Article

October 26, 2026

Analysis of the use of handling equipment in Distribution Centers through telemetry data

Rodrigo Pereira Lopes; Eleandra Maria Prigol Meneghini

DOI: 10.22167/2675-6528-202603425

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

With the advancement of Industry 4.0 and the digitalization of logistics processes, telemetry systems have become widely used in monitoring operational efficiency in Distribution Centers. The present study aimed to analyze operational data generated by telemetry systems applied to a fleet of 24 vertical order picking machines in a large-scale pharmaceutical Distribution Center, focusing on the effective utilization of the fleet and the strategic sizing of the operation. The research was characterized as a descriptive case study, with a quantitative approach, and used data collected between October 2025 and January 2026. The results showed a significant predominance of non-productive states and a misalignment between the installed fleet of machines and the effective operational demand. It was observed that a subset of machines was structurally underutilized, and its conservative return, based on an estimated projection, would generate significant net savings. It was concluded that telemetry data enabled the precise identification of underutilization patterns and supported objective managerial recommendations for the adequate sizing of the fleet in the analyzed context.

Keywords: Distribution Centers; Fleet Sizing; Operational Efficiency; Telemetry.

1. Introduction

With the advancement of Industry 4.0 and the digitalization of production and logistics processes, organizations have begun to adopt technological solutions capable of expanding the collection and analysis of operational information. The objective is to increase efficiency, safety, and the capacity for evidence-based decision-making (Sardarabady and Durst, 2024; Winkelhaus and Grosse, 2020).

The application of Internet of Things (IoT) based technologies is presented as one of the strategic elements of digital transformation, allowing for greater precision, transparency, and the generation of performance indicators applied to logistics management (Ben-Daya and Hassini, 2019; Kagermann et al., 2013). De Koster et al. (2025) highlight that IoT applications in intralogistics operations enable real-time information collection for dynamic decisions, overcoming the limitations of approaches based on historical records. In this scenario, telemetry systems, through integration with equipment, are capable of performing remote monitoring of operational variables, recording information about the functioning, operating status, and location of assets. From these records, it has become possible to analyze usage and efficiency patterns, overcoming empiricism in machine management (Said et al., 2016).

In Distribution Centers (DCs), telemetry modules combined with logistics handling machinery enable greater control over fleet usage, providing detailed information about equipment utilization and performance. This allows managers to make decisions based on real records, rather than empirical experiences or generic parameters (Ponis and Efthymiou, 2020; Said et al., 2016).

One of the factors contributing to operational inefficiency is the high level of equipment idleness, which can increase infrastructure costs for recharging and generate inadequate machine flow in the operational environment. This scenario elevates the risk of collisions and, mainly, the costs of maintenance, electricity, and rental for equipment on loan. The collection and analysis of operational indicators allow for the proactive sizing of the equipment fleet and support decisions for continuous improvement of existing processes. With reliable information, it becomes possible to identify operational bottlenecks and low efficiency in resource allocation, creating opportunities for restructuring and optimizing operations (Kochańska et al., 2023).

Despite the technological advances observed in operational monitoring systems, the adoption of solutions for equipment management in warehouses is still in its early stages in many logistics operations, mainly facing economic and digital maturity barriers, which limits their implementation (Perotti et al., 2022). Given this context, the question arises: how can the data generated by telemetry systems support decisions on sizing the fleet of handling equipment in Distribution Centers? This question applies to a Distribution Center (DC) of approximately 38,000 m² located in the metropolitan region of the city of São Paulo, belonging to a family-owned pharmaceutical distribution company. The internal movement of materials is a critical logistics activity and accounts for significant portions of operational costs (Ballou, 2006). This impact is intensified when equipment remains idle for prolonged periods, a situation observed in the DC under analysis, where fleet sizing was based on managers’ experience and demand estimates without periodic calibrations of real needs. The results of this were a significant portion of the equipment remaining idle for prolonged periods and potential impacts on Operational Expenditure (OPEX).

Starting from this problem, the present study aimed to analyze operational data generated by telemetry systems applied to a park of 24 vertical order picking machines in a large pharmaceutical Distribution Center, focusing on the effective use of the fleet and the strategic sizing of the operation. These machines are widely used in picking operations carried out in two daily operational windows, characterized by high demand for internal material handling.

2. Material and Methods

This research was characterized as a descriptive case study with a quantitative approach. The case study was employed as an investigation strategy to analyze a contemporary phenomenon in its real context (Yin, 2015). The descriptive research aimed to describe the characteristics of the phenomenon studied, without data manipulation (Gil, 2007). The quantitative approach was based on the analysis of operational numerical data to identify fleet behavior patterns (Creswell, 2010).

The empirical object of the study consisted of a park of 24 vertical order picking machines, equipped with telemetry modules. The research was carried out in a Distribution Center (CD) of approximately 38,000 m², located in the metropolitan region of São Paulo, belonging to a family-owned company in pharmaceutical logistics distribution. Data collection occurred in the period between October 1, 2025, and January 16, 2026, excluding weekends.

The deployment of telemetry modules, prior to the collection period, involved a preparatory process of approximately three months, divided into three calibration stages to ensure the stability and reliability of the records. These stages included technical adaptation, parameterization of operational variables, and validation of records through time-motion study.

The first stage, of technical adaptation, focused on resolving connectivity limitations of the monitoring modules. Signal shadow zones were identified inside the CD that compromised the continuous transmission of records. To solve this issue, the communication modules were migrated from 2G to 4G, aiming to ensure more reliable coverage in the operational area and anticipate the discontinuation of 2G technology (Anatel, 2024).

The second stage, parameterization, consisted of the creation and calibration of the monitored operational variables. Initially, the telemetry offered only two statuses (Movement and Off), which limited the analysis. Together with the solution provider, seven operational statuses were defined: Movement, Picking, Idle, Loading, Full Loading, Off, and Under Maintenance, allowing for a more precise representation of the equipment’s behavior (Kochańska et al., 2023; Ponis and Efthymiou, 2020).

The third stage, validation, involved the verification of operational records through chronanalysis, a formal methodological step to ensure data reliability (Miler et al., 2020). A systematic comparison was carried out between the times recorded by the telemetry platform and the times measured directly in the operation for each of the seven parameterized statuses. ACR Safety on Lifting & Handling, a specialized monitoring company, provided, calibrated, and validated the modules.

Data collection used secondary records, extracted directly from the telemetry modules installed in the vertical order picking machines. No subjective information was collected, nor were operators identified. The DC also had 11 lifting platforms, but their use was restricted to inventory operations and they were segregated from the main analysis, serving only to contextualize the operational environment.

The data were extracted from the Wialon telemetry platform, a cloud-based asset monitoring and tracking system. The Wialon platform received the records transmitted by the telemetry modules via LTE (4G) network, consolidating them into a centralized interface. Subsequently, the records were mirrored to Microsoft Power BI for visual treatment and then exported to spreadsheets in Microsoft Excel, where the cleaning and quantitative analysis were performed.

In the data processing stage, records were submitted to a sanitation process in Microsoft Excel, based on predefined exclusion and compensation criteria. Records with negative values were excluded. When exclusion resulted in a daily sum less than 23 hours and 59 minutes, the missing time was proportionally compensated in the category corresponding to the excluded status, preserving the integrity of the daily total.

Temporal overlaps, characterized by two records of the same status that jointly exceeded the 23 hours and 59 minutes limit, were corrected by excluding the duplicate value, re-establishing sequence consistency. This process aimed to ensure the reliability and consistency of the analyzed information before its use in fleet utilization calculations, benefiting from the stability of the 4G LTE network.

The analyzed operations occurred in two daily operational windows: from 08:00 to 16:00, for supplying flow-racks and bins and manual picking processes; and from 22:00 to 02:00, for assembling standards and closed pallets directed to packaging and shipping. The analyses considered the segmentation of data according to these operational windows.

After data processing, the analysis was conducted in two stages. The first consisted of the aggregated evaluation of the fleet’s operational behavior, by calculating the average percentage distribution of the times recorded in each status throughout the analyzed period, considering the total number of monitored working days.

The second stage of the analysis consisted of the comparative evaluation of effective utilization, which summed the movement and picking times in relation to the total available time. This analysis was performed in an aggregated manner for the entire fleet and individually by machine and by month. The effective utilization index was calculated by the ratio between the total movement and picking time and the total time recorded per machine in the period, expressed as a percentage.

Regarding ethical considerations, the study did not involve the identification of operators or individuals. The analyzed data were exclusively linked to the operational behavior of the equipment. The organization’s name was suppressed, and the information was used exclusively for academic purposes, preserving the confidentiality and anonymity of the company and its employees.

3. Results and Discussion

The analysis of operational data, collected between October 2025 and January 2026, revealed a scenario of significant inefficiency in the use of the 24 vertical order picking machines in the pharmaceutical Distribution Center. A predominance of non-productive operational states was observed, which, in total, represented 65.45% of the total monitored time. In contrast, the effective utilization of the machines, which includes movement and picking times, corresponded to only 28.48% of the total, while 6.06% of the time was classified as unavailability due to loading and maintenance. This imbalance highlights a misalignment between installed capacity and real operational demand, as pointed out by Slack et al. (2018) regarding the discrepancy between contracted capacity and movement demand.

In terms of average daily time, each machine remained in effective use for only 6 hours and 49 minutes, resulting from the sum of 4 hours and 54 minutes in movement and 1 hour and 55 minutes in picking. This period contrasts sharply with the approximately 15 hours and 41 minutes during which the machines were in unproductive or unavailable states. The condition of isolated idleness, which represents the loss of opportunity for use, reached an average of 6 hours and 6 minutes daily per machine, exceeding the effective use time itself. This finding underscores the persistent nature of underutilization, even in months with better performance, where productive time did not reach one-third of the available 24 hours.

The monthly segmented analysis showed variations in effective fleet utilization, although the underutilization pattern remained stable. October 2025 recorded the lowest utilization rate, with 24.4% of the time in movement and picking, while November and December 2025 presented the highest rates, with 30.9% and 30.7%, respectively. In January 2026, utilization was 28.1%. The difference between the lowest and highest recorded value did not exceed 6.5 percentage points, indicating consistency in the underutilization pattern throughout the period. The lower utilization in October may be linked to the initial implementation phase of the telemetry system, while the drop in January may reflect the lower number of working days, although these are interpretations that could not be confirmed by the data.

The individualized evaluation of the 24 monitored machines revealed a significant dispersion in the effective utilization rates. The machine with the highest utilization registered 42.3% of the time in movement and picking, while the least utilized reached only 16.4%, resulting in a difference of 25.9 percentage points between the extremes of the fleet. The overall average effective utilization was 27.95%, with 8 machines showing rates below 25% and 16 machines operating below 30%. This imbalance in the distribution of use among the available assets suggests the absence of formal criteria for fleet rotation and balancing, corroborating the observation by Perotti et al. (2022) on how the lack of monitoring compromises resource management.

The results indicated that the four machines with utilization below 20% represent the subset with the greatest potential for reduction, without compromising the operational capacity of the CD. The persistence of this low utilization, observed over the four months, suggests that it is not an occasional event, but a consistent pattern of underutilization. In contrast, the machines with utilization above 40% demonstrate that the operational demand exists and is met by a specific portion of the fleet, reinforcing the idea of an imbalance in asset allocation. Kochańska et al. (2023) emphasize that, in logistics operations, the workload must be balanced among the assets, a condition that was not observed in this study.

The coexistence of equipment with high utilization and others predominantly idle reflects the absence of a formal policy for rotation and balancing of the fleet. Without a monitoring system to guide the distribution of use, equipment allocation tends to be influenced by familiarity or proximity, which accentuates the imbalance. Furthermore, it was found that, despite well-defined operational windows, there were records of movement and picking outside these intervals. This practice, which may include internal movements not related to order picking, can distort utilization analysis and reinforces the importance of systematic monitoring through IoT systems, as highlighted by Ponis and Efthymiou (2020).

From the perspective of Operations Management, the high levels of unproductive time identified signal a possible discrepancy between contracted capacity and the real demand for movement (Slack et al., 2018). In a lease agreement regime, this discrepancy has a direct impact on Operational Expenditure (OPEX), as the fixed rental cost is incurred regardless of the asset’s utilization level. Kochańska et al. (2023) emphasize that high idle rates are associated with avoidable costs of energy, maintenance, and charging infrastructure, which persist as long as the equipment remains in the fleet. In this context, the adoption of telemetry systems allows for overcoming empirical management practices, providing objective criteria for sizing decisions, as pointed out by Said et al. (2016), which is corroborated by the findings of this study.

The joint analysis of the data, considering the distribution by status, the monthly variation, and the dispersion between machines, suggested that the vertical order picking machine fleet of the studied DC shows clear signs of oversizing in relation to the effective operational demand. With 65.45% of the total monitored time in unproductive states, an average effective utilization of 27.95%, and 8 machines with indices below 25%, the data indicated concrete opportunities for a review of the current fleet sizing. Telemetry, therefore, not only enabled an accurate operational diagnosis but also generated subsidies for decisions on OPEX reduction with a measurable financial return.

Based on the indicators identified, and conservatively to maintain an operational margin that absorbs demand variations and peaks, the evaluation of the return of 4 machines that presented effective utilization below 20% throughout the entire analyzed period was recommended. This measure aims to prevent the reduction of the fleet from compromising the operation’s service capacity. The simulation projected based on the collected data indicated that, with the return of these 4 machines, the average effective utilization of the remaining fleet would increase from 27.95% to 32.72%, representing an increase of 4.77 percentage points, redistributing the operation to the remaining 20 machines.

