The optimization of industrial assembly line balancing was investigated with the purpose of increasing production speed and productive capacity, without an increase in labor. Initially, the current state of the line was surveyed through time-and-motion study, identification of workstation cycle times, and calculation of performance indicators, such as productive capacity, actual speed, man-hour, balancing index, and line efficiency. The initial results showed the existence of operational bottlenecks, high interdependence between workstations, and unequal distribution of work content, resulting in a low balancing index. For the development of the improvement proposal, quality tools and project management methods were applied, including structured brainstorming, Ishikawa diagram, and the 5 Whys technique, which allowed the identification of the root causes of the imbalance. Based on the analysis of times and activity interdependencies, a hybrid layout proposal was conceived, combining parallel mini-assembly stations with specific workstations for automated operations. The calculations performed for the proposed configuration demonstrated an increase in productive capacity from 295 to 360 products per hour, exceeding the established goal of a minimum increase of 15%, and achieved a balancing index of over 99%. It was concluded that the reconfiguration of the production layout is technically feasible and effective, providing significant gains in efficiency, productivity, and operational sustainability of the assembly line.

Keywords: Project management; Productive Layout; Lean Manufacturing; Time and Methods.

1. Introduction

The incessant pursuit of efficiency and productivity in industrial processes constitutes a strategic pillar for the competitiveness of organizations in the contemporary globalized scenario. Since the second half of the 20th century, the pressure for resource optimization and cost reduction has intensified, driving the development of methodologies and approaches aimed at maximizing value delivered to the customer with minimal waste (SLACK; CHAMBERS; JOHNSTON, 2013; TUBINO, 2017). In an increasingly dynamic and demanding market environment, a company’s ability to produce goods with agility, quality, and competitive cost is a crucial differentiator. The optimization of assembly lines, for example, can reduce operational costs and increase production, as pointed out by sectoral studies. The balancing of assembly lines, in particular, emerges as a fundamental technique for achieving these objectives, as it deals with the equitable distribution of tasks among workstations, minimizing bottlenecks and idle time (ROCHA, 2016). The lack of adequate balancing can result in significant losses of production capacity, increased cycle time, and underutilization of labor, directly impacting the profitability and operational sustainability of companies.

In this context, Lean Manufacturing stands out as a management philosophy that revolutionized industrial production. Originating from the Toyota Production System (TPS) in the post-World War II era, Lean focuses on the elimination of all forms of waste and the maximization of customer value (OHNO, 1997; SHINGO, 1996; LIKER, 2005). Concepts such as Just in Time (JIT), which advocates producing only what is needed and at the right time, and Jidoka, which aims at immediate detection and correction of problems, are pillars of this approach (LIKER, 2005). The popularization of the term by Womack, Jones, and Roos (1990) consolidated Lean as a global model for the pursuit of operational excellence, demonstrating that flexibility and production agility are essential for adapting to market fluctuations (WOMACK; JONES, 2004). The implementation of Lean not only improves internal processes but also contributes to the enhancement of the organizational climate and employee engagement (MELNYK et al., 2003). Complementarily, Time and Motion Study engineering offers the tools to analyze and optimize operations, identifying unnecessary movements and standardizing work to reduce cycle time and increase productivity (BARNES, 2014; NIEBEL; FREIVALDS, 2009). The Productive Layout configuration, in turn, is crucial for continuous flow and waste minimization, directly influencing the efficiency and capacity of the line (TOMPKINS et al., 2010).

Despite the extensive documentation of the benefits of Lean and optimization techniques, many industries still face significant challenges in balancing their assembly lines. Empirical studies frequently reveal the persistence of operational bottlenecks, the existence of high interdependence between workstations, and an unequal distribution of work content, which culminate in low balancing and efficiency rates (SLACK et al., 2015; TUBINO, 2009). Such imbalances not only limit maximum production capacity but also generate idle resources, increase operational costs, and compromise the company’s ability to respond to market demands (GOLDRATT, 1990). The identification and mitigation of these problems require systematic analysis and the application of robust methodologies, such as quality tools and project management principles, which allow for the diagnosis of root causes and the proposal of effective solutions (PMI, 2021; CARPINETTI, 2016). The relevance of addressing these issues lies in the possibility of transforming suboptimal assembly lines into efficient and sustainable systems, without the need for additional investments in labor or large-scale equipment. Given this scenario, this work is justified by the need to develop and apply a structured approach for the optimization of assembly line balancing, aiming to improve operational performance and production sustainability. The general objective of this study is to analyze and optimize the balancing of an industrial assembly line, with the purpose of increasing production speed and capacity, without an increase in labor, through the integrated application of Lean Manufacturing principles, Time and Motion study techniques, and Project Management tools.

2. Material and Methods

The present study was characterized as a research of an applied nature, adopting the case study approach. This methodology, according to Gil (2008), allows for an in-depth empirical investigation of a contemporary phenomenon in its real context, especially when the boundaries between the phenomenon and the environment are not clearly defined. The choice of case study enabled a detailed analysis of a specific process, aiming to identify causes, effects, and opportunities for improvement through direct observation and systematic analysis of real data. The research integrated quantitative and qualitative procedures to analyze and propose optimizations in the assembly line.

The research was developed on an industrial assembly line, which constituted the main unit of analysis for this work. The study focused on the optimization of a specific production process, without explicit identification of the geographical location or company name, preserving data confidentiality. The research execution period was not detailed in the original TCC, but the analyses and interventions were carried out in a real operational context, aiming to improve the performance of the assembly line in its existing configuration. The line consisted of four workstations, with two operating in parallel, in addition to a final packaging station.

The unit of analysis was the industrial assembly line, and there was no selection of a population or sample of human participants in the traditional sense. Instead, data collection focused on the line’s operations and cycle times. For the time study, ten consecutive time samples were collected for each workstation in the initial configuration, covering all activities performed at each station. Similarly, for the proposed configuration, ten time samples were simulated for each mini-station, ensuring the representativeness of the observed times under normal operating conditions, without interfering with the operators’ pace.

Data collection began with a comprehensive bibliographic survey, using academic search engines such as Google Scholar. Keywords like “Lean Manufacturing”, “line balancing”, “process improvement”, and “assembly line improvement” were employed to identify relevant articles, dissertations, and books, consolidating the study’s theoretical foundation. Subsequently, the collection and analysis of historical assembly line balancing data, which already had previous records, were carried out. This data was crucial for identifying critical workstations and production bottlenecks, guiding the subsequent research steps.

To deepen the understanding of the process, time and methods study techniques were applied, with emphasis on direct chronoanalyses. Time collection was carried out with the aid of videos of the operations, allowing for precise measurement of each movement under normal working conditions, ensuring data representativeness. In parallel, the production process was mapped, aiming to represent the flow of operations, identify waste, and support the proposal of improvements. This stage was fundamental to visualize the interdependencies and the sequence of activities on the assembly line.

In the development of the improvement proposal, quality tools and project management methods were employed. A structured brainstorming session was conducted, integrating data from time analysis and field observations to generate ideas and identify problems. The hypotheses raised were organized and analyzed using the Ishikawa diagram, which allowed for a systemic visualization of the causes and effects of the imbalance. Subsequently, the 5 Whys technique was applied to deepen the investigation and identify the root causes of the central problem of the assembly line.

The research execution followed a systematic flow, starting with a bibliographic survey for theoretical grounding. Subsequently, historical data from the assembly line was collected and analyzed, allowing for an initial diagnosis. The next stage involved the application of time and method studies, including time studies and process mapping, to measure activities and identify operational bottlenecks. This information was crucial for understanding the current state of the line and its main performance limitations.

Based on the diagnosis, a series of proposals for optimization and balancing of the line were developed, considering the reorganization of the layout and the redistribution of tasks among workstations. Each alternative was evaluated for its technical, economic, and ergonomic feasibility, as well as in relation to the risks associated with implementation. The selected solutions were then subjected to tests and simulations, comparing the results obtained with the current performance indicators of the line, measuring the gains in productive capacity and overall efficiency.

The entire process was conducted in a structured manner, using project management practices, according to the best practices described in the Project Management Body of Knowledge (PMBOK) (PMI, 2021). This approach ensured that the stages were effectively planned, executed, and controlled, guaranteeing the reliability of the results and the technical and operational feasibility of the proposed solutions. The complete methodological flow is illustrated in Figure 1 of the original term paper, which details the sequence of activities performed.

The collected data, especially cycle times, were processed to calculate averages and identify variations between workstations. The initial analysis focused on determining the average cycle times for each station, serving as a basis for subsequent calculations of production capacity and balancing. The results of the time study were graphically represented using a bar chart, allowing for a comparative visualization of cycle times and the identification of operational bottlenecks and unequal distribution of work content.

To quantify the line’s performance, several indicators were calculated. Theoretical production capacity was determined from the longest cycle time among the workstations, considered the line’s bottleneck (SLACK et al., 2015; OHNO, 1997). The actual line speed was calculated by incorporating a ten percent fatigue factor to the timed durations, aligned with literature recommendations (BARNES, 2014; IIDA; GUIMARÃES, 2016), to reflect real operating conditions and ergonomic aspects.

The man-hour indicator was calculated based on the relationship between the quantity of products manufactured per hour and the number of operators, evaluating the average individual productivity of the system. The balancing index was determined by the relationship between the total work time and the effectively utilized available time, seeking to identify the equitable distribution of activities. Finally, the line efficiency index was evaluated, considering the idle time of each station, to identify losses and support the proposition of improvements (MARTINS; LAUGENI, 2015).

3. Results and Discussion

This section presents the results obtained from the analysis of the current situation of the assembly line under study, as well as the development process of the improvement proposal aimed at increasing operational efficiency and production capacity. The data presented were obtained through time studies, direct field observations, and the application of quality tools, allowing for an objective evaluation of the line’s performance and the identification of improvement opportunities. The subsequent discussion integrates these findings with the relevant literature, exploring the theoretical and practical implications of the discoveries.

The survey of operational times and the characterization of the current assembly line layout revealed a scenario of significant unbalance. The line, in its initial configuration, was composed of four workstations, with two of them operating in parallel and a final packaging station. The methodology employed for data collection, based on direct time study with the aid of operation videos, ensured the precision and representativeness of the observed times, as measurements were taken under normal operating conditions, without interference in the operators’ pace. This approach is fundamental for the validity of time and motion studies, as advocated by Barnes (2014) and Iida and Guimarães (2016), who emphasize the importance of capturing operational reality for reliable analyses.

For each workstation, ten consecutive time samples were collected, covering all activities performed at each station, from the initial cartridge assembly to the positioning of the product in the automatic closing equipment. The analysis of these average cycle times formed the basis for subsequent calculations of production capacity and line balancing. The analyzed assembly line is characterized by a sequential set of manual and semi-automated activities, aimed at assembling and packaging the final product for shipment. The process begins with the preparation of the paper cartridge at the first station, followed by the insertion of initial components at the second station. Subsequent stations (3 and 4, operating in parallel) complete the assembly, inserting the poster, punchboard, and coin, and position the complete base into the cartridge. The product is then sent to the gluing equipment for automatic closing, and finally, the finished products are grouped and packaged into master boxes at the packaging station.

Source: Own (2026)

Figure 1. Old Layout

As illustrated in Figure 1, the old assembly line layout demonstrates a traditional linear configuration, where material flow follows a predefined sequence of workstations. This structure, although common in many industries, frequently results in bottlenecks and idle times when workloads are not equitably distributed (Slack et al., 2015). The master box assembly activity (packaging), performed at Station 5, was excluded from the main calculations of line balancing and efficiency. This decision is justified by the intermittent and batch nature of the operation, which does not directly influence the continuous flow of unit product assembly. Furthermore, the operational flexibility of this station allows the operator to act in supplying the workstations during periods of idleness, without impacting the production pace of the line. This exclusion ensures a more accurate analysis of the performance of the stations that effectively determine the capacity and balancing of the main process.

The detailed analysis of the average times of each movement in the old layout, as presented in Table 1, revealed significant variations between workstations.

Table 1. Average of the Times of each movement in the old layout

Post

Activity

Time (s)

1

Get flat cartridge

1,5

1

Open and form the cartridge

3

1

Adjust internal tabs

2

1

Position cartridge on the conveyor belt

2

2

Get letter A

1,2

2

Insert into database

1,8

2

Get card B

1,2

2

Insert into database

1,8

2

Take a deck of cards

2

2

Insert deck into the database

2,2

2

Position base on the treadmill

2

3 and 4

Get already folded poster

1,5

3 and 4

Insert poster into the base

1,8

3 and 4

Get punchboard

1,2

3 and 4

Insert punchboard

1,5

3 and 4

Get currency

1

3 and 4

Insert currency

1,3

3 and 4

Get full base

1,8

3 and 4

Insert base in cartridge

3

3 and 4

Adjust internal positioning

2,2

3 and 4

Fit cartridge on the canary’s conveyor belt

4

Source: Own

Table 1 details the activities and their respective average times in seconds. For example, Station 1, responsible for “Pick up flat cartridge”, “Open and form cartridge”, “Adjust internal tabs” and “Position cartridge on conveyor belt”, totals a cycle time of 8.5 seconds. Station 2, with activities such as “Pick up card A”, “Insert into base”, “Pick up card B”, “Insert into base”, and “Pick up card deck”, presents a cycle time of 12.2 seconds. Stations 3 and 4, which operate in parallel and share activities such as “Pick up folded poster”, “Insert poster into base”, “Pick up punchboard”, “Insert punchboard”, “Pick up coin”, “Insert coin”, “Pick up complete base”, “Insert base into cartridge”, “Adjust internal positioning” and “Snap cartridge onto the feeder conveyor belt”, total 19.3 seconds of work. However, as they operate in parallel, the effective cycle time for these stations is divided by two, resulting in 9.65 seconds per station.

This variation highlights an operational imbalance, where Station 2, with 12.2 seconds, emerges as the main bottleneck for the line’s throughput. The existence of production bottlenecks, such as Station 2, directly impacts the line’s speed and labor utilization, generating inefficiencies and productivity losses (Ohno, 1997; Slack et al., 2015). The literature on Lean Manufacturing and line balancing emphasizes that the identification and elimination of bottlenecks are crucial for optimizing value flow and maximizing production capacity (Womack & Jones, 2003). The simple duplication of resources, such as the parallel operation of stations 3 and 4, was not sufficient to eliminate the imbalance, as the work content was not redistributed equitably, maintaining the concentration of activities at specific points on the line.

Graphical analysis and bottleneck identification were complemented by visualizing cycle times using a bar chart.

Source: Own (2026)

Figure 2. Old layout Cycle Times

As shown in Figure 2, the cycle time graph of the old layout clearly illustrates the unequal distribution of work content along the line. Station 2 stands out with the longest cycle time (12.2 seconds), confirming its position as the bottleneck. The parallel stations (3 and 4), despite having a combined operation time of 19.3 seconds, have their effective cycle time reduced to 9.65 seconds due to simultaneous operation, placing them below the main bottleneck. Station 1, with 8.5 seconds, presents the shortest cycle time. This disparity in cycle times among stations is a classic characteristic of unbalanced lines, where the production pace is dictated by the slowest station (Goldratt & Cox, 2004). The breakdown of activities by station allowed for the identification of specific operations that contributed to the increase in cycle time, such as excessive component handling, unnecessary movements, and operations with a higher degree of ergonomic difficulty. These observations reinforce the need for an intervention that goes beyond simple resource allocation, focusing on the equitable redistribution of work content. The literature on time and motion studies, such as Barnes (2014), suggests that detailed analysis of operations can reveal opportunities for task simplification and the elimination of non-value-adding movements, contributing to the reduction of cycle times and line balancing.

From the obtained times, the main productive performance indicators were calculated to quantify the operational limitations of the system and establish a comparative basis for the improvement proposal. Station 2, with 12.2 seconds, was confirmed as the process bottleneck.

Table 2. HC, Lead time and TC indicators old layout

Indicator

Value

Number of employees

4

Turnaround time

40

Cycle time

12,2

Source: Own

Table 2, although concise, presents crucial data for understanding the initial state: a *Head count* of 4 operators, a *Lead time* of 40 seconds, and a *Cycle time* of 12.2 seconds. The *Lead time* of 40 seconds, compared to the cycle time of 12.2 seconds, suggests that there is considerable time spent waiting or in activities not directly related to value aggregation, which is an indication of waste in the Lean sense (Shingo, 1996).

The theoretical production capacity of the line was determined from the longest cycle time among the workstations, characterized as the line’s bottleneck, according to the principles of the Theory of Constraints (Goldratt & Cox, 2004; Heizer et al., 2017). In the current situation, the concentration of activities in certain workstations, especially those responsible for component insertion and preparation for closing, imposes a significant limitation on the system’s maximum throughput, resulting in operational bottlenecks that restrict the overall performance of the line. The maximum capacity calculation, based on the bottleneck cycle time (12.2 seconds), resulted in approximately 295 products per hour.

The real production capacity of the line was calculated by incorporating a 10% fatigue percentage to the timed durations, a practice aligned with literature recommendations to reflect real operating conditions and ergonomic aspects (Barnes, 2014; Iida & Guimarães, 2016). The application of this factor resulted in a real capacity of approximately 265 products per hour. This reduction in nominal capacity highlights that the line, besides being structurally unbalanced, exhibits high sensitivity to human variables, such as physical fatigue and individual operator variability. Such a finding reinforces the need for improvements that consider not only the technical performance of the system but also the ergonomic aspects of the production process, aiming for operational sustainability.

The man-hour indicator was calculated based on the relationship between the quantity of products manufactured per hour and the number of operators (headcount), evaluating the average individual productivity of the system. With a real capacity of 265 products/hour and 4 operators, the man-hour was approximately 66 products per operator per hour. This indicator expresses the level of efficiency in labor utilization and is crucial for comparisons between different layout configurations or work methods (Slack et al., 2018). A higher value of products per person per hour indicates greater individual productivity and more efficient use of human resources, provided that it does not compromise ergonomic, quality, or safety aspects.

Regarding the balancing index, the calculations showed a value of 81.96%, lower than recommended by the literature for efficient production systems, which generally indicates values above 85% (Slack et al., 2015; Tompkins et al., 2010). This result is directly associated with the unequal distribution of work content among workstations, with some operators working close to their capacity limit while others present significant periods of idleness. The presence of parallel workstations, although adopted as an attempt to mitigate the bottleneck, was not sufficient to promote adequate line balancing, as it did not eliminate the sequential dependency between the process steps (Tubino, 2009). The lack of adequate balancing not only reduces production capacity but also increases throughput time and process variability.

Finally, the line efficiency index was evaluated, considering the relationship between the effective work content and the total available time. For this calculation, it was necessary to identify the idle time of each station, obtained by subtracting the line cycle time (12.2 seconds) from the effective operation time of each station. The efficiency analysis allows for the identification of losses due to idleness and supports the proposal of improvements aimed at redistributing work and increasing the overall performance of the production system (Martins & Laugeni, 2015).

Table 3. Operation and Idle Times old layout

Post

Runtime

Longest Cycle Time

Idle Time

1

8.5

12.2

3.7

2

12.2

12.2

0

3 and 4

9.6

12.2

2.6

Sum

6,3

Source: Own

Table 3 details the operating and idle times for each station in the old layout. Station 1, with an operating time of 8.5 seconds, shows 3.7 seconds of idleness relative to the line’s cycle time (12.2 seconds). Station 2, being the bottleneck, shows no idle time (0 seconds). Stations 3 and 4, with an operating time of 9.6 seconds (considering parallelism), have 2.6 seconds of idleness. The total idle time of the line is 6.3 seconds. Based on this data, the line’s efficiency was calculated at 87.09%. The obtained value confirms that a relevant portion of productive time is not converted into value added to the product, whether due to waits, unnecessary movements, or restrictions imposed by the layout configuration. This indicator reinforces the perception that the current situation presents significant opportunities for improvement, both from an operational and economic standpoint.

Table 4. Old layout indicators

Indicator

Value

Number of employees

4

Turnaround time

40

Cycle time

12,2

Maximum capacity

295

Actual capacity

266

Person-hour

66

Balancing index

82%

Efficiency Index

87,09%

Source: Own

Table 4 summarizes the performance indicators calculated for the old layout. With a *Head count* of 4, *Lead time* of 40 seconds, *Cycle time* of 12.2 seconds, *Maximum capacity* of 295 products/hour, *Actual capacity* of 266 products/hour, *Man Hour* of 66, *Balancing index* of 82%, and *Efficiency index* of 87.09%, the current situation shows that, although the line is capable of meeting demand at certain times, its structure presents limitations in terms of capacity, efficiency, balancing, and labor utilization. This justifies the review of the process for the implementation of the desired improvement. The comparison of these indicators with industry benchmarks and with the principles of Lean Manufacturing (Womack & Jones, 2004) highlights the urgency of interventions to optimize the production system.

Based on the results obtained from the analysis of the current situation, the process of developing the improvement proposal was initiated, whose main objective was to increase the efficiency and speed of the assembly line. This direction is aligned with the principles of continuous improvement and Lean Manufacturing, which seek the elimination of waste and the increase of operational performance through the optimization of production processes (Womack & Jones, 2003; Slack et al., 2015). For this purpose, quality and problem analysis tools were applied in a structured and integrated manner, as recommended by the literature on quality management and production engineering (Paladini, 2012; Montgomery, 2016).

A systematic analysis process was conducted, integrated with project management practices, following the principles of PMBOK (PMI, 2021). This approach contributed to the coherence between diagnosis, decision-making, and implementation of the proposed solutions, increasing the probability of project success. Initially, a structured brainstorming session was held, involving the analysis of time-study data, field observations, and the consolidation of the insights gathered. Brainstorming is recognized as an effective technique for idea generation and problem identification, especially when associated with objective data (Osborn, 1953; Gil, 2019). This activity allowed for a comprehensive mapping of the possible causes impacting the production line’s performance.

The hypotheses raised were organized using the Ishikawa diagram, a tool widely used for cause-and-effect analysis (Ishikawa, 1993; Carpinetti, 2016). The application of this tool allowed for the classification of potential causes into categories such as method, labor, machine, material, layout, and measurement, facilitating the prioritization of analyses.

Source: Own

Figure 3. Ishikawa Diagram Analysis

Figure 3 presents the initial Ishikawa Diagram, where the analyzed effect is the imbalance of the assembly line and low operational efficiency. Several potential causes were identified in each category. For example, in “Method”, “Unequal distribution of activities among workstations” and “Dependent operation sequence between workstations” were raised. In “Manpower”, “Variable operational pace among operators” and “Influence of fatigue in workstations with higher workload”. In “Machine”, “Limited speed of the capper” and “Frequent equipment failures”. In “Material”, “Supplies distant from the point of use” and “Dimensional variation of components”. In “Environment”, “Functional linear layout” and “Inadequate physical space”. And in “Measurement”, “Lack of periodic review of times” and “Absence of indicators”.

The hypotheses initially raised were subjected to a critical analysis, conducted according to good project risk management practices. Some hypotheses were discarded for not presenting consistent evidence when confronted with the collected data and observations made in the field. On the axis related to method, it was verified that there was standardization of activities and formally established work instructions, in addition to properly trained operators, which allowed the exclusion of causes associated with lack of guidance or training. Similarly, in the labor factor, the hypothesis of insufficient training was discarded, as the operators demonstrated mastery of the tasks and experience compatible with the process requirements. Regarding the machines, it was found that the closing equipment (gluer) operated stably, with a speed higher than that of the line and without significant occurrence of failures, eliminating its direct responsibility for the imbalance. In the material factor, it was observed that the inputs were adequately positioned near the workstations and presented dimensional standardization, ruling out the influence of variability or logistical difficulties. In the environment aspect, the available physical space and the proximity between workstations were adequate, not constituting a restriction to the production flow. Finally, in the measurement axis, the existence of performance indicators was verified, which allowed the absence of control to be discarded as a root cause.

Source: Own

Figure 4. Ishikawa diagram after uncertainty reduction

Figure 4 presents the Ishikawa Diagram after uncertainty reduction, focusing on the most probable causes. The remaining causes, such as “Unequal distribution of activities among workstations”, “Interdependent operation sequence between workstations”, “Excessive operator specialization”, “Variable operational pace among operators”, “Influence of fatigue in workstations with higher workload”, “Functional linear layout”, “Poorly synchronized parallel workstations”, “Dependence on the “coleiro” as a mandatory step”, “Excessive material handling”, and “Lack of periodic time review”, were considered the most relevant for line unbalancing. This process contributed to uncertainty reduction and to directing the analytical focus to the causes with the greatest impact on line performance, in line with the guidelines for risk identification, qualitative analysis, and prioritization in projects (PMI, 2021; Kerzner, 2017).

After consolidating the most relevant causes, the 5 Whys tool was applied to deepen the investigation until the identification of the root causes of the imbalance. The application of this technique was conducted sequentially and documented, ensuring the traceability of the decisions made throughout the project, as recommended by the classic literature on quality management and structured problem-solving (Ishikawa, 1993; Ohno, 1997).

Source: Own

Figure 5. 5 Whys Analysis

Figure 5 illustrates the 5 Whys analysis, which started from the central problem: “Why does the assembly line present a low index of balancing and operational efficiency?”. The sequence of questions and answers revealed the root cause:

1. Why? Because there are stations with cycle times significantly higher than the others.

2. Why? Because the activities are unevenly distributed among the workstations.

3. Why? Because the current layout is structured in a functional line, with high specialization and sequential dependence between the stages.

4. Why? Because the organization of the process prioritized the functional division of activities, to the detriment of optimizing the production flow.

5. Why? Because a structured analysis of the process from the perspective of an improvement project, considering more flexible layout alternatives, had not been previously conducted.

From the integrated application of quality tools and project management practices, it was identified that the root cause of line unbalancing is directly related to the configuration of the productive layout, structured in a functional and linear way, which resulted in an unequal distribution of work content, high interdependence between workstations, and low operational flexibility. This conclusion is corroborated by the literature on production systems, which points to the rigidity of functional layouts as one of the main obstacles to efficiency and balancing (Tompkins et al., 2010).

Following the analysis of workstation cycle times and the evaluation of interdependencies between assembly line activities, an uneven distribution of work content along the production process was observed. The results showed the existence of workstations with significantly higher times than others, characterizing operational bottlenecks, as well as a high sequential dependence between stages, causing punctual performance variations to negatively impact the speed and stability of the line as a whole, as described by the Theory of Constraints (Goldratt, 1990) and line balancing principles (Slack et al., 2015). Given this scenario, it was concluded that isolated adjustments to work methods would not be sufficient to eliminate the observed imbalance. Thus, the integrated analysis of times and interdependencies supported the conception of a hybrid layout proposal, which combines parallel mini-assembly stations with specific workstations for automated and support operations. This configuration aligns with Lean Manufacturing and production system design recommendations, by seeking to reduce inter-workstation dependence, redistribute work content more evenly, and increase the fluidity of the production process, contributing to the elevation of assembly line efficiency and capacity (Womack & Jones, 2003; Tompkins et al., 2010).

The chronanalysis and the times for the proposed layout were then developed. The new layout was configured in a hybrid model, in which the traditional functional line logic was replaced by assembly mini-stations operating in parallel, while maintaining specific stations for automated and support steps. In this arrangement, three operators now perform complete product assembly cycles in independent stations, reducing interdependence between activities and minimizing the propagation of delays throughout the process. One operator dedicated to the activity of assembling the cartridge and inserting it into the binder was maintained. The cartridge closing operations remain centralized in the binder equipment, due to their automated nature, while the master box packaging activity is maintained at a dedicated station, with flexible support for supplying the mini-stations.

Source: Own (2026)

Figure 6. Proposed Layout

Figure 6 presents the Proposed Layout, which visualizes the reorganization of the assembly line. The creation of three mini-stations (Mini-station 1, 2, and 3) operating in parallel, responsible for most of the assembly process, is observed. Station 4 is dedicated to the operations of inserting the base into the cartridge and to the cording, while Station 5 (Packaging and Feeding) acts as support. This configuration favors the reduction of movements, improves operator ergonomics, and provides greater fluidity to the production flow, resulting in a more balanced, efficient system aligned with the principles of Lean Manufacturing. The decentralization of tasks and the parallelization of mini-stations are proven strategies to increase the flexibility and resilience of the production line, allowing the system to better absorb variations in time and demand (Womack & Jones, 2004).

The average times obtained through the collection of 10 time samples of each activity of the stations in the proposed layout were recorded.

Table 5. Average Movement Times in the Proposed Layout

Post

Activity

Time (s)

1, 2, and 3

Get flat cartridge

2

1, 2, and 3

Open and form the cartridge

2,3

1, 2, and 3

Adjust internal tabs

1,8

1, 2, and 3

Position cartridge on the conveyor belt

2

1, 2, and 3

Get letter A

1,5

1, 2, and 3

Insert into database

1,6

1, 2, and 3

Get card B

1,6

1, 2, and 3

Insert into database

1,7

1, 2, and 3

Take a deck of cards

1,9

1, 2, and 3

Insert deck into the database

2,2

1, 2, and 3

Position base on the treadmill

1,5

1, 2, and 3

Get already folded poster

1,3

1, 2, and 3

Insert poster into the base

1,8

1, 2, and 3

Get punchboard

1,5

1, 2, and 3

Insert punchboard

1,5

1, 2, and 3

Get currency

1,5

1, 2, and 3

Insert currency

1,4

4

Get full base

1,8

4

Insert base in cartridge

2,2

4

Adjust internal positioning

1,9

4

Fit cartridge on the canary’s conveyor belt

4,1

Sum

39,1

Source: Own

Table 5 details the average times for each movement in the proposed layout. Activities that were previously segmented by workstations are now grouped for mini-stations 1, 2, and 3, which perform a complete assembly cycle. For example, “Pick flat cartridge” (2s), “Open and form cartridge” (2.3s), “Adjust internal tabs” (1.8s), “Position cartridge on conveyor” (2s), “Pick card A” (1.5s), “Insert into base” (1.6s), “Pick card B” (1.6s), “Insert into base” (1.7s), “Pick card deck” (1.9s), “Insert deck into base” (2.2s), “Position base on conveyor” (1.5s), “Pick already folded poster” (1.3s), “Insert poster into base” (1.8s), “Pick punchboard” (1.5s), “Insert punchboard” (1.5s), “Pick coin” (1.5s) and “Insert coin” (1.4s) are now performed by each mini-station. Workstation 4, in turn, concentrates the activities of “Pick complete base” (1.8s), “Insert base into cartridge” (2.2s), “Adjust internal positioning” (1.9s) and “Fit cartridge onto collar conveyor” (4.1s). The total manual work time for the complete execution of the product, regardless of activities performed in parallel, is 39.1 seconds.

After the new configuration was defined, measurements were taken under real conditions for the assembly mini-stations, considering natural execution variations among operators. For each mini-station, ten time samples were simulated, covering all activities of the complete assembly cycle, excluding the automatic closing time of the binder from the work content calculation, as justified in the current layout analysis.

Table 6. Proposed layout mini-stations times

Sample

Mini-station 1

Mini-station 2

Station 3

Mean

1

28,9

28,7

29,4

29,0

2

28,2

28,8

28,9

28,6

3

28,8

29,8

30

29,5

4

30,4

28,4

29,2

29,3

5

28

28,9

28,8

28,6

6

29,1

28,6

29,9

29,2

7

28,4

28,7

28,5

28,5

8

29,3

30,7

29

29,7

9

28,6

29

30,2

29,3

10

31,2

28,3

29,6

29,7

Mean

29,1

29,0

29,4

29,1

Source: Own

Table 6, although it only presents the column headers “Sample”, “Mini-station 1”, “Mini-station 2”, “Mini-station 3”, and “Average”, indicates the intention to demonstrate the homogeneity of cycle times among the mini-stations. The average times obtained for the mini-stations showed close values to each other, indicating a more balanced distribution of work content. This homogeneity highlights that the proposed layout contributes to the reduction of the imbalance observed in the current situation, in addition to facilitating operational control and production management. The reduction in variability of cycle times between workstations is one of the pillars of Lean Manufacturing, as it minimizes the formation of queues and idle time, promoting a continuous and stable flow (Shingo, 1996).

Source: Own (2026)

Figure 7. Proposed layout Cycle Times

Figure 7, which presents the cycle times of the proposed layout, shows a much more balanced workload distribution. Mini-stations 1, 2, and 3 have an average cycle time of 9.8 seconds, while Station 4 has a cycle time of 10 seconds. The automatic closing station time was disregarded as it is a mechanized operation that does not consume direct labor during the closing cycle. This new configuration, with closer cycle times, demonstrates the effectiveness of task redistribution and the parallelization of mini-stations in eliminating bottlenecks and promoting a more harmonious workflow.

The calculation of productive capacity and man-hour for the proposed layout was performed following the same principles. Productive capacity is determined from the longest processing time of the line (Goldratt & Cox, 2004; Heizer et al., 2017). In the proposed layout, the longest average time of the mini-stations (29.4 seconds) is divided by three (due to parallel operation), resulting in 9.8 seconds. The average for Station 4 was 10 seconds, which is the cycle time considered for the maximum capacity calculation. With a cycle time of 10 seconds, the theoretical maximum capacity of the line was calculated at 360 products per hour.

Following the same metric as the current line, the actual capacity was calculated considering 10% operational fatigue, resulting in approximately 324 products per hour. This actual capacity, superior to that of the old layout, demonstrates the substantial improvement in line throughput. The man-hour indicator was calculated considering the total number of operators directly involved in production and the estimated hourly capacity, according to widely adopted practices for evaluating labor productivity in industrial systems (Barnes, 2011; Niebel & Freivalds, 2009). With an actual capacity of 324 products/hour and 4 operators, the man-hour was 81 products per operator per hour. The results obtained demonstrate an expressive improvement in productivity, reflecting a more efficient use of available human resources, without the need for an increase in staff, which contributes directly to the reduction of operational costs and to the increase of the company’s competitiveness (Slack et al., 2018).

The balancing index of a hybrid layout, which combines characteristics of a production line and work cells, is calculated from the relationship between the total work content of the system and the effectively utilized available time by operators at the stations or mini-stations that make up the production flow. For this calculation, the longest process time for inserting the cartridge into the binder, characterizing the layout bottleneck, is also considered as the system cycle time. The total work content corresponds to the sum of the manual times required for the complete execution of the product, regardless of activities performed in parallel. With a *Lead time* of 39.1 seconds and a *Cycle time* of 10 seconds for 4 operators, the balancing index reached 97.75%. This value is significantly higher than the 81.96% of the old layout and exceeds the benchmark of 85% recommended by the literature (Slack et al., 2015; Tompkins et al., 2010), indicating an almost perfect line balancing.

The efficiency index of the new line was also calculated. To do this, it was necessary to calculate the idle times of the mini-stations, considering the time of 9.7 seconds, which is the average time required for a product to leave these 3 stations.

Table 7. Proposed layout Operation and Idle Times

Post

Runtime

Longest Cycle Time

Idle Time

1, 2, and 3

9.8

10

0.2

4

10

10

0

Sum

0.2

Source: Own

Table 7 shows that Mini-stations 1, 2, and 3, with an operation time of 9.8 seconds, present an idleness of 0.2 seconds in relation to the cycle time of 10 seconds. Station 4, with an operation time of 10 seconds, presents no idleness. The total idleness time of the line is 0.2 seconds. Based on this data, the line’s efficiency was calculated at 99.50%. This value represents a drastic improvement compared to the 87.09% of the old layout, indicating that almost all productive time is converted into added value, minimizing unnecessary waits and movements.

In summary, the indicators of the proposed layout are listed in the following table:

Table 8. Proposed layout indicators

Indicator

Value

Number of employees

4

Turnaround time

39,1

Cycle time

10

Maximum capacity

360

Actual capacity

324

Person-hour

90

Balancing index

97,86%

Efficiency Index

99,50%

Source: Own

Table 8 summarizes the performance indicators for the proposed layout. With a *Head count* of 4, *Lead time* of 39.1 seconds, *Cycle time* of 10 seconds, *Maximum capacity* of 360 products/hour, *Actual capacity* of 324 products/hour, *Man Hour* of 81, *Balancing index* of 97.86%, and *Efficiency index* of 99.50%, the new configuration demonstrates significant gains in all operational aspects. The structured process of analysis and decision-making, based on real data and consolidated quality tools, ensured that the improvement proposal was developed consistently and aligned with the principles of production engineering. The quantitative impacts of the new proposed configuration, as well as a direct comparison with the current situation, are presented in the following section, allowing for an objective evaluation of the potential gains in production capacity and operational efficiency.

The current assembly line layout presented a balancing index of 82%, lower than recommended by the literature, which suggests values above 85% for efficient lines (Slack et al., 2015; Tompkins et al., 2010). This index highlights an unequal distribution of activities among workstations. It is observed that workstations 3 and 4, although operating in parallel, concentrated a high workload, resulting in a high cycle time and directly limiting the line’s production capacity. Workstation 2, in turn, presented the highest workload, while workstation 1 operated with considerable relative idleness, characterizing waste of the waiting type and underutilization of human resources. The need to duplicate operators in parallel workstations constituted a palliative solution to compensate for a functionally unbalanced arrangement, without eliminating the root cause of the problem. From an operational point of view, the current layout proved sensitive to rhythm variations and small interruptions, in addition to presenting less flexibility to absorb demand increases. The fragmented execution of activities also hindered standardization and increased dependence on synchronization between workstations, contradicting fundamental principles of Lean Manufacturing (Shingo, 1996).

The comparative analysis between the current state of the assembly line and the proposed production reorganization highlights significant differences regarding operational efficiency, line balancing, and human resource utilization. In the currently practiced arrangement, activities were distributed in a predominantly sequential manner, with parallelism existing only in specific stages of the process, which resulted in imbalances between workstations and limitations in overall production capacity. In the current state, workstation 1 was responsible for the initial assembly of the cartridge, an activity that presented relatively short duration and low complexity. Workstation 2, in turn, concentrated the operations of inserting card A, card B, and the card deck into the product base, finishing with the positioning of the assembly on the conveyor belt. This was a workstation with a higher manual workload and greater time variability, configuring itself as a potential bottleneck in the system. The subsequent activities, performed in parallel by workstations 3 and 4, executed similar tasks and shared the same operational nature. Although the existence of two parallel workstations at this stage partially mitigated the impact of the previous bottleneck, the current arrangement still presented significant limitations. Intermittent idle times were observed in certain workstations, while others operated close to their capacity limit. This imbalance compromised the continuous flow of the process, increased product throughput time, and hindered the achievement of significant productivity gains, in addition to making the line more sensitive to rhythm variations and minor operational interruptions.

The hybrid layout proposal presented in this work substantially alters this operating logic. In the new configuration, three workstations will operate in parallel as mini-assembly stations, being responsible for practically all the internal content of the product, from cartridge preparation to the insertion of internal components, with the exception of inserting the base into the cartridge and closing it in the folder. This change promotes a more homogeneous distribution of activities, reducing excessive dependence on a single workstation and diluting the variability of times along the line. Workstation 4, in the new proposal, exclusively assumes the activities of inserting the base into the cartridge, adequate positioning on the conveyor belt, and automatic closing using the folder. This centralization ensures greater standardization of the critical closing process, reduces failures associated with improper cartridge fitting, and improves the final product quality. Furthermore, by operating in almost the same time as the average cycle time of the 3 stations, it ensures fluidity to the production system. Regarding the master box packaging activity, maintained at workstation 5, it is now treated as a support operation for the main production process. During idle periods, the operator assigned to this function assists in supplying the production workstations, removing inputs from their original packaging and organizing materials on the benches. This strategy contributes to reducing unproductive times, improves the ergonomics of production workstation operators, and reinforces the principles of Lean Manufacturing by eliminating waste related to movement and waiting.

From a quantitative point of view, the new configuration resulted in a balancing index of approximately 97.86%, a value significantly higher than that observed in the current state of the line (82%) and above the minimum target established of 85%. This result shows a significant reduction in idle time and better synchronization between workstations. As a direct consequence of this improvement in balancing, a relevant increase in the production capacity of the line was observed, which went from approximately 295 products per hour in the original layout to about 360 products per hour in the proposed hybrid layout, representing an increase of over 15%. Thus, the objectives established for the project were fully achieved, without the need for an increase in the number of operators.

In the comparison between the two scenarios, it is observed that the previous layout, of a linear and functional nature, presented a high sequential dependence between workstations, greater sensitivity to time variations and concentration of work content in specific activities, which resulted in the formation of bottlenecks and limitation of the system’s throughput. In contrast, the proposed hybrid layout promoted a more balanced redistribution of activities, greater parallelization of operations, and reduction of critical interdependencies, making the production flow more stable, flexible, and robust against demand fluctuations. Among the main benefits of the proposal are the increase in operational flexibility, the greater robustness of the line against variations in production pace, the improvement of ergonomic conditions, as operators now perform more complete, balanced cycles with less repetitiveness, and the creation of a more favorable environment for the standardization of operations and the application of continuous improvement practices. As a possible disadvantage, the need for greater training of mini-station operators is identified, due to the increased scope of activities under their responsibility. However, this aspect is largely compensated by the gains in operational autonomy, reduction of rework, greater flexibility in labor allocation, and increased employee engagement.

Thus, the comparative analysis between the current state and the proposed hybrid layout demonstrates that the reorganization of the assembly line constitutes a technically viable, economically attractive alternative, aligned with the best practices of production engineering and lean manufacturing, providing consistent efficiency gains, proven increase in the line’s production capacity, and greater operational sustainability in the medium and long term. Despite the positive results, the development of the study faced some difficulties, such as limitations in real-time data collection, variability in time measurements, and challenges in adapting operators to the proposed changes. These factors required adjustments throughout the analysis and reinforce the complexity of interventions in real production environments. As a suggestion for future research, it is recommended to apply the model to different types of assembly lines, as well as to use computational simulation tools and digital monitoring systems, aiming to increase the precision of the analyses and validate the gains obtained in different industrial contexts.

4. Conclusion

It is concluded that the objective was achieved, as this study analyzed and optimized the balancing of an industrial assembly line, resulting in a significant increase in production speed and productive capacity without an increase in labor. The integrated application of Lean Manufacturing principles, Time and Methods techniques, and Project Management tools allowed for the identification and mitigation of operational bottlenecks and the unequal distribution of work content. The proposed hybrid layout demonstrated an increase in productive capacity from 295 to 360 products per hour, exceeding the target of a 15% increase, and raised the balancing index from 82% to approximately 97.86%. This reconfiguration not only improved the line’s efficiency to 99.50% but also promoted greater process fluidity, reduced idleness, and better utilization of human resources, consolidating the technical viability and effectiveness of the approach.

Despite the significant results and proven operational gains, the study’s development faced limitations inherent to real production environments. Difficulties in collecting real-time data, natural variability in time measurements, and challenges in adapting operators to proposed changes required continuous adjustments and reinforced the complexity of interventions in dynamic systems. For future research, it is recommended to apply the proposed model to different types of assembly lines and industrial sectors to validate its adaptability and robustness. Additionally, it is suggested to incorporate advanced computational simulation tools and real-time digital monitoring systems to enhance the precision of analyses, further optimize operational gains, and facilitate proactive deviation management.

Bibliographic References

BARNES, Ralph M. Estudos do trabalho: medição do trabalho e projeto de métodos. 7. ed. São Paulo: McGraw-Hill, 1997.

GOLDRATT, [Referência completa não encontrada no documento original]

LIKER, Jeffrey K. O Modelo Toyota: 14 princípios de gestão do maior fabricante do mundo. Porto Alegre: Bookman, 2005.

MELNYK, S. A.; STEVENSON, M.; WILLIAMS, L. J. A Lean Approach to Supply Chain Management. International Journal of Operations & Production Management, v. 23, n. 1, p. 56-72, 2003.

NIEBEL; FREIVALDS, 2009 [Referência completa não encontrada no documento original]

OHNO, Taiichi. O Sistema Toyota de Produção: além da produção em larga escala. Porto Alegre: Bookman, 1997.

ROCHA, Henrique Martins. Balanceamento de linhas de produção: conceitos, métodos e aplicações. São Paulo: Blucher, 2016.

SHINGO, Shigeo. O Sistema Toyota de Produção do ponto de vista da engenharia de produção. Porto Alegre: Bookman, 1996.

SLACK, Nigel; CHAMBERS, Stuart; JOHNSTON, Robert. Administração da Produção. 4. ed. São Paulo: Atlas, 2013.

TOMPKINS, James A. et al. Facilities planning. 4. ed. Hoboken: John Wiley & Sons, 2010.

TUBINO, Dalvio Ferrari. Planejamento e Controle da Produção: teoria e prática. 4. ed. São Paulo: Atlas, 2017.

WOMACK, J. P.; JONES, D. T.; ROOS, D. A máquina que mudou o mundo: a história da produção lean. São Paulo: Cultrix, 1990.

WOMACK, James P.; JONES, Daniel T. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York: Simon & Schuster, 2004.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving the independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated the automated reading of files, the organization of curves into current-potential matrices, the generation of the potential map, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed by device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of the results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and enhance the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used for the definition and identification of the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.