Project management maturity in a real estate developer in the civil construction sector

Andressa Humm da Silva Dessbesell; Beatriz Cristina de Freitas

DOI: 10.22167/2675-6528-202600559

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

Project management faces continuous challenges in organizations, driving the search for methods to assess and improve project management maturity. The project management maturity level of a real estate developer in the construction sector was evaluated through a sectoral pilot assessment, aiming to support a growth plan and propose best practices for the company and other organizations. To this end, a project management maturity model was defined and applied to the company’s Quality and Backoffice sectors. Each sector responded to a model questionnaire in brainstorming sessions facilitated by the PMO, and strengths and weaknesses were recorded. The final assessment report indicated a maturity level of two for both departments, highlighting computerization and strategic alignment as the most developed dimensions. The main weaknesses included non-formalized practices, planning gaps, and a reactive approach in project execution. These findings, combined with the adherence percentages to the dimensions, supported the construction of a consolidated growth plan, organized with the 5W2H tool, which prioritized three initiatives, such as the implementation of change management. The model proved to be a viable and efficient tool for the diagnosis and sectoral assessment of project management maturity.

Keywords: sectorial assessment; model; levels and dimensions; growth plan.

1. Introduction

Project management has gained increasing relevance in organizations since the 1960s, driving the need for companies to improve their strategic approaches to become more agile, efficient, and competitive (Archibald and Prado, 2011). In this scenario, the concept of project management maturity level has emerged as an essential tool. It allows measuring an organization’s capacity to manage its projects effectively, achieving established goals and maximizing expected benefits (Prado, 2016).

The development of a high level of maturity is fundamental for organizations to optimize their resources and achieve or exceed planned results. To this end, the adherence of projects to the business strategic planning is crucial, as well as the transparency and clarity of strategic objectives for all leaders and collaborators. This alignment promotes greater engagement with the organizational purpose and the achievement of desired results (Belmiro, 2018).

The need for clarity and standardization is particularly pronounced in real estate development companies in the construction sector. In these environments, the organizational structure is often hierarchical (Archibald and Prado, 2011), and multiple projects and operations are executed simultaneously by the same teams. This dynamic can lead to task overlap and inefficiency. Decisions made at any stage of the projects, whether in planning, execution, or monitoring, directly reflect the maturity level of the company as a whole and its departments individually (Belmiro, 2018).

To foster and enhance project management maturity, many companies have implemented the Project Management Office (PMO). The PMO acts as the area responsible for standardizing processes, tools, and resources related to projects, or, in some cases, for supporting these initiatives (PMI, 2021; Cruz, 2016). In parallel, the assessment of the management maturity level serves as an instrument to classify and qualify the current state of maturity, providing the basis for developing growth plans aimed at improving the organization (Prado, 2016).

A low level of management maturity, or the absence of a dedicated PMO to manage strategic projects, can generate several obstacles. Among them, the decentralization of information, the lack of process standardization, and significant challenges in monitoring and controlling results and action plans stand out (Cruz, 2016). Consequently, there is a greater propensity for project failures or partial successes, as well as delays, budget overruns, and scope creep (Prado, 2016).

The civil construction market, characterized by its high competitiveness, complexity, and susceptibility to economic and regulatory changes and reprogrammings, requires real estate developers to continuously improve their processes and management level (Belmiro, 2018). The implementation of a sector maturity development project, led by a PMO and based on a structured methodology such as Darci Prado’s model (Prado, 2016), enables the identification of gaps, standardization of practices and processes, recording of lessons learned, and a greater perception of value in the projects carried out (PMI, 2021).

Despite the relevance of the topic of maturity in project management in academic literature, there is a limitation of studies and applied research specifically to the construction sector, particularly in the real estate development branch (Mendonça, 2021). Adherence to maturity assessment by this market niche is still restricted, as observed in the results reports of widely recognized models. This gap justifies the need for investigations that contribute to the advancement of knowledge and management practices in this segment.

Given this context and the gap identified in the literature and practice, the present research is justified by the need to understand and improve project management in real estate development companies. Thus, the objective was to evaluate the level of project management maturity of a real estate development company in the construction sector, through a sectoral pilot evaluation, aiming to support the elaboration of a growth plan for the improvement of the maturity of the selected sectors and the proposition of good practices applicable to future initiatives and projects of the company and other organizations.

2. Material and Methods

This research was characterized by its exploratory and descriptive nature, adopting a qualitative approach to deepen the understanding of the phenomenon studied. The methodological design consisted of a case study, according to the guidelines of Gil (2008), which aims at an in-depth investigation of a specific scenario in its real context, regardless of the number of participants or units of analysis.

The empirical object of the study was a real estate developer in the construction sector, named “Empresa ISE”, located on the northern coast of the state of Santa Catarina. The company operates mainly in the development of medium and high-standard vertical residential developments. During the research period, Empresa ISE was in the initial phase of implementing a Project Management Office (PMO), and the concept of project management was not yet widely disseminated across all its departments.

For the evaluation of project management maturity at ISE Company, the Project Management Maturity Model (MMGP), developed by Darci Prado in 2002 (Prado, 2016), was used. This model is based on a structured, accessible questionnaire, filled out remotely through the “Maturity Research” platform. The questionnaire consists of 31 contextual questions and 40 multiple-choice questions, which are linked to the maturity levels and dimensions proposed by the model.

The choice of the MMGP was justified by its capacity to assess maturity in a sectorized manner, allowing for a more targeted application with the involvement of a reduced number of people, which aligned with the temporal limitation of the research. Prado (2016) highlights the simplicity of application, the reliability of the results, the focus on continuous improvement, the practicality of interpreting the questionnaire, the automatic generation of the final report, and the free online access as advantages of the model.

Additionally, the MMGP enables the elaboration of a growth plan and has broad application in Brazil, with reports of previous applications available on the “Maturity Research” website. A solid alignment of the model was also observed, even dating back to 2002 (Prado, 2016), with the project management practices and concepts present in the PMBOK Guide (PMI, 2021), which reinforced its suitability for sectoral evaluation.

The sectors selected as pilot units for the research were the Quality department and the Backoffice (internal sales) of the ISE Company. The selection had the support of the board of directors and was based on three pillars: (i) adherence to Prado’s (2016) criteria for evaluation in sectors that already practice project management and seek to elevate their maturity; (ii) the strategic and multidisciplinary nature of the Quality sector; and (iii) the importance of the Backoffice for the financial sustainability and market positioning of the business.

Both sectors already adopted project management practices, although the Quality department demonstrated them more directly and the Backoffice in a more indirect and informal way. The practicality of access and the ease of application of the MMGP favored the engagement of leaders and collaborators from the pilot units, contributing to the quality and agility of data collection.

After communicating the selection for the pilot project to the sector leaders, individual facilitated discussion sessions were scheduled. The researcher, acting as the company’s general PMO and facilitator of the process, conducted the sessions with the essential participation of the area leader, with the presence of other team members being optional.

The sessions began with contextualization on project management and maturity, followed by the presentation of the MMGP, its benefits, and objectives. For each question in the questionnaire, sequential brainstormings were conducted, with active contributions from the researcher and participants. The strengths and weaknesses identified in each sector, in relation to the questions, were recorded in a previously prepared spreadsheet, serving as a basis for choosing the alternative closest to the reality of the area.

Each session had an average duration of 3 hours and 30 minutes, allowing for in-depth discussions. The meeting with the Quality department took place on December 4, 2025, with the presence of the area leader and an analyst. The session with the Backoffice department was held on January 13, 2026, with the exclusive participation of the department leader. At the end of the sessions, each department received its respective Final Maturity Assessment Report (RAFM).

The data collected through the RAFM, which contained notes, scores by maturity level, and adherence percentages to the dimensions, were interpreted and classified by the researcher in light of Darci Prado’s (2016) model and specialized literature on organizational maturity and project management. Comparisons were made between the similarities and differences observed in the individual results of the pilot units, considering their operational particularities and implications for the projects and the organization.

For benchmarking purposes, two previous years’ MMGP application reports (Alvarenga et al., 2015; Alvarenga et al., 2021) were considered. Priority was given to consulting documents with information on the construction industry and the real estate development sector, in order to establish a qualified benchmark for the analyses.

The construction of the growth plan was based on the RAFM results, the structured data analysis, the comparisons made, and the main weaknesses identified in the Quality and Backoffice sectors. A single meeting was held with the participation of the researcher and the leaders of the pilot units, on March 18, 2026, lasting 1 hour and 30 minutes.

In this meeting, the 5W2H tool was used to structure a unique and consolidated plan, containing specific actions and comprehensive initiatives. The 5W2H tool, which organizes actions in terms of “What”, “Why”, “Where”, “When”, “Who”, “How”, and “How much it costs”, was applied in a shared online spreadsheet. The weaknesses recorded in the facilitated sessions were revisited, and the premises for defining the actions included the possibility of replication in other departments, the utilization of pre-existing resources, and alignment with the strategic planning of Company ISE and its culture.

Regarding ethical considerations, although the MMGP is based on responses to a questionnaire, there was no use or disclosure of sensitive data from Company ISE or participants in the facilitated sessions. Contextual information from the first 31 questions was omitted for research purposes, as it did not influence the maturity level outcome and subsequent analyses. Therefore, the submission of the research to the Research Ethics Committee was waived, in accordance with Resolution No. 510/2016, item VII of the sole paragraph of Article 1.

3. Results and Discussion

The assessment of the project management maturity level in the real estate developer of the civil construction sector revealed a detailed diagnosis of the Quality and Backoffice sectors. Both departments were classified at maturity level two, named “Known”, according to the Project Management Maturity Model (MMGP) by Darci Prado (2016). This initial classification, although indicating a stage of recognition of management practices, also points to the need for continuous improvement and formalization of processes, which aligns with the objective of supporting a growth plan and proposing best practices for the organization.

The initial results highlighted that the dimensions of computerization and strategic alignment presented the highest development indices in both sectors. This finding is crucial, as computerization and strategic alignment are often the first vectors for structuring project management in organizations that are beginning to formalize their processes (Prado, 2016; PMI, 2021). However, sustainable maturity requires the integration of these dimensions with other competencies, such as behavioral and methodological ones, as emphasized by Archibald and Prado (2011).

Maturity assessment in PM in the quality sector

The Quality sector obtained a score of 2.86 in the final maturity assessment, placing it between levels two and three of the MMGP. The most significant score was 67 in level two, indicating initial knowledge of project management practices, the beginning of a standardization process, and minimal alignment with business objectives. Additionally, level four, “Managed,” also presented a relevant score of 52, characterized by the consolidation of the digital project management platform and the alignment of the sector’s tactical objectives with the organization’s strategic planning (Prado, 2016).

The dimensions of computerization and strategic alignment were the most developed in the Quality sector, with adherence of 63% and 56%, respectively. This performance reflects the good usability of the digital project management platform, which proved to be widely used, especially in tactical planning and strategic monitoring, through the Objective and Key-Results (OKR) methodology. The sector’s strategic objectives also coincide with the quality goals, ensuring effective alignment of actions.

The Quality department demonstrated significant strengths, including structured people management processes, with periodic meetings and individual development plans. Furthermore, the department supports process mapping in other areas, encouraging knowledge storage, and the results of certification audits are periodically disclosed and discussed. Agile management is a common practice in the routine, influencing decision-making in projects, even without specific training in project management methodologies.

Despite the strengths, several weaknesses were identified in the Quality sector. The team’s training in project management knowledge was superficial, resulting in discrepancies in performance and a lack of defined standards. A strong dependence on senior management for decision-making was observed, which can lead to delays. The absence of structured planning and consolidated practices for risk management, changes, and lessons learned contributed to a reactive, rather than preventive, approach to processes.

Other fragilities included the absence of consolidated indicator panels, hindering historical visualization and critical data analysis. Interdepartmental communication and integration were weak, generating noise between areas and a low search for root cause resolution. The recent effective structuring of the sector, less than two years old, resulted in little recorded historical information. Finally, the inactivity of a goals and processes committee led to informality in standardization and indicator discussions.

During the discussion sessions, the Quality department highlighted that project management training is a topic little explored in the ISE Company in general. However, the gradual introduction of simplified tools that generate high planning value can be an alternative to reactive action. The low feedback on processes, evidenced by the lack of registration of non-conformities or operational occurrences, was identified as an opportunity for improvement for the sector and for the company as a whole.

Maturity assessment in PM in the backoffice sector

The Backoffice department obtained a score of 2.40 in the Final Maturity Assessment Report (RAFM), also falling between levels two and three. The highest score was 57 in level two, indicating that this is the most evolved stage for the department. Although the Backoffice is in the same maturity range as the Quality department, it demonstrated less alignment of knowledge in project management.

The dynamic nature and the external and market influences that characterize the Backoffice department demand rapid responses, which historically has not prioritized standardized performance and the adoption of more defined methodologies. The dimensions of computerization and strategic alignment were also the most adherent in this sector, with 43% and 39% adherence, respectively. These percentages, although lower than those in the Quality sector, indicate a direction towards level three of maturity, according to Prado (2016), driven by the digital project management platform implemented three years ago.

Among the Backoffice’s strengths, the presence of the digital project management platform in the daily routine of employees stood out, eliminating manual controls, although its functions are not fully explored. The department’s internal goals are aligned with the business’s strategic objectives, and recurring actions are part of the strategic planning. About 50% of the team seeks behavioral, personal, and professional development in various areas, and in recent months, a growing culture of seeking the “why” behind results has been observed, favoring analyses, even if still superficial.

The main weaknesses of the Backoffice sector included low demand and incentive for general training, both technical and behavioral, for 50% of the team, resulting in knowledge stagnation and lack of adoption of new techniques. Planning was done superficially and without formal methodologies, leading to reactive performance and shallow analyses, with potential impact on other departments. The limited use of digital management platforms resulted in system ineffectiveness, rework, and longer operational time.

The inactivity of a growth and market intelligence committee was another weakness, generating unformalized discussions and low engagement in the application of new information and methodologies. Furthermore, there were few records of lessons learned, indicating a low tendency for continuous learning and planning of preventive actions. The data generated were not explored in depth, resulting in superficial decision-making without correlation between different pieces of information. Finally, projects were executed without the formalization of the project management concept, leading to non-existent or superficial records and challenges in measuring efficiency and success.

The Backoffice sector also identified the centralization of information in upper management as a point of improvement for communication and decision timeliness, aiming for a strategic view and more proactive planning. The existing superficial analyses were recognized as opportunities to optimize steps and processes, promoting critical discussions about sectoral issues and knowledge containment within the company. These aspects, combined with the strengths, support the current maturity level and guide improvement opportunities.

Interpretation of results, sector comparison and managerial implications

Based on the final maturity assessment reports, both sectors, Quality and Backoffice, were classified at level two, “Known”. This classification is consistent with the greater development and maturity observed in the dimensions of computerization and strategic alignment, as evidenced by the strengths and weaknesses discussed. The MMGP proved to be an effective tool for analyzing the current state of maturity and, thus, enabling the development of growth plans focused on the continuous improvement of project management processes (Prado, 2016).

The classification of “weak maturity”, according to Prado’s scale (2016), should not be interpreted as an organizational failure, but rather as an expected diagnosis for organizations in the initial phase of structuring their project governance. Intermediate levels are common in companies that have not yet consolidated standardized processes and use isolated and informal planning initiatives, but which demonstrate evolutionary potential from structuring actions, such as the implementation of a PMO and the pursuit of knowledge internalization.

The fragilities identified in both departments, such as the absence of formal standardization, weakness in project management and governance training processes, reactive rather than preventive action, low adherence to recording lessons learned, late or superficial analysis of indicators, and the poorly consolidated practice of robust planning, are detrimental factors. The literature (PMI, 2021) corroborates that these points can lead to lower schedule predictability, resource waste, rework, and strategic misalignment, compromising continuous improvement.

The difference in maturity scores between the sectors can be attributed to the nature of their activities. The Quality sector, with greater exposure to audits and formalized processes, tends to adhere more to structured management practices. In contrast, the Backoffice, although strategic, operates in a more dynamic and reactive environment, which hinders the consolidation of formal practices. Furthermore, the difference in team size, with the Backoffice having more collaborators, may explain the additional challenges in people management, knowledge, and communication faced by this sector.

External factors, such as market variability and the economy, also contribute to the Backoffice’s lower maturity score. While the Quality sector is less impacted, the Backoffice is constantly pressured for positive results, regardless of the external scenario, which leads it to an immediate search for solutions and a more reactive approach. These aspects make actions less predictable and project management more challenging.

The comparison of the results with reports on the application of MMGP in the Brazilian civil construction industry (Alvarenga et al., 2015; Alvarenga et al., 2021) revealed that the average overall maturity score for this sector was 2.59 in 2014 and 2.70 in 2021. The results of Company ISE (2.86 for Quality and 2.40 for Backoffice) are close to this national average, indicating that the company aligns with the sector’s panorama. Mendonça’s research (2021) also showed that 41.67% of real estate developers achieve level one or two in strategic management, corroborating the classification of Company ISE.

The ideal adherence for each dimension, according to Alvarenga et al. (2015; 2021), is above 70%. The civil construction industry, in the 2014 and 2021 reports, reached values close to 50%, with an average negative deviation of 20%. The Quality sector of Company ISE was close to the ideal in the informatization dimension (63%) and similar to the average results for the other dimensions (ranging between 41% and 56%). The Backoffice, on the other hand, reached values below 44% in all dimensions, indicating greater vulnerabilities.

Information technology and strategic alignment, although they are the first vectors for structuring project management, do not guarantee sustainable maturity in isolation (Archibald and Prado, 2011). It is essential that there is integration with the other dimensions, such as behavioral and methodological competencies. In the Quality sector, the lower adherence to the organizational structure can be explained by the strong dependence on senior management. In the Backoffice, behavioral competence was the dimension with the lowest adherence, due to low interest and incentive for training.

Growth plan

The growth plan was developed from a complete diagnosis, considering the premises of maturity at each level, adherence to dimensions, and identified weaknesses. The 5W2H tool was used to structure the actions, adapting them to operational needs. A consolidated plan was chosen, unifying actions applicable to both sectors and replicable in other departments of the ISE Company, which lent greater credibility and a sense of mutual collaboration.

The premises for defining the actions included the possibility of replication in other departments, the utilization of pre-existing resources (employees, systems, technologies, and documents), and alignment with the company’s strategic planning and culture. These guidelines guided an analytical and practical reasoning, aiming for the implementation, sponsorship, and acceptance of the plan by senior management and other leaders. In the end, three best practices were prioritized for short-term implementation, with replication potential.

The first prioritized action was the implementation of a change planning process to ensure that changes, at different impact levels, are conducted and communicated in a timely and appropriate manner to stakeholders. This process aims to organize and clarify the objectives, scope, and steps of the changes, using the already implemented digital project management platform. It will be a short-term action, led by the PMO and the Quality sector leader, with the creation of a standard procedure for employee training.

The second action consists of implementing a risk management process by indicators, with the objective of anticipating operational, tactical, and strategic problems, reducing negative impacts, and increasing the predictability of results. The indicator module of the project management platform will be used, focusing on defining critical indicators by area, configuring dashboards, and creating routines for monitoring and analyzing risks. This medium-term initiative will be led by the PMO.

The third action involves the development of a sectorized project management manual, to be made available to leadership through the digital platform. This long-term initiative, developed internally by the PMO, will depend on the complete mapping of organizational processes, including the definition of decision-making authorities. The manual will undergo validation by senior management and will be disseminated and trained for leadership, contributing to the standardization and development of project management competence.

Other proposed actions include the promotion of an internal SWOT analysis to identify strengths, weaknesses, opportunities, and threats, aiming for greater team engagement and input for strategic planning. Leadership development to elevate management maturity and analytical capacity is a continuous action, with internal training. Training employees on management tools, such as SWOT, 5W2H, and PDCA, is also planned to promote practical use and process standardization.

The resumption of the growth and market intelligence committee, with monthly meetings conducted by Backoffice leadership, aims to foster innovation and scalability. The goals and processes committee will be resumed by the PMO to discuss the optimization of resources, time, and processes, replicating improvements in other sectors. The development of individual development plans for Backoffice employees, aligned with company objectives, will use the already implemented people management tool.

Finally, the implementation of a system for managing administrative non-conformities will ensure the standardization of registration, classification of occurrences, and generation of a lessons learned register. This system, developed internally by the Information Technology department, will allow in-depth analyses by the Quality department, identifying organizational improvements and interdepartmental gaps. The execution of these actions over time will promote a gradual cultural transformation, fostering engagement and the development of project management maturity.

Final discussion on the sectoral application of MMGP at ISE Company

The application of the MMGP enabled a precise diagnosis of the current state of sectorial maturity in project management at Empresa ISE. This project, led by the recently structured PMO, demonstrated that although literature suggests initiating the implementation of a PMO when the organization reaches maturity level three, the decision to start at an earlier stage can be strategic, depending on the company’s context and needs (Cruz, 2016). The structuring of the PMO at Empresa ISE occurred at an opportune moment, with the PMO itself conceptualizing the pilot evaluation project.

Currently, individual departments do not have a dedicated project management professional, which reflects an organizational priority in consolidation. The maturity of the overall PMO and the development of other sectors will occur concurrently, reinforcing the importance of an integrated approach. As a limitation of the study, the application of the MMGP in only two of the organization’s fifteen departments, due to time constraints, prevented a generalized diagnosis. Prado (2016) does not recommend the sole application of the questionnaire to assess PMO maturity itself, suggesting specialized tools for this purpose in future research.

Another limitation identified was the scarcity of studies and publications on the application of MMGP specifically in the real estate development sector, which reduced the benchmark for external comparisons. Despite these limitations, the study demonstrated the applicability of MMGP as a structured, easy-to-use, and widely applicable questionnaire, proving to be an efficient diagnostic tool, with accessible content for interpretation and analysis of results. The alignment of MMGP with the 5W2H tool lent credibility to the project and the PMO, enabling the organization and prioritization of growth actions.

The joint construction of a structured diagnosis added value to the participants, promoting good acceptance and strong engagement, and reinforcing the importance of a tool that assists in identifying bottlenecks and gaps, directing improvements. From a practical point of view, the results of this study provided the PMO and the pilot units with a baseline for the evolutionary monitoring of project management maturity in the organization. The annual replication of the assessment and its expansion to other sectors can contribute to the dissemination of good practices.

This approach can foster more structured and assertive decision-making in daily operations, reinforcing the role of project management maturity as an organizational governance instrument. The PMO, as strategic support, and the importance of integration and collaboration among the various departments are crucial aspects for success. The execution of the proposed initiatives, many of them with low or no cost, demonstrates that even in organizations with a “Known” maturity level, it is possible to adopt and replicate actions with high potential to promote the evolution of project management maturity.

4. Conclusion

The research sought to evaluate the project management maturity level of a real estate developer in the civil construction sector, through a sectoral pilot assessment, with the aim of supporting a growth plan and proposing best practices. It was found that the Quality and Backoffice sectors were classified at maturity level two, named “Known”, with computerization and strategic alignment standing out as the most developed dimensions in both. However, weaknesses were identified such as the absence of formalized practices, planning gaps, and reactive performance, in addition to superficial training in project management. These findings supported the development of a consolidated growth plan, structured with the 5W2H tool, which prioritized initiatives such as the implementation of change planning, risk management by indicators, and the creation of a sectorized project management manual. The study demonstrated the applicability of the Project Management Maturity Model (PMMM) as an effective tool for diagnosis and for establishing a baseline for monitoring the evolution of project management maturity in the organization.

The study’s practical contribution lies in providing the PMO and pilot units with a framework to enhance organizational governance and disseminate project management best practices, with many of the proposed actions being of low or no cost, which favors their adoption and replication. As limitations, the application of the MMGP in only two of the organization’s fifteen departments was pointed out, which prevented a generalized diagnosis, and the scarcity of specific comparative studies in the real estate development sector. For future studies, it is suggested to replicate the evaluation annually and expand it to other company sectors, in addition to investigating and applying specialized tools for the maturity of the PMO itself, aiming for continuous evolution of project management maturity.

Bibliographic References

Alvarenga, C.; Prado, D.; Oliveira, I. J. 2015. Relatório 2014: “indústria da construção” parte A: indicadores. Disponível em: <https://maturityresearch.com/wp-content/uploads/2020/05/RelatorioMaturidade2014-IC-Parte-A-Indicadores.pdf>. Acesso em: 12 abr. 2026.

Alvarenga, C.; Prado, D.; Oliveira, I. J. 2021. Relatório pesquisa 2021: “indústria da construção” indicadores de desempenho. Disponível em: <https://maturityresearch.com/wp-content/uploads/2022/02/RelatorioMaturidade2021-Ind-Construcao-Parte-A-Indicadores-V2_compressed.pdf>. Acesso em: 04 abr. 2026.

Archibald, R. D.; Prado, D.; 2011. Gerenciamento de projetos para executivos. 2ed. Falconi, Belo Horizonte, MG, Brasil. Disponível em: <https://plataforma.bvirtual.com.br/Leitor/Publicacao/191034/epub/0?code=ou7m7Bk5HjIB/LWYL5V2M9/VkxcZZBlyXs2UHzDk9y8DSCDR6+7unWFHb8chUqbxvIDOTkwdyF0uUY8FwYcmPA==>. Acesso em: 05 out. 2025.

Belmiro, T. 2018. Bússola de gestão para a construção civil. 1ed. Brasport, Rio de Janeiro, RJ, Brasil. Disponível em: <https://plataforma.bvirtual.com.br/Leitor/Publicacao/164691/epub/0?code=yIBC8d0/hWqGdnmoJYhD/+xKvR/5vp7WDMXCRx0sjeyBjzHsa/yi1RAlcx7re569qp5/1Ka+cU4dS3adV1jxEg==>. Acesso em: 24 set. 2025.

Cruz, F. 2016. PMO ágil: escritório ágil de gerenciamento de projetos. 1ed. Brasport, Rio de Janeiro, RJ, Brasil. Disponível em: <https://plataforma.bvirtual.com.br/Leitor/Publicacao/160067/epub/0?code=kk4/cAM5EQRNyYan3PFWt+RruXS3rq0hmVMMNghHrljVi8fRyjTNhV9fmH3cHk54HNYjc9CPf3W9PZOYVnzuXg==>. Acesso em: 24 set. 2025.

Gil, A.C. 2008. Métodos e técnicas de pesquisa social. 6ed. Atlas, São Paulo, SP, Brasil.

Mendonça, M.A. 2021. Proposição de um Sistema de Avaliação do Nível de Maturidade em Gestão Estratégica de Incorporadoras Imobiliárias Residenciais. Dissertação de Mestrado em Inovação na Construção Civil. Escola Politécnica da Universidade de São Paulo, São Paulo, SP, Brasil.

Prado, D. 2016. Maturidade em gerenciamento de projetos: faça uma avaliação da maturidade em gerenciamento de projetos na sua organização usando o modelo de maturidade prado-mmgp e monte um plano de crescimento. 3ed. Falconi, Nova Lima, MG, Brasil. Disponível em: <https://plataforma.bvirtual.com.br/Leitor/Publicacao/213068/epub/0?code=qS6Xxbpz0PT5RHOikXKz28Fzp8zSJBjyh4oSRaj2n8LsIxvfRVugUbsefeWhyrhqiPVhrRejdCjktQimtE8G1A==>. Acesso em: 23 set. 2025.

Project Management Institute [PMI]. 2021. A Guide to the Project Management Body of Knowledge. 7th ed. Project Management Institute, Newtown Square, PA, USA.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.