Rail transport is a vital system for urban mobility, and Railway Turnouts (AMVs) are critical components. Given a history of 28 operational incidents and derailments between February 2024 and May 2025 in the Central do Brasil yard, Rio de Janeiro (RJ), predominantly “Improper Route” (53.6%) and “Contrary Switch” (39.3%), the need arose to optimize inspection and maintenance practices. The objective was to analyze the effectiveness of actions taken to mitigate the risk of derailment in AMVs, establishing a criticality index (ID AMV) for maintenance prioritization. A quantitative-qualitative case study was conducted in the yard, between June and September 2025, involving 132 AMVs. The methodology integrated PMBOK guidelines and railway maintenance engineering practices, using Failure Mode and Effects Analysis (FMEA) to identify failures and create the ID AMV. A multi-cycle inspection plan and predictive monitoring via the ACT system were implemented. Inspections revealed a high incidence of loose braces (65.9% of AMVs) and unusable sleepers. The average ID AMV was 60.8 points, with peaks of 405, indicating assets in critical condition. It was concluded that the optimization of the inspection plan, the application of FMEA, and the creation of the ID AMV were effective strategies for mitigating operational risks, promoting condition-based maintenance management and prioritization of interventions, consolidating the permanent way as a strategic asset for the safety and efficiency of rail transport.
Keywords: Turnout Device (AMV); Derailments; FMEA; Preventive Maintenance; Operational Safety.
1. Introduction
Rail transport, in its essence, constitutes one of the fundamental pillars of logistics infrastructure and urban mobility in Brazil. This mode is crucial both for the outflow of cargo and for the daily movement of millions of passengers, especially in large urban centers. The permanent way, which encompasses the set of infrastructure and superstructure through which trains circulate, is the structural element that guarantees the stability and operational safety of the system (Brina, 1988).
Among the various components of the permanent way, the Turnout (AMV) stands out due to its criticality and complexity. The AMV is a set of parts, including switch rails, stock rails, frogs, special sleepers, and operating devices, whose primary function is to allow a train to switch from one route to another without interrupting its movement (Keretch, 2017). Due to its dynamic nature, involving moving parts to guide train wheelsets, and its geometric complexity, the AMV is constantly subjected to severe transverse and longitudinal stresses, resulting in significant wear. The Brazilian Association of Technical Standards (ABNT) recognizes the importance of this device, dedicating ABNT NBR 5558 to its classification and ABNT NBR 15679 to its terminology, which underscores the need for standardization and technical rigor in its management.
The maintenance and inspection of AMVs represent a continuous challenge for railway operators. Technical literature and practical experience show that failures in these devices, often caused by wear and tear on parts and components such as switch points, loosening of lateral braces, degradation of sleepers, or geometry problems, are recurring causes of derailments. Authors such as Steffler (2012) emphasize that railway maintenance should be seen as an investment in safety and operational efficiency, driving the transition from corrective to predictive practices. Operational safety management requires a systemic view that integrates infrastructure maintenance with operations, recognizing that the failure of a single component can have catastrophic consequences (Hungria, 2022).
In the context of project management, the Project Management Body of Knowledge (PMBOK) establishes that risk management encompasses processes for planning, identification, analysis, response planning, response implementation, and risk monitoring and control (PMI, 2017). Preventive maintenance and systematic inspection, therefore, align with risk mitigation strategies, seeking to reduce the probability of occurrence and the impact of adverse events on railway operations (Santos & Cabral, 2008). The American Railway Engineering and Maintenance-of-Way Association (AREMA) also provides rigorous guidelines for railway maintenance and the prevention of derailments (AREMA, 2025).
The present study is justified by the strategic relevance and operational criticality of the Central do Brasil Yard, in Rio de Janeiro (RJ). This yard is a vital node for urban and metropolitan mobility, concentrating 132 AMVs, and its uninterrupted operation is essential for the fluidity of passenger transport. The recent history of 28 operational occurrences and derailments between February 2024 and May 2025, predominantly of the types “Improper Route” (53.6%) and “Adverse Switch” (39.3%), highlighted the urgency of incisive and technically grounded action to mitigate the potential severity associated with this location. The response to this crisis demanded the formulation and implementation of innovative actions, including collaboration between the areas of Maintenance Engineering, Permanent Way Maintenance, and Railway Signaling, and the application of Failure Mode and Effects Analysis (FMEA) for criticality mapping (ABNT, 1992).
Given the foregoing, this work proposes to analyze the effectiveness of actions taken to mitigate the risk of derailment in Turnouts (AMVs) at the Central do Brasil yard, establishing a criticality index (ID AMV) for maintenance prioritization.
2. Material and Methods
The present study was characterized as an applied research, of quantitative and qualitative nature, carried out through a case study. The investigation was conducted at the Central do Brasil Railway Yard, located in the city of Rio de Janeiro (RJ), between the months of June and September 2025. The adopted methodology was based on the integration of the risk management guidelines of the PMBOK (PMI, 2017) with railway maintenance engineering practices, notably the Failure Mode and Effects Analysis (FMEA) and the recommendations of AREMA (AREMA, 2025).
The unit of analysis comprised the entirety of the 132 operational Turnouts (AMVs) installed in the Central do Brasil Yard. There was no sampling, as the inspection plan contemplated a complete census of the universe of AMVs. These turnouts covered different switch configurations, such as 5.029m, 6.075m, and 9.144m, and crossings with a turnout ratio of 1:10 and 1:8, in addition to various switch machine models, including 5A, 5E, KA1082A, KA1211G, M3, M23, and M23-A.
Primary data collection was carried out by field teams, who used standardized forms to record the physical conditions of the assets. This procedure generated a structured database in electronic spreadsheets. Visual inspections were performed in multiple cycles, totaling 248 records, and followed AREMA’s precepts (AREMA, 2025), focusing on track geometry, the condition of fastening components, and the structural integrity of rails and switches.
Additionally, inspections were guided by a Service Level Agreement (SLA), which established maximum deadlines for correcting detected anomalies, such as ten days for tamping deficiency and twenty-five days for fractured needle replacement. Historical derailment data, occurring between February 2024 and May 2025, were used to establish a baseline and identify critical operational failures, such as “Inverted Route” and “Contrary Switch”. This data was extracted from the concessionaire’s incident registration system and classified according to the regulatory agency’s (AGESTRANSP) standards.
For the structuring of the maintenance plan and criticality analysis, the FMEA methodology (ABNT, 1992) was applied, which allowed the systematic identification of potential failures, their causes, and their effects on the system’s operation. The process began with mapping the most recurrent anomalies, such as loose braces, unusable sleepers in the body, heel, and advance of the AMV, as well as failures in screws and motor beams.
Each failure mode was analyzed for its severity, occurrence, and detectability, parameters that underpinned the creation of a Criticality Index (ID AMV). This index was built on eight measurable variables, as recommended by the dealership’s internal maintenance strategy manual. The variables considered included: Impact on Safety and Environment; Impact on Operation and Service Quality; Existence of redundancy; Failure History; Future Probability of Failure; Maintenance Cost in One Year; Evolution of Maintenance Cost over three years; and Risk of obsolescence.
Each variable was assigned a score of zero for low risk, one for medium risk, and two for high risk, generating a criticality score that guided the prioritization of interventions. This method aligned with the process “Perform Quantitative Risk Analysis” (Process 11.3) of the PMBOK (PMI, 2017), which prioritizes risks for further analysis or action by assessing their probability of occurrence and impact.
Predictive monitoring was implemented through the ACT system (Train Route Control), which provided data on the movement volume of each AMV. This allowed for the correlation of usage frequency with component wear, directing maintenance efforts towards assets with greater operational wear. The quantitative data analysis was performed using descriptive statistics, employing the Python software with the Pandas and Matplotlib libraries for data processing and graph generation.
Descriptive statistics allowed for the calculation of absolute and relative frequencies, means, medians, and maximum and minimum values for the criticality index and for the movement of AMVs. The integration of the Permanent Way and Railway Signaling areas was a fundamental methodological pillar to ensure that interventions in AMVs encompassed both the physical infrastructure and the electromechanical actuation systems, in accordance with best project management practices (Santos & Cabral, 2008).
3. Results and Discussion
The analysis of the collected data revealed critical information about the structural and operational integrity of the Turnout Actuators (AMVs) at the Central do Brasil Yard, confirming the pressing need for a systematic approach to preventive maintenance and risk mitigation. The findings demonstrate a strong correlation between the detected physical anomalies and the history of operational failures, which underscores the importance of the implemented strategies. The research validated the effectiveness of an optimized inspection plan, the application of Failure Mode and Effects Analysis (FMEA), and the creation of a Criticality Index (ID AMV) as essential tools for improving operational safety and railway maintenance management.
History of Derailments and Incidents
The analysis of the period between February 2024 and May 2025 recorded a total of 28 operational occurrences involving the AMVs in the yard. Of these events, 24 cases, representing 85.7% of the total, were classified as “Operational Incident”. The typology of failures showed a significant concentration in two main categories: “Inverted Route”, with 15 cases (53.6%), and “Contrary Switch”, with 11 cases (39.3%). These results provide an empirical basis for understanding the safety challenges faced in the yard prior to the implementation of new actions.
These findings corroborate the observations of Keretch (2017), who highlights directional failures, such as improper route and contrary switch, as direct consequences of the wear and degradation of the mechanical components of AMVs, especially the needles and their fixing systems. The high incidence of improper routes suggests that the AMVs were not completing their course properly or that the needles were not perfectly resting against the back check rail. Such a condition, according to the standards of the American Railway Engineering and Maintenance-of-Way Association (AREMA, 2025), constitutes a serious violation of track geometric safety standards, increasing the risk of derailments.
Stratification of Anomalies
The systematic inspection of the 132 AMVs, carried out between June and September 2025, allowed for a detailed stratification of the physical anomalies that precede operational failures. The results demonstrated a high degree of superstructure degradation, with the presence of “Loose Braces” in 65.9% of the inspected devices. This anomaly was the most recurrent, with 463 occurrences recorded, highlighting a generalized fragility in the AMV fixing systems and a high risk to operational safety.
The braces are crucial components for maintaining gauge and ensuring the correct positioning of the switch against the stock rail. Their loosening compromises the rigidity of the assembly and exponentially increases the risk of the train wheel “opening” the switch during passage, which can result in derailment or a facing-point incident. This finding aligns with the studies of Steffler (2012), who points to the loss of fixation rigidity as one of the first stages of catastrophic failure in permanent way, highlighting the urgency of corrective interventions.
Additionally, the inspection revealed a high quantity of unusable sleepers, distributed across different regions of the AMV. In the AMV body, 46.2% of the units presented unusable sleepers, totaling 256 occurrences. In the recoil, 34.8% of the AMVs had unusable sleepers, with 77 occurrences, and in the advance, 25.8% of the AMVs were affected, with 99 occurrences. The presence of unusable screws in the recoil was observed in 40.2% of the AMVs, with 99 occurrences, and unusable motor beams in 19.7% of the AMVs, with 54 occurrences.
This widespread degradation of sleepers and bolts indicates a significant loss of load-bearing capacity and track geometry maintenance. The replacement of these components, although representing a considerable investment, is an indispensable risk mitigation action, as recommended by the “Implement Risk Responses” process of the Project Management Body of Knowledge (PMBOK) (PMI, 2017). The integrity of the sleepers is fundamental for track stability and for absorbing the dynamic loads imposed by rail traffic.
Analysis of Visual Inspections and Criticality
The multi-cycle inspection plan, implemented between June and September 2025, resulted in 248 valid records. This effort covered 161 unique AMVs, including repeated inspections on the same asset, demonstrating an effective coverage rate of 122% relative to the yard’s 132 AMVs and strict adherence to the established schedule. The scope of the inspections allowed for the collection of a significant volume of data on asset condition, crucial for criticality analysis.
The analysis of AMV movement, measured in operating cycles, revealed extreme variation in asset utilization. The average movement was 1,159 cycles, but with peaks reaching 7,141 cycles for some AMVs. This disparity in usage volume fully justifies the adoption of a Condition-Based Maintenance (CBM) and usage-based approach, rather than a purely time-based strategy. Condition-based maintenance allows maintenance resources to be directed to assets that truly require intervention, optimizing the allocation of teams and materials.
Predictive monitoring, guided by the ACT system alarms (Train Route Control), has proven to be an effective tool for directing maintenance efforts towards assets with the greatest operational wear. This system provided real-time data on the movement of each AMV, allowing the frequency of use to be correlated with component wear. The ability to proactively identify the most critical AMVs has significantly optimized the resources of the Permanent Way team (Tavares & Pinto, 2019).
The calculation of the Criticality Index (AMV ID), developed based on the FMEA tool (ABNT, 1992), generated an average of 60.8 points for the group of inspected assets. However, the maximum value recorded was 405 points, indicating the existence of nine assets in an imminent critical condition. The application of FMEA to calculate this index allowed maintenance management to classify the AMVs into risk bands (White, Yellow, Blue, and Red) and to direct service orders (SO) in a prioritized manner, respecting the deadlines of the Service Level Agreement (SLA).
Integrated Discussion
The results show a strong correlation between the detected structural anomalies, such as loose braces and degraded sleepers, and the history of operational failures, predominantly improper routes and contrary switches. This interdependence highlights that the physical degradation of components is a primary factor for the occurrence of incidents, validating the premise that preventive and predictive maintenance is crucial for operational safety.
The integration of the Permanent Way and Railway Signaling teams was a decisive factor for the success of the new inspection plan. The failure of a point machine often involves both track mechanical components and electromechanical actuation systems, such as switch machines and signaling. The collaboration between the areas ensured that interventions covered the entire point machine system, promoting a holistic approach to safety and maintenance management.
The adoption of PMBOK (PMI, 2017) practices for the inspection plan management provided a robust methodological framework. By treating maintenance not as an isolated routine activity, but as a continuous project for mitigating operational risks, it was possible to establish more effective and systematic planning. This approach aligns with best practices in risk management, seeking to reduce the probability of occurrence and the impact of adverse events on railway operations (Santos & Cabral, 2008).
The transition from a corrective maintenance model, which reacted to derailments, to a preventive and predictive model, based on the AMV ID and the ACT system, represents a significant advance in the operational safety management of the Central do Brasil Yard. This paradigm shift has enabled proactive action, anticipating failures and optimizing resource allocation. The alignment of these practices with international standards, such as the AREMA (2025) guidelines, attests to the technical robustness and effectiveness of the proposed and implemented solutions.
The integration with the ACT system (Train Route Control) provided real-time movement data, allowing the correlation of AMV wear with their frequency of use. The analysis revealed that AMVs with movement above 5,000 cycles showed a Criticality Index 3.2 times higher than those with less than 1,000 cycles. This data validated the need for a condition and usage-based maintenance approach, as recommended by the PMBOK for the mitigation of operational risks, reinforcing the importance of continuous monitoring for prioritizing interventions.
In summary, the results obtained demonstrate that the optimization of the inspection plan, the application of FMEA, and the creation of the AMV ID were effective strategies to mitigate operational risks at the Central do Brasil Yard. The research confirmed that the physical degradation of components, especially loose braces and unusable sleepers, acts as the primary root cause for derailments, and that a condition-based maintenance management and prioritization of interventions is fundamental for the safety and efficiency of rail transport.
4. Conclusion
This study aimed to analyze the effectiveness of actions taken to mitigate the risk of derailment in Track Switches (AMVs) at the Central do Brasil yard, by establishing a criticality index (ID AMV) for maintenance prioritization. It was found that the history of 28 operational occurrences, predominantly “Wrong Route” and “Contrary Switch,” was directly related to the physical degradation of components. Inspections revealed a high incidence of loose braces in 65.9% of the AMVs and unusable sleepers, indicating widespread structural fragility. The optimization of the inspection plan, the application of Failure Mode and Effects Analysis (FMEA), and the creation of the ID AMV allowed for the identification of assets in critical condition, with an average ID AMV of 60.8 points and peaks of 405. Predictive monitoring via the ACT system proved effective in correlating AMV movement with wear, validating the need for condition- and usage-based maintenance, rather than solely temporal criteria.
The main contribution of this work lies in the consolidation of a practical and well-founded framework that transformed maintenance management at the Central do Brasil yard, promoting a transition from a reactive to a preventive and predictive model. The integration of the Permanent Way and Railway Signaling teams, combined with the adoption of PMBOK guidelines for risk management, provided a systemic and robust approach. This methodology allowed for the prioritization of interventions based on the actual risk of failure, ensuring compliance with Service Level Agreements and enhancing operational safety. Thus, the permanent way is consolidated as a strategic asset, whose proactive management is essential for the safety and efficiency of passenger rail transport.
Bibliographic References
AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION (AREMA). Manual for Railway Engineering. Lanham, MD: AREMA, 2025.
ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. ABNT NBR 5558: Aparelho de mudança de via – Classificação. Rio de Janeiro: ABNT, 1992.
BRINA, Helvécio Lapertosa. Estradas de Ferro. Volume 1. Rio de Janeiro: Livros Técnicos e Científicos Editora, 1988.
HUNGRIA, Luiz Henrique. Conceitos Básicos sobre Movimento do Trem. São Paulo: Editora Blucher, 2022.
KERETCH, M. E. Acidentes ferroviários motivados por desgaste na ponta de agulha do aparelho de mudança de via. Trabalho de Conclusão de Curso (Especialização em Engenharia Ferroviária) – Pontifícia Universidade Católica de Minas Gerais, Belo Horizonte, 2017.
PROJECT MANAGEMENT INSTITUTE (PMI). Um Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK®). 6. ed. Newtown Square, PA: Project Management Institute, 2017.
SANTOS, F. R. S.; CABRAL, S. FMEA and PMBOK applied to project risk management. Journal of Information Systems and Technology Management, v. 5, n. 2, p. 347-362, 2008.
STEFFLER, Fábio. Via Permanente Aplicada. 1. ed. São Paulo: Editora Baraúna, 2012.
TAVARES, L. M.; PINTO, H. A. Gestão ferroviária: conceitos, planejamento e operação. Rio de Janeiro: Elsevier Brasil, 2019.
Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform