Project management in SCADA systems from the perspective of electricity sector professionals

Ana Carolina Ribeiro dos Santos Morimatsu; Desirée Baldin Damame

DOI: 10.22167/2675-6528-202600528

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The growing complexity of “Supervisory control and data acquisition” [SCADA] systems demands structured project management practices. In the electric power sector, this demand is even more relevant, given the strategic role of these systems in operation and continuous energy supply. The objective of this study was to analyze the application of structured project management practices in the implementation of SCADA systems, identifying positive and negative impacts from the perspective of industry professionals. The research was conducted through a structured questionnaire applied to engineers from an electric sector company, obtaining 40 valid responses. Subsequently, the data were organized and evaluated through SWOT and 5W2H analysis. The results indicated significant advances in the application of formal methodologies, especially in the quality of deliverables and operational efficiency. However, weaknesses were observed in critical points, such as scope definition, schedule planning, and risk management. Communication and integration between different areas showed intermediate performance, suggesting the existence of positive practices, although not fully consolidated. It was concluded that project management applied to SCADA systems has development potential but requires greater formalization. The study contributes to the improvement of management in the electric sector, providing support to enhance predictability, efficiency, and safety in automation projects.

Keywords: Automation; Communication; Schedules; Risks.

1. Introduction

Project management is a field of knowledge essential for conducting developments in various segments, especially in those characterized by high technical and operational complexity. In such environments, structuring processes becomes indispensable to ensure effective integration between teams, adherence to established deadlines, and the guarantee of delivery quality. These factors are directly correlated with the success of any undertaking (Zarei et al., 2014). The application of formal management methodologies contributes to resource optimization and risk minimization, crucial elements for the sustainability and competitiveness of organizations in today’s market.

In the context of the electric power sector, which represents a vital infrastructure activity, the need for advanced monitoring and control systems is even more pronounced. Power generation, transmission, and distribution companies critically depend on systems like SCADA, an acronym for “Supervisory Control and Data Acquisition”. These supervisory systems allow for simultaneous monitoring and control of various plants through graphical interfaces located in operation centers, often at a distance. SCADA technology enables real-time decision-making, optimizing operation and ensuring high reliability in processes, which is fundamental for the continuous and safe supply of energy (Junior, 2019). The greater the complexity and scale of the plant, the more sophisticated and critical the supervisory system to be developed and implemented becomes.

The operator’s performance in locations with limited access is carried out more safely and with a reduction in operational failures thanks to SCADA systems (Junior, 2019). The growing demand for energy in Brazil drives the need for robust, secure, and efficient SCADA systems, leading companies in the sector to continuously invest in the creation and improvement of these tools. However, the implementation of a SCADA system without structured and well-defined project management can generate a series of challenges. Among them, the lack of adequate planning, the occurrence of operational failures, and the consequent increase in costs stand out, compromising the effectiveness and safety of automation projects.

The reality observed in electric energy companies frequently illustrates these challenges. SCADA projects, by their nature, require the integration of multiple areas, such as engineering, operation, information technology, and external suppliers. This intrinsic complexity intensifies the need for clear communication, precise scope definition, and effective risk management (Altaleb and Zoltan, 2024). The absence of detail in the initial stages of a project often results in frequent requirement changes, rework, and delays. Such occurrences directly compromise the project schedule and costs, impacting the predictability and efficiency of deliveries (Tyas Darmaningrat et al., 2019).

Time management also presents itself as a recurring challenge. Delays in schedules, often resulting from arbitrary deadlines or inadequate planning, hinder project execution and increase costs (De Melo and Pereira, 2012). In the electricity sector, where regulatory milestones and market demands require high predictability, the difficulty in aligning deadlines with real development conditions can compromise the delivery of critical systems (Damian et al., 2015). Furthermore, the pursuit of delivery quality is fundamental for the reliability of implemented systems, ensuring safety and effective response in critical situations, such as failures or overloads (Sayed and Gabbar, 2017). Risk management is another indispensable element, as the absence of structured analyses and mitigation plans increases vulnerability to delays, additional costs, and operational failures, including technical difficulties, supplier delays, and cybersecurity threats (Kermani et al., 2020).

Given this complex scenario, the application of continuous improvement tools and methods becomes crucial for optimizing SCADA projects. Organizations must seek to continuously improve their processes to achieve excellence in deliveries, maintain customer satisfaction, and ensure competitiveness in the market (Gayer, 2020). Recognizing the importance of more formalized and efficient project management, this study seeks to analyze the application of structured project management practices in the implementation of SCADA systems, identifying their positive and negative impacts from the perspective of professionals in the electrical sector, in order to contribute to the improvement of management in the sector, increasing predictability, efficiency, and safety in automation ventures.

2. Material and Methods

This work was characterized as a descriptive case study, conducted under a mixed approach, which integrated qualitative and quantitative elements. The case study was adopted to allow an in-depth analysis of the specific context of an electric power sector company. The aim was to understand how structured project management practices are applied in the implementation of SCADA systems and what impacts they generate in the conduct of developments. The descriptive nature of the research made it possible to portray the characteristics of the phenomenon under analysis, highlighting limitations and patterns in management.

The qualitative approach proved adequate, as the investigation was based on both numerical data obtained through a structured questionnaire and critical interpretations from the open-ended responses provided by the professionals. The study was conducted in a company that develops automation and supervision solutions, mainly for the electric energy sector. The organization is responsible for SCADA system implementation projects in different operational contexts, including the supervision of substations, and energy generation, transmission, and distribution companies.

The target population consisted of professionals working in the electric power sector, linked to the company, responsible for automation and supervision projects. Participation in the research was voluntary and anonymous, and all participants were informed about the academic use of the data through the Free and Informed Consent Term [TCLE], presented at the beginning of the form. No other selection criteria were applied besides the link to the company and involvement in SCADA projects.

Data collection was carried out using a structured questionnaire, developed based on project management principles and adapted to the specific context of SCADA systems implementation. The questionnaire used a five-point Likert scale to evaluate statements and included open-ended questions to gather qualitative perceptions from professionals. The instrument was developed and administered electronically through the Google Forms platform, facilitating respondent access and automatic consolidation of responses.

The questionnaire was sent to approximately 200 professionals, and the instrument remained available for responses during May and June 2025. Of the total invitations sent, 40 professionals fully completed the questionnaire, which corresponded to a response rate of approximately 20%. The estimated average response time was 15 minutes.

Although the participation did not cover the entire target audience, the number of respondents was considered sufficient to ensure a representative view of the practices and perceptions related to SCADA project management in the analyzed company. The choice of the questionnaire as a methodological tool was justified by its ability to systematize the perception of professionals directly involved in the projects, allowing for the collection of quantitative and qualitative data.

For the organization and presentation of the collected data, column charts were used, relating the main areas of knowledge in project management, such as schedule, risks, quality, communication, and integration. These charts were developed with the support of PowerPoint software, aiming for clear visualization for data interpretation. Additionally, a radar chart was employed to represent the maturity distribution across different project management domains, assigning weights based on the five-point Likert scale. The data were also organized into tables to detail percentages and compare thematic blocks, as needed for analysis.

The SWOT analysis (Strengths, Weaknesses, Opportunities, Threats) was employed as a support tool to systematize the perceptions collected in the questionnaire. This technique allowed for the structured organization of identified points, categorizing responses into internal dimensions (strengths and weaknesses) and external ones (opportunities and threats). The application of SWOT analysis made it possible to translate the data into an analytical framework, guiding reflections on project management practices in SCADA systems.

As a complement to the SWOT analysis, the 5W2H tool was used to structure action plans based on the identified elements. The 5W2H method was based on seven dimensions: “What” (what will be done), “Why” (why it will be done), “Where” (where it will be carried out), “When” (when it will be carried out), “Who” (who will be responsible), “How” (how it will be done), and “How Much” (how much it will cost). The application of 5W2H was conducted based on the survey responses, transforming the observed factors into structured initiatives, which provided a logical organization between raised problems and potential solutions.

3. Results and Discussion

The research on project management in SCADA systems revealed a complex panorama, characterized by advances in the application of formal methodologies and, simultaneously, by the persistence of fragilities in critical areas. The study involved the participation of 40 professionals with previous experience in SCADA projects, which conferred robustness to the collected perceptions, as all respondents had practical experience in supervision and control systems in the electric sector. This experience base is crucial for the validity of the analyses presented.

The participants’ profile demonstrated significant professional maturity. Regarding experience time, 7.5% of professionals had less than one year of practice, 30% between one and three years, 27.5% between three and five years, and the majority, 35%, had more than five years of experience. As for the number of SCADA projects, 2.5% participated in one to two projects, 12.5% in three to five, and a vast majority of 85% had worked on more than five projects. This heterogeneous distribution, with a predominance of experienced professionals, ensured a comprehensive view of the impacts of project management practices.

The diversity of professionals’ experiences also extended to energy sources and application areas of SCADA systems. The data indicated that participants mainly worked on projects related to renewable sources, such as wind, solar, hydroelectric, and biomass, in addition to transmission and distribution substations. To a lesser extent, there was experience with non-renewable sources, industry, tunnel security systems, and process automation. This breadth of activity reinforces the versatility of SCADA systems and the complexity inherent in their management, given that requirements vary considerably depending on the energy matrix and operational environment.

One of the most critical findings of the study was the perception of clarity in defining the project scope. Although there was a predominantly favorable perception, the presence of partial, neutral, and dissenting responses indicated that scope clarity is not fully consolidated. This result corroborates the literature that warns about the risks of “scope creep”, that is, the uncontrolled increase in requirements, which is one of the main factors of project failure (Tariq et al., 2019). The difficulty in delimiting and maintaining a clear scope compromises predictability and can generate rework, especially in complex systems like SCADA, which require intense integration between different technical areas.

The definition and adherence to schedules also presented intermediate results, suggesting that, despite the existence of planning, execution still faces obstacles. This positions time management as one of the main critical success factors in projects (He et al., 2024). The dependence on multiple suppliers and the complexity of system integration, characteristics of SCADA projects, significantly increase the difficulty of adhering to established schedules, directly impacting the efficiency and costs of the ventures.

In contrast, the research revealed that roles and responsibilities in project teams are reasonably defined, indicating a present organizational structure, albeit with some weaknesses. However, the formal documentation of project phases proved to be only partial, evidencing that, although part of the projects use systematic records, a significant portion lacks consistent formalization. The absence of records compromises knowledge management and hinders the replication of good practices in future projects (Javier Maseda et al., 2021), which explains the perception of fragility captured among professionals.

A relevant point was the widespread recognition that the lack of structured methodologies negatively impacts project outcomes. Most professionals agreed with this statement, reinforcing the perception that project management, when mature and formalized, contributes positively to the efficiency, predictability, and quality of deliverables (Novelli and Souza, 2024). This consensus underscores the importance of investing in more structured approaches to optimize SCADA system development.

In the domain of team communication and integration, internal communication among team members was positively assessed, indicating adequate clarity and frequency. However, communication with clients and stakeholders was perceived as slightly less favorable, suggesting that while interaction efforts exist, there is still room for improvement, especially in closer engagement with stakeholders. Effective communication is one of the pillars of project management, according to the PMBOK (PMI, 2021), and its deficiency can lead to misalignments and rework.

The use of communication and management tools, such as Clickup, Smartsheet, and Microsoft Teams, presented a balanced scenario, indicating that these support technologies are present and contribute to project performance. Collaborative software is fundamental for monitoring activities, integrating teams, and reducing communication failures (Ferreira et al., 2019). The integration between the different areas involved, such as engineering, software, and operation, achieved positive results, but without signaling full consolidation, reflecting the typical complexity of SCADA projects, which require intense multidisciplinary coordination.

Regarding the quality of deliverables, professionals’ perception was predominantly positive, with the final quality being one of the most well-evaluated aspects. This indicates that SCADA projects tend to achieve the expected product, even in the face of instabilities in scope, deadline, or communication throughout the process. This finding is in line with the principles of the PMBOK (PMI, 2021), which recognizes Quality Management as essential to ensure the conformity of the delivered products and services.

However, the analysis of the existence of quality control throughout the project cycle showed greater dispersion in the responses. Although final quality is achieved, continuous monitoring mechanisms are not fully consolidated. This tendency for some teams to focus on the final delivery, neglecting systematic controls during the process, can increase the probability of rework (Sverko et al., 2022). Delivery cadence, in turn, showed intermediate performance, confirming that meeting deadlines remains a relevant challenge, influenced by external variables and the complexity of system integration (Gnana et al., 2024).

The recurrence of rework was another point of attention, pointing to fragilities in scope definition and communication between teams. This result was reinforced by the finding that poorly defined requirements are a constant in projects. The absence of clarity in the scope not only increases the probability of changes throughout the project, the so-called “scope creep”, but also directly impacts the occurrence of rework and deadline compliance, highlighting the need for greater investment in scope management (Myszewski, 2013).

Regarding planning and risks, most professionals perceived the existence of planning in SCADA projects, albeit with limitations. This suggests that the practice of planning is present, but its application is not yet a consolidated reality, with difficulty in adhering to the plan in projects of high technological complexity (Fernandes et al., 2013). Risk management, in turn, emerged as one of the weakest domains of the study, showing that it is not systematically addressed in most SCADA projects, contrary to the recommendations of the PMBOK (PMI, 2021) which considers it fundamental to avoid critical failures.

The fragility in risk management was even more evident in the issue concerning the definition of action plans, where the results reinforced the perception that, even when risks are identified, they do not translate into formal response plans. The absence of structured risk processes increases the probability of delays and additional costs (Amaro and Domingues, 2023). In contrast, most respondents agreed that the lack of planning contributed to project delays and failures, confirming that structured management is essential to reduce failures (Ara, 2022).

The open question about the factors that most compromise the success of SCADA projects revealed eight main categories of critical factors. The most recurrent, cited twelve times, was the lack of clarity in the scope and poorly defined requirements. This result demonstrates that the initial project ambiguity directly compromises predictability, resource allocation, and delivery quality, indicating “scope creep” as one of the main causes of failure in complex projects (Susuruth Narayana Saker, 2023).

Other critical factors mentioned included unrealistic deadlines, reinforcing the difficulties in meeting schedules in environments with multiple suppliers and strong dependence on technological integration (Kermani et al., 2020). Poor communication also stood out, with reports of failures in both internal communication and interaction with stakeholders and clients, contributing to rework and misalignment of expectations. The lack of structured planning, often superficial, was pointed out for not contemplating all potential risks and failures, compromising the ability to anticipate problems and respond to changes.

The SWOT analysis carried out from the questionnaire results showed that the main strengths of SCADA project management in the company are associated with the positive perception of the adoption of structured methodologies, good internal communication, and the final quality of deliverables. Eighty percent of respondents agreed that formal methodologies improve results, 67.5% use digital support tools, and 68% agreed on the clarity and frequency of internal communication. Furthermore, 87.5% of professionals positively assessed the final quality of deliverables, indicating that the organization has important foundations for maturing its project management.

However, the identified weaknesses demonstrated significant gaps, such as partial integration between areas, poorly defined scope and unclear requirements (cited twelve times in open-ended questions), lack of detailed planning and action plans for risks (42.5% disagreed with the existence of mitigation plans), frequent rework (47.5% confirmed), and failures in formal documentation of project phases. These factors directly affect project predictability and explain why the good perceived quality in the final delivery coexists with difficulties throughout the execution.

The opportunities highlighted in the SWOT analysis include investment in scope and requirements training with clients and stakeholders, more consistent application of risk analysis and management to avoid critical failures, and greater integration of agile practices, such as SCRUM and Kanban, in parallel with the predictive methodologies already in use. These action fronts can elevate management maturity without requiring a break from existing practices, but rather continuous improvement.

The threats, in turn, reflect the negative impacts arising from the absence of the mentioned practices, such as recurrent rework and additional costs derived from the lack of a well-defined scope. Unrealistic schedules, which frequently result in delays and customer dissatisfaction, and communication failures with stakeholders, which generate misalignment of expectations and loss of trust, were also identified as significant threats, reinforcing the need for strategic interventions.

The application of the 5W2H tool allowed the transformation of identified problems into practical improvement actions. To improve the definition of scope and requirements, it was proposed to conduct a requirements gathering kickoff with clients and stakeholders in the initial phase of SCADA projects, ensuring a validated scope before the schedule elaboration. This low-cost action aims to reduce rework and increase delivery predictability, addressing the most critical factor pointed out by professionals.

To implement formal risk management practices, the proposal was to develop probability and impact matrices and define mitigation plans (FMEA) at the beginning of the project, with periodic reviews. This low-cost initiative seeks to overcome the fragility in risk identification and treatment, aligning with PMBOK recommendations. The absence of action plans for risks was a point of great concern, and this measure aims to formalize the process.

The reduction of rework in projects can be achieved through the creation of quality checklists, weekly alignment meetings, and formal documentation of deliverables during execution and validation. This action, of moderate cost, aims to mitigate the frequency of rework, which increases costs and deadlines, and which was confirmed by 47.5% of professionals. Improving communication with stakeholders involves the implementation of collaborative tools, such as Clickup, Smartsheet, and Teams, and standardized weekly reports in all project phases, with moderate cost, to avoid misalignment of expectations and loss of trust.

In summary, the research results indicated that project management in SCADA systems at the studied company presents a scenario of contrasts. Although there is recognition of the importance of formal methodologies and strengths such as the final quality of deliverables and internal communication, significant weaknesses persist in scope definition, schedule planning, and risk management. These findings reinforce the need for greater formalization of processes, multidisciplinary integration, and systematic application of management tools, aiming to increase predictability, efficiency, and safety in automation projects.

4. Conclusion

This study sought to analyze the application of structured project management practices in the implementation of SCADA systems, identifying their positive and negative impacts from the perspective of professionals in the electric sector. It was found that, although there were significant advances in the adoption of formal methodologies, especially in the quality of deliverables and operational efficiency, fragilities persisted in critical points. It was identified that scope definition, schedule planning, and risk management presented gaps, frequently resulting in rework and delays. Communication and integration between areas, although present, were not fully consolidated, and there was a consensus that the absence of structured approaches negatively impacts project outcomes.

The main contribution of this work lies in the development of an action plan, based on SWOT and 5W2H analysis, which offers guidelines to mitigate identified difficulties, such as improving scope definition, formalizing risk management, and optimizing communication. This plan aims to enhance management in the electric sector, increasing predictability, efficiency, and safety in automation projects. However, the study has limitations, such as the restriction of the sample to a specific group, which may affect the generalization of results, and the subjective nature of the collected perceptions. For future studies, it is suggested to expand the sample to different industrial segments and geographical regions, as well as to deepen comparisons between traditional and agile methodologies in SCADA projects.

Bibliographic References

Altaleb and Zoltan, 2024. Disponível em: Uma Análise Abrangente e Soluções para Aprimorar a Segurança dos Sistemas SCADA em Infraestruturas Críticas | Publicação da Conferência IEEE | IEEE Xplore. Acesso em: 16 de agosto de 2025.

Amaro, F., Domingues, L., 2023. Disponível em: PMBOK 6° encontra 7º: Como vincular ambos os guias para apoiar a personalização de projetos? – ScienceDirect. Acesso em 22 de novembro de 2025.

Ara, A., 2022. Disponível em: Segurança em Sistemas de Controle Industrial Baseados em Controle Supervisor e Aquisição de Dados (SCADA): Desafios e Soluções – IOPscience. Acesso em 23 de novembro de 2025.

Damian, C., Tirnovan, R.A., Hotea, A., Sava, S., 2015. Disponível em: A Dependência Direta dos Sistemas SCADA da Infraestrutura de Comunicações e do Fornecimento de Energia Elétrica – ScienceDirect. Acesso em: 07 de fevereiro de 2026

De Melo, Y.C., Pereira, M.C., 2012. Disponível em: SciELO Brasil – Plataforma de aprendizagem para gestão de projetos: dois casos de implementação de projetos de automação para a indústria automobilística Plataforma de aprendizagem para gestão de projetos: dois casos de implementação de projetos de automação para a indústria automobilística. Acesso em: 07 de fevereiro de 2026.

Fernandes, G., Ward, S., Araújo, M., 2013. Disponível em: Identificação de práticas úteis de gestão de projetos: uma abordagem de metodologia mista | Revista Internacional de Sistemas de Informação e Gestão de Projetos. Acesso em: 23 de novembro de 2025.

Ferreira, E.P., Gruber, C., Díaz Merino, E.A., Alves Díaz Merino, G.S., Lupi Vergara, L.G., 2019. Disponível em: SciELO Brasil – Gestão estratégica em frigoríficos: aplicação da análise SWOT na etapa de armazenagem e expedição Gestão estratégica em frigoríficos: aplicação da análise SWOT na etapa de armazenagem e expedição. Acesso em: 23 de novembro de 2025.

Gayer, Jéssika Alvares Coppi Arruda, 2020. Gestão da qualidade total e melhoria contínua de processos. 1ed. Contentus, Curitiba, PR, Brasil.

Gnana S., Karthikeyan, A., Karthikeyan K., Sanjeevikumar P., Karapparambil T.S., Babu A., Disponível em: Revisão crítica da SCADA e PLC em edifícios inteligentes e setor de energia – ScienceDirect. Acesso em: 16 de agosto de 2025.

He, W., Baig, M.J.A., Iqbal, M.T., 2024. Disponível em: Uma Arquitetura de Controle Supervisor e Aquisição de Dados de Código Aberto para Monitoramento de Sistemas Fotovoltaicos Utilizando ESP32, Banana Pi M4 e Node-RED | MDPI. Acesso em: 22 de novembro de 2025.

Javier Maseda, F., López, I., Martija, I., Alkorta, P., Garrido, A.J., Garrido, I., 2021. Disponível em: Análise de Dados de Sensores em Sistemas de Controle Supervisor e Aquisição de Dados (SCADA) para Prever Falhas de Origem Indeterminada | MDPI. Acesso em: 14 de março de 2026.

Junior, Ervaldo Garcia, 2019. Introdução a sistemas de supervisão, controle e aquisição de dados: SCADA. 1ed. Alta Books. Rio de Janeiro, RJ, Brasil.

Kermani, M., Luca, D., Rotondo, S., Paolillo, A., Manzo, F., Martirano, L., 2020. Centralized Control Strategy Based on SCADA System. Energies.

Myszewski, J.M., 2013. Disponível em: Na história de melhoria por 5 porquês | O Jornal TQM | Emerald Publishing. Acesso em: 11 de outubro de 2025

Novelli, J.G.N., Souza, D.R.S. de, 2024. Disponível em: Os desafios de conectar liderança situacional e inteligência emocional | Revista de Administração da UFSM. Acesso em: 23 de novembro de 2025.

Project Management Institute [PMI], 2019. Um Guia do Conhecimento em Gerenciamento de Projetos. 7ed. Project Management Institute, Newtown Square, PA, EUA.

Sayed, K., Gabbar, H.A., 2017. Disponível em: SCADA e automação de controle de redes inteligentes de energia – ScienceDirect. Acesso em: 23 de novembro de 2025.

Susuruth Narayana Saker, V., 2023. Disponível em: Garantindo Infraestruturas Críticas Baseadas em SCADA: Desafios e Questões Abertas – ScienceDirect. Acesso em: 11 de outubro de 2025

Sverko, M., Grbac, T.G., Mikuc, M., 2022. Disponível em: Sistemas SCADA com Foco em Manufatura Contínua e Indústria do Aço: Uma Pesquisa sobre Arquiteturas, Padronizações, Desafios e Indústria 5.0 | Revistas e Revistas IEEE | IEEE Xplore. Acesso em: 11 de outubro de 2025

Tariq et al., 2019 [Referência completa não encontrada no documento original]

Tyas Darmaningrat, E.W., Muqtadiroh, F.A., Bukit, T.A., 2019. Disponível em: Plano de Gestão da Comunicação de Programa de Implementação de ERP: Um Estudo de Caso do PTPN XI – ScienceDirect. Acesso em: 07 de fevereiro de 2026.

Zarei, B., Chaghouee, Y., Ghapanchi, F., 2014. Disponível em: Diagnóstico Organizacional em Empresas Baseadas em Projetos – Behrouz Zarei, Yahya Chaghouee, Fereshteh Ghapanchi, 2014. Acesso em: 17 de agosto de 2025.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Executive Mba In Leadership And Management

November 23, 2026

Improvements in the efficiency of a secondary biological sludge drying plant

The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included stopping the addition of effluent, hiring a maintenance team, and testing polymers, had a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.

Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.

Data Science And Analytics For Operations

November 19, 2026

Polyp-YOLO: an efficient, low-latency detector for polyps in colonoscopies

The early detection of colorectal polyps is crucial for the prevention of colorectal cancer, and real-time computer-aided detection (CADe) systems have shown gains in endoscopic practice. The objective was to develop and validate a lightweight colorectal polyp detector, based on the YOLO architecture, capable of operating on restricted hardware with high precision and low latency. The methodology used public datasets of endoscopic images, partitioning the Kvasir-SEG dataset for training and internal validation, and CVC-ClinicDB and ETIS-Larib Polyp DB for cross-dataset evaluation. Lightweight variants of the YOLOv8, YOLO11, and YOLO26 families with 640×640 pixel input were evaluated. A grid search tested 70 combinations of optimizers and activation functions, and identified AdaBelief and LeakyReLU as the configuration with the best generalization. The optimization pipeline applied unstructured pruning, knowledge distillation, and fine-tuning. The optimized YOLO11n-seg model outperformed the higher-capacity architecture (YOLO26m-seg) in mAP50 and showed similar performance in F1-Score, operating with approximately seven times fewer parameters. It achieved an mAP50 of 0.7929 and an F1-Score of 0.7514 on the ETIS-Larib dataset, and fast inference was demonstrated in different formats, with real-time latencies. The explainability of predictions was validated by Grad-CAM activation maps. The proposed solution demonstrated itself to be a promising experimental tool for diagnostic support, with technical feasibility for integration into environments with reduced computational power, although it requires future clinical validation.

Keywords: Computer-aided detection; Edge computing; Hyperparameter optimization; Endoscopic image segmentation; Medical computer vision.

Data Science And Analytics For Operations

November 19, 2026

Multi-touch Attribution in E-commerce: A Comparison between Markov Chains and Last-Click

The research investigated Multi-touch Attribution (MTA) Models in e-commerce, seeking to overcome the limitations of the Last-Click model, widely used in the market. The objective was to compare the performance of first-order Markov Chains with Last-Click and Position-Based approaches, identifying the value of assistance channels frequently ignored. To this end, Markov Chain algorithms were applied to a large volume of purchase journey data from the Google Merchandise Store, extracted via BigQuery. The study probabilistically mapped the purchase journey and calculated the Removal Effect to quantify channel relevance. The results demonstrated that data-driven models identified the strategic role of discovery (awareness) and assistance channels, which Last-Click neglected in 65% of complex journeys. Simulated financial analysis indicated an approximate 28% hidden efficiency in Cost Per Acquisition (CPA) for Paid Search, compared to the Last-Click model. It was concluded that Markov Chains allowed for a more accurate mapping of purchase journeys, validating the technical feasibility of the modeling and providing evidence for more efficient budget allocation in digital media, mitigating the risk of early divestment in crucial channels.

Keywords: Assistance channels; Data science; E-commerce; Digital marketing; Media optimization.

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Data Science And Analytics For Operations

November 19, 2026

Predictive Analysis Methodology for Performance Optimization in E-commerce: Correlation between Public Data and Paid Media

A predictive analysis methodology was developed for e-commerce, integrating transactional data and public search trends. The objective was to develop and validate a predictive model, based on machine learning algorithms, capable of correlating organic search trends with sales performance and paid media costs in the Beauty and Health category of Brazilian e-commerce. The Brazilian E-Commerce Public Dataset by Olist and data from Google Trends were used, processed in Python with the Random Forest Regressor algorithm. A moderate inverse correlation (r = -0.43) with a seven-day lag was identified between organic search volume and purchase. Initial models, based solely on behavioral variables, presented insufficient metrics (R² = -0.47; MAE of R$ 2,120.54). The incorporation of microeconomic (average ticket and shipping) and macroeconomic (exchange rate and Ibovespa index) variables raised the R² of the final model to 0.29, with an MAE of R$ 1,489.63, representing a 24.7% reduction in error compared to the baseline. Temporal cross-validation showed that, in periods of mature operation (2018), the model achieved an R² of 0.42. It was concluded that isolated search volume explains the moment of consumer interest, but not the financial magnitude of sales, making the fusion with transactional and economic data mandatory for predictive viability.

Keywords: Beauty and Health; Consumer Behavior; Google Trends; Machine Learning; Time Series.