Article

October 26, 2026

Resource management in projects: integration of agile methodologies and PMBOK

Antonia Karolyna de Menezes Almeida; Décio Henrique Franco

DOI: 10.22167/2675-6528-202600572

Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.

Summary

With the advancement of digital transformation, technology companies faced challenges in the efficient management of projects, especially regarding the use of their resources. In this context, the combination of agile methodologies and PMBOK guidelines emerged as a complementary and effective approach, justifying the theoretical and practical relevance of the integration between flexibility and structure in project management. It was investigated how the combined application of these approaches contributed to the performance of project teams in technology companies located in the Northeast region of Brazil. The research adopted a qualitative, descriptive, and applied approach. Data were collected through remote semi-structured interviews with four project managers, selected by convenience, who worked with both methodological approaches. The analysis was performed with ATLAS.ti software, using the content analysis technique. The results allowed the identification of good practices in resource management and demonstrated that the methodological combination positively influenced the definition of objectives, task distribution, and, mainly, the productivity of the teams involved. The study contributed significantly to the improvement of professional practice and to the advancement of academic knowledge in the area of project management.

Keywords: Hybrid approach; Content analysis; Team performance; Semi-structured interview; Project leadership.

1. Introduction

The era of digital transformation imposes on companies a growing need for adaptation, profoundly impacting both the execution of their daily activities and the provision of services. In this scenario of constant business evolution, project management faces complex challenges, especially regarding the optimization of resource use and the maximization of team performance. To respond to these demands, agile methodologies and the guidelines of the Project Management Body of Knowledge (PMBOK) emerge as strategic tools.

The future success of project management is intrinsically linked to organizations’ ability to adapt to a constantly changing environment, which presents new challenges for achieving the best performance, as highlighted in the 15th annual Pulse of the Profession® report from the Project Management Institute (PMI, 2024). Flexibility and agility thus become crucial elements for companies to overcome traditional approaches and promote more dynamic and responsive work environments.

In this context, the analysis of the applicability of agile practices, when aligned with the PMBOK guidelines, proves to be effective and relevant for organizations seeking not only to improve their efficiency but also to foster innovation and agility in their processes (Carvalho et al., 2020). This methodological combination can transform the way companies manage their projects, allowing for continuous adaptation to the demands of a volatile market.

The PMBOK, in its 7th edition, emphasizes that the integrated use of knowledge, skills, tools, and techniques for management activities, focused on achieving project objectives, and leadership, concentrated on people, significantly enhances the chances of project success and contributes to achieving the desired results (PMI, 2021). This perspective underscores the importance of a structured approach that is also flexible.

This research addresses the application of agile methodologies and PMBOK guidelines in resource management in technology projects, where leaders seek team efficiency and productivity. This combination is often referred to as “hybrid”, as it integrates the flexibility and adaptability of agile practices with the structure and control offered by traditional project management models. The hybrid approach constitutes a management strategy that combines distinct practices to offer more efficient solutions in the face of the complexities and dynamics of current projects (Carvalho et al., 2024).

In a scenario of uncertainties, there is no single management model that adapts to all situations. This requires customized roadmaps that balance control with the flexibility needed to generate innovation (Carvalho and Rabechini, 2011). Technology companies have historically been pioneers in the pursuit of managerial maturity in Brazil, aiming to optimize efficiency in resource use and effectiveness in delivering strategic results (Carvalho and Rabechini, 2011).

The theoretical relevance of this study lies in its contribution to the academic debate on the integration of methodologies in project management, while the practical relevance is manifested in the ability of its results to assist managers in optimizing resource allocation, improving their teams’ performance, and consequently, increasing the project success rate. The central problem that guides this work questions how the combined application of Agile methodologies and PMBOK guidelines contributes to efficiency in resource management in team performance.

Thus, the choice of the theme is justified, because, while agile methodologies promote speed in adapting to changes, the PMBOK provides guidelines for structured resource management. Given this context, the present work aimed to analyze how the combined application of agile methodologies and PMBOK guidelines can contribute to the performance of project teams in technology companies located in the Northeast region of Brazil.

2. Material and Methods

The present study adopted a qualitative approach, of a descriptive and applied nature, seeking to analyze the contribution of the combined application of agile methodologies and PMBOK guidelines. Qualitative research, through an in-depth approach, aimed to understand human experiences in their social contexts, exploring the implicit meanings and social dynamics that shape individuals’ reality (Trivinos, 1987; Creswell, 2018). Complementarily, the descriptive nature of the study focused on representing and detailing the characteristics of the investigated phenomenon, collecting and analyzing data that describe reality without manipulating variables (Gil, 2008).

The unit of analysis consisted of project managers working in technology companies located in the Northeast region of Brazil. The sample was composed of four project managers, selected by convenience. The inclusion criteria included managers who used agile methodologies and were accustomed to the PMBOK guidelines in their professional routines. Managers who did not apply these practices in their daily work were excluded.

For data collection, a semi-structured interview script was used, as detailed in Appendix A of the original work. Participants were approached individually through private messages sent via LinkedIn and in WhatsApp groups focused on project management. The interviews were conducted remotely, using video calls on the Google Meet platform. For recording the information, an audio recording application on a mobile device was employed, with prior consent from the participants. The semi-structured interview was chosen for its flexibility, allowing the researcher to delve deeper into topics and the participant to express themselves spontaneously (Trivinos, 1987).

All ethical precautions were rigorously followed to ensure the integrity of the research. The Consent agreement (TCLE) was sent in advance to all participants, guaranteeing the anonymity of respondents and the confidentiality of the collected information, in accordance with CNS Resolution nº 510/2016. The research was approved by the Research Ethics Committee (CEP) of the Continuing Education Program in Economics and Management (PECEGE), under Consolidated Opinion nº 7.821.812 and the Certificate of Presentation for Ethical Review (CAAE) n° 89828525.3.0000.9927, considering CNS Resolutions n°. 466/12 and 510/16, and Operational Standard 001/13.

The collected data, including interview audios, were stored and password-protected in a secure environment, with restricted access to the lead researcher, and will remain archived for five years. Although the research involved minimal risks, the possibility of emotional discomfort during the reporting of professional experiences, as highlighted by De Almeida (2013), and risks inherent to the security of digital platforms were acknowledged. Such risks were minimized by an ethical and respectful approach, and by the adoption of good data protection practices.

After collection, the interview audios were converted into text using Microsoft Word software. The textual data were then processed and analyzed with the help of ATLAS.ti software, employing the content analysis technique. According to Creswell (2018), content analysis is a fundamental method in qualitative research, allowing for the examination and interpretation of data, identifying significant patterns and themes. This process was structured in three main stages: pre-analysis, which involved initial reading of the material and data organization; coding, for the identification of categories and patterns; and interpretation, seeking to extract meanings and relate them to the research objectives.

To guide the coding stage in the ATLAS.ti software, the interview script questions were grouped into four thematic axes. This organization served as the basis for content analysis, allowing for clear data structuring and directing the interpretation of results. The defined thematic axes were: Fundamentals and practices of the hybrid approach; Impacts on management areas; Benefits, challenges, and critical factors; and Learnings, recommendations, and future vision. This structure enabled the identification of patterns, convergences, and divergences in the perceptions of the interviewed managers.

3. Results and Discussion

The analysis of data collected through semi-structured interviews with project managers in technology companies in the Northeast of Brazil revealed significant patterns and perceptions regarding the combined application of agile methodologies and PMBOK guidelines. The findings indicate that this integration, although not formalized as a predefined hybrid model, occurs pragmatically and contextually, adapting to the specificities of each project and organization. This approach demonstrated a positive influence on resource management, communication, and team performance, as detailed in the thematic axes that guided data coding and interpretation.

The research’s analytical structure was organized into four main thematic axes, which allowed for an in-depth understanding of managers’ experiences. The first axis addressed the foundations and practices of the hybrid approach; the second investigated the impacts on management areas; the third focused on benefits, challenges, and critical factors; and the fourth consolidated the learnings, recommendations, and future vision. This organization facilitated the identification of convergences and divergences in the interviewees’ perceptions, offering an integrated view of the most relevant themes in the managers’ accounts.

Axis 1: Fundamentals and practices of the hybrid approach

The results obtained indicate that the application of the hybrid approach in the analyzed technology companies is characterized by an intentional integration between the operational flexibility of agile methodologies and the planning and control elements of PMBOK. The interviewed managers do not follow a rigid hybrid model, but adapt practices according to the specific characteristics of each project and organizational needs. This flexibility is crucial in dynamic environments, where the ability to respond to changes is a strategic differentiator for project success.

Agile practices, such as short work cycles, frequent meetings, and continuous delivery monitoring, are combined with traditional processes for planning, scope definition, and performance monitoring. This integration aims to maintain execution agility while ensuring the structure and organization necessary for project control. One of the managers, for example, highlighted that predictive practices are primarily applied in planning, scope definition, scheduling, and stakeholder management, while agile practices are used in the execution and system development.

Another interviewee highlighted that the PMBOK serves as a basis for planning, risk management, scheduling, and governance, and agile practices are employed in project execution, promoting short delivery cycles, continuous feedback, and greater team engagement. This perspective is corroborated by a third manager, who uses PMBOK concepts to structure the project, including scope, organization, and risks, but adopts a more agile approach in execution, especially with methods like Kanban and shorter cycles, which optimizes productivity.

The general perception is that hybrid management is adopted out of practical necessity, rather than strict adherence to a specific methodology. This reinforces the idea that contemporary project management requires continuous adaptation and a deliberate adjustment process of workflows and decision-making structures, known as tailoring. This customization aims to ensure that the chosen approach is technically suitable for the purpose and execution environment, maximizing value and controlling limitations by using only the essential processes and methods to achieve the desired results (PMI, 2021; PMI, 2025).

Axis 2: Impacts in the management areas

The combined application of agile methodologies and PMBOK guidelines has demonstrated direct and significant impacts in various areas of project management. Managers observed that this approach aids in the pursuit of a balance between operational flexibility and the implementation of control and monitoring mechanisms, essential for the efficiency and productivity of teams in technology projects. The areas of resource management, stakeholder communication, tool usage, and results monitoring were the most affected.

In resource management, the hybrid approach enabled a more dynamic allocation of teams, allowing for continuous adjustments according to project needs and professional availability. While traditional PMBOK guidelines contribute to the clear definition of responsibilities and initial planning, agile practices favor the reorganization of activities during execution. A manager mentioned that the initial planning, although guided by PMBOK, needed constant adjustment to manage team changes and reallocate responsibilities due to the entry of new collaborators, highlighting the necessary flexibility.

Another interviewee highlighted that the hybrid approach allows for more dynamic and strategic resource management, with the PMBOK assisting in initial planning and allocation, and agile practices enabling continuous adjustments in demand prioritization and effort redistribution. This combination avoids waste and team overload. A third manager stated that the PMBOK helps organize thinking, while agile facilitates execution, emphasizing the importance of working in smaller parts, obtaining quick feedback, constantly prioritizing, and maintaining visibility of what is happening in the project.

Regarding the use of tools and techniques, the adoption of management platforms was a standout factor. Tools like Monday, Asana, and Jira are widely used for tracking sprints, periodic alignment meetings, schedule control, and task management. These tools allow for the integration of agile and traditional practices in a single environment, facilitating monitoring and communication. A manager exemplified the use of Jira to manage tasks and projects, and Teams and corporate email to handle human resources, indicating that the company discourages other means of communication.

Communication and team relationship were also positively impacted by the hybrid approach, making interactions more frequent and aligned. Although formal communication channels exist, agile practices promote continuous contact and constant feedback, while the PMBOK contributes with formal records and strategic alignments. This combination improves decision-making and reduces noise between the team and stakeholders, being essential in projects involving both data and systems, as one of the managers pointed out.

Regarding performance indicators, managers emphasized the importance of continuous monitoring of results. The hybrid approach allows for adjustments throughout the project cycle, enabling performance evaluation even in a dynamic and constantly changing environment. The results included greater transparency in deliverables and adaptability of the team, better monitoring of activities, recording of adjustments, and faster decision-making. Managers observe metrics such as delivery deadline, performance, volume, operational efficiency, volume of completed demands, quality of deliverables, and business impact, with a focus on stability and error reduction in systems development.

In general, the observed effects confirm that the effectiveness of contemporary management is intrinsically linked to the ability to adapt approaches to the particularities of each project and its environment. This operational flexibility allows for dynamic balancing and stabilization of resources, reconciling predictive structures with the agility needed for continuous adjustments (PMI, 2017, p. 212; PMI, 2025, p. 80). Furthermore, the use of digital tools contributes to greater transparency and visibility of project progress, supporting communication aligned with the 5Cs principles: correct, concise, clear, coherent, and controlled (PMI, 2017, p. 362; PMI, 2025, p. 32). Hybrid management, therefore, consolidates itself as an approach adapted to the demands of each project, shifting the focus from the execution of formal outputs to the delivery of real business value (PMI, 2024; PMI, 2025).

Axis 3: Benefits, challenges, and critical factors

Managers’ reports indicate that the success of hybrid management is directly related to its ability to adapt to the real needs of the project. The perceived benefits do not arise from the simple combination of agile and traditional practices, but from the skill of adjusting processes according to the specific demands of each project stage. When this alignment occurs, greater fluidity is observed in the execution of activities and more assertive coordination between teams, contributing to the continuous delivery of value, even in scenarios of uncertainty and frequent team changes.

Managers highlighted that the balance between flexibility and control is essential for dealing with complex environments, especially in technology projects, where changes are inevitable and the ability to adapt becomes a strategic differentiator. The combination of these practices, when well applied, generates significant value for the business, as it allows avoiding rework and significant errors, especially in the testing phase, by breaking down the work into smaller parts and validating quickly. This approach is crucial in areas that require a balance between speed, quality, and organization.

However, hybrid management also imposes significant operational challenges. The integration of practices with different levels of formality requires considerable coordination effort from managers, potentially generating conflicts and uncertainties about the adopted processes, especially if there is no clear definition of how the approaches should be combined. One of the challenges mentioned was the absence of previously mapped processes, which generated rework and inconsistencies identified only during the implementation of functionalities.

Other challenges include the team’s adaptation to the specific terms and concepts of agile methodologies, difficulty in dealing with task organization, dependency management, and, mainly, people management. Maintaining a standard without rigidifying the process in environments with operational system demands was also pointed out as a difficulty. These points underline the complexity of managing the transition and integration of different mindsets and approaches within the same team.

In this sense, company culture and experience in managing projects are critical factors for the effective functioning of the hybrid approach. Environments that promote autonomy and open communication tend to better absorb this form of management, while more rigid contexts increase implementation difficulties. The acceptance of agile practices, for example, gradually expanded as the incremental deliveries of the application generated perceptible value for the assistance and administrative areas. Managers’ experience allowed them to understand different levels of project management maturity and adapt methodologies according to the needs of each initiative.

Maturity in management and organizational culture are crucial factors for success in the implementation of hybrid models, as argued by Costa Júnior and Nunes (2023). This implies that leadership plays an essential role in driving change, creating an environment of trust and engagement that enhances cultural transformation and continuous value generation. The success of hybrid management is, therefore, conditioned by organizational alignment and capability development. Reports indicate that balance in management areas depends on an integrated vision of the project as an interdependent system, especially in complex contexts (PMI, 2025).

Axis 4: Learnings, recommendations, and future vision

The learnings identified in this research are related to how managers adjust their decisions throughout project execution, a process that occurs gradually, based on the observation of results and the need to respond to changes in the project context, without following a rigid or previously defined model. One of the main lessons learned was the importance of prior process mapping and Knowledge Management, being fundamental to consider organizational culture and team maturity when defining the methodological approach. Adaptation is key, as it is not effective to be rigidly bound to a methodology.

Managers learned that it is fundamental to understand the business context, the type of project, and the team’s profile to apply practices that truly generate value at that moment. There is no perfect methodology; what works is adapting. In projects involving Business Intelligence, development, and systems, each demand has a different characteristic, making flexibility essential. These lessons reinforce the idea that project management is a dynamic process that requires constant evaluation and adjustment, rather than a linear application of rules.

Regarding recommendations, the results point to the importance of maintaining clarity in role definition, promoting alignment among all parties, and consciously using management tools. Managers indicate that ambiguities in this process tend to generate recurring adjustments and coordination difficulties during project execution. It is recommended to invest in process mapping before development, maintain clear records of project decisions, adopt agile practices incrementally, and reinforce communication between areas. It is crucial to deeply understand the project and the team before defining the approach, using methodologies as support tools and not as sources of bureaucracy.

The recommendations also include the suggestion not to try to implement everything at once, adapting to the team and focusing on the result, not just the process. Starting simply and evolving gradually, as well as understanding the team’s profile well and adjusting the company culture, are important steps to apply the correct approach. These guidelines aim to mitigate the identified challenges and maximize the benefits of hybrid management, promoting a smoother and more effective transition for organizations seeking this integration.

Regarding the future outlook, reports suggest a trend of continuity in the use of more flexible approaches in technology projects. However, the consolidation of these practices depends on the development of managerial competencies and the strengthening of organizational culture, particularly concerning team autonomy and communication among those involved. The literature indicates that initiatives such as Knowledge Management, communities of practice, and mentoring processes can contribute to risk reduction and performance improvement, especially in contexts with teams at different maturity levels (PMI, 2024; Almeida Neto et al., 2020).

This evolution points to a scenario where managerial effectiveness is enhanced by technological advancement, utilizing Artificial Intelligence to automate routine tasks and allow the manager to focus on business acumen and anticipation indicators (PMI, 2025, p. 239; PMI, 2024, p. 27). Thus, project success is measured by the delivery of strategic and sustainable results, surpassing the traditional metric of hours worked or simple compliance with rigid plans (PMI, 2024, p. 70; Layton; Morrow, 2018, p. 336). Hybrid management, therefore, is projected as an essential approach for the future, capable of adapting to market complexities and dynamics, focusing on continuous value generation and optimization of team performance.

In summary, the research demonstrated that the combined application of agile methodologies and PMBOK guidelines contributes significantly to the performance of project teams in technology companies, by promoting a dynamic balance between flexibility and structure. This approach optimizes resource management, improves communication and adaptability, and fosters productivity, with its effectiveness conditioned by organizational culture, project management maturity, and leadership’s ability to adjust processes to the specific needs of each project, responding directly to the study’s central objective.

4. Conclusion

This study analyzed how the combined application of agile methodologies and PMBOK guidelines contributed to the performance of project teams in technology companies in the Northeast region of Brazil. It was found that this hybrid approach, characterized by pragmatic and contextualized integration, enabled a dynamic balance between the operational flexibility of agile practices and the planning and control structure of PMBOK. It was observed that this combination positively influenced resource management, allowing for more dynamic allocations and continuous adjustments to project needs. Additionally, an improvement in communication with stakeholders, effective use of digital tools for monitoring, and an enhanced team adaptability capacity were identified, resulting in greater transparency in deliverables and faster decisions. Hybrid Management, therefore, proved to be a model that optimizes objective definition, task distribution, and, primarily, the productivity of the teams involved.

The main contribution of this work lies in the enhancement of professional practice, offering insights for project managers to optimize resource allocation and team performance in dynamic environments, and in the advancement of academic knowledge on methodological integration. However, the study has limitations inherent to its qualitative approach and sample size, composed of four project managers from a specific region, which restricts the generalization of findings. Future studies are suggested to investigate how organizational maturity and corporate culture impact the successful implementation of hybrid approaches in different sectors. It is also recommended to explore the role of Artificial Intelligence in optimizing hybrid project management, focusing on the automation of routine tasks so that managers can concentrate on strategic aspects and continuous value delivery.

Bibliographic References

Almeida Neto, F. Â. et al. Um guia do conhecimento em gerenciamento de projetos (Guia PMBOK®) e na metodologia Scrum: uma análise da aplicabilidade em um projeto-piloto de uma organização pública. ReCiC – Revista de Ciência da Computação, 2020.

Carvalho, F. dos S.; Almeida Neto, F. Ângelo de; Reis, J. S. dos; Assis, A. P. P. Práticas ágeis para gestão de projetos baseados no guia PMBOK, no guia de prática ágil e na metodologia Scrum: uma análise da aplicabilidade em um projeto-piloto de uma organização pública. Revista de Ciência da Computação, [s.l.], v. 1, p. 53-60, 2020. Disponível em: https://periodicos2.uesb.br/index.php/recic/article/view/6692. Acesso em: 4 de março de 2025. DOI: 10.22481/recic.v2i1.6692.

Carvalho, I. A., da Silva, C. M. (2024). Integração de metodologias ágeis na gestão de projetos de engenharia de produção. Revista Ibero-Americana de Humanidades, Ciências e Educação, 10(12), 3080-3096.

Carvalho, Marly Monteiro de; Rabechini JR., Roque. Fundamentos em gestão de projetos: construindo competências para gerenciar projetos. 3. ed. São Paulo: Atlas, 2011.

Costa Júnior, R. A.; Nunes, T. S. Perspectivas em Ciência da Informação, v. 28, e-29487, 2023.

Creswell, J. W. Research design: qualitative, quantitative, and mixed methods approaches. 5. ed. Thousand Oaks, CA: Sage Publications, 2018.

De Almeida, Jorge Fonseca. Ética da investigação em ciências sociais. 2013.

Gil, A. C. Métodos e técnicas de pesquisa social. 6ª ed. São Paulo: Editora Atlas, 2008.

Layton, Mark C.; Morrow, David. Scrum for dummies. 2. ed. Hoboken, NJ: John Wiley & Sons, 2018.

Project Management Institute (PMI). A guide to the project management body of knowledge (PMBOK® Guide). 8. ed. Newtown Square, PA: PMI, 2025.

Project Management Institute (PMI). O futuro do trabalho de projeto: Pulso da Profissão® 2024. 2024. Disponível em: https://pmirs.org.br/documento/93/?pulse-of-the-profession-2024.html. Acesso em: 8 de março de 2025.

Project Management Institute (PMI). Um guia do conhecimento em gerenciamento de projetos (Guia PMBOK®). 6. ed. Newtown Square, PA: PMI, 2017.

Project Management Institute (PMI). Um guia do conhecimento em gerenciamento de projetos (Guia PMBOK®). 7ª ed. Pennsylvania: PMI, 2021.

Trivinos, Augusto Nibaldo Silva. Introdução à pesquisa em ciências sociais. São Paulo: Editora Atlas, 1987.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.