October 26, 2026
Risk management in projects of the insurance community in the banking segment
Paloma Alejandra Baez da Silva; Felipe Miranda de Souza Almeida
DOI: 10.22167/2675-6528-202601285
Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.
Summary
The growing complexity of projects in the insurance banking sector demands structured practices to mitigate uncertainties and ensure activity control, as the absence of risk management can compromise deadlines, delivery quality, and regulatory compliance. A structured risk management model was developed and applied to projects within the insurance community in the banking segment, aiming to structure actions, promote greater organization, define responsibilities, and monitor activities throughout the lifecycle. An action-research study of a descriptive nature and qualitative approach was adopted, conducted in a large financial institution in the Brazilian banking sector. The intervention consisted of implementing standardized workflows, defining control milestones, and deviation monitoring rituals, using the 5W2H tool to detail mitigation actions. Data collection occurred through direct observation and documentary analysis. The results indicated that structuring activities contributed to greater clarity in defining responsibilities, improved alignment between areas, and increased delivery predictability. A reduction in execution inconsistencies, decreased rework, and a more agile response to risk events were also observed. It was concluded that adopting structured practices, even with the use of simple tools, significantly favored operational efficiency, strengthened monitoring and control, and supported decision-making throughout the project lifecycle.
Keywords: Alignment; Lifecycle; Operational efficiency; Planning; Decision-making.
1. Introduction
Project management has consolidated itself as an essential discipline for conducting strategic initiatives in increasingly complex organizational environments. The systematic application of project management methods, tools, and techniques is recognized for its ability to enhance corporate performance, reduce uncertainties, and increase delivery predictability (Project Management Institute, 2021). In a globalized and dynamic scenario, where the pursuit of innovation and efficiency is constant, the ability to manage projects in a structured manner becomes a competitive advantage. Studies indicate that organizations with high project management maturity achieve significantly higher success rates, with projects being completed within budget and on time in a proportion three times greater than those with low maturity (Kerzner, 2022). This context underscores the need for solid frameworks for project planning, execution, and control, especially in highly regulated and volatile sectors.
In the financial sector, particularly in the banking segment that integrates the offering of insurance products and services, known as bancassurance, project management assumes even greater criticality. This environment is intrinsically exposed to a high range of operational, regulatory, technological, and market risks. The absence of proactive risk management focused on operational organization can severely compromise the achievement of deadlines, the quality of deliverables, and compliance with current regulations (Hillson and Murray-Webster, 2017). The inherent complexity of financial and insurance products, coupled with the interconnection of systems and processes, amplifies the potential for failures. Empirical evidence demonstrates that failures in risk management in projects within this sector can result in substantial financial losses, reputational damage, and regulatory sanctions, with costs that can exceed ten percent of the total project value in cases of unmitigated adverse events (Meredith et al., 2022).
Risk management therefore emerges as a central knowledge area in project management, especially in initiatives involving robust financial systems, digital platforms, and service integration. Effective risk management not only allows for early identification of threats but also for the exploitation of opportunities, positively impacting project performance through mitigation, transfer, acceptance, or exploitation strategies (Hillson, 2016). Digital transformation has driven the implementation of innovative projects in the financial sector, focused on process automation and platform integration. These initiatives, often conducted by multidisciplinary and distributed teams, increase complexity and exposure to technical and strategic risks, requiring risk management practices that deal with high uncertainty (Highsmith, 2020). The multiplicity of stakeholders, including technology, compliance, legal departments, and external partners, demands robust governance and communication mechanisms to ensure strategic alignment and transparency (Larson and Gray, 2021).
The strict regulatory requirements imposed by supervisory bodies of the financial system and the insurance market demand a high level of control and traceability of project activities. Regulatory compliance, audits, and information security standards reinforce the importance of structured risk management as a pillar of organizational governance, ensuring robust processes for identification, analysis, and continuous monitoring (Chapman and Ward, 2011). However, despite its recognized importance, many organizations still face significant challenges in implementing standardized processes for project risk management. A tendency towards reactive approaches is observed, where risks are addressed only after their materialization, resulting in delays, rework, and additional costs. Lack of clarity in defining responsibilities, fragmented communication, and the absence of control milestones are common gaps that compromise operational efficiency and delivery predictability in complex projects.
Given this scenario of complexity and challenges in project and risk management in the insurance banking sector, the need to develop and apply models that promote the structuring of activities and the strengthening of control is justified. Proactive intervention in risk management, through formalized practices, can mitigate uncertainties and optimize decision-making, contributing to operational efficiency and regulatory compliance. Thus, this study aimed to develop and apply a structured risk management model for insurance community projects in the banking segment, aiming to structure actions, promote greater organization, define responsibilities, and monitor activities throughout the project lifecycle.
