Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.
Summary
The growing demand for operational efficiency in water supply systems, intensified by the regulatory framework and the high energy consumption of pumping stations, has made the implementation of technical and economic criteria for asset management crucial. The economic feasibility of replacing electric motors in a raw water pumping system, located in Brumadinho, Minas Gerais, was evaluated. For this purpose, operational data, maintenance history, and electrical tests of the motors, collected in the field and through corporate planning and monitoring systems, were used. The Life Cycle Cost Analysis (LCCA) methodology was applied, complemented by economic engineering indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), and simple and discounted payback. The results revealed that large-sized motors in critical condition showed economic feasibility for replacement, driven by reduced maintenance costs and energy efficiency gains. In contrast, motors with satisfactory operational performance did not demonstrate economic attractiveness within the analyzed horizon, regardless of their operating time. It was concluded that the replacement decision should be based on an integrated technical-economic analysis, being more beneficial for motors with a high degree of degradation and increasing operational and maintenance costs.
Keywords: Sensitivity analysis; Life cycle cost analysis; Energy efficiency; Maintenance engineering; Asset management.
1. Introduction
The basic sanitation sector in Brazil underwent a significant transformation with the enactment of Law No. 14.026, of July 15, 2020. This new legal framework established ambitious goals for the universalization of services and promoted the opening of the market for the participation of private entities. Consequently, the National Water Agency (ANA) was given the responsibility of issuing reference standards for the regulation of public services, fostering a competitive environment that demands the continuous pursuit of improvements in operational efficiency and the optimization of investments. Among the published standards, NR 08/2024, which defines progressive goals for water supply and sewage disposal, and NR 09/2024, which addresses operational indicators for the provision of these services, stand out (Special Advisory for Social Communication of the Ministry of Cities, 2025a; 2025b).
In this scenario, efficient management of energy resources becomes a fundamental pillar for the sustainability and competitiveness of sanitation companies. Data from the Ministry of Cities (2023), through the National Sanitation Information System (SINISA), reveal that Brazilian water supply systems consumed 12.6 TWh in 2022, with an average ratio of 0.67 kWh for each cubic meter of water produced and treated. Motor-pump sets, responsible for converting electrical energy into hydromechanical energy for pumping, are the main equipment involved in this production. It is estimated that the energy consumption of pumping stations accounts for between 90% and 95% of the total in water supply systems (ABES, 2009).
Given the high energy consumption and the pressure for efficiency, the decision-making regarding equipment replacement, such as electric motors, cannot be based solely on technical aspects like maintainability or team experience. Ignoring the economic dimension can lead to postponing the disposal and alienation of these assets beyond the most economically advantageous period, compromising long-term business results (Souza and Clemente, 2015). Equipment reaches the end of its economic life when its operation is no longer attractive, even if it still functions (Torres, 2006).
The literature distinguishes equipment with decreasing efficiency and predictable lifespan, in which wear and maintenance costs increase over time, characterizing a replacement problem. In these cases, replacement is recommended when economically attractive. For the replacement of equipment to be advantageous, it is essential that there is both technical and economic feasibility, ensuring adequate remuneration of the invested capital according to a minimum attractiveness rate (Torres, 2006). This study focuses on replacement with more efficient equipment, one of the low alternatives.
The complexity in decision-making for large-scale, high-acquisition-cost assets requires managers to consider both technical and economic aspects to optimize medium and long-term costs and ensure business sustainability. It is common for efforts to focus on continuous equipment maintenance, without an established methodology for adequate planning of asset fleet renewal. Thus, this work is justified by offering methodological support in evaluating replacement alternatives for a large-scale long-term elevating system, and aims to assess the economic feasibility of replacing the electric motors of a raw water elevating system of the production system located in the city of Brumadinho, Minas Gerais.
2. Material and Methods
This study was characterized as exploratory, employing a qualitative and quantitative approach. The central objective was to evaluate the economic feasibility of replacing electric motors in a raw water pumping system, located in the city of Brumadinho, Minas Gerais. To this end, a literature review, analysis of analogous case studies, field data collection, and consultation of maintenance histories were carried out, complemented by technical reports evaluating the equipment.
The unit of analysis consisted of seven motor-pump sets installed in the raw water pumping station, four with a power of 522 kW and three with a power of 1,789.68 kW. The collection of operational data began with the analysis of the pumping station’s current operating scenario. Energy multimeters and protection relays, installed per equipment, were used to obtain average values of voltage, current, power, and power factor during one hour of normal operation of each set.
Based on the collected data, the efficiency (η) of each equipment was calculated, using equation (1) proposed by Kuritza (2017). The diagnosis of electric motors was expanded to include a comprehensive analysis of the maintenance scenario and operational costs. Historical data from the last five years and cost projections until the end of the expected useful life of the equipment were considered.
To assess the general condition of the motors and the integrity of the insulating system, field tests were carried out in 2023. These tests included stator tests for ohmic resistance of windings, insulation resistance, Absorption Index (AI), Polarization Index (PI), step voltage, dielectric breakdown, capacitance, dissipation factor, tip-up partial discharges, and surge test.
The tests were conducted in accordance with specific technical standards, namely: ABNT NBR 17094-3, IEEE 286, IEEE 43, IEEE 522, IEC 60270, and IEC 60034.27.1. Winding resistance measurement was performed with a microohmmeter, and insulation resistance with a megohmmeter, allowing for the acquisition of polarization and absorption indices.
The energy cost projections were elaborated considering a current average tariff of R$ 0.40/kWh. An annual correction by the Índice Nacional de Preços ao Consumidor Amplo (IPCA) of 4.0% and a real tariff growth rate of 1.5% per year were adopted. The estimation of the average energy tariff value per year was performed using the equation Tt=To(1+i)t(1+g)t, where Tt is the tariff in year t, To is the tariff in year 2026, i is the inflation index, and g is the real tariff growth.
The maintenance costs per equipment were estimated based on the values from the current electric motor maintenance contract and maintenance history. The Life-Cycle Costing Analysis (LCCA) followed Dhillon’s (2010) Model I of general life-cycle costs, which divides costs into recurring and non-recurring. For this study, only operational and maintenance costs were considered, excluding other components due to their irrelevance or non-existence within the scope.
Economic feasibility was evaluated with the support of spreadsheets, using economic engineering indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), and simple and discounted payback (Souza and Clemente, 2015). The Minimum Attractiveness Rate (MAR) of 7.939% per annum (real after-tax) was defined based on the Weighted Average Cost of Capital (WACC) of the Regulatory Agency for Water Supply and Sewage Services of Minas Gerais (ARSAE-MG, 2021).
The time horizon for LCCA modeling analysis was set at 20 years, aligned with consolidated sectoral and institutional parameters (Confederação Nacional da Indústria, 2014). Equipment depreciation was calculated by the formula D=(VI-VR)/vu (Souza e Clemente, 2015), where VI is the initial value, VR the residual value, and vu the useful life in years. For most engines, a null residual value was considered, except for the CMB 306.
Additionally, a sensitivity analysis was performed to consider alternative scenarios for projecting maintenance costs. These scenarios hypothetically increased the failure rate and maintenance costs for equipment with compromised insulation, varying from one to three additional critical failures during the useful life period. The initial scenario was classified as unlikely, and the optimistic, moderate, and pessimistic scenarios were simulated for each motor-pump set.
3. Results and Discussion
The economic feasibility assessment for the replacement of electric motors in a raw water pumping system, located in Brumadinho, Minas Gerais, was conducted through the analysis of the life cycle cost assessment (LCCA), complemented by economic engineering indicators. Initially, the study focused on characterizing the current scenario of the pumping station, which operates with seven motor-pump sets, four of 700 HP and three of 2,400 HP. These pumps, with specific flow rate and manometric head characteristics, are driven by electric motors whose technical specifications were detailed, including nominal power, current, and power factor. The average flow rate obtained varied according to the configuration of the operating sets, demonstrating the system’s complexity.
The diagnosis of electric motors, carried out through field tests in 2023, revealed varied degradation conditions. Tests such as winding ohmic resistance, insulation resistance, polarization index, step voltage, dielectric discharge, and tangent delta were applied, following specific technical standards. The results indicated an advanced degree of contamination and compromised insulation capacity for motors CMB 306 and 307. Furthermore, motors CMB 303 and 304 presented risky conditions, with an estimated useful life of up to two years for CMB 303 and up to twelve months for CMB 306 and 307, evidencing the need for intervention.
Based on this diagnosis, specific technical recommendations were issued for each motor. For motors in critical condition, such as CMB 303, 304, 306, and 307, the recommendations included planning rewinding and thermal cleaning within twelve months, or preventive maintenance. Motors in a state of attention, such as CMB 302 and 308, required winding cleaning and thermal treatment, while CMB 301, operable with attention, demanded continuous monitoring. These actions aimed to extend the equipment’s lifespan and prevent definitive failures of unpredictable cost, aligning with proactive asset management.
The life cycle cost analysis (LCCA) considered recurring costs, focusing on operational (OC) and maintenance (MTC) costs, due to their direct relevance to the results. Inventory, installation, research and development, human capital qualification, support, legal, and quality certification costs were disregarded due to the internal team’s expertise or their non-existence for the study’s scope. This simplified approach allowed the analysis to concentrate on the most impactful cost components for the replacement decision, according to the literature by Dhillon (2010).
Cost projection
The projection of operational costs had energy consumption as the main component. The current average tariff of R$ 0.40/kWh was adjusted annually by the IPCA of 4.0% and real growth of 1.5% p.a., reflecting the history of increasing costs of the national electrical infrastructure and a scenario of macroeconomic balance. The estimate of the average energy tariff value was carried out for a horizon of 20 years, a period considered the useful life of the electric motors. The average daily operation time of each equipment, obtained from the operating history, was crucial to calculate the annual energy cost, which varied significantly among the motor-pump sets.
The replacement of current electric motors with more efficient models would generate substantial savings in annual energy costs. This saving was calculated based on the difference between the current efficiency of the motors and the predicted efficiency for the new equipment. For example, the reduction in annual energy cost for CMB 301 was projected at R$ 27,943.86 in the first year, reaching R$ 78,242.82 in the twentieth year. For CMB 303, the initial saving was R$ 36,581.06, reaching R$ 102,426.97. These projections highlight the potential for energy efficiency gains as a direct benefit of the replacement.
Maintenance cost projection
Maintenance costs were estimated based on the current contract for large electric motors and maintenance history. Basic preventive maintenance, which includes disassembly, cleaning, dimensional evaluation, stator drying, and ohmic resistance and insulation tests, had a total cost of R$ 69,777.81 for 700 HP motors and R$ 101,205.06 for 2,400 HP motors. Preventive maintenance also included motor painting and rewound stator re-impregnation, with costs detailed for each type of service, being essential for asset preservation.
Corrective maintenance, in turn, involved more complex and costly services, such as motor rewinding, material supply (new coils, cables), stator re-shuffling, rotor maintenance, LA and LOA cover recovery, and shaft bearing seat recovery. The costs for rewinding and stator re-shuffling were R$ 171,170.21 for 700 HP motors and R$ 317,023.30 for 2,400 HP motors. These costs, added to those for materials and component recovery, resulted in a total immediate corrective maintenance cost of R$ 385,896.23 for 700 HP motors and R$ 774,536.77 for 2,400 HP motors, reflecting the complexity and financial impact of major failures.
Equipment depreciation
The depreciation analysis of the equipment revealed that most engines (CMB 301, 302, 303, 304, 307, and 308) had already reached the end of their useful life, being assigned a residual value of zero. This is justified by the high wear and tear and the absence of a functional secondary market for these assets. The only exception was the electric motor of CMB 306, which, after twelve years of use, still had a current residual value of R$ 800,514.03, calculated based on an annual depreciation of R$ 100,064.25 over its 20-year useful life (Souza and Clemente, 2015). The consideration of residual value was crucial for the economic feasibility calculations.
Cash flow
The cash flows were structured for a 20-year horizon, considering the initial investment (CAPEX) and the results verified each period. In the first year of the replacement project, the initial investment for a 700 HP engine, such as the CMB 301, was R$ 875,326.61, while for a 2,400 HP engine, such as the CMB 306, it was R$ 2,001,285.08. The benefits included energy savings and maintenance savings, minus income taxes. The accumulated cash flow, both simple and discounted at the Minimum Attractiveness Rate (TMA) of 7.939% p.a., was calculated for each motor pump set.
The initial analysis of economic indicators, considering the MAR of 7.939% p.a., revealed that the Net Present Value (NPV) for all replacement projects was negative. For example, the NPV for CMB 301 was -R$ 450,811.66, and for CMB 306, -R$ 1,468,401.43. The most favorable Internal Rate of Return (IRR) was 6.00% p.a. for CMB 303, still lower than the MAR, indicating that, under the initial assumptions, investing in the replacement of any engine would not be economically feasible. Simple and discounted payback also indicated that most projects would not pay for themselves within the 20-year horizon, with the exception of simple payback for some engines.
Sensitivity study
Sensitivity analysis was performed to address the limitation of the initial assumption of failure rate and maintenance cost equivalence between new and maintained equipment. Previous studies, such as those compiled by the Electric Power Research Institute (EPRI, 1985), indicate that the aging of the insulation system and variability in repair quality compromise the reliability of refurbished equipment. Thus, alternative scenarios (optimistic, moderate, and pessimistic) were considered, projecting an increase in the failure rate and maintenance costs, ranging from one to three additional critical failures over the equipment’s useful life, re-evaluating the economic feasibility of replacement.
The results of the sensitivity analysis significantly altered the decision-making landscape. For engines under critical conditions, such as CMB 303, 306, and 307, the substitution proved to be economically attractive depending on the scenario evaluated. CMB 303, for example, presented a positive NPV and an IRR of 12.96% in the pessimistic scenario, with a simple payback of 7 years and 3 months, becoming economically feasible in all scenarios except the unlikely one. CMB 306 showed economic feasibility in the moderate and pessimistic scenarios, while CMB 307 was economically feasible only in the pessimistic scenario, with an IRR of 10.95% and a simple payback of 9 years and 1 month.
In contrast, for engines with satisfactory operational performance and a moderate to low degree of degradation, such as CMB 301, 302, 304, and 308, replacement was not economically justified in any of the scenarios analyzed within the 20-year horizon. For these assets, preventive maintenance strategy and continuous monitoring of the current condition remained the most appropriate approaches. This distinction highlights that the replacement decision should not be based solely on accumulated operating time, but rather on the actual state of degradation and the associated increasing costs of maintenance and failure risk.
The study’s limitations include the assumptions adopted for the projection of electricity tariffs, inflation rate, and real cost growth, which may vary with changes in the macroeconomic and regulatory scenario. Furthermore, the 20-year useful life horizon and the non-explicit incorporation of operational risk variables, such as catastrophic failures and system unavailability, may have underestimated the indirect costs and replacement benefits. The analysis did not consider revenue losses associated with supply interruptions, which could impact the company’s credibility with customers. In summary, the results indicate that the economic feasibility of replacing electric motors is strongly influenced by the degree of equipment degradation and the projection of maintenance and failure costs, making it attractive for motors in critical condition under higher risk scenarios.
4. Conclusion
This study assessed the economic feasibility of replacing electric motors in a raw water pumping system, located in Brumadinho, Minas Gerais. Initially, it was found that the investment in replacing any motor was not economically attractive, as the isolated gains in energy efficiency were insufficient to overcome the capital cost. However, the sensitivity analysis, which incorporated the aging of the insulation system and the variability in repair quality, significantly altered the decision-making landscape. It was identified that large motors in critical condition, such as CMB 303, 306, and 307, presented economic feasibility for replacement in moderate to pessimistic risk scenarios, driven by reduced maintenance costs and efficiency gains. In contrast, for motors with satisfactory operational performance, replacement was not economically justified within the analyzed horizon. It was concluded that the replacement decision should be based on an integrated technical-economic analysis, being more beneficial for motors with a high degree of degradation and increasing operational and maintenance costs, and not solely on accumulated operating time.
As limitations of the study include the assumptions adopted for the projection of electricity tariffs, inflation rate, and real cost growth, which may vary due to changes in the macroeconomic and regulatory scenario. Furthermore, the analysis did not explicitly incorporate variables associated with operational risk, such as catastrophic failures and consequent system unavailability, which may have underestimated indirect costs and the benefits of replacement. For future studies, it is recommended to expand the analysis by incorporating probabilistic methodologies for risk assessment and equipment reliability, as well as considering alternative scenarios for energy tariffs and maintenance costs. It is also suggested to include environmental aspects, such as emission reduction associated with increased energy efficiency, and to apply the methodology to other pumping systems, in order to validate and expand its applicability. Integration with asset management and predictive maintenance tools can contribute to more assertive decisions aligned with the best practices in the sanitation sector.
Bibliographic References
Agência Reguladora de Serviços de Abastecimento de Água e de Esgotamento Sanitário do Estado de Minas Gerais [ARSAE-MG]. 2021. NT_CRE_11_2021: Resultado final da Taxa de Remuneração Regulatória da Copasa – WACC. Belo Horizonte, 2021. Disponível em: <http://www.arsae.mg.gov.br/wp-content/uploads/2021/06/NT_CRE_11_2021_Resultado_RTP_Copasa_PreCP23.pdf>. Acesso em: 15 jan. 2026.
Assessoria Especial de Comunicação Social do Ministério das Cidades. 2025a. Cinco anos das alterações ao marco legal do saneamento: avanços, ajustes e metas para 2033. Disponível em: <https://www.gov.br/cidades/pt-br/assuntos/noticias-1/noticia-mcid-n-1384>. Acesso em: 21 set. 2025.
Assessoria Especial de Comunicação Social do Ministério das Cidades. 2025b. Em cinco anos do novo marco legal do saneamento básico, ANA tem mais de dez normas de referência publicadas para o setor. Disponível em: <https://www.gov.br/ana/pt-br/assuntos/noticias-e-eventos/noticias/em-cinco-anos-do-novo-marco-legal-do-saneamento-basico-ana-tem-mais-de-dez-normas-de-referencia-publicadas-para-o-setor>. Acesso em: 30 out. 2025.
Associação Brasileira de Engenharia Sanitária e Ambiental [ABES]. 2009. Conservação de água e energia em sistemas prediais e públicos de abastecimento de água. Rio de Janeiro, RJ, Brasil. Disponível em: <http://www.finep.gov.br/images/apoio-e-financiamento/historico-de-programas/prosab/prosab5_tema_5.pdf>. Acesso em: 30 out. 2025.
Confederação Nacional da Indústria [CNI]. Motor Elétrico: Eficiência energética. Distrito Federal: CNI/Senai, 2014. Disponível em: <https://arquivos.portaldaindustria.com.br/app/conteudo_18/2014/04/22/6281/Motor_eletrico.pdf>. Acesso em: 21 ago. 2026.
Dhillon, B.S. 2010. Life-cycle costing for engineers. CRC Press, Taylor & Francis Group, Boca Raton, FL, EUA. Disponível em: <https://research-solution.com/uplode/books/book-50636.pdf>. Acesso em: 02 set. 2025.
Electric Power Research Institute [EPRI]. 1985.” Improved motors for utility applications: industry assessment study”. Volume 2. Palo Alto: EPRI. Disponível em: <https://www.osti.gov/biblio/6759647>. Acesso em: 10 fev. 2026.
Kuritza, J.C. 2017. Metodologia para avaliação da eficiência energética de sistemas de bombeamento de água com velocidade de rotação variável. Universidade Federal do Rio Grande do Sul, Instituto de Pesquisas Hidráulicas, Porto Alegre, RS, Brasil. Disponível em: <https://lume.ufrgs.br/bitstream/handle/10183/170645/001053561.pdf?sequence=1>. Acesso em: 04 dez. 2025.
Ministério das Cidades [MCID]. 2023. Diagnóstico temático de serviços de água e esgoto. Brasília, DF, Brasil. Disponível em: <https://www.gov.br/cidades/pt-br/acesso-a-informacao/acoes-e-programas/saneamento/snis/produtos-do-snis/diagnosticos/DIAGNOSTICO_TEMATICO_VISAO_GERAL_AE_SNIS_2023.pdf>. Acesso em: 21 set. 2025.
Souza, A.; Clemente, A. 2015. Decisões financeiras e análise de investimentos: fundamentos, técnicas e aplicações. Atlas, São Paulo, SP, Brasil. 6. ed. Disponível em: <https://app.minhabiblioteca.com.br/reader/books/9788597023466>. Acesso em: 01 set. 2025.
Torres, O.F.F. 2006. Fundamentos da engenharia econômica e da análise econômica de projetos. Cengage Learning, São Paulo, SP, Brasil. Disponível em: <https://app.minhabiblioteca.com.br/reader/books/9788522128402>. Acesso em: 01 set. 2025.
Article originating from the Final Course Work of the Specialization in Business Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform