October 26, 2026
Optimization of the maintenance process through the integration between Project Management and BPM
Matheus Lima Barreto de Souza Barcellos; Leticia Franceschini Rodrigues Moscatelli
DOI: 10.22167/2675-6528-202601228
Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.
Summary
The growing complexity of organizational processes and the need for greater predictability in terms of time, cost, and performance have driven the application of Project Management practices in operational contexts, such as the maintenance process of own equipment. This study aimed to analyze the application of Project Management tools in the optimization of this process, focusing on the structuring of routines aligned with the guidelines of a Project Management Office (PMO), seeking to establish an integrated model of Project and Process Management. The research was characterized as applied, with a qualitative approach, and was conducted as a case study in a large state-owned company in the offshore sector. For this purpose, semi-structured meetings with the main stakeholders involved, documentary analysis, and process mapping in the current (AS IS) and future (TO BE) states were used, complemented by SWOT and RACI matrices. The initial analysis revealed weaknesses related to the absence of formal planning, scope definition, deadline control, governance structure, and integration between areas. Based on this diagnosis, improvements were proposed through the incorporation of planning, monitoring, and control practices, as well as the standardization of routines, in line with the logic of process management. The results indicated advances in the definition of responsibilities, organization of activities, and mitigation of operational risks and losses. It was concluded that the structured application of Project Management practices in the maintenance process constitutes a viable alternative for increasing managerial maturity and operational performance, promoting a robust and replicable model that favors integration between the Project Management Office (PMO) and the Business Process Management Office (BPMO).
Keywords: Project Management; Equipment Maintenance; Process Mapping; PMO.
1. Introduction
The growing complexity of organizational processes and the need for greater predictability in terms of time, cost, and performance have driven the application of management practices. Organizational maturity is often driven by the effectiveness of its practices in Project Management and Process Management.
Project Management, according to the Project Management Institute (PMI, 2017), focuses on unique activities with a beginning, middle, and end, producing a unique product, service, or result. In contrast, Business Process Management (BPM) aims at the optimization, standardization, and continuous improvement of routine operations that are repetitive, critical, and permanent (Rodrigues, 2015), focusing on efficiency, stability, and control of value-generating activities.
In many corporate structures, these functions are segregated into a Project Management Office (PMO) and a Business Process Management Office (BPMO). The absence of effective direction or centralized coordination results in costly and fragmented continuous improvement efforts, limiting synergies and the consolidation of benefits (Tregear et al., 2010). This disarticulation can lead to a fragmented strategic vision, where projects are implemented without proper integration into existing processes.
The central problem lies not only in the separation of these areas, but in the practical barriers to their integration. The application of Project Management tools in process improvement initiatives faces strong resistance. Intyre (2016) points out that project management is often perceived as a bureaucratic or rigid structure, contrasting with the more fluid and continuous nature of process optimization, generating cultural and methodological misalignment.
The alignment between Project Management and Process Management still shows limitations from the perspective of practical application. Ribeiro (2020) points out that the connections between these disciplines in publications do not offer practical guidance for conducting projects, highlighting a gap. Investigations are lacking on how Project Management tools can optimize organizational processes and integrate the PMO and BPMO.
In this context, the equipment maintenance process presents itself as a favorable environment for the integrated application of these approaches. It involves planning, resource coordination, deadline control, and interaction between different organizational areas, characteristics inherent to Project Management. In offshore maintenance contexts, this complexity is amplified by the criticality of the assets and the need for coordination between technical disciplines (Teixeira et al., 2023). The lack of structured planning and integration between areas compromises the fulfillment of deadlines and operational reliability (Vitório and Nogueira, 2016).
The application of Project Management practices is beneficial for initiatives with activity interdependence, multiple stakeholders, and time and resource constraints, even in recurring operational contexts (PMI, 2017). Ribeiro (2020) reinforces that the integration between Project Management and Business Process Management (BPM) contributes to the increase of organizational maturity, promoting greater alignment between improvement initiatives, governance, and process execution.