The financial projection, based on market reference values, indicated that the conservative return of the 4 machines would generate an estimated net savings of R$ 49,200.00 per month. Considering a unit leasing cost of R$ 12,000.00 per machine and a telemetry cost of R$ 300.00 per machine, the total monthly cost of the current fleet of 24 machines is R$ 295,200.00. With the reduction to 20 machines, the projected cost would be R$ 246,000.00. In an annual projection, the estimated savings reach R$ 590,400.00, a value that exceeds by more than eight times the total investment in telemetry monitoring, suggesting a significant financial return and a direct impact on OPEX reduction.

To structure the implementation of the recommendations, the 5W2H management tool was applied, which detailed the actions for the return of underutilized machines and the implementation of a formal equipment rotation policy. The return of the 4 machines, with effective utilization below 20%, aims to reduce OPEX and eliminate fixed costs without proportional operational counterpart. This action is applicable to the analyzed Distribution Center, with potential for extension to other DCs in the network, and should occur after data validation and contractual analysis with the supplier, involving operations management and the contracts and supplies departments.

The implementation of a formal equipment rotation policy aims to establish allocation and rotation criteria among available equipment, reducing usage dispersion, improving recharge management, and balancing the wear and tear of fleet machines. This policy is relevant for all Distribution Centers (CDs) that operate with monitored vertical order picking machines and should be defined with periodic review of indicators. Operational supervision, along with reading telemetry data, will ensure machine balancing, defining rotating use rules that prioritize less utilized equipment. The implementation cost is linked to the review of internal processes, with no need for additional investment in technology.

In summary, the telemetry data were crucial for identifying underutilization patterns and a misalignment between the machine fleet and the effective operational demand. This analysis supported objective managerial recommendations for fleet sizing, including the return of underutilized machines and the implementation of a rotation policy, with projections of significant net savings. The findings demonstrate how monitoring technology, aligned with Industry 4.0 principles, can transform operational data into inputs for strategic decisions, optimizing asset utilization and reducing operational costs in the analyzed Distribution Center.

4. Conclusion

This study analyzed operational data generated by telemetry systems in a fleet of 24 vertical order picking machines in a pharmaceutical Distribution Center, with the purpose of evaluating the effective utilization of the fleet and supporting its strategic sizing. A predominance of non-productive operational states was observed, representing 65.45% of the total monitored time, while the effective utilization of the machines was only 28.48%. This discrepancy highlighted a significant misalignment between installed capacity and real operational demand, with a subset of machines being structurally underutilized. Individualized analysis revealed a significant dispersion in usage rates, with eight machines operating below 25% of their effective capacity. The telemetry data were crucial for identifying these underutilization patterns and for supporting objective managerial recommendations, including the return of four machines with low utilization and the implementation of a formal rotation policy. This approach generated a projected net monthly savings of R$ 49,200.00, demonstrating the potential of telemetry to optimize asset management and reduce operational costs.

However, the study presented limitations related to the analysis period of approximately three and a half months, which may not have captured broader seasonal variations in operational demand. Furthermore, the research focused on equipment behavior, without integrating data on order volume or operator productivity, which prevented a correlation of machine utilization with performance indicators of the operation as a whole. For future studies, it is suggested to extend the data collection period, incorporate information on operational demand, and apply predictive models. Such advancements would allow for the simulation of sizing scenarios with greater precision and a smaller margin of uncertainty. The practical contribution of this work lies in demonstrating how monitoring technology, aligned with Industry 4.0 principles, can transform operational data into inputs for strategic decisions, optimizing asset utilization and generating a measurable financial return in the context of Distribution Centers.

Bibliographic References

Ben-Daya, M., Hassini, E., & Bahroun, Z. (2019). Internet of things and supply chain management: a literature review. International Journal of Production Research 57(15-16):

Ben-Daya, M., Hassini, E., & Bahroun, Z. (2019). Internet of things and supply chain management: a literature review. International Journal of Production Research 57(15-16): 4719-4742.

Sardarabady, N.J., & Durst, S. (2024). A systematic literature review on the economic impact of digitalization technologies in transport logistics. Technology in Engineering and Management 2: 76-89.

Winkelhaus, S., & Grosse, E.H. (2020). Logistics 4.0: a systematic review towards a new logistics system. International Journal of Production Research 58(1): 18-43.

Article originating from the Final Course Work of the Specialization in Business Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.