2. Material and Methods
The present study adopted an action-research of descriptive character and qualitative approach to investigate and intervene in project risk management. Action-research was chosen because it allows the researcher’s active participation in the planning, development, and implementation stages of solutions, promoting organizational improvements and the production of scientific knowledge. This methodology is suitable for applied studies involving real changes in processes and systems of the insurance sector in the banking segment, integrating theory and practice for an in-depth understanding of complex phenomena (Thiollent, 2011; Gil, 2019).
The descriptive nature of the research sought to record, analyze, and interpret the characteristics of the project and risk management practices in their natural context, without manipulation of variables. The qualitative approach proved adequate by allowing an in-depth analysis of the interactions, decisions, and organizational aspects involved in the project. Thus, the adopted methodological combination enabled a comprehensive understanding of the risk management process, considering both technical and organizational aspects, as recommended in studies investigating contemporary phenomena embedded in real contexts (Marconi and Lakatos, 2017; Creswell; Poth, 2018; Yin, 2015).
The study was developed in a large financial institution, belonging to the Brazilian banking sector, with national operations and a consolidated presence in the financial services market. The organization operates in an integrated manner across different segments, including banking operations, investments, credit, payment methods, and insurance products, serving millions of customers throughout the national territory and in international markets. Its administrative headquarters is located in the city of São Paulo, in the state of São Paulo, one of the main financial centers in Latin America. The research was conducted during the execution of projects in the insurance community.
The central unit of analysis for the research consisted of two specific projects developed within the institution’s insurance community. These projects were intentionally selected because they presented characteristics representative of the initiatives conducted by the area and involved different stages of the lifecycle. The first project focused on updating and adapting insurance product brochures to regulatory requirements. The second project involved the parameterization of automatic cancellation rules due to non-payment, implemented in the insurance product management system, ensuring compliance with the institution’s regulatory and operational guidelines.
Data collection was carried out through direct observation and documentary analysis, methods widely used in qualitative research to understand organizational processes. Direct observation occurred during the researcher’s participation in the projects, acting as Senior Analyst, which provided privileged access to technical discussions, decisions, and interactions between areas (Flick, 2009). Complementarily, documentary analysis included the review of meeting minutes, requirements documents, operational flows, and various project management artifacts, providing evidence of current practices and existing gaps in risk management.
The research was conducted in analytical stages. The first stage consisted of a detailed characterization of the scenario prior to the implementation of new risk management practices. For this purpose, direct observation and documentary analysis were used to gather evidence on the methods then employed in identifying and monitoring risks. This survey identified the current practices and, crucially, the main gaps related to the absence of standardization, formalization, and systematic monitoring of risks. The objective was to establish a solid diagnostic base to understand the organizational context and the needs for improvement.
The second stage of the research was interventionist and applied, focusing on the development and application of a structured risk management model. The two selected projects served as an empirical basis for the practical implementation of this model, which aimed to formalize and standardize risk management throughout the entire project lifecycle. Practices such as systematic risk identification, qualitative analysis, definition of response strategies, and continuous monitoring were incorporated. The model’s application was integrated into the existing project stages, such as requirements analysis, prioritization, development, and testing.
As support for the planning and organization of actions, the 5W2H tool was used to detail risk mitigation actions. It allowed for clear specification of responsibilities, deadlines, methods, and objectives, strengthening the governance and control of initiatives (Werkema, 2014). The 5W2H is a simple and efficient instrument to support the planning and execution of organizational actions, contributing to greater clarity in defining responsibilities and monitoring activities. Furthermore, the methodology included the integration of risk management into project routines, incorporating its analysis at key moments, such as demand refinement, technical planning, validations, and testing and approval stages.
The third stage of the research consisted of a comparative analysis between the previous scenario, characterized by the absence of structured practices, and the scenario after the adoption of planning and organization tools for activities, focusing on the application of the 5W2H. The objective was to evaluate the impacts of the improvements implemented in the conduct of the analyzed projects. This evaluation considered aspects such as the organization of activities, clarity in defining responsibilities, communication effectiveness, proactivity in risk management, and predictability of deliverables.
For the comparative analysis, qualitative and operational metrics were defined, built from data collected through direct observation and documentary analysis during project execution. The qualitative metrics allowed for the evaluation of aspects such as the degree of detail and understanding of tasks, alignment between areas, and communication quality. The operational metrics, on the other hand, enabled the observation of practical effects in execution, such as rework frequency, occurrence of late adjustments, delivery stability, and the need for replanning. The comparative analysis was conducted based on these empirical evidences, allowing for a structured evaluation of the evolution of risk management.
The study presented some methodological limitations that should be considered. There was restricted access to detailed quantitative data, which limited the precise measurement of the impacts of the implemented improvements, especially from a quantitative perspective. Furthermore, the confidentiality of organizational information and the limited number of projects analyzed imposed restrictions on the generalization of the findings. These conditions, inherent to the action-research environment in a large institution, directed the focus towards an in-depth qualitative analysis and the demonstration of the practical applicability of the model in a specific context.
3. Results and Discussion
The first stage of the analysis consisted of a detailed characterization of the scenario prior to the adoption of structured risk management practices in insurance community projects. Through direct observation and documentary analysis, which included meeting minutes, demand flows, requirements documents, and operational controls, it was possible to gain an in-depth understanding of how activities were conducted and identify the main gaps in the planning and execution process of initiatives. Initial results showed that projects were managed in a predominantly reactive manner, lacking systematic use of formal planning and monitoring tools. Demands were frequently handled as they arose, with a primary focus on meeting regulatory requirements, but without a consolidated structure that ensured standardization, formalization, and systematic risk monitoring.
This reactive approach and the absence of a formal project management structure are consistently pointed out in the literature as factors that compromise the efficiency and predictability of deliveries. The Project Management Institute (PMI, 2021) and Kerzner (2022) emphasize that the lack of structured planning and risk control mechanisms results in high uncertainties, rework, and misalignment between teams. In the specific context of the banking and insurance sector, where regulatory compliance is critical and deadlines are often tight, the absence of such practices can lead to serious consequences, including fines, loss of reputation, and service disruption. Risk management, when not proactive, turns into crisis management, which is inefficient and costly (Hillson & Murray-Webster, 2017).
To synthesize the main characteristics identified in the previous scenario, Table 1 was elaborated, which presents the observed practices and their respective implications in project management.
Table 1. Characterization of the scenario prior to the adoption of structured practices
|
Analyzed aspect |
Observed situation (before) |
Impact on the project |
|
Activity planning |
Absence or informal |
Low predictability of deadlines |
|
Risk Management |
Unstructured |
Late identification of risks |
|
Definition of responsibilities |
Diffuse among the areas |
Difficulty of “accountability” |
|
Communication |
Decentralized and informal |
Noise and rework |
|
Documentation |
Partial and non-standardized |
Low traceability of decisions |
|
Demand prioritization |
Reactive, urgency-based |
Operational overload |
Source: Original research results
As presented in Table 1, the scenario prior to the adoption of structured practices showed significant weaknesses related to the absence of structured management practices, resulting in low predictability, coordination difficulties between areas, and greater exposure to operational risks. Risk management, specifically, was not conducted systematically, being treated punctually and reactively, generally after problems occurred. This finding aligns with Hillson and Murray-Webster (2017), who highlight that reactive approaches increase the probability of negative impacts on projects. The absence of formal planning and reactive risk management created a vicious cycle of uncertainties, where a lack of clarity in activities and undefined responsibilities contributed to the occurrence of problems that, in turn, were dealt with emergently, without a deep analysis of their root causes or the implementation of effective preventive measures.
Another relevant aspect identified was the lack of clarity in defining responsibilities, which generated ambiguities in the execution of activities and hindered the monitoring of delivery progress. In complex organizational environments, such as the one analyzed, this absence tends to compromise operational efficiency and delivery quality, as discussed by Kerzner (2022). The diffusion of responsibilities, without a clear assignment of “owners” for each task or risk, led to overlapping efforts, gaps in execution, and, frequently, rework. This not only increased project costs and deadlines but also generated frustration among teams and compromised employee morale. Project management literature, such as that by Larson and Gray (2021), emphasizes that the clear definition of roles and responsibilities is a fundamental pillar for project success, especially in contexts with multiple stakeholders and interdepartmental dependencies.
Communication, in turn, was predominantly decentralized and informal, which resulted in noise, misalignment, and consequently, rework. The lack of formal and standardized channels for information exchange prevented teams from having a unified view of the project and its risks. Chapman and Ward (2011) argue that, in regulated environments, effective communication is vital to ensure compliance and operational sustainability. The absence of structured communication in the initial scenario of the study hindered the dissemination of critical information, such as regulatory changes or technical requirements, leading to divergent interpretations and inconsistent decisions among the technology, product, legal, and risk areas. This communication fragmentation is a risk in itself, as it prevents the construction of a common understanding of the project’s objectives and challenges.
The documentation of activities was partial and non-standardized, which compromised the traceability of decisions and the capacity for organizational learning. The lack of formal and consistent records made it difficult to audit processes, justify decisions, or replicate successes in future projects. In a highly regulated sector like banking and insurance, robust documentation is not just a best practice in management, but a regulatory requirement. The absence of standardization in documentation meant that each team or individual could record information differently, making data consolidation and analysis a significant challenge. This aligns with the observations of Meredith et al. (2022), who highlight the importance of structured documentation for project resilience and regulatory compliance.
Finally, demand prioritization was reactive and based on urgencies, which generated operational overload and hindered long-term planning. Teams were constantly diverted from their original tasks to deal with emergencies, which prevented efficient resource allocation and the completion of planned activities. This “firefighting” approach is unsustainable and leads to team exhaustion, in addition to compromising the quality of deliverables. Highsmith (2020) points out that, in environments of innovation and high uncertainty, prioritization should be strategic and value-based, not just urgency-based. The lack of a clear and formal prioritization matrix in the initial scenario of the study prevented the institution from optimizing its resources and focusing on initiatives with the greatest strategic impact.
The second stage of the research consisted of an in-depth analysis of the two selected projects, focusing on the dynamics of activity execution and the application of the structured risk management model. From the observation of the stages of regulatory analysis, demand prioritization, development, testing, and implementation, critical points were identified related to the integration between areas, dependence on external validations, and the absence of standardized criteria for risk treatment. These elements were fundamental for the practical application of the proposed model, allowing for the identification, analysis, and treatment of risks to be structured in an integrated manner with the project lifecycle.
Two projects developed within the institution’s insurance community were analyzed, both related to the adaptation of products and processes to regulatory requirements. Despite having distinct scopes, both presented similar characteristics regarding the need for integration between multiple areas and dependence on regulatory requirements for their execution. The first project aimed at reviewing and updating insurance product brochures, contemplating the adaptation of contractual information to regulatory requirements. This initiative involved the inclusion and review of elements such as coverages, excluded risks, indemnity limits, and definition of the geographical scope of policies. The second project, on the other hand, was related to the implementation of automatic cancellation rules due to non-payment, requiring systemic parameterization for the cancellation of policies with delays exceeding ninety days.
Table 2 presents a comparative summary of the analyzed projects, highlighting their main objectives, characteristics, and areas involved.
Table 2. Characterization of the analyzed projects
|
Project |
Main Objective |
Type of intervention |
Involved Areas |
|
Project 1 – Leaflet |
Adequacy of contractual documents |
Regulatory and documentary review |
Products, Legal, “Compliance”, Technology |
|
Project 2 – Automatic cancellation |
Parameterization of systemic rules |
Operational and technological adjustment |
Technology, Products, Risks, Operations |
Source: Original research results
The analysis of Table 2 reveals the inherent complexity of both projects, which required the collaboration of several areas, such as Technology, Products, Legal, Risks, and Operations. This interdependency between departments, although common in large financial institutions, amplifies communication and alignment challenges, as pointed out by Larson and Gray (2021). The regulatory nature of the projects, which aimed at compliance with industry guidelines, added an extra layer of criticality, as any failure could result in non-compliance and sanctions. Kerzner (2022) emphasizes that projects in highly regulated environments demand robust and proactive risk management to ensure adherence to standards. The parameterization of systemic rules, as in Project 2, also underscores the dependence on technological solutions and the need for precise technical alignment, where the interpretation of requirements and the implementation of solutions must be impeccable to avoid operational failures.
Table 3 presents the main stages identified in the execution of the projects and the challenges observed in each phase. In general, the projects followed a flow composed of the following stages: analysis of regulatory requirements, alignment with involved areas, refinement of solutions, technical estimation, development, testing, approval, and implementation. However, the absence of formalization of these stages resulted in variations in the execution method and difficulties in monitoring deliveries.
Table 3. Project stages and main challenges identified
|
Stage |
Activities performed |
Main challenges |
|
Requirements analysis |
Survey of regulatory requirements |
Divergent interpretation between areas |
|
Refinement |
Discussion of proposed solutions |
Lack of technical alignment |
|
Development |
Implementation of systemic solutions |
Prioritization dependency in “backlog” |
|
Tests |
Technical and functional validation |
Late identification of inconsistencies |
|
Homologation/ Approval |
Approval by responsible areas |
Rework and additional adjustments |
|
Deployment |
Deployment in production environment |
Operational risk and the need for emergency adjustments |
Source: Original research results
The analysis presented in Table 3 shows that, although the projects followed a logical execution sequence, there were significant weaknesses in practically all stages of the workflow. In the requirements analysis phase, divergent interpretations between areas already indicated an initial misalignment that propagated throughout the project. This problem intensified in the refinement stage, where the lack of technical alignment compromised the quality of the proposed solutions, generating inconsistencies that directly impacted subsequent stages. This type of initial misalignment is pointed out in the literature as one of the main risk factors in complex projects, especially when there is no adequate integration between stakeholders (PMI, 2021; Kerzner, 2022). The lack of a common understanding of the requirements and proposed solutions from the beginning of the project created an unstable foundation, where each area interpreted the needs according to its own perspective, leading to conflicts and rework in later phases.
During development, the strong reliance on backlog prioritization demonstrated an environment with multiple competing demands, which made it difficult to meet deadlines and ensure planning stability. This scenario contributed to late identification of inconsistencies during the testing phase, increasing the need for rework. Consequently, homologation became more complex, requiring additional adjustments and repeated validations, which increased team effort and compromised process fluidity. According to Verzuh (2021), the absence of structured control throughout the project lifecycle tends to generate an accumulation of failures and rework in the final stages, directly impacting delivery performance. Managing a backlog without clear prioritization criteria or alignment with team capacity resulted in a bottleneck, where demands accumulated and deliveries were constantly postponed, undermining stakeholder confidence and project predictability.
Finally, during implementation, operational risks materialized more frequently, requiring emergency corrections and highlighting the absence of preventive treatment throughout the previous stages. In general, the results indicate that the challenges were not concentrated in a single phase but distributed throughout the entire project cycle, with a strong cumulative effect. The lack of standardization and structured monitoring mechanisms caused initial problems to amplify in the final stages, reducing predictability and increasing exposure to risks. This behavior reinforces the need for more structured and continuous action in risk management throughout the project, as highlighted by Hillson and Murray-Webster (2017), who emphasize the importance of a preventive and integrated approach to risk management in projects. The occurrence of operational risks in the implementation phase, often requiring emergency adjustments, is a clear symptom that risks were not properly identified, analyzed, and mitigated in the previous phases, resulting in additional costs and potential service interruptions.
Given the previously identified limitations, characterized by a lack of standardization in planning, undefined responsibilities, low integration between areas, and difficulty in monitoring activities, the 5W2H tool was fully implemented as a structuring mechanism for project actions. Unlike the previous scenario, where initiatives were conducted in a decentralized manner and with a low level of formalization, the application of 5W2H occurred systematically in all demands related to regulatory adequacies. The tool’s application began with the consolidation of demands identified in the diagnostic phase, which were previously scattered across different areas and documents. Each initiative was then mandatorily structured according to the seven elements of 5W2H, which allowed generic demands to be transformed into clear, complete, and executable action plans. This process was conducted collaboratively, involving the Product, Technology, Legal, and Risk areas, promoting alignment from the planning phase.
The use of 5W2H made it possible to structure the actions systematically, objectively defining the essential elements for project execution, according to Table 4.
Table 4. Structured application of the 5W2H tool in project action planning
|
Element |
Application in the project |
Contribution to the mitigation of identified problems |
|
“What” (What) |
The actions were unfolded into specific and measurable deliverables |
It eliminated subjectivity in the definition of activities and increased the clarity of the scope |
|
“Why” (Why) |
The initiatives were linked to regulatory requirements and operational risks |
Reinforced the strategic direction and reduced low value-added activities |
|
“Who” (Quem) |
Clear definition of those responsible for each activity |
Reduced overlap of efforts, execution gaps, rework, and delays |
|
“When” (At what time) |
Integration of actions into the project schedule, with defined deadlines |
Increased predictability and reduced reactive execution of activities |
|
“Where” (Where) |
Definition of the impacted systems and processes |
Reduced scope ambiguities in environments with multiple interfaces |
|
“How” (How) |
Detailing of execution strategies (development, validation, and testing) |
Increased execution consistency and reduced failures due to divergent interpretations |
|
“How Much” (How Much) |
Association of initiatives with available operational capacity |
Improved prioritization and avoided team overload |
Source: Original research results
The complete application of 5W2H resulted in a significant change in the way projects were conducted. Initially, an expressive improvement was observed in the organization of activities, with greater clarity in defining scope, responsibilities, and deadlines. This gain directly impacted the reduction of rework, as actions were previously structured and validated among the involved areas. The clarity of the scope, obtained by breaking down actions into specific and measurable deliverables (“What”), eliminated the subjectivity and ambiguity that previously permeated activities. This is crucial to avoid deviations and ensure that all stakeholders have a common understanding of the project objectives, as advocated by Werkema (2014) for effective planning.
Furthermore, there was relevant progress in stakeholder alignment, with a reduction in conflicts and inconsistencies in task execution. The standardization promoted by the tool enabled all areas to adopt the same planning logic, facilitating communication and integration between teams. The “Why” element, by linking initiatives to regulatory requirements and operational risks, reinforced strategic direction and helped prioritize high-value activities, eliminating those with low impact. This proactive approach to justifying actions is fundamental to ensuring that projects are aligned with the organization’s strategic objectives and regulatory demands, a point emphasized by Kerzner (2022) in complex environments.
Another significant result was the increased predictability of deliveries. The structured definition of actions, associated with the link to the schedule (“When”), allowed for greater control over the progress of activities, reducing delays and improving project progress monitoring. Clarity in defining responsibilities (“Who”) reduced overlapping efforts, execution gaps, and consequently, rework and delays. The formal assignment of responsibilities is one of the pillars of project governance, ensuring that each task has a clear “owner” and that accountability is established, which is vital for operational efficiency (PMI, 2021).
Additionally, the use of 5W2H contributed to the strengthening of monitoring and controlling, as each action now has complete and traceable information, allowing for rapid identification of deviations and corrective action. This aspect was fundamental in mitigating previously identified operational risks, especially those related to regulatory non-compliance. The detailing of execution strategies (“How”) increased the consistency of activities and reduced errors due to divergent interpretations, while the definition of the impacted systems and processes (“Where”) reduced ambiguities in environments with multiple interfaces. Associating initiatives with available operational capacity (“How Much”) improved prioritization and avoided overloading teams, optimizing resource allocation and ensuring planning sustainability.
Thus, the results show that the full application of 5W2H not only structured the planning of initiatives but also acted as a central element for improving project governance, promoting greater efficiency, integration between areas, and predictability of deliveries. These advances represent a significant evolution compared to the initial scenario, where the absence of structured tools compromised the execution and control of activities. The transition from reactive to proactive management, facilitated by 5W2H, allowed the organization to anticipate problems instead of just reacting to them, which is a competitive advantage in dynamic and regulated markets.
The third stage of the research consisted of a comparative analysis between the previous scenario, characterized by the absence of structured practices, and the scenario after the adoption of planning and organization tools for activities, with emphasis on the application of 5W2H. The objective of this stage was to evaluate the impacts of the improvements implemented in the conduct of the analyzed projects, considering aspects related to the organization of activities, definition of responsibilities, communication, risk management, and predictability of deliveries.
For this analysis, qualitative and operational metrics were defined, built from the data obtained through direct observation and documentary analysis throughout the execution of the projects. The qualitative metrics allowed for the evaluation of aspects such as clarity of activities, alignment between areas, and quality of communication, while the operational metrics made it possible to observe practical effects in execution, such as frequency of rework, occurrence of late adjustments, stability of deliverables, and need for replanning. Table 5 presents the consolidation of the metrics used, as well as their collection and analysis methods.
Table 5. Qualitative and operational metrics used in the comparative analysis
|
Metric |
Type |
Description |
Data collection |
Form of analysis |
|
Clarity of activities |
Qualitative |
Level of detail and understanding of tasks |
Direct observation and document analysis |
Comparative classification (low, medium, high) |
|
Definition of responsibilities |
Qualitative |
Level of assignment of responsible parties for activity |
Document analysis and decision records |
Verification of consistency and presence of responsible parties |
|
Alignment between areas |
Qualitative |
Degree of agreement between involved areas |
Observation of interactions and validations |
Frequency of divergences and assessments |
|
Quality of communication |
Qualitative |
Clarity and centralization of flow information |
Tracking records |
Occurrence of noise and rework |
|
Rework frequency |
Operational |
Number of adjustments, validations, and corrections in testing, homologation/ approval, and deployment |
History of demands and executions |
Before/after comparison |
|
Adjustments in final phases |
Operational |
Operational records |
Reduction or recurrence |
|
|
Stability of deliverables |
Operational |
Degree of variation in the flow of activities |
Monitoring of executions |
Deviation analysis |
|
Risk Identification |
Operational |
Moment of risk identification |
Occurrence records |
Comparison between late and early identification |
|
Occurrence of critical problems |
Operational |
Unforeseen relevant failures |
Incident logs |
Comparison between scenarios |
|
Need for replanning |
Operational |
Frequency of unplanned changes |
Execution logs |
Reduction assessment |
Source: Original research results
From the application of the 5W2H tool, a significant change was observed in the way activities were structured and conducted. Qualitative metrics indicated an evolution in the clarity level of activities and in the definition of responsibilities, with a reduction in ambiguities and greater consistency in task execution. The alignment between areas also showed improvement, evidenced by a decrease in divergences and less need for revalidation of decisions throughout the project. The clarity of activities, measured by the degree of detail and understanding of tasks, went from a low level to a medium/high level, indicating that the formalization of planning by 5W2H made the instructions more explicit and understandable for all involved. This corroborates the literature that points to clarity as a critical factor for efficient project execution (Kerzner, 2022).
From an operational point of view, a reduction was observed in the frequency of rework and in the occurrence of adjustments in final phases, especially during testing and approval. Furthermore, greater stability was observed in the flow of activities, with a decreased need for replanning and increased predictability of deliveries. Risk identification began to occur earlier, reducing the incidence of critical unforeseen problems during execution. The reduction in rework and late adjustments is a direct indicator of improved planning and execution quality. Slack et al. (2018) highlight that operational efficiency is directly impacted by an organization’s ability to minimize waste and optimize its processes, which was clearly observed after the implementation of 5W2H.
To highlight these changes, Table 6 presents a comparison between the main aspects analyzed before and after the adoption of structured practices.
Table 6. Comparison between the scenario before and after the adoption of 5W2H
|
Analyzed aspect |
Previous scenario (before) |
Posterior scenario (after) |
|
Activity planning |
Absent or informal |
Structured with clear definition of actions |
|
Risk Management |
Reactive |
Anticipation of problems and greater control |
|
Definition of responsibilities |
Diffuse |
Clearly attributed by activity |
|
Communication |
Decentralized |
More aligned and directed |
|
Activity monitoring |
Limited |
More systematic monitoring |
|
Predictability |
Low |
Greater predictability of deliveries |
|
Rework |
Frequent |
Reduction of inconsistencies |
Source: Original research results
The results presented in Table 6 show that the adoption of structured practices contributed to the improvement of project management, especially in the organization of activities and control of deliverables. The formalization of actions allowed for the reduction of uncertainties and an increase in decision consistency, directly reflecting the operational efficiency of the teams involved. Activity planning, which was previously absent or informal, became structured with a clear definition of actions, representing a fundamental advance for project predictability. Risk management, which was reactive, transformed into problem anticipation and greater control, a pillar of modern risk management (PMI, 2021). The definition of responsibilities, previously diffuse, became clearly assigned by activity, eliminating ambiguities and increasing accountability.
Communication, which was decentralized, became more aligned and directed, facilitating information exchange and consensus among teams. Activity tracking, which was limited, became more systematic, allowing continuous progress monitoring and early identification of deviations. Delivery predictability, which was low, increased significantly, and rework frequency was reduced, indicating a substantial improvement in execution quality and efficiency. These results demonstrate that, even with the use of simple tools like 5W2H, the systematic and integrated application of management practices can generate transformative impacts in the conduct of complex projects.
To complement the analysis, Table 7 presents the main gains observed after the adoption of structured practices.
Table 7. Main gains observed after the adoption of structured practices
|
Dimension |
Observed gain |
|
Organization |
Greater clarity and structuring of activities |
|
Communication |
Better alignment between areas |
|
Risk Management |
Greater capacity for problem anticipation |
|
Operational efficiency |
Reduction of rework |
|
Control |
Better monitoring of activities |
|
Decision making |
More assertive and based on structured information |
Source: Original research results
The analysis of the results demonstrates that the adoption of structured practices, even through simple tools like 5W2H, generated relevant impacts on project management. The observed gains were not limited to the perception of those involved, being also evidenced by qualitative and operational metrics, which indicated improvements in organization, reduction of failures, and greater predictability in execution. These findings reinforce the importance of structuring risk management and planning as essential elements for project performance in complex and regulated organizational environments. Greater clarity and structuring of activities (Organization) and better alignment between areas (Communication) are interconnected gains that feed back into each other, creating a more collaborative and efficient work environment.
The results showed that the absence of a formal structure in activity planning, observed in the initial scenario, was associated with low predictability of deliverables, rework occurrence, and coordination difficulties among the involved areas. This finding is consistent with PMI (2021) guidelines, which highlight the importance of structured planning as an essential element for project success, especially in complex organizational environments with multiple “stakeholders”. The improvement observed in activity organization after applying the 5W2H reinforces the relevance of using structured planning tools. According to Kerzner (2022), clearly defining project scope, responsibilities, and stages directly contributes to reducing uncertainties and increasing efficiency in activity execution. In the analyzed context, the formalization of actions allowed for greater clarity in project management, reducing ambiguities and facilitating alignment among the involved areas.
Regarding risk management, the results indicated a transition from a reactive approach to a more preventive one, where risks began to be identified and treated proactively. This behavior aligns with what the PMI (2021) advocates, by defining risk management as a set of processes focused on identifying, analyzing, and responding to risks throughout the project lifecycle. The anticipation of problems observed after the adoption of structured practices highlights the contribution of these tools to mitigating negative impacts. The increased capacity to anticipate problems (Risk Management) is a strategic gain, as it allows the organization to prepare for contingencies, minimizing surprises and unexpected costs.
Another relevant aspect identified was the improvement in communication between the areas involved in the projects. In the previous scenario, communication occurred in a decentralized and informal manner, which hindered information sharing and increased the risk of misalignment. After structuring the activities, greater clarity in information exchange and better coordination among those involved were observed. According to Kerzner (2022), effective communication is one of the main critical success factors in projects, especially in environments with high organizational complexity. The reduction of rework (Operational efficiency) is a direct result of improved communication and planning, freeing up resources and time for higher value-added activities.
The reduction in rework observed in the analyzed projects can also be associated with the improvement in the definition of activities and responsibilities. According to Slack et al. (2018), the use of structured management tools contributes to increasing operational efficiency, reducing waste and improving the execution of organizational processes. In the studied context, the greater organization of activities allowed minimizing inconsistencies in the testing and approval stages, contributing to higher quality of deliverables. Better activity monitoring (Control) and more assertive decision-making based on structured information (Decision-making) are results of the greater visibility and traceability that 5W2H provided.
Furthermore, the greater predictability of deliveries observed after the adoption of 5W2H is directly related to the improvement in planning and monitoring of activities. According to PMI (2021), effective schedule management depends on the clear definition of activities, proper sequencing, and continuous monitoring of project progress. The structuring of actions provided by the tool used contributed to greater control over the project stages, favoring the fulfillment of established deadlines. Predictability is a highly valued attribute in projects, as it allows stakeholders to manage their expectations and plan their own activities with greater confidence.
