Article

October 26, 2026

Scrum and traditional project management: comparison of efficiency and results

Marcelo Rodrigo Veroneze; Gilberto Marassi de Loiola Leite

DOI: 10.22167/2675-6528-202601167

Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.

Summary

Project management in Information Technology (IT) companies requires methods capable of structuring workflows characterized by high variability and the need for timely response. The study aimed to comparatively analyze traditional and Scrum management approaches, focusing on the efficiency and results of an organizational project in a small IT company in São Paulo. The methodology was characterized as applied research, qualitative and descriptive, developed through a case study based on documentary analysis and operational record survey. The results showed that the traditional approach ensured traceability and predictability in continuous services, such as security and monitoring, while Scrum optimized visibility and responsiveness in critical incidents and technical urgencies. It was concluded that the integration of elements from both management logics in a hybrid model allowed for the reduction of informational bottlenecks and the strengthening of operational control. The study highlighted that the methodological choice should be aligned with the nature of the deliverables to ensure organizational efficiency.

Keywords: Organizational Efficiency; Hybrid Management; Operational Records.

1. Introduction

Project management holds a central position in contemporary organizations, especially in contexts marked by constraints of time, cost, and quality. Projects, as defined by the Project Management Institute (PMI, 2021), are temporary endeavors undertaken to create a unique product, service, or result, requiring planning, coordination, and control aligned with organizational objectives. In the Information Technology (IT) sector, the relevance of this discussion is intensified by constant digital transformation and the growing demand for specialized services.

The Brazilian IT market demonstrates remarkable dynamism. Data from the Brazilian Association of Software Companies (ABES, 2026), based on the International Data Corporation (IDC), indicated that the sector generated US$ 67.8 billion in 2025, a growth of 18.5% compared to 2024. Brazil maintained the tenth position in the global IT investment ranking and expanded its participation in Latin America to 38.4%. This expansion scenario imposes growing demands on IT companies for adaptation, availability, and rigorous control of the services provided.

However, this growth environment also presents significant managerial challenges, particularly for small businesses operating in IT services. The coexistence of recurring tickets, urgent requests, and an intense dependence on communication between the technical team and users is frequently observed. In the specific case analyzed, the company offers support for small and medium-sized organizations, monitoring, technical documentation, auditing, and periodic reports, which characterizes an operational routine with multiple work fronts.

In this operational context, problems such as equipment slowness, email failures, system unavailability, data loss, connectivity difficulties, and information security risks directly affect the continuity of customer operations. The absence of clear mechanisms for prioritization, demand control, and activity visibility results in rework, delays, and loss of efficiency, highlighting a gap in the structuring of the technical demand tracking flow.

To deal with the complexity of project management, several methodological approaches have been developed. Traditional project management, systematized by the PMI (2021) guidelines, favors upfront planning, detailed scope formalization, rigorous schedule control, and structured performance monitoring. This approach is characterized by the predictability of activities and structured control of changes, seeking to minimize uncertainties and ensure adherence to the initial plan.

In contrast, “Scrum” is a lightweight framework, grounded in empiricism, transparency, inspection, and adaptation, as described by Schwaber and Sutherland (2020). In this approach, work is organized into short cycles, known as sprints, with frequent reviews and continuous reprioritization, aiming for incremental deliveries. “Scrum” offers greater flexibility and responsiveness to change, being particularly suitable for environments with high variability and uncertainty.

The literature indicates that there is no absolute superiority between predictive and adaptive models, and the methodological choice should be aligned with the nature of the deliverables and the organizational context. Given the need to understand how different management logics apply to an IT environment with varied demands, this study is justified by the search for greater visibility, control, predictability, and adaptability. Thus, the objective of this study was to comparatively analyze the traditional project management and “Scrum” approaches regarding efficiency and results in an organizational project developed in a small IT company, in São Paulo (SP), between February and April 2026.

2. Material and Methods

The study was characterized as applied research, with a qualitative approach, a descriptive and analytical objective, developed through a single case study. The applied nature stemmed from the analysis of a concrete situation in the area of Project Management, seeking to examine how different methodological approaches could structure the conduct of a project in a business environment.

