Article

October 26, 2026

Management and Planning in Civil Construction: Use of digital tools and AI as strategic support

Andrews Fernando Carlos Pinto; Fabricio Martins Lacerda

DOI: 10.22167/2675-6528-202600561

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

Civil construction, a vital sector for economic and social development, faced challenges in project planning, especially in controlling deadlines, costs, and risks. In this context, the advancement of digital technologies, including Artificial Intelligence (AI)-based tools, expanded the possibilities for supporting project management. The objective was to analyze the perception of civil construction professionals regarding the use of AI tools to support project planning. The research was classified as applied, with a quali-quantitative approach and descriptive character. Data collection was carried out through a structured questionnaire, applied to 55 professionals in the field, including engineers, project managers, and technicians working in project planning. Preliminary results indicated that Artificial Intelligence-based tools showed significant potential to support the initial stages of planning, especially in information organization and data processing agility. However, their use depended on technical validation by professionals in the field and highlighted their role as a complementary tool in project management.

Keywords: Civil construction; Project management; Artificial intelligence; Construction planning; Digital transformation.

1. Introduction

Civil construction represents one of the fundamental pillars for global economic and social development. Its relevance is manifested in its capacity to generate a significant volume of jobs, drive infrastructure expansion, and stimulate urban growth. It is estimated that this activity is responsible for employing approximately seven percent of the world’s working-age population, according to Teixeira, Teixeira, and Rocha (2020). However, despite its expressive contribution, the sector still faces considerable structural challenges regarding the efficiency of planning and construction management, especially in meeting deadlines, controlling costs, and mitigating project-related risks.

In the context of civil construction, project planning is a complex activity that encompasses a series of technical and managerial processes. These include the development of the Work Breakdown Structure (WBS), the creation of detailed schedules, and proactive risk analysis. It is observed, however, that many organizations still rely on traditional methods, such as the predominant use of spreadsheets and other conventional tools. This reliance can limit operational efficiency, hinder strategic decision-making, and compromise the ability to respond in increasingly complex and dynamic market scenarios, reinforcing the persistence of consolidated practices that, while functional, may not be the most efficient in the face of contemporary demands.

In parallel, the technological landscape has been marked by a continuous advance of digital innovations, which promote significant transformations in various productive sectors. Artificial Intelligence (AI) emerges as one of these innovations, with its application expanding in support of analyzing large volumes of data, automating repetitive processes, and providing qualified support for decision-making. AI-based solutions, as highlighted by Flores and Bess (2023), are capable of providing greater agility in information processing and contributing to the identification of relevant patterns, crucial elements for effective strategic management.

Despite the transformative potential of Artificial Intelligence, its incorporation into the construction sector is occurring gradually. This progressive adoption is influenced by a series of factors, such as the need for technical training of professionals, the existence of structural limitations within organizations, and a certain resistance to the implementation of new technologies. This scenario suggests an intermediate stage of digital maturity in the sector, where knowledge about the technology does not always translate into its practical application in planning processes. The implementation of emerging technologies, such as AI, requires not only technical mastery but also cultural and organizational changes that foster innovation, as argued by Kaufman (2021). This gap between recognizing the potential and its effective application can even compromise the advancement of organizational maturity in project management, as indicated by the Project Management Institute (PMI, 2017).

Given the coexistence between the recognition of Artificial Intelligence’s potential and its limited practical application, it becomes pertinent to investigate the perception of construction industry professionals regarding the use of AI-based tools in project planning. Understanding these perceptions is fundamental to identifying the opportunities that technology offers, as well as the limitations and challenges associated with its adoption. Such an investigation contributes to the advancement of academic and practical discussions in the field of project management, offering subsidies for the development of strategies that promote a more effective and strategic integration of AI in the sector.

Thus, this study seeks to answer the research question about how construction professionals perceive the use of Artificial Intelligence-based tools in the construction planning process, and to this end, it aims to analyze the perception of these professionals regarding the use of Artificial Intelligence-based tools in construction planning.

2. Material and Methods

The present investigation was characterized as a research of an applied nature, seeking to produce knowledge aimed at understanding the use of technological tools, specifically those based on Artificial Intelligence, in the context of construction project planning. This type of approach aims to contribute to the resolution of practical and specific problems, as discussed by Gil (2008), by generating knowledge directly applicable to the sector.

Regarding the methodological approach, the study adopted a quali-quantitative design, integrating statistical analysis techniques with the interpretation of participants’ perceptions. This combination allowed for a comprehensive understanding of the phenomenon investigated, by articulating objective data with subjective aspects related to the professionals’ experiences and opinions, as proposed by Creswell (2010). With regard to the objectives, the research was descriptive in nature, as it sought to identify, organize, and analyze the perceptions of construction professionals regarding the use of Artificial Intelligence tools in project planning, without the intention of establishing cause-and-effect relationships.

Data collection was carried out using a structured questionnaire, applied online through the Google Forms platform, during the month of March 2026. The research instrument, presented in Appendix A of the original work, was predominantly composed of closed-ended questions, allowing for the quantification of responses, in addition to including an open-ended question intended for obtaining more detailed perceptions on the topic.

The sample was defined by convenience, considering participant accessibility, and comprised 55 professionals working in the civil construction sector. Engineers, project managers, and technicians involved in construction planning were included. Although this type of sampling does not allow for broad statistical generalizations, it proved adequate for exploratory and descriptive studies, especially when the objective was to understand perceptions and trends.

For analytical organization purposes, the questionnaire was structured into thematic blocks. These included: (I) participant profile; (II) the use of tools in project planning; (III) the level of knowledge about Artificial Intelligence; and (IV) the perception regarding the applicability of these technologies in the professional context. The development of the instrument considered the principles of project management established by the Project Management Institute (PMI, 2017) as its conceptual basis, especially concerning scope, schedule, and risk planning, ensuring theoretical alignment with the area of study.

Quantitative data were treated through descriptive statistics, using absolute and relative frequencies. Subsequently, the data were organized to facilitate visualization and interpretation. The responses from the open-ended question were analyzed qualitatively, through thematic categorization. This process involved individual reading of the responses, identification of recurring patterns, and subsequent grouping into analytical categories, such as process optimization, cost and deadline control, risk analysis, and decision-making support.

The data interpretation was conducted in light of project management concepts, seeking to establish relationships between participants’ perceptions and fundamental planning aspects, such as predictability, control, and decision-making. Regarding ethical aspects, respondents’ participation was voluntary, with anonymity and confidentiality of the collected information assured, in accordance with the ethical principles applicable to scientific research.

In this way, the methodological strategy adopted enabled not only the quantitative analysis of the collected data but also the qualitative understanding of the professionals’ perceptions. This contributed to the formation of an integrated view on the use of Artificial Intelligence as a support tool for planning in civil construction, aligning with the general objective of the study.

3. Results and Discussion

The present investigation revealed a multifaceted scenario regarding the perception of construction professionals about Artificial Intelligence (AI) in project planning, evidencing a coexistence between the recognition of the technology’s potential and its limited practical application. The findings indicate that, although AI is seen as a promising tool for optimizing processes and supporting decision-making, the sector still faces significant challenges related to technical training and infrastructure. This dynamic suggests an intermediate stage of digital maturity, where knowledge about the technology does not always translate into its effective incorporation into work processes, impacting efficiency and innovation in project management.

The study sample was composed of 55 professionals working in civil construction, with a predominance of males, representing 61.1% of the participants, while females corresponded to 38.9%. The age range of the respondents proved to be heterogeneous, varying between 21 and 72 years, suggesting a diversity of experiences and professional perspectives. This age and gender breadth contributes to a comprehensive view of perceptions about Artificial Intelligence, reflecting different levels of familiarity and openness to technological innovation in the workplace.

Regarding the time of professional activity in the area, it was found that 34.5% of practitioners had between 10 and 20 years of experience, and 27.3% had been active for a period between 5 and 10 years. This data indicates that the majority of participants have consolidated experience in the sector, which lends greater relevance to their perceptions about the adoption of new technologies. The direct involvement of most respondents in construction planning activities reinforces the pertinence of their contributions to the investigated topic, aligning with the objective of understanding the vision of those who experience the sector’s day-to-day operations.

Regarding the tools used in construction planning, the results indicated a strong dependence on traditional methods. Spreadsheets were mentioned by 72.7% of participants, followed by Microsoft Project, used by 56.4%. In contrast, the use of BIM software was reported by only 16.4% of respondents, and 10.9% stated they do not use digital tools. This predominance of conventional tools, such as spreadsheets and generic software, suggests a technological gap in the sector and the persistence of consolidated practices that, although functional, may limit operational efficiency and responsiveness to contemporary demands, as pointed out by the Brazilian Construction Industry Chamber (2022).

The analysis of the level of knowledge about Artificial Intelligence applied to construction planning revealed that the majority of professionals have limited knowledge. It was observed that 41.8% of participants declared having superficial knowledge, and 40% stated they had already heard about the topic, but with little depth. Only 10.9% indicated having good knowledge about AI, while 7.3% had never heard of it. This distribution of knowledge suggests that, despite the growing visibility of AI, a deep understanding of its specific applications in civil construction is still limited, which can directly impact the adoption and strategic use of these tools.

Regarding the practical use of Artificial Intelligence tools in professional planning activities, the data indicated that 40% of respondents had never used them. Another 20% reported having used them only for testing, while 23.6% stated they had used them a few times and 16.4% use them frequently. These results demonstrate a low practical application of AI in the sector, despite the recognition of its potential. The discrepancy between theoretical knowledge and effective application may be attributed to the lack of technical training and the low dissemination of these technologies in the professional environment, as discussed by Kaufman (2021).

Despite the low level of use, professionals’ perception of the potential of Artificial Intelligence in construction planning is widely positive. It was found that 56.4% of participants fully agree that these tools can assist in planning, and 32.7% partially agree. When asked about the general potential of AI, 45.5% considered it high and 38.2% very high, evidencing significant expectation. Furthermore, 57.4% of respondents showed high interest in using these tools, and 31.5% indicated moderate interest, reinforcing professionals’ openness to adopting these technologies, which aligns with Flores and Bess’s (2023) view on the expansion of AI use in organizational environments.

Participants identified several areas where Artificial Intelligence can significantly contribute to construction planning. The main applications pointed out were the development of schedules, with 78.2% of mentions, and the organization of technical documents, with 76.4%. Risk analysis was highlighted by 67.3% of professionals, followed by cost estimation (60%) and productivity analysis (58.2%). These perceptions demonstrate that AI is seen as a tool capable of optimizing crucial planning stages that involve a large volume of data and information, corroborating the literature that points to the potential of these technologies in reducing uncertainties and increasing operational efficiency (TEIXEIRA; TEIXEIRA; ROCHA, 2020).

However, the adoption of Artificial Intelligence in the construction sector faces significant challenges. The main obstacle pointed out by participants was the lack of technical knowledge, mentioned by 43.6% of respondents. Lack of confidence in AI-generated results was cited by 20%, and technological infrastructure limitations by 18.2%. Other relevant factors include implementation cost (10.9%) and professional resistance (7.3%). These findings suggest that the barriers to AI incorporation are not only technological but also involve human and structural aspects, such as the need for training and overcoming cultural and organizational resistance.

The qualitative analysis of open-ended responses deepened the understanding of professionals’ perceptions, reinforcing the quantitative data. Participants highlighted AI’s potential for process optimization, increased productivity, task automation, rework reduction, and greater agility in activity execution. Improvement in deadline and cost control, the ability to anticipate delays, and schedule accuracy were frequently mentioned. AI was also recognized for its contribution to risk analysis, decision-making support, problem identification, and proposition of alternative solutions, in addition to optimizing the organization and processing of information, such as report updates and document control.

These qualitative perceptions, by corroborating the quantitative data, strengthen the study’s analysis, indicating a coherence between what professionals express and what the numbers reveal. However, the responses also pointed out crucial limitations, such as the idea that Artificial Intelligence does not replace human experience. The need for technical validation of information generated by AI was a recurring point, as was the demand for greater maturity and reliability of the tools. This perspective reinforces the complementary role of AI, where the project manager’s technical judgment remains essential to ensure the quality and reliability of the results, as advocated by the Project Management Institute (PMI, 2017).

The research findings highlight a scenario of coexistence between the recognition of Artificial Intelligence’s potential and its limited practical application in civil construction. This discrepancy between perception and effective use suggests an intermediate stage of digital maturity in the sector, where knowledge about the technology does not necessarily translate into its incorporation into planning processes. This gap may compromise the advancement of organizational maturity, a critical aspect for project management, as discussed by PMI (2017).

The predominance of traditional tools, such as spreadsheets and conventional software, reinforces the permanence of consolidated practices that, although functional, may limit operational efficiency in the face of contemporary demands. This result aligns with the analysis by the Brazilian Chamber of the Construction Industry (2022), which points to the digitalization of the sector as a process that is still unequal and gradual, especially in smaller organizations. Studies by Teixeira, Teixeira, and Rocha (2020) also indicate that structural and cultural factors constitute significant barriers to the adoption of more advanced technologies, which aligns with the challenges identified in this study.

The low practical use of Artificial Intelligence, as identified in the results, can be interpreted as a direct consequence of the limitation of technical knowledge among professionals. In this sense, training emerges as a central element to enable technological adoption. As argued by Kaufman (2021), the implementation of AI-based solutions requires not only access to tools but also the development of skills that allow their critical and strategic use, which is fundamental for professionals to extract the maximum value from these innovations.

On the other hand, the high level of interest shown by participants indicates a favorable predisposition towards the incorporation of these technologies, which represents a positive factor for future transformations in the sector. This disposition suggests that, once barriers related to knowledge and infrastructure are overcome, Artificial Intelligence tends to be progressively integrated into planning practices. As highlighted by Flores and Bess (2023), the use of AI in organizational environments has been expanding, especially in activities that require data analysis and decision-making support, which aligns with the expectations of construction industry professionals.

The applications most mentioned by participants, such as schedule elaboration, risk analysis, and information organization, highlight the perception that Artificial Intelligence can directly contribute to core functions of construction planning. This understanding aligns with the literature, which points to the potential of these technologies in optimizing processes, reducing uncertainties, and increasing operational efficiency (Teixeira, Teixeira, and Rocha, 2020). AI’s ability to process large volumes of data and identify complex patterns can, in fact, enhance the accuracy and agility of these activities, which are crucial for project success.

However, the recurrent mention of the need for human validation indicates that professionals do not perceive Artificial Intelligence as a substitute, but rather as a complementary tool. This aspect reinforces the importance of the project manager’s role, whose performance involves not only the use of tools but also technical judgment and informed decision-making. According to the PMI (2017), the integration between technology and human expertise is essential to ensure the quality and reliability of project outcomes, ensuring that decisions are informed by data, but also by professional experience and discernment.

Additionally, although with less emphasis, resistance to the adoption of new technologies also presents itself as a relevant factor, possibly associated with cultural and organizational aspects. In this sense, digital transformation should not be understood solely as the implementation of tools, but as a broader process, involving structural changes, revision of practices, and development of a culture focused on innovation, as pointed out by Fundação Getulio Vargas (2021). Overcoming these resistances requires a joint effort of training, communication, and leadership to promote a change in mindset in the sector.

In summary, the results obtained indicate that Artificial Intelligence has significant potential to transform construction project planning, especially by expanding the analytical capacity of project managers, improving decision quality, and reducing uncertainties associated with information processing and data analysis. However, its effective adoption depends on overcoming factors such as professional training, investment in technology, and the evolution of organizations’ digital maturity. The construction sector is in an early stage of AI incorporation, marked by experimentation and learning processes, which requires the development of academic and professional initiatives to promote a more strategic and efficient adoption of these technologies in project planning.

4. Conclusion

This study sought to analyze the perception of construction professionals regarding the use of Artificial Intelligence-based tools in construction planning. It was found that, although the practical application of these technologies is still limited in the sector, participants demonstrated a broadly positive perception of their potential. Artificial Intelligence was identified as a promising tool for optimizing processes and supporting decision-making, particularly in the elaboration of schedules, organization of technical documents, and risk analysis. Professionals expressed a high interest in using these tools, showing an openness to innovation.

However, the research revealed that the adoption of Artificial Intelligence faces significant challenges, such as the predominance of traditional tools, limited technical knowledge of professionals, and the need for human validation for generated results. These findings indicate that AI is perceived as a complementary support to human expertise, rather than a substitute. The main contribution of this work lies in empirically demonstrating the coexistence between the recognition of Artificial Intelligence’s potential and its still incipient application, broadening the discussion on the incorporation of emerging technologies and the need for professional training for the advancement of digital maturity in the sector. As a limitation of the study, the convenience sampling and the restricted number of participants are highlighted, which restricts the generalization of the results. It is suggested that future studies expand the sample, explore different application contexts, and investigate, in more depth, the impacts of Artificial Intelligence on project performance. The development of academic and professional initiatives that promote training and knowledge dissemination is also recommended, consolidating Artificial Intelligence as a strategic element for digital transformation and maturity in project management in civil construction.

Bibliographic References

Creswell, J. W. 2010. Projeto de pesquisa: métodos qualitativo, quantitativo e misto. 3. ed. Artmed, Porto Alegre, RS.

Câmara Brasileira Da Indústria Da Construção. 2022. Transformação digital na construção civil. Brasília, DF.

Flores, M. J. DAS; Bess, A. L. 2023. Inteligência artificial aplicada a negócios. InterSaberes, Curitiba, PR.

Fundação Getulio Vargas. 2021. Pesquisa sobre maturidade digital no Brasil. São Paulo, SP.

Gil, A. C. 2008. Métodos e técnicas de pesquisa social. 6. ed. Atlas, São Paulo, SP.

Kaufman, D. 2021. Desmistificando a inteligência artificial. Autêntica, Belo Horizonte, MG.

Project Management Institute. 2017. Guia PMBOK®: um guia para o conjunto de conhecimentos em gerenciamento de projetos. 6. ed. Project Management Institute, Newtown Square, PA.

Teixeira, F. S.; Teixeira, P. S.; Rocha, C. A. M. 2020. Estudo prospectivo sobre inteligência artificial aplicado ao setor da construção civil. Cadernos de Prospecção 13(4): 1134–1146.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.