The structured application of Project Management practices in the maintenance process, therefore, constitutes a viable alternative for increasing managerial maturity and operational performance, addressing the fragilities identified in the absence of formal planning, scope definition, and control. Given this problem and the relevance of the topic, the objective of the present work was to structure an integrated Project and Process Management model for optimizing the equipment maintenance process, using AS IS/TO BE mapping and definition of responsibilities.
2. Material and Methods
This research was characterized as applied, with a qualitative approach, and was classified as exploratory regarding its objectives. The study aimed to analyze the practical application of Project Management tools in a real organizational context, seeking to structure an integrated Project and Process Management model for optimizing the equipment maintenance process.
The research strategy adopted was the case study, selected for enabling an in-depth analysis of a contemporary phenomenon embedded in its real context. This approach allowed for the investigation of the application of Project Management tools in the optimization of organizational processes, as highlighted by Santos et al. (2015) and Villela (2000).
The object of study was a large state-owned company in the offshore sector, recognized as one of the largest companies in the global energy sector. The case analyzed corresponded to an initiative to optimize and standardize the maintenance process for offshore drilling equipment, focusing on the methodological interaction between the practices of a Project Management Office (PMO) and a Business Process Management Office (BPMO).
For the development of the study, six collaborators from the company were involved. Three participants belonged to the Equipment Maintenance discipline (one manager, one supervisor, and one employee), and the other three to the Fixed Rig Operations discipline (one manager, one supervisor, and one employee). Together, these collaborators were responsible for the planning and execution of rig equipment maintenance.
The research was structured in sequential steps. Initially, a *kickoff* meeting was held, which marked the formal start of the project and aimed at a deep understanding of the analyzed process. In this stage, information was collected for stakeholder management, identifying people, groups, or institutions impacted by the process.
During the kickoff meeting, expectations, responsibilities, and the methodology to be applied for the documentation, optimization, and preliminary definition of the product scope and the activity schedule were also aligned. A schedule of subsequent steps was developed, detailing the activities, participants, number of meetings assigned to each, and the expected deliverables at the end of each phase.
The subsequent steps were carried out through asynchronous meetings. Four of the previously identified *stakeholders* (supervisors and employees) participated in periodic weekly meetings for mapping the process flow in the current state (AS IS) and in the future state (TO BE).
For the process mapping, the Bizagi tool was used, adopted by the organization for standardization and recognized for its ease of use, intuitive interface, and compatibility with BPMN (Business Process Model and Notation) notation. The mapping represented the inputs, activities, *gateways*, events, conditions, and outputs of the process as executed in practice (AS IS).
In the TO BE process flow mapping stage, the four *stakeholders* involved in the previous phase collaborated in developing a proposal for improvement. This proposal was built upon the contributions gathered during the AS IS mapping and the perceptions related to resource optimization and value aggregation to the process, seeking to more clearly define the roles and responsibilities of each agent involved.
After the definition and approval of the process flow by the *stakeholders*, the elaboration of a Standard Process Document began. This document aimed to formalize activities, roles, and responsibilities, recording the procedure in accordance with the organization’s current corporate norms and guidelines.
The qualitative data obtained during the meetings and mappings were analyzed using the content analysis technique. The objective was to identify patterns and improvement opportunities, supporting the construction of a SWOT Matrix, a strategic planning tool created by Albert Humphrey in the 1960s, to analyze Strengths, Weaknesses, Opportunities, and Threats.
In addition to the SWOT Matrix, a RACI Matrix was developed to consolidate and support the definition of roles and responsibilities. The RACI Matrix is a management tool used to define and clarify roles and responsibilities within a project, process, or activity, with the acronym meaning R (Responsible), A (Accountable), C (Consulted), and I (Informed).
All study stages were submitted for validation by all process *stakeholders*, with the exception of the final stage. The last stage consisted of a closing meeting, conducted to formalize the process finalization, consolidate the achieved results, and discuss the lessons learned, aligning with good project management practices (PMI, 2017).
3. Results and Discussion
The analysis of the equipment maintenance process revealed an inherent complexity, characterized by organizational transversality and the multiplicity of actors and functional interfaces involved in its flow. This complex nature demands rigorous coordination between activities, a precise definition of responsibilities, and the implementation of formal monitoring mechanisms, essential elements to ensure operational stability and efficiency, as pointed out by Rodrigues (2015). The absence of adequate structuring in processes like this tends to hinder organizational learning and the consolidation of improvements, especially when the clarity of steps and roles is insufficient, as observed by Villela (2000).
In offshore maintenance environments, the criticality of assets and the need for coordination among various technical disciplines amplify this complexity. Teixeira et al. (2023) emphasize that the lack of clearly modeled processes hinders the effective extraction and sharing of organizational knowledge, directly impacting the efficiency and reliability of maintenance activities. Additionally, Vitório and Nogueira (2016) highlight that deficient planning and the lack of integration between areas can significantly compromise deadline adherence and operational reliability, especially in floating production and storage units (FPSO).
The application of Project Management practices proves particularly beneficial for initiatives involving activity interdependence, multiple stakeholders, and deadline and resource constraints, even in recurring operational contexts, as advocated by the Project Management Institute (PMI, 2017). The maintenance process studied, with its characteristics, aligns with this integrated approach between Project Management and Process Management. The joint action of a Project Management Office (PMO) and a Business Process Management Office (BPMO) is crucial for this integration, as discussed by Intyre (2016), promoting greater alignment between improvement initiatives, governance, and the execution of organizational processes, as reinforced by Ribeiro (2020).
The initial characterization of the equipment maintenance process, carried out through semi-structured meetings and document analysis, allowed for the identification of the involved areas and their respective roles. The Maintenance and Integrity, Maintenance Planning and Execution, and Fixed Platform Operation teams were identified as the main stakeholders. Maintenance and Integrity is responsible for the work order, which is then processed by the Equipment Maintenance Process. After maintenance, the equipment is serviced and returns to Fixed Platform Operation, which also issues work orders. This complex interaction highlights the need for a management model that integrates different perspectives and responsibilities.
Initial Diagnosis of the Process
The initial diagnosis of the process was conducted through a kickoff meeting with key stakeholders, including the maintenance team and the operations team. This meeting allowed for the collection of detailed insights into the execution of activities, existing communication flows, and operational challenges. The qualitative data obtained were systematically analyzed using the content analysis technique, which enabled the identification of recurring patterns and convergences in the participants’ reports, providing a solid foundation for understanding the context and the aspects that challenge the maintenance process.
From the initial information, it was possible to structure a SWOT matrix, which identified the strengths, weaknesses, opportunities, and threats of the process. Among the strengths, the specialized technical team with consolidated practical knowledge stood out, including tacit knowledge about recurring failures, the perennialized process with availability of operational resources and execution history, the safety-oriented organizational culture, and leadership support for improvement initiatives. These points represent important assets for any optimization initiative.
However, several weaknesses were identified, such as the absence of formal standardization in maintenance planning, resulting in excessive dependence on tacit knowledge and a lack of clarity regarding scope and responsibilities. A low level of project management maturity was observed, hindering the prioritization of demands and generating rework, in addition to the lack of integration between planning and execution, involving the operation and maintenance areas. These fragilities point to the urgent need for structured interventions to optimize the process.
The identified opportunities included the application of PMBOK best practices, the structuring of a process governance model, the use of digital tools for control and monitoring of actions, the standardization of flows and procedures, and the optimization of resource utilization, such as materials, team, and schedule. These opportunities indicate clear paths for improvement and integration of management practices. On the other hand, the threats comprised the occurrence of failures in critical equipment, financial losses resulting from unplanned downtimes, lack of resource availability, dependence on external suppliers, communication failures, and overload of operational teams, which could generate significant operational risks.
The preliminary analysis of the maintenance process revealed significant weaknesses related to the absence of structured planning, the poorly formalized definition of the scope of maintenance, and the lack of clarity regarding roles and responsibilities. These findings are consistent with the studies by Santos et al. (2015), who, when analyzing processes in the service sector, demonstrated that the absence of formalized procedures frequently leads to rework, excessive reliance on informal communication, and difficulties in monitoring activities, negatively impacting operational efficiency.
The importance of stakeholder involvement in the diagnosis was crucial, as structured relationship and communication practices are fundamental for aligning expectations, reducing conflicts, and improving the performance of organizational processes, as highlighted by Tavares et al. (2018). The absence of formal governance and coordination mechanisms, observed in the process, tends to fragment organizational initiatives, hindering the consolidation of improvements and the achievement of synergies, as discussed by Tregear et al. (2011). This fragmentation compromises the strategic vision and the effectiveness of optimization actions.
The diagnostic findings converge with the observations of Ribeiro (2020), who indicates that the isolated application of Business Process Management (BPM) practices, without the support of Project Management tools, can result in reactive activity management and low predictability of outcomes. This perspective reinforces the need for an integrated approach that combines the strengths of both disciplines to achieve sustainable and effective optimization of the maintenance process. Methodological integration is, therefore, a pillar for overcoming the identified weaknesses.
The synthesis of the initial diagnosis, consolidated from the analyses, evidenced critical gaps in several dimensions. In planning, the absence of structured maintenance planning was identified, with interviewees reporting activities planned in an unstructured manner and without a standard roadmap. This resulted in difficulty in predicting deadlines and dependence on adjustments during execution. Regarding roles and responsibilities, it was observed that they were not clearly defined, generating doubts among interviewees and resulting in overlapping activities and dependence on informal communication.
Communication was predominantly informal, with interactions occurring mostly through informal exchanges. This scenario entails a high risk of information loss and alignment failures between teams. In control and monitoring, the absence of formal milestones was verified, with no control points identified throughout the process, which hindered the monitoring of activity progress. These critical points reinforce the need for formalization and structuring to ensure the effectiveness of the maintenance process.
With the context diagram defined, the SWOT matrix, and the initial diagnosis synthesis, it was possible to obtain a detailed view of the process actors, their roles and responsibilities, and the critical points to be addressed to align the process with Project Management practices. These deliverables were fundamental to guide information gathering in subsequent meetings, aiming at process mapping and structuring. Based on this understanding, a schedule of activities was developed, which included the kickoff meeting, the AS IS flow mapping, the TO BE flow mapping, and the closing meeting, each with its expected deliverables, such as the initial diagnosis, the SWOT matrix, the schedule, the AS IS flow, the TO BE flow, the standard document, and the RACI matrix, culminating in managerial approval.
Mapping of the process in the current state (AS IS)
The mapping of the process in the current state (AS IS) was a fundamental step to graphically represent the flow of activities as they are executed, highlighting the stages, the interfaces between different areas, and the decision points. This mapping was built from information collected in meetings with stakeholders, an approach that aligns with studies of process mapping in service organizations and complex environments, such as those by Santos et al. (2015) and Villela (2000). This methodology contributes to capturing the tacit knowledge of participants and representing the process faithfully, reducing discrepancies between practice and formal documentation.
The AS IS flow of the Equipment Maintenance Process, although not visually detailed here, revealed a sequence of activities that, at many points, lacked formalization and standardization. It was observed that the process inputs included service orders and maintenance requests, which went through various activities, gateways, and events, culminating in the delivery of a maintained equipment. The graphical representation allowed for visual identification of the points where decisions were made and interactions between areas occurred, often in a non-optimized manner.
Bueno et al. (2023) highlight that the AS IS flow mapping is an essential preparatory step in Business Process Management (BPM) initiatives, as it allows for the identification of bottlenecks, rework, and improvement opportunities. The use of BPMN (Business Process Model and Notation) notation in the Bizagi tool favored common understanding of the process flow among participants. This standardization of notation was a crucial facilitator for cross-functional communication and for the structured analysis of processes, allowing all stakeholders to have a clear and unified view of the current state, essential for proposing improvements.
Analysis of the AS IS Process according to Project Management
The analysis of the AS IS process from the Project Management perspective confirmed the previously identified gaps, especially those related to scope definition, activity planning, communication, and delivery monitoring. The Project Management Institute (PMI, 2017) emphasizes that the absence of structured practices in these dimensions compromises the predictability and performance of initiatives involving multiple stakeholders and task interdependence. This lack of structure in the maintenance process resulted in delays, additional costs, and dissatisfaction among those involved.
Regarding communication, it was observed that the interaction between the requestor and the maintenance team did not occur systematically. The Project Management framework emphasizes the planning and management of project communications, and the absence of such a practice in the maintenance process generated risks of alignment failures, rework, and loss of relevant information. This situation was aggravated by the lack of a standard for email communications related to maintenance, which, in contrast to the definition of standards and formal communication records, hindered the organization and retrieval of information.
Email exchanges often did not follow a logical thread, compromising the traceability of decisions. The practice of recording and controlling project communications, essential in Project Management, was neglected, resulting in low traceability of information and decisions made. This informality hindered auditing and accountability, as well as prolonging problem resolution. The absence of a consolidated dashboard for visualizing the maintenance portfolio was also a critical point, contrasting with the integration of information and activity monitoring advocated by Project Management.
The lack of an integrated dashboard resulted in a fragmented view of maintenance progress and difficulty in prioritizing activities. This fragmentation hindered proactive and data-driven management, leading to reactive and less efficient decisions. Intyre (2016) points out that in organizations where projects and processes are treated separately, resistance to applying Project Management tools in continuous processes is common, which limits the potential for methodological integration between PMO and BPMO. This cultural and methodological resistance was an evident challenge in the studied context.
Santos et al. (2015) reinforce that the absence of structured planning and formal control points hinders the identification of failures and the measurement of process performance. These results align with the conclusions of Ribeiro (2020), who indicates that the lack of practical integration between Project Management and BPM reduces the effectiveness of process improvement initiatives. The detailed analysis of the AS IS process, from the perspective of Project Management practices, served as a crucial subsidy for identifying the improvement opportunities to be addressed in the elaboration of the proposal for the process in the future state (TO BE).
TO BE Process Proposal
Based on the diagnostic findings and the analysis of the AS IS process, the elaboration of the process mapping in the future state (TO BE) was proposed, incorporating Project Management practices into maintenance routines. According to Villela (2000), TO BE mapping allows for the redesign of processes with a focus on standardizing activities, improving performance, and increasing clarity of organizational roles. This approach aims to transform identified weaknesses into opportunities for optimization and efficiency, promoting a more structured and predictable environment for maintenance operations.
In this sense, Baldam et al. (2014) highlight that process redesign should seek the clear definition of responsibilities, integration among those involved, and standardization of activities, in order to support the practical implementation of BPM in organizations. These aspects were fully contemplated in the proposition of the TO BE process, which sought to align the activity flow with the good Project Management practices described by the PMBOK (PMI, 2017). The emphasis was on defining responsibilities, establishing monitoring points, and improving communication among those involved, crucial elements for the governance and success of the process.
Bueno et al. (2023) emphasize that process redesign, when based on consistent diagnosis, contributes to greater control, integration, and alignment of organizational activities. The proposed TO BE flow for the Equipment Maintenance Process, although not visually presented, incorporated guidelines to improve communication, increase the visibility of the maintenance portfolio, ensure information traceability, and strengthen the governance of activity coordination. This was achieved through the introduction of formal planning, monitoring, and control steps, which were previously deficient.
Tregear et al. (2011) complement that the integration between improvement initiatives and formal governance structures favors the consolidation of results and reduces organizational fragmentation. This aspect was also discussed by Ribeiro (2020) when addressing the integrated performance between PMO and BPMO. The process flow in the future state was structured to address the gaps identified in the AS IS process, especially those related to communication, visibility of the maintenance portfolio, information traceability, and governance of activity coordination, promoting a more collaborative and efficient work environment.
To confirm the governance guidelines, including the sequence of activities, conditions, events, responsibilities, and interactions throughout the process cycle, a document called “Standard” was developed. This document presents summary, objective, description, definitions, and process references sections. Attached to this document, in addition to the AS IS and TO BE flows, a RACI (Responsible, Accountable, Consulted, and Informed) matrix was developed, which supported the definitions of responsibilities during the process execution. The RACI matrix details the responsibilities for various stages, such as performing preventive maintenance, requesting a maintenance order, executing maintenance, issuing notes, evaluating and correcting, receiving equipment, performing inspections, generating reports, scrapping, opening SCDR, creating a maintenance order, communicating with the contractor, sending proposals, reviewing, planning, approving, executing services, and generating a databook, evaluating the databook, performing adjustments, payment, communicating closure, sending materials, finalizing orders and notes, modifying notes, creating RC, defining suppliers, elaborating ET, sending requisitions, performing quotations, issuing RT, performing transportation, monitoring maintenance, and confirming material destination.
The RACI matrix, although extensive in its original composition, was fundamental to clearly and objectively assigning responsibilities to each stakeholder involved in the maintenance process, including the Multidisciplinary Group (Drilling Rig Operation + Maintenance), Drilling Rig Operation, Contracting Area, Maintenance Inspector, Maintenance Center, Contractor, and Equipment Execution Plan (PEE). For example, for the activity “Perform preventive maintenance”, the Maintenance Center is responsible (R), while the Multidisciplinary Group is informed (I). For “Approve planning of the delineation Work Order”, the PEE is the approver (A) and the Multidisciplinary Group is responsible (R). This tool allowed for the reduction of ambiguities and strengthened the governance of the process, ensuring that each participant understood their specific role and the interdependencies between activities.
Closing meeting
The final stage of the study was the closing meeting, conducted with the objective of formalizing the project’s completion after the proposed improvements, consolidating the achieved results, and discussing the lessons learned throughout the process. According to the PMBOK (PMI, 2017), this stage aligns with good project management practices, which recommend formalizing the closure as a way to ensure knowledge transfer and validation of deliverables with stakeholders. In the context of this study, validation occurred mainly at the managerial level, ensuring that the results were aligned with initial expectations.
The meeting was attended by all six stakeholders involved. During the meeting, the initial project context, the analyses and diagnoses performed, and the results obtained from applying project management tools to the equipment maintenance process were presented. The tools presented included the SWOT matrix, the AS IS and TO BE process flows, the standard document, and the RACI matrix. The discussion highlighted significant gains in standardization, clarity of responsibilities, and improved predictability of activities, which are essential elements for process optimization.
Additionally, the main challenges faced during the implementation of the methodology were discussed, as well as the identified improvement opportunities. In this context, lessons learned were discussed, covering aspects related to communication between areas, definition of scopes, use of tools, and prioritization of activities. This exchange of experiences and knowledge was fundamental to consolidate organizational learning and identify points for future improvements. The validation of deliverables with stakeholders formalized the closure of the proposed improvement cycle, and the internal dissemination of results allowed the spread of practices to other areas of the organization, expanding the study’s impact.
In summary, the structured application of Project Management tools in the equipment maintenance process, according to the proposed integrated model, proved to be a viable alternative for increasing managerial maturity and operational performance. The findings revealed that the formalization of planning, the clear definition of scope and responsibilities, the standardization of communications, and the integration between areas are crucial elements for mitigating risks, reducing rework, and optimizing resource utilization. The structuring of a TO BE model, supported by tools such as the RACI matrix, promoted greater predictability and governance, directly responding to the objective of optimizing the maintenance process through the integration between Project and Process Management.
4. Conclusion
The present work aimed to structure an integrated Project and Process Management model for optimizing the equipment maintenance process, using AS IS/TO BE mapping and definition of responsibilities. The initial analysis of the maintenance process revealed a transversal complexity, characterized by the absence of formal planning, imprecise scope definition, deficient deadline control, fragility in the governance structure, and low integration between areas. An excessive dependence on tacit knowledge and predominantly informal communication were identified, factors that generated rework and hindered activity predictability. The mapping of the process in its current state (AS IS) confirmed these gaps, highlighting the need for structured interventions to improve operational efficiency.
Based on this diagnosis, a future state (TO BE) model was proposed, which incorporated Project Management practices, such as the formalization of planning, the clear definition of roles and responsibilities through a RACI matrix, and the standardization of routines and communications. The application of these tools proved to be a viable alternative for increasing managerial maturity and operational performance, promoting greater alignment and governance. The structured model is robust and replicable, favoring integration between the Project Management Office (PMO) and the Business Process Management Office (BPMO). However, limitations related to organizational factors were identified, such as the level of process maturity and resource availability, which may impact the effectiveness of the implementation. It is suggested that future studies deepen the analysis of the results obtained and explore the application of the model in different organizational contexts, aiming to broaden and validate its applicability.
Bibliographic References
BALDAM, Roquemar e VALLE, Rogerio e ROZENFELD, Henrique. Gerenciamento de processos de negócio – BPM: uma referência para implantação prática. Rio de Janeiro: Elsevier, 2014. Acesso em: 08 fev. 2026.
BUENO, R. V.; MACULAN, B. C. M. S.; AGANETTE, E. C. Mapeamento de processos e BPM em organizações: uma revisão sistemática da literatura. Múltiplos Olhares em Ciência da Informação, Belo Horizonte, v. 13, n. 2, p. 1–17, 2023.
Intyre, C.A.M. 2016. Um Modelo de Escritório Unificado de Projetos e Processos Como Agente de Execução da Estratégia Organizacional. Dissertação de Mestrado em Engenharia de Produção. Universidade Federal de Pernambuco, Recife, PE, Brasil.
Project Management Institute [PMI]. 2017. Um Guia do Conhecimento em Gerenciamento de Projetos. 6ed. Project Management Institute, Newtown Square, PA, EUA.
Ribeiro, L.R.B. 2020. Contribuições do Gerenciamento de Projetos à Promoção de BPM. Dissertação de Mestrado em Engenharia de Produção. Escola Politécnica, Universidade de São Paulo, São Paulo, SP, Brasil.
Rodrigues, G.O. 2015. Aplicação da Gestão de Processos em uma Universidade Pública do Estado de São Paulo. Dissertação de Mestrado em Engenharia de Produção. Faculdade de Engenharia, Universidade Estadual Paulista, Bauru, SP, Brasil.
SANTOS, L. A.; PERUFO, L. D.; MARZALL, L. F.; GARLET, E.; GODOY, L. P. Mapeamento de processos: um estudo no ramo de serviços. Iberoamerican Journal of Industrial Engineering, Florianópolis, SC, Brasil, v. 7, n. 14, p. 108-128, 2015.
TAVARES, V. C. M.; SIQUEIRA, J. P. L.; MORAES, M. B.; COSTA, B. K. Práticas da experiência e do relacionamento na gestão de stakeholders. Latin American Journal of Business Management, v. 9, n. 2, p. 3–19, 2018.
TEIXEIRA, Y. P.; DOMICIANO NETO, B. A.; JACYNTHO, M. D. A.; SILVA, S. V. Extração de conhecimento a partir da modelagem de processos e grafo semântico: uma abordagem no processo de manutenção offshore. Revista Principia, João Pessoa, v. 60, n. 4, p. 1187–1204, 2023.
Tregear, R.; Jesus, L.; Macieira, A. 2011. Estabelecendo o Escritório de Processos. Elo Group. Disponível em: <https://www.dpo.unb.br/images/phocadownload/dpr/biblioteca/escritoriodeprocessos.pdf>. Acesso em: 12 out. 2025.
VILLELA, C. da S. S. Mapeamento de processos como ferramenta de reestruturação e aprendizado organizacional. 2000. Dissertação de Mestrado em Engenharia de Produção. Universidade Federal de Santa Catarina, Florianópolis, 2000.
VITÓRIO, L. S. de M.; NOGUEIRA, D. A. C. Gestão da manutenção e planejamento de parada programada de um navio-plataforma, estocagem e produção de petróleo – floating production storage offloading (FPSO). Leopoldianum, ano 42, n. 116–118, 2016.
Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform