October 26, 2026
Attracting girls to STEM in the aerospace sector: applied project management model
Mariana Conti Tarifa; Leticia Franceschini Rodrigues Moscatelli
DOI: 10.22167/2675-6528-202601197
Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.
Summary
Female participation in Science, Technology, Engineering, and Mathematics (STEM) remains low, especially in the aerospace sector, despite its relevance for innovation and sustainable development. This inequality highlights the need for structured strategies to increase female presence in these fields. The research objective was to develop and validate a project management model to attract girls to STEM areas in the aerospace sector, analyzing best practices, challenges, and evidence from an existing project, aiming at the systematization of a model applicable to different institutional contexts. To this end, evidence from a pilot project was analyzed, a model with phases of initiation, planning, execution, monitoring, and closure was structured, and its applicability was validated through expert evaluation. The results indicated that the model presented clarity, organization, and potential for adaptation. Strengths included detailed planning, continuous monitoring, and clear role definition, while the need for user familiarization for consistent and flexible application was identified. The research showed that structured project management contributed to strengthening gender diversity initiatives in STEM, systematizing actions, tracking results, and enhancing the social impact of educational and institutional programs.
Keywords: Science and Technology; Gender diversity; Social impact; Process modeling; Strategic planning.
1. Introduction
In the current scenario of accelerated transformations, the areas of Science, Technology, Engineering, and Mathematics (STEM) assume a central role in shaping the future of work and the dynamics of the globalized world. These fields are recognized for promoting innovation, social well-being, and inclusive and sustainable growth (Bello and Estebanez, 2022). STEM disciplines underpin the advancement of new systems and solutions, such as artificial intelligence, robotics, and the internet of things, pillars of the Fourth Industrial Revolution (Costa et al., 2024). Furthermore, they constitute the basis of strategic sectors, such as the aerospace industry, driven by innovation and specialized knowledge (Duca et al., 2022).
Despite the critical importance of STEM fields, they continue to be marked by a significant gender disparity. Global reports indicate that, although women surpass men in higher education enrollment, they remain underrepresented in STEM courses, accounting for only 35% of the total student population, and three percent in areas such as Information Technology (UN Women, 2022). In Brazil, this trend is repeated: women represent 56% of higher education enrollments, but their presence in STEM is approximately 30%. The inequality is even more pronounced in Engineering courses, such as Mechanical (11%) and Electrical (13%) (Costa et al., 2024; Rodrigues, 2024).
The aerospace sector, one of the most strategic fields for technological innovation, also reflects this persistent gender inequality. Globally, the Organisation for Economic Co-operation and Development (OECD, 2023) points out that women represent only about 22% of the workforce in aerospace engineering. In Brazil, the aviation scenario mirrors this global trend, with only 3.2% of pilots being women and just over 10% of the sector’s engineers being female (ANAC, 2024).
Several factors can hinder women’s participation in STEM. These include gender stereotypes, prejudice, segregation, isolation, and lack of support from colleagues and professors (Costa et al., 2024). Added to this are a lack of knowledge about the potential of these careers, misconceptions about difficulty, socioeconomic inequalities, intersectionality issues, lack of methodologies and infrastructure, and a scarcity of female role models (Bello and Estebanez, 2022).
Gender issues are part of an international debate of relevance, contemplated in the 2030 Agenda for Sustainable Development Goals (SDGs), which establish gender equality (SDG 5) as a structuring goal (UN, 2015). Given this scenario, it is imperative to promote the inclusion of women in STEM and strategic sectors, such as aerospace, to ensure an equitable future in technological, economic, and social dimensions.
Encouraging girls and young women to enter these fields helps reduce the skilled labor gap and develop competencies for the future job market (Bello and Estebanez, 2022). Gender diversity enriches science, innovation, and the quality of technological solutions for the challenges of the 21st century (Lima et al., 2025). Various educational initiatives, such as school programs, workshops, and mentoring, seek to stimulate female interest in STEM, including the aerospace sector (Bello and Estebanez, 2022). In the business context, the integration of diversity actions into Environmental, Social, and Governance (ESG) practices has become increasingly common (Godoi, 2024).
In this context, effective project management plays a central role in initiatives to promote female participation in STEM. A structured management model allows for planning and coordinating resources, defining clear goals, monitoring progress, and identifying impact indicators. According to the PMBOK Guide (PMI, 2021), the application of good management practices ensures the integration of processes, consistency of actions, and continuous evaluation of results, enhancing the social impact of educational and institutional programs. Thus, the research question guiding this study is: How can the application of structured project management practices contribute to increasing the participation of girls in STEM fields, with a focus on the aerospace sector? Based on this problem and the need to systematize effective approaches, the objective of this research was to develop and validate a project management model aimed at attracting girls to STEM fields in the aerospace sector, based on the analysis of good practices, challenges, and evidence observed in an existing project, aiming at the systematization of a model applicable to different institutional contexts.
2. Material and Methods
This research was conducted under an action-research approach, of a qualitative nature, according to the guidelines of Gil (2019). The methodology employed integrated systematic observation, documentary analysis, and interviews, articulating data collection with critical reflection for the practical construction of a model and its subsequent validation. The study design was characterized as applied research, of an exploratory and descriptive nature, with the direct involvement of the researcher in the elaboration and validation of the proposed model.
The central objective of the study was to develop, structure, and validate a project management model applicable to initiatives aimed at promoting female participation in Science, Technology, Engineering, and Mathematics (STEM) areas within the Brazilian aerospace context. The clarity, applicability, structural coherence, and replicability potential of the model in different institutional contexts were sought to be evaluated.
Initially, the research was based on primary data obtained through systematic observation of an existing pilot project. This project, focused on female participation in STEM, was carried out in São José dos Campos between the years 2024 and 2025. During the observation, engagement strategies, adopted practices, and challenges faced were recorded, with the purpose of identifying good practices and structured procedures that could support the development of the management model.
Next, the project management model was built. A project management software available on the market was used to organize the structure of project elements, their stages, resources, and monitoring indicators. The model’s design applied the concepts studied throughout the course and the best practices of project management described in the PMBOK Guide (PMI, 2021).
The model structure was organized based on the principles of the project life cycle, comprising the phases of initiation, planning, execution, monitoring and control, and closure. Each of these phases was detailed into specific activities and components, aiming for a clear and systematic organization of the actions necessary for conducting initiatives to attract girls to STEM areas.
For the model validation stage, a group of professionals working in engineering and technology areas was selected, predominantly female and linked to the aerospace sector. Selection criteria included previous experience in project management, educational initiatives, or projects focused on gender diversity. Of the total invited professionals, seven responded to the data collection instrument, constituting the final sample for validation.
The validation was conducted by applying a structured questionnaire. The instrument consisted of closed-ended questions, using a five-point Likert scale, and open-ended questions, intended for collecting qualitative perceptions and suggestions. The questionnaire was made available and completed remotely and asynchronously, through the Google Forms platform, characterizing a virtual and distributed research environment.
Data collection regarding the observation stage occurred throughout the years 2024 and 2025. The application of the questionnaire for model validation was carried out from March 3 to 6, 2026. Data from the closed-ended questions were analyzed using simple descriptive statistics, considering frequencies and agreement levels. Responses to open-ended questions were examined by content analysis, identifying thematic categories and recurring patterns in the participants’ contributions.
The model’s operationalization was carried out on the ClickUp platform, where each phase of the project cycle was organized into folders and lists corresponding to the defined stages. Within each phase, tasks and subtasks were created, structured in the format of cards, representing the activities and components described in the model. This organization aimed to facilitate the practical application of the proposal, allowing users to visualize, adapt, and utilize the activities according to the needs of their initiatives.
3. Results and Discussion
The research results are presented and discussed in accordance with the objective of developing and validating a project management model to attract girls to STEM areas in the aerospace sector. The initial analysis of an existing pilot project provided the empirical basis, while the structuring of the proposed model and its validation by experts allowed for the systematization of good practices and the identification of improvement opportunities. The discussion integrates the findings with project management concepts and relevant literature, as addressed in the original work.
Pilot Project Analysis
The analysis of a pre-existing educational initiative, focused on sparking the interest of high school girls in STEM with an emphasis on the aerospace sector, revealed crucial aspects for the construction of the proposed model. The project operated with minimal governance, including a manager responsible for coordination, engineering and technology focal points for the technical scope, and a multidisciplinary support team. This structure, although functional, highlighted the importance of well-defined roles and responsibilities for effective coordination and structured decision-making, as advocated by PMI (2021) and Kerzner (2017).
The main deliverable of the pilot project was the execution of an educational immersion day, replicable in different locations, which included career contextualization, introduction to technical concepts, practical dynamics, and interaction with professionals. The initial planning extended for approximately six months, and a second edition incorporated adjustments based on lessons learned, evidencing an incremental learning process and continuous improvement, a common characteristic in educational and social initiatives (Kerzner, 2017).
The project’s conduction, although initially empirical, incorporated project management concepts, such as life cycles and stakeholder engagement. In later editions, more structured mechanisms were implemented for feedback collection, such as pre- and post-event forms, aiming to assess participants’ perception, engagement, and understanding. Systematic stakeholder engagement is a critical success factor, especially in projects with social impact (PMI, 2021).
The turnover of participating schools between editions of the initiative underscored the need for standardized data collection instruments. This standardization is essential to ensure consistency in impact assessment over time, a practice widely recommended in the literature on social and educational program evaluation (Rossi, Lipsey, and Henry, 2019). Clear scope definition and structured change management are fundamental to aligning results with established objectives (PMI, 2021), and the pilot project demonstrated this adherence with specific adjustments based on feedback.
The identification of stakeholders was a central step, initially focused on the age range of the target audience. However, the analysis revealed the need to incorporate additional criteria, such as socioeconomic context and type of educational institution, to adapt the content and methodology to the reality of the participants. Socioeducational factors are recognized as significantly influencing girls’ access to and interest in scientific and technological careers (UNESCO, 2017).
Besides the beneficiary girls, other stakeholders were identified as crucial for the initiative’s execution, including educational institutions, teachers, guest professionals, and the organizing team. The research also noted the interest of external institutional stakeholders, such as companies and universities, in potential partnerships. The identification and engagement of these diverse stakeholders are essential for aligning expectations, strengthening collaborations, and increasing the effectiveness of initiatives (PMI, 2021).
Schedule management was performed using simple tools and periodic meetings. In the first edition, frequent adjustments were necessary, but subsequent editions showed greater predictability due to advance planning. Continuous schedule monitoring is a fundamental mechanism for identifying deviations and implementing corrective actions in a timely manner (Kerzner, 2017). Quality management, although initially without formal criteria, allowed for the collection of qualitative information, such as participants’ perceptions and team feedback, which supported improvements and adjustments in activities, reinforcing the importance of quality indicators for evaluating results (PMI, 2021).
The absence of formalized documentation for change control and decision recording in the pilot project increased reliance on the central team’s and the manager’s experience, limiting the model’s replicability. Risk management was also predominantly reactive, with some risks anticipated and others identified only during execution, requiring immediate adaptations. The prior definition of budget and efficient resource allocation were crucial, especially in social and educational projects with budgetary constraints (Kerzner, 2017).
In terms of results, the initiative was successful in its operational objective of carrying out the immersion day, with noticeable engagement from the participants. However, the initial absence of objective criteria for success evaluation resulted in a predominantly qualitative impact analysis. The literature on the evaluation of educational programs emphasizes that the prior definition of success indicators is fundamental for consistent measurement of results (Rossi, Lipsey, and Henry, 2019).
The analysis of the pilot project revealed that, despite having achieved its operational objectives, its initial execution was characterized by an empirical and poorly structured approach from a project management perspective. This scenario suggests that initiatives with high potential for social impact can generate positive results even without methodological formalization, but with significant limitations in terms of predictability, scalability, and replicability for future contexts.
Analysis for the Elaboration of the Management Model
Based on the evidence and lessons learned from the pilot project, it was possible to identify structural elements that guided the construction of a project management model that is replicable and applicable to different contexts. The systematization of this evidence contributes to the development of a model suitable for educational and social initiatives aimed at promoting female participation in scientific and technological careers, a global challenge that demands early exposure and encouragement (UN Women, 2022; Bello & Estebanez, 2022).
The project management model developed, focused on attracting girls to STEM in the aerospace sector, systematizes practical learnings and articulates them with project management principles. It serves as an organizational reference to support the conception, planning, and implementation of similar initiatives, not being a prescriptive model, but a tool to support decision-making, information recording, and critical reflection throughout the project lifecycle. This approach seeks to balance structure and flexibility, essential characteristics for diversity and inclusion initiatives involving multiple actors and institutional contexts.
The model’s structure was organized based on project management principles, following the lifecycle that comprises the stages of initiation, planning, execution, monitoring and control, and closure. This organization favors clarity in defining responsibilities, tracking activities, and recording lessons learned (PMI, 2021). The adoption of a clear project management structure is particularly relevant for initiatives promoting girls in science and technology, which are often conducted by small teams with significant volunteer participation, facing challenges in formalizing and systematizing processes.
Among the most relevant elements for structuring the model, the clear definition of the target audience stood out, considering the age range, socioeconomic context, type of educational institution, and cultural characteristics of the group. These factors are crucial for designing the scope and selecting educational activities, which may include career contextualization, introductory classes, practical exercises, interactive dynamics, quizzes, panels with professionals, and moments of interaction with specialists.
The selection of activities should prioritize engagement, learning, and a meaningful experience for the participants, maintaining flexibility for adjustments according to the audience’s profile. This process can be improved with a prior diagnostic survey of the participants’ perceptions and expectations, as well as a social research to align activities and evaluate impact. Educational approaches based on active methodologies and student participation are effective strategies to broaden female interest in technological and scientific fields (Rodrigues, 2024).
The project’s governance structure also proved to be a relevant element, with clearly defined roles and responsibilities. A manager can coordinate execution and support strategic decisions, while technical facilitators lead activities and build the educational scope. A support team can manage logistics, communication, and budget. External stakeholders, such as students, professors, and partner institutions, can be integrated through structured feedback mechanisms.
Schedule planning should be carried out with sufficient advance notice to define milestones and key dates, but with flexibility for punctual adjustments. The pilot project experience indicated the possibility of structuring rapid implementation versions, with about three months for conception, planning, and adjustments, without compromising the quality of the activities. Risk and contingency management is equally important, with early identification of logistical issues, age range incompatibility, variations in the number of participants, and engagement difficulties, accompanied by mitigation strategies and recording of lessons learned.
The impact assessment should be systematic, combining qualitative and quantitative indicators to analyze participant engagement, information clarity, and overall experience perception. Instruments such as pre- and post-activity questionnaires can capture changes in perception regarding STEM areas. Regarding resources and costs, preliminary budget estimation and adequate allocation are fundamental, although the model does not present a fixed estimate due to the variability of initiatives. Finally, post-project communication, with the dissemination of results and learnings, strengthens the initiative’s value and encourages the replication of the model in other institutional contexts.
Model Construction
The proposed project management model was structured based on the general guidelines identified, organized according to the project lifecycle phases. This organization allows for a clear view of the expected results in each phase, detailing the activities and components that guide the initiative. The complete detailing of the model, including support instruments, aims to facilitate its practical implementation.
Initiation Phase
The initiation phase establishes the project’s foundations, encompassing the initiative’s context, the definition of its objectives, and the identification of key stakeholders. Activities include identifying the problem or opportunity related to the low participation of girls in technology and aligning with institutional goals. The initiative’s general objectives and expected educational outcomes are defined, and stakeholders, such as schools, partner organizations, industry professionals, and volunteers, are identified. The initial scope is delimited, defining the initiative’s format, target audience, and types of activities, and the initial team is identified with the definition of roles and responsibilities.
Planning Phase
The planning phase structures in detail the necessary elements for the initiative’s execution, establishing the project scope, activities, resources, and schedule. Scope planning involves identifying deliverables, such as aerospace technical material, STEM practical workshops, career familiarization activities, impact measurement instruments, and the final report. Work structuring breaks down these deliverables into work packages and consolidates the scope statement, while defining the target audience establishes the age range and eligibility criteria for participants.
The planning of aerospace technical content covers the development of familiarization material, practical workshops, and career familiarization activities, with validation by professionals in the field. Human resources planning identifies the necessary roles, defines responsibilities, plans the recruitment of female volunteers, and establishes internal communication channels. Material resources planning includes the survey of materials, audiovisual equipment, physical space, and transportation logistics. Financial resources planning estimates costs and identifies financial needs, seeking sources of support.
Schedule planning defines project phases, sequences activities, estimates duration, establishes milestones, and consolidates the schedule. Risk planning involves risk identification and analysis, including stakeholder engagement and team availability. Quality planning defines criteria for educational material, considering clarity and accessibility. Stakeholder planning maps actors and defines engagement strategies. Finally, monitoring and control planning defines impact indicators, data collection instruments, and assessment timing.
Execution Phase
The execution phase corresponds to the implementation of planned activities and the effective realization of the initiative. Logistics activities include space and infrastructure preparation, participant reception, equipment testing, and operational support. Agenda management encompasses conducting the aerospace familiarization class, the practical STEM workshop, the career familiarization activity, time management, and adapting the delivery based on group engagement.
The management of the technical and volunteer team involves an initial briefing, awareness-raising regarding the target audience, distribution of roles, and operational support. Communications management supports the managers and guests, in addition to managing general notices and guidance. Registration and documentation include photographic or audiovisual recording, participant attendance tracking, and perception notes. Participant experience support aims at welcoming and encouraging active participation in the proposed activities.
Monitoring and Controlling Phase
The monitoring and control phase accompanies the execution of activities and verifies the project’s adherence to the plan. Monitoring the execution of STEM activities involves tracking participation and engagement, observing interaction with aerospace and practical content, identifying comprehension difficulties, and recording relevant occurrences. Scope and time control verifies adherence to the schedule, compliance with the educational scope, identifies delays, assesses the impacts of adjustments, and records changes.
Risk management monitors previously identified risks, identifies new risks during execution, and applies mitigation actions. The application of assessment instruments and feedback collection includes participant forms, collection of perceptions on interest in STEM and aerospace careers, feedback from volunteers and the technical team, recording of qualitative perceptions, and organization of collected data. This phase is crucial for generating learnings and supporting future editions of the initiative.
Closing Phase
The closing phase consolidates the initiative’s results, evaluates the project’s performance, and records learnings for future editions. The final evaluation of the results compiles and organizes the collected data, analyzing the girls’ engagement and interest in STEM. The final project performance evaluation verifies the fulfillment of the scope and planned activities, identifying strengths and opportunities for improvement.
The lessons learned register documents the main challenges and solutions adopted, in addition to developing recommendations for future initiatives to encourage girls in STEM. The administrative and documentary closure organizes and archives the project records, consolidating the documentation. Finally, the final dissemination of the initiative communicates the results to participants, volunteers, and partners, highlighting the educational and social impact of the project.
The operational model was implemented on the ClickUp platform, where each phase of the project cycle was organized into folders and lists, with tasks and subtasks structured in a card format. This organization aims to facilitate practical application, allowing users to visualize, adapt, and utilize activities according to their needs. The card structure promotes flexibility, enabling adaptation to different project tracking methods, such as task lists, visual boards, timelines, or agile methodologies, seeking to reconcile a clear management structure with the flexibility required for its application in various initiatives to promote girls in STEM in the aerospace sector.
Preliminary Template Validation
The model validation was carried out through an evaluation form applied to seven specialists with experience in initiatives to promote girls in STEM. The instrument, composed of closed Likert scale questions and open-ended questions, sought to assess the clarity, organization, and applicability of the model. The results indicated a broadly positive evaluation, with five out of the seven participants (71.4%) fully agreeing and two (28.6%) partially agreeing that the model presents well-defined steps for conducting initiatives aimed at promoting girls in STEM in the aerospace context. There were no records of disagreement, suggesting that the structure is perceived as organized and understandable.
The clarity of the structure is a fundamental aspect for the model to function as an easy-to-use tool, aligned with its purpose of guiding each important step of the initiatives. This is especially relevant within the proposed tool, as it allows users to feel guided even without prior familiarity with project management concepts. As a future suggestion, it was pointed out that the application of the model could be complemented by practical usage workshops and additional guidance from a specialized team, aiming to maximize understanding and effectiveness in monitoring all essential project stages.
Regarding the model’s organization, five out of seven respondents (71.4%) fully agreed and two (28.6%) partially agreed that the model presents a well-organized sequence of steps. This suggests that participants perceive the sequence of steps as logical and well-structured. Clarity and organization are complementary aspects, where clarity refers to the understanding of instructions and concepts, and organization relates to the arrangement and chaining of steps, offering a concrete guide for planning and executing the project, facilitating the mapping of activities and the allocation of resources in a way that is consistent with the initiative’s objectives.
To assess the model’s applicability in different contexts, five out of six participants who provided valid responses (83.3%) fully agreed that the model is applicable to the reality of educational, social, or volunteer projects with similar objectives, while one (16.7%) indicated partial agreement. This positive perception of the model’s suitability highlights that its logic can be adapted to various types of projects and contexts, including initiatives conducted by research institutes, university groups, private companies, non-governmental organizations, or volunteer collectives. This flexibility allows any group to use the model as a guide, adjusting the steps according to their needs, target audience, and available resources, without losing the core principles of the proposal, such as fostering curiosity about the aerospace sector and introducing relevant technical concepts through practical activities.
An additional point that complements the discussion on adaptability is the importance of considering the representativeness of women as role models and the intersectionality of participants when applying the model, which can enhance the impact of initiatives. This perspective reinforces the need to make projects inclusive and aligned with social objectives, ensuring that girls from different backgrounds and contexts feel represented and motivated to participate in the activities.
The analysis of open-ended responses deepened the validation, investigating the most relevant steps, tools, and components, and suggestions for improvement. The initiation phase was pointed out as fundamental to ensure clarity on objectives, scope, and initial resources, aligning with the processes of Develop Project Charter and Identify Stakeholders (PMBOK, 2021). Respondents highlighted the definition of the core team as positive, reinforcing the importance of establishing clear roles and responsibilities from the beginning, as well as mapping stakeholders and their interests to ensure initial engagement.
The planning was highlighted as the most relevant phase, structuring scope, schedule, resources, responsibilities, and risks, in line with the processes of Develop Project Management Plan and Plan Risk Management (PMBOK, 2021). Suggestions for improvement focused on this phase, including detailing activities, pedagogical validation of content, defining backups for the core team, identifying special needs of participants and the team, and adjusting schedule and resources as the project develops.
A critical point identified was the balance between detail and flexibility. Excessive detail can make the model rigid, while insufficient detail compromises clarity and standardization. A future improvement would be to make explicit, through schedule markings, which steps are essential and which are adaptable, facilitating the understanding and application of the model by novice users. This approach reflects the practice of tailoring, recommended by PMI (2021), which adapts the steps to the specific characteristics of the project without compromising governance.
Although the model is presented sequentially, respondents emphasized that planning and monitoring should occur continuously. The recommendation was that the model also be presented in a timeline or Gantt chart format, tools widely used in project management to visualize activities, durations, dependencies, and overlaps in the schedule (Kerzner, 2022; PMBOK, 2021). This type of visualization allows for the identification of deadline conflicts, resource planning, and temporal adjustments, being especially useful for users applying the model for the first time. This approach aligns with the Monitor and Control Project Work and Control Changes processes of the PMBOK (2021), ensuring the project remains aligned with objectives and allowing for continuous adjustments.
The closing phase, although it received little direct mention in the responses, foresees important activities such as the consolidation of deliverables and the realization of lessons learned, aligned with the process of Closing a Project or Phase from the PMBOK (PMI, 2021). The absence of specific suggestions for this phase indicates that the respondents did not identify direct improvements, but its formalization remains essential to ensure continuous improvement and feedback for future initiatives. In general, participants demonstrated satisfaction with the model, highlighting its clarity and organization, and the main opportunities for improvement focused on planning and schedule visualization, including tailoring, roles and responsibilities, special needs, and the use of timeline/Gantt. These adjustments reinforce the model’s applicability, balancing methodological rigor and flexibility, in alignment with the best practices of the PMBOK (PMI, 2021) and project management literature (Kerzner, 2022).
In summary, the research demonstrated that the project management model developed and validated offers a clear, organized, and applicable framework for initiatives to attract girls to STEM in the aerospace sector. The analysis of the pilot project and the expert evaluation confirmed the relevance of its initiation, planning, and monitoring phases as pillars for project structure and control. Suggestions for improvement indicated the need for greater flexibility and user familiarization for consistent and adapted application, but the general findings reinforce that structured project management is a promising path to strengthen gender diversity in STEM, systematizing actions and enhancing the social impact of educational and institutional programs.
The research results are presented and discussed in accordance with the objective of developing and validating a project management model to attract girls to STEM areas in the aerospace sector. The initial analysis of an existing pilot project provided the empirical basis, while the structuring of the proposed model and its validation by experts allowed for the systematization of good practices and the identification of improvement opportunities. The discussion integrates the findings with project management concepts and relevant literature, as addressed in the original work.
Pilot Project Analysis
The analysis of a pre-existing educational initiative, focused on sparking the interest of high school girls in STEM with an emphasis on the aerospace sector, revealed crucial aspects for the construction of the proposed model. The project operated with minimal governance, including a manager responsible for coordination, engineering and technology focal points for the technical scope, and a multidisciplinary support team. This structure, although functional, highlighted the importance of well-defined roles and responsibilities for effective coordination and structured decision-making, as advocated by PMI (2021) and Kerzner (2017).
The main deliverable of the pilot project was the execution of an educational immersion day, replicable in different locations, which included career contextualization, introduction to technical concepts, practical dynamics, and interaction with professionals. The initial planning extended for approximately six months, and a second edition incorporated adjustments based on lessons learned, evidencing an incremental learning process and continuous improvement, a common characteristic in educational and social initiatives (Kerzner, 2017).
The project’s conduction, although initially empirical, incorporated project management concepts, such as life cycles and stakeholder engagement. In later editions, more structured mechanisms were implemented for feedback collection, such as pre- and post-event forms, aiming to assess participants’ perception, engagement, and understanding. Systematic stakeholder engagement is a critical success factor, especially in projects with social impact (PMI, 2021).
The turnover of participating schools between editions of the initiative underscored the need for standardized data collection instruments. This standardization is essential to ensure consistency in impact assessment over time, a practice widely recommended in the literature on social and educational program evaluation (Rossi, Lipsey, and Henry, 2019). Clear scope definition and structured change management are fundamental to aligning results with established objectives (PMI, 2021), and the pilot project demonstrated this adherence with specific adjustments based on feedback.
The identification of stakeholders was a central step, initially focused on the age range of the target audience. However, the analysis revealed the need to incorporate additional criteria, such as socioeconomic context and type of educational institution, to adapt the content and methodology to the reality of the participants. Socioeducational factors are recognized as significantly influencing girls’ access to and interest in scientific and technological careers (UNESCO, 2017).
Besides the beneficiary girls, other stakeholders were identified as crucial for the initiative’s execution, including educational institutions, teachers, guest professionals, and the organizing team. The research also noted the interest of external institutional stakeholders, such as companies and universities, in potential partnerships. The identification and engagement of these diverse stakeholders are essential for aligning expectations, strengthening collaborations, and increasing the effectiveness of initiatives (PMI, 2021).
Schedule management was performed using simple tools and periodic meetings. In the first edition, frequent adjustments were necessary, but subsequent editions showed greater predictability due to advance planning. Continuous schedule monitoring is a fundamental mechanism for identifying deviations and implementing corrective actions in a timely manner (Kerzner, 2017). Quality management, although initially without formal criteria, allowed for the collection of qualitative information, such as participants’ perceptions and team feedback, which supported improvements and adjustments in activities, reinforcing the importance of quality indicators for evaluating results (PMI, 2021).
The absence of formalized documentation for change control and decision recording in the pilot project increased reliance on the central team’s and the manager’s experience, limiting the model’s replicability. Risk management was also predominantly reactive, with some risks anticipated and others identified only during execution, requiring immediate adaptations. The prior definition of budget and efficient resource allocation were crucial, especially in social and educational projects with budgetary constraints (Kerzner, 2017).
In terms of results, the initiative was successful in its operational objective of carrying out the immersion day, with noticeable engagement from the participants. However, the initial absence of objective criteria for success evaluation resulted in a predominantly qualitative impact analysis. The literature on the evaluation of educational programs emphasizes that the prior definition of success indicators is fundamental for consistent measurement of results (Rossi, Lipsey, and Henry, 2019).
The analysis of the pilot project revealed that, despite having achieved its operational objectives, its initial execution was characterized by an empirical and poorly structured approach from a project management perspective. This scenario suggests that initiatives with high potential for social impact can generate positive results even without methodological formalization, but with significant limitations in terms of predictability, scalability, and replicability for future contexts.
Analysis for the Elaboration of the Management Model
Based on the evidence and lessons learned from the pilot project, it was possible to identify structural elements that guided the construction of a project management model that is replicable and applicable to different contexts. The systematization of this evidence contributes to the development of a model suitable for educational and social initiatives aimed at promoting female participation in scientific and technological careers, a global challenge that demands early exposure and encouragement (UN Women, 2022; Bello & Estebanez, 2022).
The project management model developed, focused on attracting girls to STEM in the aerospace sector, systematizes practical learnings and articulates them with project management principles. It serves as an organizational reference to support the conception, planning, and implementation of similar initiatives, not being a prescriptive model, but a tool to support decision-making, information recording, and critical reflection throughout the project lifecycle. This approach seeks to balance structure and flexibility, essential characteristics for diversity and inclusion initiatives involving multiple actors and institutional contexts.
The model’s structure was organized based on project management principles, following the lifecycle that comprises the stages of initiation, planning, execution, monitoring and control, and closure. This organization favors clarity in defining responsibilities, tracking activities, and recording lessons learned (PMI, 2021). The adoption of a clear project management structure is particularly relevant for initiatives promoting girls in science and technology, which are often conducted by small teams with significant volunteer participation, facing challenges in formalizing and systematizing processes.
Among the most relevant elements for structuring the model, the clear definition of the target audience stood out, considering the age range, socioeconomic context, type of educational institution, and cultural characteristics of the group. These factors are crucial for designing the scope and selecting educational activities, which may include career contextualization, introductory classes, practical exercises, interactive dynamics, quizzes, panels with professionals, and moments of interaction with specialists.
The selection of activities should prioritize engagement, learning, and a meaningful experience for the participants, maintaining flexibility for adjustments according to the audience’s profile. This process can be improved with a prior diagnostic survey of the participants’ perceptions and expectations, as well as a social research to align activities and evaluate impact. Educational approaches based on active methodologies and student participation are effective strategies to broaden female interest in technological and scientific fields (Rodrigues, 2024).
The project’s governance structure also proved to be a relevant element, with clearly defined roles and responsibilities. A manager can coordinate execution and support strategic decisions, while technical facilitators lead activities and build the educational scope. A support team can manage logistics, communication, and budget. External stakeholders, such as students, professors, and partner institutions, can be integrated through structured feedback mechanisms.
Schedule planning should be carried out with sufficient advance notice to define milestones and key dates, but with flexibility for punctual adjustments. The pilot project experience indicated the possibility of structuring rapid implementation versions, with about three months for conception, planning, and adjustments, without compromising the quality of the activities. Risk and contingency management is equally important, with early identification of logistical issues, age range incompatibility, variations in the number of participants, and engagement difficulties, accompanied by mitigation strategies and recording of lessons learned.
The impact assessment should be systematic, combining qualitative and quantitative indicators to analyze participant engagement, information clarity, and overall experience perception. Instruments such as pre- and post-activity questionnaires can capture changes in perception regarding STEM areas. Regarding resources and costs, preliminary budget estimation and adequate allocation are fundamental, although the model does not present a fixed estimate due to the variability of initiatives. Finally, post-project communication, with the dissemination of results and learnings, strengthens the initiative’s value and encourages the replication of the model in other institutional contexts.
Model Construction
The proposed project management model was structured based on the general guidelines identified, organized according to the project lifecycle phases. This organization allows for a clear view of the expected results in each phase, detailing the activities and components that guide the initiative. The complete detailing of the model, including support instruments, aims to facilitate its practical implementation.
Initiation Phase
The initiation phase establishes the project’s foundations, encompassing the initiative’s context, the definition of its objectives, and the identification of key stakeholders. Activities include identifying the problem or opportunity related to the low participation of girls in technology and aligning with institutional goals. The initiative’s general objectives and expected educational outcomes are defined, and stakeholders, such as schools, partner organizations, industry professionals, and volunteers, are identified. The initial scope is delimited, defining the initiative’s format, target audience, and types of activities, and the initial team is identified with the definition of roles and responsibilities.
Planning Phase
The planning phase structures in detail the necessary elements for the initiative’s execution, establishing the project scope, activities, resources, and schedule. Scope planning involves identifying deliverables, such as aerospace technical material, STEM practical workshops, career familiarization activities, impact measurement instruments, and the final report. Work structuring breaks down these deliverables into work packages and consolidates the scope statement, while defining the target audience establishes the age range and eligibility criteria for participants.
The planning of aerospace technical content covers the development of familiarization material, practical workshops, and career familiarization activities, with validation by professionals in the field. Human resources planning identifies the necessary roles, defines responsibilities, plans the recruitment of female volunteers, and establishes internal communication channels. Material resources planning includes the survey of materials, audiovisual equipment, physical space, and transportation logistics. Financial resources planning estimates costs and identifies financial needs, seeking sources of support.
Schedule planning defines project phases, sequences activities, estimates duration, establishes milestones, and consolidates the schedule. Risk planning involves risk identification and analysis, including stakeholder engagement and team availability. Quality planning defines criteria for educational material, considering clarity and accessibility. Stakeholder planning maps actors and defines engagement strategies. Finally, monitoring and control planning defines impact indicators, data collection instruments, and assessment timing.
Execution Phase
The execution phase corresponds to the implementation of planned activities and the effective realization of the initiative. Logistics activities include space and infrastructure preparation, participant reception, equipment testing, and operational support. Agenda management encompasses conducting the aerospace familiarization class, the practical STEM workshop, the career familiarization activity, time management, and adapting the delivery based on group engagement.
The management of the technical and volunteer team involves an initial briefing, awareness-raising regarding the target audience, distribution of roles, and operational support. Communications management supports the managers and guests, in addition to managing general notices and guidance. Registration and documentation include photographic or audiovisual recording, participant attendance tracking, and perception notes. Participant experience support aims at welcoming and encouraging active participation in the proposed activities.
Monitoring and Controlling Phase
The monitoring and control phase accompanies the execution of activities and verifies the project’s adherence to the plan. Monitoring the execution of STEM activities involves tracking participation and engagement, observing interaction with aerospace and practical content, identifying comprehension difficulties, and recording relevant occurrences. Scope and time control verifies adherence to the schedule, compliance with the educational scope, identifies delays, assesses the impacts of adjustments, and records changes.
Risk management monitors previously identified risks, identifies new risks during execution, and applies mitigation actions. The application of assessment instruments and feedback collection includes participant forms, collection of perceptions on interest in STEM and aerospace careers, feedback from volunteers and the technical team, recording of qualitative perceptions, and organization of collected data. This phase is crucial for generating learnings and supporting future editions of the initiative.
Closing Phase
The closing phase consolidates the initiative’s results, evaluates the project’s performance, and records learnings for future editions. The final evaluation of the results compiles and organizes the collected data, analyzing the girls’ engagement and interest in STEM. The final project performance evaluation verifies the fulfillment of the scope and planned activities, identifying strengths and opportunities for improvement.
The lessons learned register documents the main challenges and solutions adopted, in addition to developing recommendations for future initiatives to encourage girls in STEM. The administrative and documentary closure organizes and archives the project records, consolidating the documentation. Finally, the final dissemination of the initiative communicates the results to participants, volunteers, and partners, highlighting the educational and social impact of the project.
The operational model was implemented on the ClickUp platform, where each phase of the project cycle was organized into folders and lists, with tasks and subtasks structured in a card format. This organization aims to facilitate practical application, allowing users to visualize, adapt, and utilize activities according to their needs. The card structure promotes flexibility, enabling adaptation to different project tracking methods, such as task lists, visual boards, timelines, or agile methodologies, seeking to reconcile a clear management structure with the flexibility required for its application in various initiatives to promote girls in STEM in the aerospace sector.
Preliminary Template Validation
The model validation was carried out through an evaluation form applied to seven specialists with experience in initiatives to promote girls in STEM. The instrument, composed of closed Likert scale questions and open-ended questions, sought to assess the clarity, organization, and applicability of the model. The results indicated a broadly positive evaluation, with five out of the seven participants (71.4%) fully agreeing and two (28.6%) partially agreeing that the model presents well-defined steps for conducting initiatives aimed at promoting girls in STEM in the aerospace context. There were no records of disagreement, suggesting that the structure is perceived as organized and understandable.
The clarity of the structure is a fundamental aspect for the model to function as an easy-to-use tool, aligned with its purpose of guiding each important step of the initiatives. This is especially relevant within the proposed tool, as it allows users to feel guided even without prior familiarity with project management concepts. As a future suggestion, it was pointed out that the application of the model could be complemented by practical usage workshops and additional guidance from a specialized team, aiming to maximize understanding and effectiveness in monitoring all essential project stages.
Regarding the model’s organization, five out of seven respondents (71.4%) fully agreed and two (28.6%) partially agreed that the model presents a well-organized sequence of steps. This suggests that participants perceive the sequence of steps as logical and well-structured. Clarity and organization are complementary aspects, where clarity refers to the understanding of instructions and concepts, and organization relates to the arrangement and chaining of steps, offering a concrete guide for planning and executing the project, facilitating the mapping of activities and the allocation of resources in a way that is consistent with the initiative’s objectives.
To assess the model’s applicability in different contexts, five out of six participants who provided valid responses (83.3%) fully agreed that the model is applicable to the reality of educational, social, or volunteer projects with similar objectives, while one (16.7%) indicated partial agreement. This positive perception of the model’s suitability highlights that its logic can be adapted to various types of projects and contexts, including initiatives conducted by research institutes, university groups, private companies, non-governmental organizations, or volunteer collectives. This flexibility allows any group to use the model as a guide, adjusting the steps according to their needs, target audience, and available resources, without losing the core principles of the proposal, such as fostering curiosity about the aerospace sector and introducing relevant technical concepts through practical activities.
An additional point that complements the discussion on adaptability is the importance of considering the representativeness of women as role models and the intersectionality of participants when applying the model, which can enhance the impact of initiatives. This perspective reinforces the need to make projects inclusive and aligned with social objectives, ensuring that girls from different backgrounds and contexts feel represented and motivated to participate in the activities.
The analysis of open-ended responses deepened the validation, investigating the most relevant steps, tools, and components, and suggestions for improvement. The initiation phase was pointed out as fundamental to ensure clarity on objectives, scope, and initial resources, aligning with the processes of Develop Project Charter and Identify Stakeholders (PMBOK, 2021). Respondents highlighted the definition of the core team as positive, reinforcing the importance of establishing clear roles and responsibilities from the beginning, as well as mapping stakeholders and their interests to ensure initial engagement.
The planning was highlighted as the most relevant phase, structuring scope, schedule, resources, responsibilities, and risks, in line with the processes of Develop Project Management Plan and Plan Risk Management (PMBOK, 2021). Suggestions for improvement focused on this phase, including detailing activities, pedagogical validation of content, defining backups for the core team, identifying special needs of participants and the team, and adjusting schedule and resources as the project develops.
A critical point identified was the balance between detail and flexibility. Excessive detail can make the model rigid, while insufficient detail compromises clarity and standardization. A future improvement would be to make explicit, through schedule markings, which steps are essential and which are adaptable, facilitating the understanding and application of the model by novice users. This approach reflects the practice of tailoring, recommended by PMI (2021), which adapts the steps to the specific characteristics of the project without compromising governance.
Although the model is presented sequentially, respondents emphasized that planning and monitoring should occur continuously. The recommendation was that the model also be presented in a timeline or Gantt chart format, tools widely used in project management to visualize activities, durations, dependencies, and overlaps in the schedule (Kerzner, 2022; PMBOK, 2021). This type of visualization allows for the identification of deadline conflicts, resource planning, and temporal adjustments, being especially useful for users applying the model for the first time. This approach aligns with the Monitor and Control Project Work and Control Changes processes of the PMBOK (2021), ensuring the project remains aligned with objectives and allowing for continuous adjustments.
The closing phase, although it received little direct mention in the responses, foresees important activities such as the consolidation of deliverables and the realization of lessons learned, aligned with the process of Closing a Project or Phase from the PMBOK (PMI, 2021). The absence of specific suggestions for this phase indicates that the respondents did not identify direct improvements, but its formalization remains essential to ensure continuous improvement and feedback for future initiatives. In general, participants demonstrated satisfaction with the model, highlighting its clarity and organization, and the main opportunities for improvement focused on planning and schedule visualization, including tailoring, roles and responsibilities, special needs, and the use of timeline/Gantt. These adjustments reinforce the model’s applicability, balancing methodological rigor and flexibility, in alignment with the best practices of the PMBOK (PMI, 2021) and project management literature (Kerzner, 2022).
In summary, the research demonstrated that the project management model developed and validated offers a clear, organized, and applicable framework for initiatives to attract girls to STEM in the aerospace sector. The analysis of the pilot project and the expert evaluation confirmed the relevance of its initiation, planning, and monitoring phases as pillars for project structure and control. Suggestions for improvement indicated the need for greater flexibility and user familiarization for consistent and adapted application, but the general findings reinforce that structured project management is a promising path to strengthen gender diversity in STEM, systematizing actions and enhancing the social impact of educational and institutional programs.
4. Conclusion
This study sought to develop and validate a project management model aimed at attracting girls to Science, Technology, Engineering, and Mathematics (STEM) areas in the aerospace sector. To this end, an existing pilot project was analyzed, identifying best practices and challenges, which supported the structuring of a model with phases of initiation, planning, execution, monitoring, and closure. It was found that the proposed model presented clarity, organization, and potential for adaptation, according to expert evaluation. The findings indicated that detailed planning, continuous monitoring, and clear definition of roles constituted strengths of the proposal. The main contribution lies in the systematization of an organizational framework that supports the conception and implementation of gender diversity initiatives in STEM, enhancing the social impact of educational and institutional programs.
However, a limitation identified was that the tool, despite being detailed, requires additional user familiarization to understand its nuances and for consistent, customized application. The absence of formalized documentation and predominantly reactive risk management in the pilot project were also observed, impacting replicability. It is suggested that future studies test the model in different contexts, evaluate its effectiveness in the field, and develop visual tools, such as timelines or Gantt charts, to facilitate monitoring and adaptation. It is also recommended to complement the model’s application with practical workshops and to consider the representativeness of women as reference models and the intersectionality of participants, aiming to maximize the impact of initiatives.
Bibliographic References
Agência Nacional de Aviação Civil [ANAC]. 2025. Asas para Todos: sobre o programa. Disponível em: <https://hotsites.anac.gov.br/asasparatodos/sobre.html>. Acesso em: 16 outubro 2025.
Bello, Alessandra; Estebanez, Maria Elina. 2022. Uma Equação Desequilibrada: Aumentar a Participação das Mulheres na STEM na LAC. Report. UNESCO, Paris, França.
Costa, L. F. C. et al. 2024. Women’s journey in STEM education in Brazil: A rapid review on engineering and computer science. IEEE Access 2024.
Duca, M. E. et al. 2022. A criação de uma oficina pedagógica: uma didática transdisciplinar na educação aeroespacial. In: VIII Encontro de Pesquisa em Educação e Ensino, 2022, Campina Grande, PB, Brasil. Anais… p. 4218-4221. Disponível em: <https://editorarealize.com.br/artigo/visualizar/83458>.
Gil, Antonio Carlos. Métodos e técnicas de pesquisa social. 7. ed. São Paulo: Atlas, 2019.
Godoi, Jéssica Luana de França. 2024. Práticas de ESG nas empresas brasileiras: desafios e perspectivas. Trabalho de Conclusão de Curso (Graduação) em Administração. Universidade Estadual Paulista (UNESP), Guaratinguetá, SP, Brasil.
Kerzner, H. 2022. Project Management: A Systems Approach to Planning, Scheduling, and Controlling (13th Edition). Hoboken, NJ: Wiley.
Lima, M. L. de F.; Aquino, R. S. de; Leão, A. M. D. A. C. 2025. STEM e questões de gênero: uma revisão sistemática. Contexto 40(122).
Organização das Nações Unidas [ONU]. 2015. Transformando Nosso Mundo: A Agenda 2030 para o Desenvolvimento Sustentável. Disponível em: <https://brasil.un.org/sites/default/files/2020-09/agenda2030-pt-br.pdf>. Acesso em: 16 outubro 2025.
Organização para a Cooperação e Desenvolvimento Econômico [OCDE]. 2023. Global Trends in Government Innovation 2023. Disponível em: <https://www.oecd-ilibrary.org/governance/global-trends-in-government-innovation-2023_0655b570-en>. Acesso em: 17 outubro 2025.
Project Management Institute (PMI). 2021. Guia do conhecimento em gerenciamento de projetos (Guia PMBOK). 7ed. Project Management Institute, Newtown Square, PA, EUA.
Rodrigues, Gabrielle de Almeida. 2024. Capacitação de jovens mulheres no setor aeroespacial: um estudo de caso sobre metodologias ativas de ensino. Trabalho de Conclusão de Curso (Graduação) em Engenharia de Produção. Universidade Federal do Rio Grande do Norte, Natal, RN, Brasil.
Rossi, Peter H.; Lipsey, Mark W.; Henry, Gary T. 2019. Evaluation: A Systematic Approach. 8. ed. Thousand Oaks: SAGE Publications.
UNESCO, 2017 [Referência completa não encontrada no documento original]
United Nations Women. 2022. Progress on the Sustainable Development Goals: The gender snapshot 2022. Disponível em: <https://www.unwomen.org/en/digital-library/publications/2022/09/progress-on-the-sustainable-development-goals-the-gender-snapshot-2022>. Acesso em: 10 outubro 2025.
Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform