Efficient bug management in brewery logistics software with continuous improvement

Pamella Silva Pinheiro; Desirée Baldin Damame

DOI: 10.22167/2675-6528-202601299

Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.

Abstract

The growing complexity of logistics software in the brewing industry has established efficient bug management as a critical factor for maintaining the quality, reliability, and operational success of systems. In this scenario, the application of continuous improvement, through the PDCA cycle, in the bug management of logistics software used in production planning for a brewery was understood. The research was characterized as exploratory and descriptive, with a qualitative and quantitative approach, and was conducted through a detailed case study in a large company in the brewing sector. The methodology employed the application of a questionnaire, observation of meetings of the product, engineering, and support teams, and the use of project management tools, such as the Ishikawa Diagram, the 5W2H method, and the Gantt Chart, to collect and analyze data. The results indicated that the application of the PDCA cycle contributed significantly to the identification of root causes, such as the lack of process standardization, deficiencies in knowledge transfer, weaknesses in governance, and the absence of clear performance indicators. It was concluded that the PDCA cycle was effective in organizing bug management, transforming it into a sustainable process capable of continuous evolution, through improvement actions focused on standardization, documentation, knowledge management, and performance indicator monitoring, which represents a valuable contribution to the optimization of logistics operations.

Keywords: PDCA Cycle; Governance; Incident; Performance indicators; Standardization.

1. Introduction

The brewing industry is a sector of great global impact, producing one of the most consumed and valued beverages in the world. Its relevance is underscored by data positioning Brazil as the third largest global consumer by volume (Kirin Brewery Company, 2023). The history of beer dates back to prehistory, with its origins linked to the improvement of agricultural skills and the discovery of grain fermentation (Pereira, 2021). Over millennia, production has evolved from artisanal methods to complex industrial operations, characterized by intelligent machinery, robust administration, and intricate logistical planning (da Silva; Kawakame, 2019). This transformation has been driven by globalization and the rise of Industry 4.0, which seeks maximum efficiency with minimal resources, integrating technologies such as the internet of things, process automation, and digitalization to make industrial operations smarter and more connected (Jamwal et al., 2021).

In this scenario of intense digital transformation, logistics has emerged as a strategic pillar, encompassing the entire supply chain, from the acquisition of raw materials to the final delivery to the consumer (da Silva; Kawakame, 2019). The fusion of logistics with technology, catalyzed by the digitalization of Industry 4.0, has become a decisive factor in improving the quality, operational efficiency, and competitiveness of companies in the global market (Lagorio et al., 2022; Moldabekova et al., 2021). The concept of intelligent logistics, in particular, depends on the development and integration of sophisticated software, capable of assisting in decision-making and continuous optimization of the supply chain through advanced information systems (de Gois et al., 2023). However, the growing complexity of these logistic software systems in the brewing industry introduces an inherent challenge: the management of “bugs”. Bugs, defined as unexpected behaviors or failures that deviate the software from its expected functionality, can seriously compromise the reliability, security, and operational performance of the systems (Gegick et al., 2010). The occurrence of bugs in logistic software can result in production interruptions, distribution delays, financial losses, and damage to brand reputation, making the efficient management of these incidents a strategic imperative for maintaining quality and operational success.

To mitigate the negative impacts of bugs and ensure the continuous evolution of systems, the concept of continuous improvement is fundamental. This systematic process aims at progressive development, long-term effectiveness elevation, and resource optimization in any process or system (Slack, 2015). Among the methodologies for implementing continuous improvement, the Plan-Do-Check-Act (PDCA) cycle stands out for its structured and iterative approach. The PDCA comprises four phases: Plan (P), the phase where problems are identified and goals and action plans are established; Do (D), which consists of implementing the plan; Check (C), the phase of monitoring and analyzing results compared to goals; and Act (A), the phase where successful solutions are standardized or plans are adjusted for a new improvement cycle (Isniah et al., 2020). This cycle allows for focused attention on problem-solving, transforming corrective solutions into permanent and sustainable actions. The application of PDCA in the context of developing and maintaining logistics software is particularly beneficial, offering a framework for managing complexity, adjusting processes, and continuously evolving systems.

Despite the clear benefits of continuous improvement, the effective implementation of methodologies such as PDCA in the management of bugs in logistics software still faces considerable challenges, such as the persistence of failures and rework. The absence of standardization, deficiencies in knowledge transfer, and the lack of clear performance indicators are factors that frequently compromise quality and efficiency. Given this scenario, this study is justified by the pressing need to improve the reliability and performance of logistics software systems, reducing rework and adding significant value to the brewing industry. Thus, the objective of this work is to analyze how the application of the PDCA cycle can optimize bug management in a logistics software used in the production planning of a brewery, identifying the root causes of problems and proposing continuous improvement actions to transform incident management into a sustainable and evolutionary process.

2. Material and Methods

The research was characterized as exploratory and descriptive, seeking to deepen familiarity with the bug management problem and understand its characteristics in a poorly structured scenario. A mixed approach was adopted, combining qualitative and quantitative elements for a comprehensive analysis. The quantitative aspect employed a questionnaire with closed-ended questions, allowing for the collection of objective statistical data. Complementarily, the qualitative approach involved observing meetings of product and engineering teams, aiming to analyze the subjective challenges and internal processes related to bug management. The study was conducted in the form of a case study, focusing on a specific organization to gain an in-depth understanding of the phenomenon.

The case study was conducted in a large multinational company in the brewing sector, with significant operations in the Brazilian logistics market. The specific research context was the digital area of logistic planning of the brewery, located in the Jaguariúna hub. This area is responsible for a software that automates the weekly beer production forecast, managing variables such as inventory, production forecast, operational capacity, and supplier availability. The unit of analysis focused on the bug management process within this logistic software. The data collection period for the questionnaire extended from December 15, 2025, to March 1, 2026, while qualitative observations occurred over two months.

The population for the quantitative data collection, through a questionnaire, included 25 company employees, covering mid-level and senior analysts, and leaders working in technology, projects, and development. Additionally, the questionnaire was distributed to approximately 900 students of the MBA in Project Management program at USP Esalq, located in various regions of Brazil. The selection criteria aimed at participants with experience or background in project management and technology development. Of the total questionnaires sent, 27 responses were obtained, with most respondents working in planning, development, and testing/quality areas, which confirmed the relevance of the audience to the investigated topic.

For the qualitative data collection, the population of interest consisted of the 11 people who make up the digital area of logistic planning at the brewery, with three from the product team and eight from the engineering team. The sample for observation was composed of ten routine meetings scheduled by the teams, distributed into two “discovery” meetings, six Scrum ceremonies, and two accountability meetings. Each observed meeting had an average of five participants and lasted approximately one hour. The selection criterion for observation was active participation in the routines of management and development of the logistic software, allowing for a direct analysis of behaviors and processes.

The main instrument for collecting quantitative data was an anonymous questionnaire, composed of nine questions, which included both closed-ended and open-ended questions. The questions were structured to address three central research themes: risk management, process efficiency, and suggestions for improvement. The objective of the questionnaire was to identify behavioral patterns and perceptions about the current bug management scenario, as well as to verify if the application of continuous improvement could generate positive results in preventing and reducing incidents. The response options for the closed-ended questions were designed to capture objective data on the classification and complexity of bugs, the frequency of occurrence, and the methodologies employed.

Qualitative data collection was carried out through direct observation of routine meetings and the work tools used by the product and engineering teams in the logistics area, over a period of two months. The observed meetings included “discovery” sessions, where user difficulties and solution hypotheses were discussed; Scrum ceremonies, such as daily meetings, sprint planning, review, and retrospective; and accountability meetings, focused on alignment between teams and discussion of priorities. This procedure aimed to understand the influence of internal methodologies and processes on bug generation and mitigation, capturing the challenges and subjective approaches adopted by the teams.

The research execution was structured and guided by the Plan-Do-Check-Act (PDCA) cycle, a continuous improvement methodology that offers a systematic framework for problem-solving and process optimization (Isniah et al., 2020). The PDCA was employed as a central analytical tool to organize the obtained data and results, facilitating the identification of causes, the proposal of solutions, and the formulation of improvements. This iterative cycle allowed for a focused approach to bug management, transforming incident analysis into a continuous process of learning and evolution, aligned with the objective of sustainability and enhancement of logistical systems.

The “Plan” phase of the PDCA cycle involved the application of the questionnaire, observation of meetings, and the use of the Ishikawa Diagram. The Ishikawa Diagram, also known as the cause-and-effect diagram, was fundamental for mapping and analyzing the root causes of efficient bug management problems, based on the results of qualitative and quantitative research. The categories for the diagram were defined from the patterns identified in the collected data, encompassing aspects such as people, processes, governance, and success indicators. This stage allowed for a deep understanding of the factors contributing to the occurrence and persistence of bugs.

In the “Do” (Execute) phase, proposals for solutions to the identified problems were developed using the 5W2H method. This method aimed to analyze the causes in detail and structure possible solutions, answering the questions: What, Why, Where, When, Who, and How. The cost estimation step, which is part of the 5W2H, was not considered in this study, as the main objective was not the practical implementation of actions in the company, but rather the proposition of solutions that would mitigate the causes of bug management problems.

The subsequent phases of the PDCA cycle, “Check” and “Act”, were outlined with theoretical grounding for future applications. The “Check” phase involved validating the execution deadline and the effectiveness of the proposed actions, using performance indicators organized in a Gantt Chart. This chart allowed for the visualization of the schedule and validation criteria for each solution. Finally, the “Act” phase recommended the standardization, documentation, and feedback of validated improvement suggestions, aiming to establish an effective continuous improvement process for bug management in the brewery’s logistics area, ensuring the sustainability of actions over time.

The quantitative data collected through the questionnaire were subjected to a descriptive analysis, with the aim of identifying patterns, frequencies, and percentages related to bug management, process efficiency, and improvement suggestions. The questions were grouped by themes to facilitate the consolidation and interpretation of the results. For the qualitative data, from the observation of meetings, a content analysis was employed, seeking to identify the challenges faced, the subjective processes adopted by the teams, and the influence of internal methodologies on bug generation and mitigation. The integration of these analyses fed the Ishikawa Diagram and the 5W2H method, which served as tools to deepen the understanding of the causes and propose solutions.

Regarding ethical procedures, the research ensured the anonymity of the questionnaire participants, guaranteeing the confidentiality of the information provided. As for methodological limitations, it is important to highlight that the study focused on a specific problem in the area of logistics technology, bug management, in a single brewery. The results obtained were not applied or monitored in a real environment with continuous monitoring of the proposed improvements. Thus, the conclusions are intrinsically limited to the studied context, although the techniques and methods presented can be adapted and applied in different scenarios and project areas, serving as a basis for future investigations and implementations.

3. Results and Discussion

The analysis of the results obtained through exploratory quantitative research, conducted via questionnaire, and qualitative research, based on the observation of routine meetings, allowed for an in-depth understanding of the challenges and opportunities in bug management in a logistics software for a brewery. The questionnaire questions were categorized into main focuses, and the data were consolidated to facilitate interpretation, providing a robust basis for discussing root causes and proposing continuous improvements.

One of the first relevant findings, as illustrated in Figure 1, concerns the criteria that respondents consider when initiating a new project with stakeholders. It was observed that the majority of participants attribute high importance to the mapping of current and future processes, to the final delivery deadline, and to the schedule, with 52% of mentions for each of these criteria. In contrast, the analysis of Key Performance Indicators (KPIs) was significantly less valued, with only 26% of respondents considering it a crucial criterion. This disparity suggests a gap in the project management approach, where the emphasis is predominantly placed on operational and temporal aspects, to the detriment of measuring results and long-term effectiveness.

Figure 1. Criteria analyzed with the stakeholder. Question Q5 of the questionnaire

Source: Original research results

The low priority given to KPIs in the initial project planning, as evidenced in Figure 1, is a critical point that deserves attention. Kerzner (2023) argues that a successful project cannot be evaluated solely by on-time and on-budget delivery; measuring the value generated and performance through indicators is fundamental. The absence of clear KPIs from the outset can lead to a false perception of success, where the project is considered successful for meeting deadlines and costs but fails to deliver the expected value or prevent future problems, such as the emergence of bugs. This superficial approach can mask inefficiencies and create an environment conducive to bugs manifesting, as there are no clear metrics to monitor software quality and performance over time. The practical implication is that teams may be operating without an accurate thermometer of project health, missing the opportunity for proactive intervention.

Figure 2 presents the methods by which risks are raised and mitigated, according to the respondents. It was found that planning meetings with the internal team are the main way to raise risks (70%), followed by technical and architectural analyses (52%) and project refinement (44%). However, risk mitigation during project refinement, already in the development phase with the engineering team, is an indication that many risks are not being identified and addressed in the initial stages. This leads to delivery delays and the need for rework, as the project needs to return to previous stages for correction.

Figure 2. Risk survey and mitigation. Questionnaire question Q6

Source: Original research results

The practice of mitigating risks in advanced development phases, such as refinement, contradicts the principles of effective project management. Sommerville (2016) emphasizes that risk identification and mitigation should occur as early as possible in the project lifecycle, preferably during the feasibility and discovery analysis phase. By postponing this stage, the organization incurs higher costs and greater impacts on the schedule and the quality of the final product. Excessive reliance on internal meetings for risk assessment, without robust process formalization or the inclusion of external stakeholders, can result in a limited view of potential problems. The practical implication is the need to establish a formal and comprehensive risk management process that begins in the project conception phase, involving all stakeholders and using tools that allow for predictive and proactive analysis. This includes the creation of risk matrices and detailed contingency plans, which are continuously reviewed and updated.

Regarding the methodologies used to understand project risks and pain points, Figure 3 reveals a scattered use of approaches, with Continuous Improvement, SWOT Analysis, Kanban, and Scrum tied at 33% of mentions. Other methodologies such as Design Thinking (19%) and Lean (15%) are also employed, albeit on a smaller scale. The diversity of methodologies indicates a search for tools that assist in management, but the observation that they are often not applied correctly or at the appropriate time raises concerns about the effectiveness of their use.

Figure 3. Most used methodologies to understand risks. Questionnaire question Q7

Source: Original research results

The application of methodologies such as Scrum and Kanban, although valuable for agility and workflow management, can be ineffective in early risk identification if not integrated with a robust “discovery” phase. Cagan (2018) argues that the discovery phase is crucial for validating hypotheses, identifying user needs, and aligning expectations before development begins. When methodologies are applied in isolation or at inappropriate times, they lose their preventive potential, becoming reactive rather than proactive tools. The practical implication is that the organization must invest in training and standardization of the use of these methodologies, ensuring they are employed in an integrated and strategic manner, especially in the initial “discovery” phase, to maximize the identification and mitigation of risks before they become costly bugs. The lack of a deep understanding of how each methodology fits into the project lifecycle can lead to a false sense of security, where the team believes it is managing risks, but in reality is only reacting to them.

The frequency of dealing with bugs on a daily basis, presented in Figure 4, is an alarming indicator of the development process’s health. The majority of respondents (44%) deal with bugs “a few times a week,” and 22% do so “daily.” This high frequency suggests that the project’s study and development process requires a thorough review to ensure its effectiveness from the outset. The constant interruption to deal with bugs not only consumes time and resources but also affects team productivity and morale.

Figure 4. Frequency of working with bugs in daily life. Questionnaire question Q2

Source: Original research results

A high frequency of bugs, as revealed in Figure 4, is a symptom of a development process that is not entirely healthy. This can be attributed to failures in earlier stages, such as requirements gathering, design, coding, or testing. Software engineering literature, such as Sommerville (2016), highlights that defect prevention is always more efficient and economical than correction. When teams are constantly diverted to fix bugs, the workflow is interrupted, focus is lost, and the ability to innovate is compromised. Practical implications include the need to implement more rigorous development practices, such as peer code review, automated testing, and continuous integration, to identify and fix defects before they reach the production environment. Furthermore, the organizational culture must promote accountability for quality at all stages of the development cycle, not just in the testing phase.

Bug resolution efficiency, as illustrated in Figure 5, shows that 37% of bugs are resolved in 1 to 2 days, and 22% in 3 to 5 days. Although a significant portion is resolved quickly, a relevant percentage of bugs take more than a week to be solved, which raises concerns about user perception and product trust. Agility in problem resolution is crucial for maintaining customer satisfaction and software reputation.

Figure 5. Bug resolution speed percentage. Questionnaire question Q3

Source: Original research results

The bug resolution speed, while reasonable for most, still presents points of slowness that can negatively impact the user experience. Sommerville (2016) argues that an agile and effective incident resolution process not only improves product perception but also increases user confidence and perceived value. When a bug persists for more than a week, user frustration can escalate, leading to a loss of trust and, in extreme cases, the search for alternative solutions. Practical implications include the need to optimize support and development workflows, ensuring that bugs are prioritized correctly, that teams have the necessary tools and knowledge to resolve them quickly, and that there is a clear communication process with users about the status of fixes. The implementation of a robust incident management system, with well-defined SLAs (Service Level Agreements), can help monitor and improve these response times.

The incorrect classification of incidents, shown in Figure 6, reveals that 37% of registered bugs actually represent between 10% and 25% of misclassified user stories, and 26% represent between 2% and 10%. This data is critical, as erroneous classification prevents understanding the root cause of the problem. An incident may be classified as a bug when it is actually a request for a new feature or an improvement, or vice versa. This confusion generates incorrect visibility of the project execution process efficiency and hinders prioritization and planning.

Figure 6. Average of misclassified bugs. Questionnaire question Q4

Source: Original research results

The incorrect classification of bugs, as shown in Figure 6, directly reflects a lack of knowledge and standardization in incident logging processes. When a “bug” is actually a user story (a new feature or improvement), resources are misallocated, and the development team may be “fixing” something that isn’t broken, instead of building value. This not only distorts software quality metrics but also delays the development of new features and impacts user satisfaction. The practical implication is the urgent need to define clear, standardized criteria for classifying bugs and user stories, accompanied by training for all involved teams (product, engineering, and support). Implementing a more rigorous triage process, with the participation of product and technical experts, can ensure that each incident is correctly categorized and routed for appropriate resolution.

The research also explored the public’s perception of the efficiency of the bug opening and logging process (Q8). Although some consider the process fast, structured, and functional, critical points were raised. The lack of standardization in descriptions and severity criteria, prioritization difficulties, the support team’s dependence on the product team due to lack of knowledge, and the existence of manual processes due to the absence of a ticketing platform were factors that hinder efficient incident management.

These qualitative findings on the inefficiency of the bug opening and registration process corroborate the need for continuous improvement. The lack of standardization, in particular, is a significant obstacle. Slack (2015) highlights that process standardization is fundamental to ensuring consistency, reducing errors, and optimizing performance. Without clear criteria for describing and classifying bugs, prioritization becomes subjective and inconsistent, leading to rework and delays. The support team’s dependence on other teams due to lack of knowledge is a bottleneck that increases resolution time and user frustration. The absence of a robust ticketing platform, resulting in manual processes, is a governance failure that hinders scalability and efficiency. Practical implications include the implementation of a centralized ticket management system, the creation of standardized templates for bug registration, the definition of a clear severity and priority matrix, and investment in cross-training so that the support team has the autonomy to resolve more common issues.

The participants’ suggestions for improvement (Q9) reinforce the need for standardization and automation. 51.9% of respondents highlighted standardization in the bug opening and registration process and test automation as fundamental. Technical code review (48.1%), more effective use of management tools (48.1%), and greater collaboration between teams (37%) were also pointed out as essential. Curiously, improvement in the “discovery” process obtained the lowest percentage (14.8%), which may indicate an underestimation of the importance of this initial phase.

Suggestions for improvement, especially the standardization and automation of tests, are pillars of modern software engineering. Gegick et al. (2010) and Sommerville (2016) emphasize that automated tests are crucial for ensuring software quality, identifying defects early, and reducing manual testing effort. The standardization of bug reporting processes, combined with code review, contributes to the detection and prevention of failures. The low valuation of improvement in the “discovery” process is concerning, as, Cagan (2018) points out, it is in this phase that most risks and requirements are defined. Ignoring this stage can lead to software development that does not meet user needs, resulting in more bugs and rework. Practical implications include the creation of a comprehensive training program on best software development practices, the implementation of test automation tools, and the promotion of a culture of collaboration and shared responsibility for quality across all teams.

Qualitative research, based on the observation of routine meetings, provided valuable insights into the team’s behaviors and ways of working. Table 1 consolidates these results, highlighting themes such as communication, development stages, urgencies, and knowledge.

Table 1. Results of routine meeting observations

Topic

Stakeholders

Observed behavior

Communication

stakeholder, business team, product and engineering

Difference in prioritization interest

Project development stages

Product team

Lack of standardization in the “discovery” process and risk matrix analysis

Emergencies

Product and engineering team

Pause in the development of current projects to solve urgent tasks (bugs)

Knowledge

Support team

Lack of knowledge about the software and projects, long call resolution time, and absence of root cause discussion for resolved bugs

Source: Original research results

Table 1 reveals that, although communication is effective, there is a divergence of interest in prioritization between the teams. The business team focuses on company results and goals, while the product and development team prioritizes product planning and scope. This difference in priorities, as Kerzner (2017) describes, turns the backlog into a “battleground”, making it difficult to manage deadlines and costs. The lack of standardization in the “discovery” process and in the risk matrix analysis, along with the interruption of current project development to solve urgent tasks (bugs), are indicators of an immature and reactive process. The individualized concentration of knowledge and the absence of discussion about the root cause of resolved bugs contribute to a long resolution time and a lack of organizational learning.

The divergence of priorities between teams, as observed in Table 1, is a common problem in organizations with functional silos. Kerzner (2017) emphasizes that the lack of strategic and operational alignment can lead to conflicts and inefficiencies, where each team optimizes its own objectives at the expense of overall project success. The constant interruption of development to resolve urgent bugs, without a formal incident management process, is a symptom of a reactive culture, where prevention is neglected. The lack of knowledge dissemination and the absence of root cause analysis prevent the organization from learning from its mistakes and implementing lasting improvements. The practical implications are the need to establish a clear governance model, with well-defined roles and responsibilities, and a unified prioritization process involving all stakeholders. The creation of a centralized knowledge base and the performance of root cause analyses for all resolved bugs are essential to promote organizational learning and reduce the recurrence of problems.

The Ishikawa Diagram methodology was used to map and analyze the causes raised in the qualitative and quantitative research, serving as the basis for the “Plan” phase of the PDCA cycle. Figure 7 illustrates the diagram with its categorizations and causes.

Figure 7. Ishikawa diagram for understanding the causes of the bug management problem

Source: Original research results

The Ishikawa Diagram (Figure 7) categorized the causes of bug management problems into four axes: People, Processes, Governance, and Success Indicators (KPIs). In the “People” axis, the imbalance of knowledge, individualized knowledge concentration, lack of training, and divergence of priority interest stand out. In “Processes,” causes include the lack of standardization in incident registration and feasibility studies, lack of root cause analysis, lack of incident management, lack of test automation, and inadequate use of methodologies. The “Governance” axis points to the lack of standardization in “discovery” processes. Finally, in “Success Indicators (KPIs),” the absence of continuous monitoring and the high frequency of bug identification are evident problems.

The analysis of the Ishikawa Diagram (Figure 7) reveals a complex web of interconnected causes contributing to inefficiency in bug management. The lack of standardization in processes, from incident registration to feasibility studies, is a recurring theme that generates rework and compromises product quality, as highlighted by Isniah et al. (2020) regarding the importance of the “Plan” phase of PDCA. The imbalance of knowledge and the individualized concentration of expertise on the “People” axis create dependencies and increase incident resolution time, as the support team, for example, lacks autonomy to resolve more complex problems, requiring escalation to other areas. This aligns with the observation that the project operates in “urgency mode,” without adequate planning and with a high probability of failures.

The absence of adequate methodologies and training, identified in the “Governance” axis, hinders project evolution and continuous learning. The lack of continuous KPI monitoring, in the “Success Indicators” axis, means the organization cannot validate the effectiveness of implemented actions, making it difficult to identify which problems need attention and to implement continuous improvements. This gap prevents the organization from effectively closing the PDCA cycle, transforming bug management into a reactive effort rather than a proactive improvement process. The practical implications are the need for a continuous training program, the implementation of a knowledge management system, the formalization of processes with clear documentation, and the definition of a set of relevant KPIs to monitor software health and intervention effectiveness.

In the “Do” (Execute) phase of the PDCA cycle, the proposed solutions were developed using the 5W2H method. Figure 8 presents the detailed action plan, addressing the identified causes and proposing specific solutions for each axis.

Figure 8. Action plan for the causes of the bug management problem applied in 5W2H

Source: Original research results

The 5W2H action plan (Figure 8) details solutions for bug management problems. For “Processes”, standardization of incident processes, root cause analysis, risk management, and test automation are proposed, aiming to minimize incorrect classifications and incident repetition. In “People”, knowledge dissemination and training are crucial to reduce incident response time and inter-team dependency. For “Governance”, the standardization of “discovery” and the use of methodologies aim to increase team maturity. Finally, for “KPIs”, the definition and monitoring of performance indicators are essential to track the project’s current scenario and its efficiency.

The application of the 5W2H method in the “Do” (Execute) phase of PDCA, as shown in Figure 8, demonstrates a systematic effort to transform identified root causes into concrete actions. The creation of documents with instructions for resolving critical problems and the standardization of the “discovery” process are fundamental steps to mitigate risks and ensure that projects are developed correctly from the outset, aligning with Cagan’s (2018) recommendations on the importance of the discovery phase. The dissemination of knowledge and training for all teams, including support, are crucial to reduce dependency and incident resolution time, promoting a culture of continuous learning, as suggested by Isniah et al. (2020).

Test automation, one of the proposed actions, is a strategic investment that, although it may have an initial cost, generates significant long-term returns by reducing the occurrence of bugs and rework. The definition and monitoring of KPIs, in turn, are essential for measuring the progress and effectiveness of actions, ensuring that project success is evaluated comprehensively, and not just by deadlines and costs, as argued by Kerzner (2023). The practical implications of these actions are improved software quality, reduced operational costs, increased user satisfaction, and the building of a more proactive organizational culture oriented towards continuous improvement.

The “Check” phase of the PDCA cycle organized the actions mapped in the 5W2H method into a Gantt Chart, as shown in Figure 9. This chart identifies the execution deadlines for the actions based on their urgency and the validation indicators for each proposed solution.

Figure 9. Gantt chart with schedule and action validation indexes

Source: Original research results

The Gantt Chart (Figure 9) is an essential tool in project management, allowing visualization of the schedule and validation criteria for each solution. The actions were organized by quarters and classified on the axes People, Processes, Governance, and KPIs, mirroring the categories of the Ishikawa Diagram. For “People”, validation includes the number of incidents resolved by support and the frequency of escalation. For “Processes”, the adoption of incident monitoring, the reduction of reclassified bugs, and the evolution of automated tests are key metrics. In “Governance”, the evolution in the adoption of standardized “discovery” and the increase in mapped risks are indicators. For “KPIs”, the average bug resolution time and the frequency of bugs per month are crucial.

The use of the Gantt Chart in the “Check” phase, as shown in Figure 9, is fundamental for monitoring and controlling the proposed actions, aligning with the systematic PDCA approach (Isniah et al., 2020). By establishing deadlines and validation indicators for each action, the organization can analyze trends and compare the scenario before and after the implementation of improvements. This allows for verification of whether bug management problems are decreasing and if the actions are being effective. Continuous validation is crucial to ensure that improvements are not only implemented but also maintained and enhanced over time.

It is expected that, with the application of these actions and continuous monitoring of indicators, it will be possible to mitigate the main problems identified in the questionnaire and observations, such as the low knowledge of the support team, the high bug resolution time, the lack of standardization in bug opening and classification processes, and the incorrect use of continuous improvement methodologies. The reduction in the frequency of bug occurrences and the mitigation of risks during project development are expected results that will contribute to the sustainability and improvement of the logistic software.

Finally, the “Act” (Act) phase of the PDCA cycle was based on the standardization, documentation, and feedback of the established process. Figure 10 presents the conceptual model of this phase, organized by people, processes, governance, and success indicators.

Figure 10. Conceptual model of the “Act” phase organized by people, processes, governance, and success indicators

Source: Original research results

The conceptual model of the “Act” phase, presented in Figure 10, consolidates the recommendations for the sustainability of improvements. For “People”, the creation of a Bug Management Guide and a Technical FAQ is proposed, aiming to disseminate knowledge and reduce inter-area dependency. In “Processes”, the creation of SOPs (Standard Operating Procedures) for process standardization is essential. For “Governance”, the use of a Decision-Making Model and structured Role Definition, along with the Standardization of “Discovery”, ensure clarity in responsibilities and prioritization. Finally, for “Success Indicators”, KPI Monitoring is fundamental for continuous adjustments and feedback.

The “Act” phase, as shown in Figure 10, is the culmination of the PDCA cycle, where validated improvements are standardized and institutionalized to ensure their sustainability. The creation of a Bug Management Guide and a Technical FAQ for the “People” topic is an effective Knowledge Management strategy, allowing acquired knowledge to be disseminated and accessible to all teams, especially support. This reduces dependence on specialists and incident resolution time, increasing the assertiveness of solutions, according to the literature on Knowledge Management (Nonaka & Takeuchi, 1995).

The standardization of processes through SOPs for the “Processes” theme is crucial to formalize the steps to be followed, reducing rework and ensuring consistency in execution. For “Governance”, the implementation of a structured decision-making model and the clear definition of roles and responsibilities are essential to align priorities and avoid conflicts between teams. The standardization of the “discovery” process ensures that all new project studies are structured in the same way and with the same criteria, reducing development risks, schedule delays, and increasing bug prevention.

Finally, the continuous monitoring of KPIs, under the theme “Success Indicators”, acts as a thermometer, indicating the moment for adjustments and the restart of the PDCA cycle. This allows the organization to be proactive in identifying deviations and implementing corrective actions, ensuring that the continuous improvement process is dynamic and adaptable to environmental changes. The integration of these actions in all phases of PDCA demonstrates a commitment to operational excellence and the sustainability of the logistic software, transforming bug management from a reactive problem into a strategic process of continuous enhancement.

It is important to highlight the methodological limitations of this study. The research focused on a specific problem in the area of logistics technology, bug management, in a single brewery. Although the case study allowed for an in-depth understanding of the phenomenon, the results obtained are intrinsically limited to the context studied and were not applied or monitored in a real environment with continuous monitoring of the proposed improvements. Thus, the conclusions should be interpreted with caution regarding their generalization. However, the techniques and methods presented can be adapted and applied in different scenarios and project areas, serving as a basis for future investigations and implementations. Future studies aimed at deepening risk mitigation in the area of logistics software products, as well as priority management and the “discovery” process, can complement the results of this study, broadening the understanding of bug management and contributing to more effective and sustainable practices.

4. Conclusion

It is concluded that the objective was achieved, as this study analyzed how the application of the PDCA cycle can optimize bug management in a logistics software used in the production planning of a brewery. The methodology allowed for the identification of root causes of problems and the proposal of continuous improvement actions, transforming incident management into a more sustainable and evolutionary process. The use of PDCA proved fundamental for organizing and structuring the approach to problems, from process standardization and knowledge management to performance indicator monitoring. This systematic approach contributed to a deep understanding of inefficiencies and to the formulation of a robust action plan, aiming at reducing rework and the continuous improvement of software quality.

However, it is crucial to recognize the limitations of this work. The research was a case study focused on bug management in a logistic software of a single brewery, which restricts the generalization of the results. The proposed improvements were not implemented or monitored in a real environment with continuous oversight, which prevents practical validation of their long-term effectiveness. For future studies, it is suggested to deepen risk mitigation in the logistic software product area, explore priority management, and optimize the “discovery” process. Such investigations can complement the findings of this study, broadening the understanding of bug management and fostering even more effective and adaptable practices for diverse organizational contexts.

Bibliographic References

Cagan, M. 2018. Inspired: how to create tech products customers love. Wiley, Hoboken, NJ, USA.

Da Silva, E.; Kawakame; M.D.S. 2019. Logística 4.0: Desafios e inovações. In: IX Congresso brasileiro de engenharia de produção. Ponta Grossa, Paraná, Brasil. Anais… p. 11.

de Gois, T.C.; de Sousa Oliveira, M.H.; da Silva, R.B.; Del Fiaco, R.M.; da Silva Rodrigues, G.; de Sousa, G.P.; Gomes, J.M., 2023. Logística inteligente e serviços logísticos: uma revisão sistemática da literatura. Revista de Gestão e Secretariado 14(6): 10666-10686.

Gegick, M.; Rotella, P.; Xie, T. 2010. Identifying security bug reports via text mining: An industrial case study. In: International Conference on Software Engineering, 2010, Cape Town, South Africa. Anais… p. 11-20.

Isniah, S.; Purba, H. H.; & Debora, F. 2020. Plan do check action (PDCA) method: literature review and research issues. Jurnal Sistem dan Manajemen Industri 4(1): 72-81.

Jamwal, A.; Agrawal, R.; Sharma, M.; Giallanza, A. 2021. Industry 4.0 technologies for manufacturing sustainability: A systematic review and future research directions. Applied Sciences 11(12): 5725.

Kerzner, H. 2017. Project management: a systems approach to planning, scheduling, and controlling. Wiley, Hoboken, NJ, USA.

Kerzner, H. 2023. Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons, Hoboken, NJ, USA.

Kirin Brewery Company, Limited. 2024. Global Beer Consumption by Country in 2023. Disponível em: <https://www.kirinholdings.com/en/newsroom/release/2024/1219_01.html>. Acesso em: 11 set. 2025.

Lagorio, A.; Zenezini, G.; Mangano, G.; Pinto, R. 2022. A systematic literature review of innovative technologies adopted in logistics management. International Journal of Logistics Research and Applications 25(7): 1043-1066.

Moldabekova, A.; Philipp, R.; Satybaldin, A.A; Prause, G. 2021. Technological readiness and innovation as drivers for logistics 4.0. The Journal of Asian Finance, Economics and Business 8(1): 145-156.

Pereira, C.M. 2021. Cerveja: história e cultura. Editora Senac São Paulo, São Paulo, SP, Brasil.

Slack, N.; Chambers, S.; Johnston, R. 2015. Administração da Produção. 4ed. Atlas, São Paulo, SP, Brasil.

Sommerville, I. 2016. Software engineering. Pearson Education Limited, Harlow, England.

Article originating from the Final Course Work of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.