The descriptive classification was adopted to characterize the organizational context, the selected project, and the elements that comprised its management. The analytical character stemmed from the comparison between traditional project management and “Scrum”, based on criteria related to efficiency and results (Gil, 2022).

The qualitative approach proved adequate because the analysis was centered on the interpretation of processes, management practices, work organization, and project execution dynamics, rather than on in-depth statistical measurement of variables (Richardson, 2017). The technical procedure adopted was the case study, understood as an appropriate strategy for investigating contemporary phenomena in their real context (Yin, 2015).

The research was conducted in a small company in the Information Technology (IT) sector, located in the municipality of São Paulo (SP), whose identity was preserved for confidentiality reasons. The organization provided technical support, monitoring, information security, technological environment documentation, and corporate services to small and medium-sized enterprises.

The research scope focused on the area responsible for monitoring operational demands, organizing technical activities, and coordinating the services provided. The object of study consisted of an organizational project aimed at structuring the workflow for monitoring technical demands, focusing on defining work stages, distributing responsibilities, monitoring activities, and improving the organization of deliverables.

The period considered in the analysis comprised the months from February to April 2026. The process improvement project aimed to structure the registration, prioritization, distribution, monitoring, and closing of technical demands, covering from the initial registration to the control of pending issues and the closing of the request.

The team involved in the project was composed of a project manager, responsible for the overall coordination of the workflow, organization of priorities, and alignment of services. A process analyst acted in the organization of records, standardization of the workflow, and consolidation of information for control.

The technical team was responsible for the execution of remote and in-person support, network management, security, “backup”, and monitoring. Representatives from the demanding areas acted as the origin of requests and validation of solutions, while internal “stakeholders” influenced priorities and project direction.

Data collection was carried out through documentary analysis and a survey of the project’s operational records. Planning documents, schedules, task definitions, progress records, activity execution notes, demand controls, and workflow organization tools were considered.

Records of communication between those involved, task monitoring instruments, and support materials for activity management were also used. These materials allowed for a structured description of the project, reconstruction of its management logic, and identification of the execution sequence, organization of deliverables, and monitoring mechanisms.

The data analysis was conducted in a descriptive and comparative manner, based on the sequential organization of the information obtained in the case study. Initially, the collected records were ordered according to the project’s development logic, considering the scope definition, the steps executed, those responsible for the activities, the monitoring instruments, and the workflow.

In the next stage, the data were systematized into analytical categories compatible with the research objective. The information was grouped according to central elements of project management, such as planning, execution, monitoring, communication, change management, and delivery organization.

The analysis criteria covered the degree of detail in the initial planning, the clarity in defining responsibilities, the frequency of activity review, the way changes were handled, the regularity of deliverables, communication among those involved, and the perceived effects on project efficiency and results.

Finally, the comparison between the organized data allowed distinguishing the predictive logic of traditional management from the adaptive logic of “Scrum”. In the traditional approach, the analysis focused on the formalization of planning, the control of changes, and adherence to the initial schedule. In “Scrum”, the observation focused on the continuous prioritization of demands, frequent review of activities, visibility of progress, and responsiveness to changes.

On the theoretical-methodological level, classic Project Management tools were considered to structure the case study analysis. Among them, scope definition, schedule, Work Breakdown Structure (WBS), “backlog”, follow-up meetings, and change control mechanisms were included.

The WBS (Work Breakdown Structure) was understood, according to PMI (2021), as an instrument for hierarchical work decomposition. The schedule was used as a reference for the temporal ordering of activities. The “backlog” was considered an instrument for organizing and prioritizing demands in an adaptive logic. Monitoring and change control meetings were treated as resources for monitoring and decision-making.

Traditional project management was based on the PMI (2021) guidelines, favoring scope formalization, detailed upfront scheduling, activity predictability, and structured change control. “Scrum” was based on Schwaber and Sutherland (2020), who define it as a lightweight “framework” based on empiricism, transparency, inspection, and adaptation, with work organized in short cycles and incremental deliveries.

The methodological conduction of the study was organized in successive stages: characterization of the organizational context and the object of study; survey and organization of project documents and records; definition of comparative criteria and theoretical tools mobilized; and, finally, analysis of the data in light of traditional project management and “Scrum”, to allow comparison between the approaches.

3. Results and Discussion

The case study revealed that the small-sized company in the Information Technology (IT) sector, located in São Paulo, operated in an environment characterized by the provision of essential services for the operational continuity of its clients. The routine was marked by a diversity of demands, which included technical support, monitoring, information security, network management, “backup”, and solution development. This multiplicity of services and the critical nature of technical occurrences imposed significant challenges on workflow management, requiring both stability and agility in response.

The initial analysis of the organizational context demonstrated that the central problem resided not only in the volume of calls, but in the absence of clear structuring for the registration, prioritization, distribution, and monitoring of technical demands. This gap generated delays, rework, and loss of visibility on task progress, increasing dependence on informal communication. The breadth of the service portfolio and the recurrence of critical incidents, such as connectivity failures and system unavailability, amplified the need for a more robust and adaptable management approach.

Project developed characterization

The investigated project focused on structuring the flow of technical demand tracking, aiming to improve how requests were registered, classified, prioritized, distributed, tracked, and closed. It was not a strategic redefinition of the company or its portfolio, but a direct intervention in the operational core to optimize service coordination. The project scope covered from the initial demand registration to its closure, including categorization, priority definition, routing, execution monitoring, status updates, and pending control.

The relevance of this project lay in its capacity to directly address identified operational problems, such as equipment slowness, email failures, data loss, and security vulnerabilities. The structuring of the workflow was crucial to increase the company’s visibility, control, predictability, and adaptability. The intervention did not include, however, aspects such as commercial expansion, personnel hiring, or integral restructuring of the technological infrastructure, maintaining the focus on process improvement of technical support.

Structure of the team involved

The team involved in the project was organized to meet the operational demands of the technical demand flow, which included remote and in-person support, monitoring, and information security. The structure comprised distinct but interdependent functions to ensure the registration, coordination, execution, and validation of activities. The project manager was responsible for overall coordination, priority organization, and alignment of services, while the process analyst focused on standardizing records and controlling information flow, supporting traceability.

The technical team, in turn, was directly responsible for the execution of operational activities, responding to calls, performing interventions, and updating the progress of tasks. The representatives of the demanding areas acted as the origin of requests and validators of solutions, while internal “stakeholders” influenced priorities and project direction. This organization of roles, with clear responsibilities and efficient communication, was fundamental for the comparative analysis of management approaches, as it allowed an examination of how each method handled task distribution and delivery tracking.

Project stages and execution

The project execution was divided into five sequential stages: diagnosis, planning, implementation, monitoring, and evaluation. This structure, according to Wysocki (2013), is essential in technological projects to reduce operational dispersion and increase the chances of success. The initial diagnosis focused on understanding the service environment, customer profile, and the nature of requests, including the criticality of issues such as security and “backup” failures, an aspect that Barboza et al. (2016) consider vital for adequate intervention.

In the planning stage, priorities, responsibilities, and monitoring mechanisms were defined, seeking greater predictability, in line with the guidelines of the Project Management Institute (PMI, 2021). The implementation corresponded to the operationalization of the defined flow, with registration and updating of demands, a crucial point to avoid informational failures in IT services, as stated by Oliveira et al. (2020). Monitoring verified adherence to the plan through records and reports, while the final evaluation compared the planned with the executed, verifying the improvement of operational control and the quality of technical deliveries, as highlighted by Richardson (2017).

The chaining of these steps allowed for a sequential structuring of the project, without compromising the ability to absorb the variations inherent in the IT services environment. This approach articulated the context gathering, activity organization, operational conduction, continuous control, and critical appraisal of results. The division into phases, therefore, provided a solid empirical basis for the comparative analysis of management approaches, demonstrating how the company sought to balance procedural order with the need for flexibility.

Application of traditional project management

The application of traditional project management in the studied company was manifested in how services were formally structured and controlled. The prior definition of scope and detailed planning were central, especially for activities requiring technical stability, such as network management, automated backup, remote monitoring, auditing, and information security. This approach proved compatible with the need for predictability and traceability in continuous services and structured contracts, where execution followed a well-defined temporal order.

Formal control, a pillar of traditional management, was evidenced by the use of IT documentation, periodic reports, audits, and tracking records. These mechanisms ensured the verification of deliverables and stability in execution. Change management also followed a structured logic, with prior evaluation and formal registration for alterations in configurations, networks, and security routines. This formalization reinforced the predictability and traceability of the services provided, contributing to the sustenance of operational control, according to the guidelines of the PMI (2021).

Traditional management, therefore, offered the company a logic of organization centered on prior delimitation, control, and formalization. This approach was particularly suited to activities that demanded technical stability and predictability of execution, reducing ambiguities and avoiding the disordered expansion of demands. The standardization of execution and the increase in technical consistency were direct results of this application, ensuring the compatibility of execution with operational continuity and guaranteeing the traceability and visibility of deliverables.

Application of “Scrum”

The interpretation of the flow of technical demands from the perspective of “Scrum” revealed an adaptive, iterative logic oriented towards continuous prioritization, even if the company did not formally adopt the framework in its entirety. Adherence to agile principles was observed in situations of high variability, where rapid response and reordering of activities were crucial. The routine of technical occurrences, such as connectivity failures and system unavailability, could be understood as a prioritized list of demands, continuously reorganized according to the criticality of each situation.

The organization of work into progressive deliveries and frequent reviews also aligned with the principles of “Scrum”. More complex activities, such as adjustments in infrastructure and cloud services, were broken down into smaller steps, which increased the visibility of progress and reduced the concentration of risk. Remote monitoring and IT infrastructure documentation allowed for continuous inspection of the workflow, enabling immediate interventions and successive adjustments in the course of work, according to the pillars of transparency, inspection, and adaptation by Schwaber and Sutherland (2020).

Recurring communication and continuous adaptation were points of strong practical adherence to agile rites. Although there were no formal meetings like the “Daily Scrum”, the nature of the service required frequent alignments between coordination and the technical team to identify impediments and redistribute efforts. This operational flexibility expanded the organization’s ability to respond to unforeseen events, without, however, completely breaking with the need for workflow control. Dynamic prioritization and frequent review of activities contributed to greater visibility of progress and risk reduction.

Comparative analysis between the approaches

The comparative analysis demonstrated that the company operated in a context that simultaneously demanded control, predictability, and adaptability. Traditional project management showed greater dependence on prior definition and structured sequence, being more effective for activities that required stability and traceability. In contrast, “Scrum” showed greater adherence to situations of urgency and variability, where immediate task reorganization was essential. This duality reflects the complexity of the IT environment, which combines continuous services with unpredictable incidents.

Regarding formalization, traditional management was more compatible with the company’s existing documentation structure, favoring traceability and stability in execution, as pointed out by Barboza et al. (2016) regarding the adherence of traditional models to initial planning. On the other hand, “Scrum” demonstrated greater centrality in task progress visibility, continuous demand updates, and frequent communication, aspects that Oliveira et al. (2020) associate with work adaptation and informational fluidity.

Predictability was broader in traditional management, associated with the defined plan and scope, while in “Scrum” it focused on the immediate work cycle, allowing for greater agility. Flexibility was lower in the traditional approach, with adaptation to frequent changes, while “Scrum” demonstrated a high capacity for adjustment to dynamic priorities. Communication, more formal and record-based in traditional management, was more frequent and task-progress oriented in “Scrum”, showing greater dynamism in the adaptive approach.

In traditional management, monitoring focused on verifying adherence to the plan, while in “Scrum” there was continuous inspection and adjustment during execution. The impacts on results were distinct: traditional management favored standardization, stability, and control, while “Scrum” promoted speed, adaptation, and response to unforeseen events. This complementarity between approaches suggests that neither of them, in isolation, would be able to fully meet the demands of the context, corroborating Wysocki’s (2013) view on the need to align the method with the project environment.

Discussion of results

The operation of the studied company revealed a logic of complementarity between formal control and continuous adaptation, essential for efficiency in the IT sector. Traditional project management ensured stability and traceability for support contracts and service plans, such as information security and data “backup”. This approach, with its focus on schedules, defined scope, and audit reports, contributed to the compliance of continuous services and to the reduction of ambiguities, aligning with the observations of Barboza et al. (2016) on the suitability of traditional methods in stable contexts.

In contrast, the analytical application of the “Scrum” principles offered the necessary flexibility to respond to critical security and connectivity incidents, demands that required agility and reprioritization. Continuous prioritization and frequent inspections, pillars of “Scrum” according to Schwaber and Sutherland (2020), expanded the team’s responsiveness to scenarios of uncertainty. This duality reinforces the idea that the effectiveness of the method depends on the nature of the demand and the organizational environment, as argued by Barboza (2019).

In terms of communication and coordination, the findings align with the discussions by Oliveira et al. (2020), who highlight the importance of fluidity and priority updates in agile environments. However, the maintenance of defined roles, a characteristic of traditional management, proved decisive in avoiding informational noise and preserving workflow coherence. This indicates that, although the agile mindset favors frequent communication, clarity in responsibilities is a fundamental element for operational efficiency, regardless of the main approach.

The relationship between responsiveness and uncertainty, as addressed by Dias (2024) and Wysocki (2013), was evident in how the dynamic reordering of tasks increased the team’s reaction speed. This agility, however, did not eliminate the usefulness of predictive logic in routine activities, which benefited from standardization and control. The pillars of transparency and inspection of “Scrum” were observed in practice, with the visibility of demands and the use of audit reports providing an organized basis for continuous workflow review.

The results indicate that efficiency in the IT company is strengthened through a hybrid management arrangement, where traditional management orders the process and agile adaptation sustains service readiness. This articulation between stability and flexibility produced more consistent results than the exclusive adoption of a single model. Document standardization and the adoption of visual prioritization mechanisms, as suggested by the study, can reduce information dispersion and improve task visibility, ordering, and impediment identification, favoring preventive actions and faster decisions.

The systematic integration of performance records into daily monitoring, rather than restricting them to the end of cycles, can transform IT documentation and remote monitoring reports into proactive tools. This allows for early identification of deviations and pending issues, increasing the compliance and efficiency of deliverables. The improvement of the communication flow and delivery validations, with the refinement of the initial request registration criteria and technical feedback, reduces rework and strengthens the reliability of service, contributing to effective gains in availability and operational efficiency.

The combination of minimal formal control with frequent priority reviews, and the adoption of a hybrid logic between traditional management and “Scrum”, are essential to balance predictability, control, and flexibility. Strengthening the team’s competencies in Project Management practices and improving the registration of requests and feedback to stakeholders are also crucial. This integrated approach, which combines documentation, visibility, monitoring, communication clarity, and adaptability, is fundamental to strengthening operational efficiency and making the articulation between process control and response to the emerging needs of the IT environment more consistent.

4. Conclusion

The study aimed to comparatively analyze the traditional project management and Scrum approaches regarding efficiency and results in an organizational project developed in a small IT company in São Paulo. It was found that traditional project management ensured traceability and predictability in continuous services, such as security and monitoring, especially in those where technical stability and formalization were crucial. In contrast, it was observed that the analytical application of Scrum principles optimized visibility and responsiveness in critical incidents and technical emergencies, demonstrating greater adherence to scenarios of high variability and the need for reprioritization. The comparative analysis showed that neither approach, in isolation, fully met the context’s demands, but rather a logic of complementarity between formal control and continuous adaptation.

The study’s main contribution lies in demonstrating that operational efficiency in IT companies is strengthened through a hybrid management arrangement, where traditional management orders the process and agile adaptation sustains service readiness. This integration of elements from both management logics allowed for the reduction of informational bottlenecks and the strengthening of operational control, evidencing that the methodological choice should be aligned with the nature of deliverables. However, the study was limited to a single case and the analytical application of Scrum principles, which restricts the generalization of findings. For future studies, it is suggested to strengthen document standardization and adopt visual prioritization mechanisms, systematically integrate performance records into daily monitoring, and improve communication with demanding areas, aiming to continuously enhance the flow of technical demands and organizational responsiveness.

Bibliographic References

Associação Brasileira das Empresas de Software [ABES]. 2026. Brasil mantém liderança em TI na América Latina, cresce acima da expectativa em 2025, mas desacelera ritmo de crescimento neste ano e consolida nova fase do mercado, aponta estudo da ABES. Disponível em: <https://abes.org.br/brasil-mantem-lideranca-em-ti-na-america-latina-cresce-acima-da-expectativa-em-2025-mas-desacelera-ritmo-de-crescimento-neste-ano-e-consolida-nova-fase-do-mercado-aponta-estudo-da-abes-2/>. Acesso em: 2 abr. 2026.

Barboza, H. 2019. Limites da aplicação da metodologia ágil no setor público. Trabalho de final de curso (Mestrado Profissional em Administração Pública). Escola Brasileira de Administração Pública e de Empresas, Fundação Getulio Vargas. Rio de Janeiro, RJ, Brasil. Disponível em: <https://repositorio.fgv.br/server/api/core/bitstreams/7a04ab3e-7709-459e-92b2-42300a352b1d/content>. Acesso em: 6 fev. 2026.

Barboza, L.F.; Vaz, A.C.F.; Antunes, T.G.P.; Salume, P.K. 2016. Análise comparativa entre as abordagens ágil e tradicional de gestão de projetos: um estudo de caso no setor industrial. Simpósio Internacional de Gestão de Projetos, Inovação e Sustentabilidade (SINGEP), V SINGEP, 2016. Disponível em: <https://www.singep.org.br/5singep/resultado/289.pdf>. Acesso em: 6 fev. 2026.

Dias, F.W. 2024. Aplicabilidade das metodologias ágeis no gerenciamento de projetos no setor de saneamento básico. Trabalho de conclusão de curso (Mestrado Profissional em Administração Pública). Universidade Tecnológica Federal do Paraná. Curitiba, PR, Brasil. Disponível em: <https://profiap.org.br/wp-content/uploads/2025/02/FABIO-WILSON-DIAS.pdf>. Acesso em: 6 fev. 2026.

Gil, A.C. 2022. Como elaborar projetos de pesquisa. 7ed. Atlas, Barueri, SP, Brasil.

Oliveira, R.A.; Zych, D.R.; Oliveira, J.; Michaloski, A.O. 2020. Desafios no uso de metodologias ágeis de gestão de projetos em órgãos públicos: um estudo de caso da Receita Estadual do Paraná. Revista de Gestão e Projetos 11(2): 12-36.Disponível em: <https://doi.org/10.5585/gep.v11i2.16522>. Acesso em: 7 fev. 2026.

Project Management Institute [PMI]. 2021. A guidetotheproject management body ofknowledge (PMBOK® Guide).7ed. Project Management Institute, Newtown Square, PA, Estados Unidos.

Richardson, R.J. 2017. Pesquisa social: métodos e técnicas. 4ed. GEN Atlas, São Paulo, SP, Brasil.

Schwaber, K.; Sutherland, J. 2020. The scrumguide: thedefinitiveguidetoscrum. 1ª Edição. Scrum.org. Boston, MA, Estados Unidos. Disponível em: <https://scrumguides.org/docs/scrumguide/v2020/2020-Scrum-Guide-US.pdf>. Acesso em: 06 fev. 2026.

Wysocki, R.K. 2013. Effectiveproject management: traditional, agile, extreme. 7ed. John Wiley & Sons, Hoboken, NJ, Estados Unidos.

Yin, R.K. 2015. Estudo de caso: planejamento e métodos. 5ed. Bookman, Porto Alegre, RS, Brasil.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.