Another highlight was the improvement in decision-making, which became based on more structured and organized information. According to Kerzner (2022), the quality of decisions in projects is directly related to the availability of clear and reliable information. In this sense, the use of 5W2H contributed to increasing information transparency and supporting more assertive decisions throughout the project lifecycle. The ability to make informed and proactive decisions is a competitive advantage, especially in a sector where regulatory and market changes are constant.
Thus, the analysis of the results in light of the literature showed a strong alignment between the empirical findings of the study and the best practices in project management recommended by authors in the field. The adoption of structured tools, even if simple, proved capable of generating significant improvements in project execution, reinforcing the importance of planning, activity organization, and risk management for the success of organizational initiatives. Action research, by allowing direct intervention and real-time observation of results, provided robust evidence of the practical applicability and benefits of a structured approach.
Finally, the results obtained indicate that the application of structured management practices has contributed significantly to increasing operational efficiency, improving communication, and reducing risks in projects developed within the context of the financial and insurance sector, characterized by high complexity and rigorous regulatory requirements. The ability to adapt and implement risk management methodologies in a real-world environment, such as that of a large financial institution, demonstrates the flexibility and effectiveness of these practices. The research also suggests that the simplicity of the 5W2H tool does not diminish its impact, but rather can facilitate its adoption and dissemination in organizations seeking to improve their processes without the need for complex investments in software or overly elaborate methodologies.
4. Conclusion
It is concluded that the objective was achieved, with the development and application of a structured risk management model for projects in the insurance community within the banking segment. The intervention, centered on the 5W2H tool, proved effective in promoting greater organization of activities, clarity in defining responsibilities, and improved alignment among the involved areas. The results evidenced a transition from reactive risk management to a proactive approach, culminating in greater predictability of deliverables, reduction of rework, and significant improvement in operational efficiency and decision-making in a complex and regulated environment.
However, the present study faced important limitations, such as restricted access to detailed quantitative data, the confidentiality of organizational information, and the limited number of projects analyzed. These restrictions impacted the more precise measurement of the impacts of the implemented improvements, especially from a quantitative perspective. For future studies, it is suggested to expand the research to a larger number of projects and institutions, allowing for a more robust quantitative analysis of the benefits. Additionally, investigating the applicability of other risk management tools or the evaluation of the long-term effects of implementing these practices could enrich the field of knowledge.
Bibliographic References
Chapman, C.; Ward, S. 2011. How to Manage Project Opportunity and Risk: Why Uncertainty Management Can Be a Much Better Approach Than Risk Management. 2.ed. Wiley, Hoboken, New Jersey, United States.
Creswell, J.; Poth, C. 2018. Qualitative Inquiry and Research Design: Choosing Among Five Approaches. 4.ed. Sage Publications, Thousand Oaks, California, United States.
Flick, U. 2009. An Introduction to Qualitative Research. 4.ed. Sage Publications, London, United Kingdom.
Gil, A. C. 2019. Métodos e Técnicas de Pesquisa Social. 7.ed. Atlas, São Paulo, SP, Brasil.
Highsmith, J. 2020. Adaptive Leadership: Accelerating Enterprise Agility. 1.ed. Addison-Wesley, Boston, Massachusetts, United States.
Hillson, D. 2016. The Risk Management Handbook: A Practical Guide to Managing the Multiple Dimensions of Risk. 2.ed. Kogan Page, London, United Kingdom.
Hillson, D.; Murray-Webster, R. 2017. Understanding and Managing Risk Attitude. 2.ed. Routledge, London, United Kingdom.
Kerzner, H. 2022. Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 13.ed. Wiley, Hoboken, New Jersey, United States.
Larson, E.; Gray, C. 2021. Project Management: The Managerial Process. 8.ed. McGraw-Hill Education, New York, New York, United States.
Marconi, M.; Lakatos, E. 2017. Fundamentos de Metodologia Científica. 8.ed. Atlas, São Paulo, SP, Brasil.
Meredith, J.; Mantel Jr., S.; Shafer, S. 2022. Project Management: A Managerial Approach. 10.ed. Wiley, Hoboken, New Jersey, United States.
Project Management Institute [PMI]. 2021. A Guide to the Project Management Body of Knowledge (PMBOK® Guide). 7.ed. Project Management Institute, Newtown Square, Pennsylvania, United States.
Slack, N.; Brandon-Jones, A.; Johnston, R. 2018. Operations Management. 9.ed. Pearson Education, Harlow, United Kingdom.
Thiollent, M. 2011. Metodologia da Pesquisa-Ação. 18.ed. Cortez, São Paulo, SP, Brasil.
Verzuh, 2021 [Referência completa não encontrada no documento original]
Werkema, M. C. C. 2014. Ferramentas Estatísticas Básicas para o Gerenciamento de Processos. 1.ed. Elsevier, Rio de Janeiro, RJ, Brasil.
Yin, R. 2015. Estudo de Caso: Planejamento e Métodos. 5.ed. Bookman, Porto Alegre, RS, Brasil.
Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq