration of how structured schedule management can enable innovation projects based on artificial intelligence, even under strong time pressure and the need for multidisciplinary integration. The developed solution offers valuable support for risk classification and legal decision-making, improving accounting provisioning processes and supporting negotiation strategies. However, the analysis was conducted in a single organizational context and was qualitative in nature, which limits the generalization of the results. It is suggested that future studies explore different contexts, levels of project management maturity, and governance models, as well as quantitative approaches to deepen the understanding of factors influencing temporal performance in legal innovation projects.

Bibliographic References

COMITÊ DE PRONUNCIAMENTOS CONTÁBEIS [CPC]. 2009. Pronunciamento Técnico CPC 25: Provisões, Passivos Contingentes e Ativos Contingentes. CPC, Brasília, DF, Brasil.

CONSELHO NACIONAL DE JUSTIÇA [CNJ]. 2024. Justiça em Números 2024. CNJ, Brasília, DF, Brasil. Disponível em: <https://www.cnj.jus.br/pesquisas-judiciarias/justica-em-numeros/>. Acesso em: 06 abr. 2026.

CRESWELL, J.W. 2014. Research Design: Qualitative, Quantitative, and Mixed Methods Approaches. 4ed. Sage Publications, Thousand Oaks, CA, USA.

DELGADO, M.G. 2025. Curso de Direito do Trabalho. 22ed. LTr, São Paulo, SP, Brasil.

KATZ, D.M.; BOMMARITO, M.J. 2021. Legal Informatics. Cambridge University Press, Cambridge, UK.

KERZNER, H. 2017. Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 12ed. Wiley, Hoboken, NJ, USA.

PROJECT MANAGEMENT INSTITUTE [PMI]. 2017. Um Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK®). 6ed. Project Management Institute, Newtown Square, PA, USA. Disponível em: <https://www.pmi.org/pmbok-guide-standards>. Acesso em: 06 abr. 2026.

RABECHINI JR., R.; MÜLLER, S.; RACZ, A.; SILVA, A.C.P. 2010. Maturidade e sucesso em projetos sob a perspectiva do binômio fornecedor e cliente. Revista Brasileira de Gestão de Negócios 12(34): 56-72.

SANTOS, J.M. 2012. Mensuração da contingência trabalhista e sua repercussão contábil: estudo de caso em uma empresa prestadora de serviços na área de mineração. Monografia (Especialização em Auditoria Externa), Universidade Federal de Minas Gerais, Belo Horizonte, MG, Brasil. Disponível em: <https://repositorio.ufmg.br/server/api/core/bitstreams/80b490b6-dee4-4eca-8814-f01d9354a04a/content>. Acesso em: 06 abr. 2026.

SUSSKIND, R. 2023. Tomorrow’s Lawyers: An Introduction to Your Future. 3ed. Oxford University Press, Oxford, UK.

THIOLLENT, M.J.М. 2011. Metodologia da Pesquisa-Ação. 18ed. Cortez, São Paulo, SP, Brasil.

TITARENKO, R.; CAMARA, N. 2025. Investigation of project schedule management challenges underpinned by process approach. PM World Journal XIV(II). Disponível em: <https://pmworldlibrary.net/wp-content/uploads/2025/02/pmwj149-Feb2025-Titarenko-Camara-Investigation-of-Project-Schedule-Management-Challenges-2.pdf>. Acesso em: 06 abr. 2026.

VANHOUCKE, M. 2009. Measuring Time: Improving Project Performance Using Earned Value Management. Springer, Dordrecht, Netherlands.

VANHOUCKE, M. 2014. Integrated Project Management and Control: First Comes the Theory, Then the Practice. Springer, Cham, Switzerland.

ZWIKAEL, O.; SMYRK, J. 2015. Project governance: balancing control and trust. International Journal of Project Management 33(4): 852-866.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving the independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated the automated reading of files, the organization of curves into current-potential matrices, the generation of the potential map, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed by device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of the results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.