Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The modernization of public tenders in Brazil, driven by Law no. 14.133/2021, sought greater transparency and efficiency in resource management. The study analyzed the main changes and impacts of this legislation on the contracting of engineering services through electronic bidding, focusing on the participation of companies without technical capacity in the bidding phase and its effects on price formation and the efficiency of tender processes. To this end, an applied, descriptive, and exploratory research was conducted, using multiple case studies and documentary analysis of three tender processes from small municipalities in Minas Gerais. Data were collected from public portals and analyzed based on variables such as reference values, submitted proposals, discount percentages, number of participants, disqualifications, and duration of the tenders. The results showed that the inversion of phases, by allowing the participation of companies without prior qualification, favored the submission of aggressive proposals, generating distortions in price formation, increased delays, and risks of non-executability. In contrast, the adoption of prior qualification contributed to greater competitive balance and better alignment of proposals with market values. It was concluded that the effectiveness of the legislation depends on how it is applied, and it is recommended to consider the complexity of the object in defining the order of the phases.

Keywords: Electronic competition; Administrative efficiency; Prior qualification; Infeasibility; Engineering services.

1. Introduction

Public works are fundamental for national development, encompassing activities such as renovation, recovery, expansion, or construction of public heritage (TCU, 2014). In Brazil, the modernization of public bidding processes has become essential to ensure greater transparency, efficiency, and control over public resources. This need intensified particularly after the implementation of Law no. 14.133/2021, which sought to address historical challenges in public contracting.

The concept of public bidding is defined as an administrative procedure through which the public administration seeks to meet its needs, allowing all interested parties to submit proposals under specific conditions (Di Pietro, 2020). The purpose of the bidding process is to select the most advantageous proposal for the public administration (Mascena, 2017). The new Law no. 14.133/2021 (Brazil, 2021) introduced several changes aimed at improving the implementation of these processes, centralizing them and unifying their disclosure through platforms such as the National Public Procurement Portal (Toledo, 2021).

Historically, public procurement in Brazil, previously governed by Law no. 8.666/1993 (Brazil, 1993), has been associated with challenges such as bureaucracy, corruption, and diversion of public funds. The evolution of bidding processes has consistently sought to increase formalization and introduce stricter rules to combat these issues (Alves, 2021). Although bureaucracy can be seen as an obstacle to administrative agility, its correct implementation is crucial for transparent processes, ensuring that public interests are respected and minimizing corruption risks. Thus, continuous monitoring of the new law’s application is vital for improvements, oversight, optimization, and quality in public procurement.

Despite the advances, the current model of electronic bidding, especially regarding phase inversion, presents specific challenges. This inversion allows companies to participate in the bidding phase without prior technical qualification, which can lead to the submission of aggressive proposals. Such dynamics can distort price formation, increase process slowness, and elevate the risks of contractual non-performance. This scenario can generate a “false economy,” where apparently lower prices do not result in an effective reduction of public costs, but rather in an increase of contractual risks, such as delays, abandonment of works, and the need for re-contracting and administrative rework. These issues highlight a possible fragility in the relationship between the planning of acquisition requirements and their application during the conduct of the bidding process, impacting the quality of competition.

The effectiveness of the new legislation depends directly on how it is applied, making it essential to consider the complexity of the object when defining the order of phases. Understanding these dynamics is crucial to ensure that public works projects are executed by truly qualified suppliers, resulting in more efficient and effective public procurement. Thus, the objective of the study was to analyze the procurement management of public works in the state of Minas Gerais, through electronic bidding, focusing on the participation of companies without technical capacity in the bidding phase and their impacts on efficiency and price formation in bidding processes.

2. Material and Methods

The research conducted was characterized as applied, with a descriptive and exploratory methodological approach, according to the classification proposed by Gil (2010). To achieve the study’s objective, the strategy of multiple case studies was employed, complemented by a documentary analysis. This approach allowed for an in-depth investigation of contemporary phenomena in their real contexts, aligning with Yin’s (2015) methodological guidelines.

The unit of analysis consisted of three specific bidding processes, conducted in the electronic bidding modality, related to public works. These contests were carried out by city halls located in the state of Minas Gerais, in small municipalities, with populations ranging between 3,000 and 12,000 inhabitants. The processes studied included works in Brás Pires, Senador Firmino, and Lima Duarte, covering both standard models and an exception model.

The selection of bidding processes was based on specific criteria: the occurrence of disqualification and declassification of companies, the similarity in the size of the municipalities involved, and the adherence of the auctioned objects to the research focus. These criteria aimed to enable an effective comparison between the analyzed cases, allowing for the identification of relevant patterns and dynamics.

Data collection was carried out through documentary analysis, using public domain information. The database was formed from documents accessible on transparency portals, official gazettes, and electronic bidding platforms, such as Licitar Digital (2026) and BLL (2026).

The collected data were organized into a summary table and descriptive graphs. The analyzed variables included the reference value of the work, the final proposal values, the discount percentages, the number of participants, the number of disqualified companies, the duration of the process, and the reasons for disqualification. These indicators were fundamental for constructing a comparison between the studied processes.

For the analysis, the “Project Management Body Of Knowledge” [PMBOK] Guide (PMI, 2017) was adopted as a reference, focusing on the area of procurement management. This framework allowed for the examination of bidding processes from the perspective of planning, conducting, and controlling acquisitions, complementing the normative analysis based on Law No. 14.133/2021 (Brazil, 2021).

In procurement planning, the elements present in the tender documents and public documents were analyzed, such as the object of the contract, reference value, qualification requirements, and established conditions, verifying their adequacy to the nature and complexity of the works. For the conduct, the selection of suppliers and the competitive dynamics were analyzed, considering participants, proposal values, discounts, phase order, and disqualifications, aiming to verify the effects on price formation and the effectiveness of the contracting.

In the procurement control stage, the recorded results were evaluated, considering the duration of the bidding process, the need for due diligence, rework in the analysis of documents and proposals, reasons for disqualification or exclusion, and identified risks to contracting efficiency, including impacts related to the infeasibility of proposals.

The data analysis was carried out through a comparative approach between cases, seeking to identify recurring patterns in price formation, bidder participation, and the outcome of tenders, in line with the social research procedures described by Gil (2017). Additionally, a normative analysis was conducted, based on Law no. 14.133/2021 (Brazil, 2021), and a literature review to deepen the understanding of the central concepts and previous studies on the new legislation. To protect the identity of the companies involved, all publicly collected information was presented anonymously.

3. Results and Discussion

The analysis of the bidding processes revealed distinct patterns in the conduct of electronic tenders, with direct implications for efficiency and price formation. In two of the three processes examined, a predominance of the lowest price criterion was observed, without an in-depth evaluation of the competitors’ spreadsheets. This approach resulted in delays in the delivery of works, increased administrative slowness and, in some cases, the need to initiate new bidding processes for the completion of projects. In contrast, the third process demonstrated a differentiated approach, with the technical qualification phase preceding the bidding phase, which positively impacted the outcome of the tender.

The protection of the identity of the companies involved in the contests was ensured, with the collected information being presented publicly and anonymously. The multiple case study methodology, following Yin’s (2015) guidelines, allowed for an in-depth and comparative analysis of competitive dynamics, pricing patterns, and contest outcomes. This approach was complemented by the normative analysis of Law no. 14.133/2021 (Brazil, 2021) and by confrontation with the principles of Procurement Management from the PMBOK (PMI, 2017), offering an integrated perspective between project management and public procurement.

Process 1

The first bidding process analyzed, concerning the construction of a roof and changing rooms in Brás Pires, occurred in the electronic bidding modality, with the lowest price judgment criterion. The reference value of the work was established at R$ 640,730.22. During the bidding phase, several proposals were submitted, with the winning one offering a final value of R$ 195,000.00, which represented a significant discount of 69.57% compared to the reference value. This sharp discrepancy between the estimated value and the final proposal raised questions about the feasibility of the offer and the sustainability of the contract.

The distribution of discounts presented by suppliers evidenced a pattern of aggressive proposals, with several bidders offering reductions greater than 25% of the reference value. This dynamic, although apparently advantageous for public administration, may indicate pricing patterns potentially incompatible with the execution of the object. Law no. 14.133/2021 (Brazil, 2021) advocates that the acceptance of proposals should not be limited to the lowest price, requiring verification of economic viability and rigorous analysis of justifications for proposals with indications of inexecutability.

The slowness of the bidding process was a critical point, attributed to the participation of companies that did not have the qualification documentation in accordance with the Requirements in the bidding phase. Four suppliers were disqualified or deemed ineligible. Supplier 16, with a discount of 69.57%, was disqualified for not submitting the updated proposal and the requested feasibility declaration. Supplier 15, with a 34.14% discount, was deemed ineligible for presenting a technical capacity certificate incompatible with the object and for the absence of proof of the technical responsible’s link and registration with the professional council (CREA), thus failing to meet the technical qualification requirements.

Additionally, Supplier 14, who offered a 26.65% discount, was disqualified after an analysis by the engineering department which verified the non-conformity of its Technical Record Certificate (CAT) with the tender’s requirements. Similarly, Supplier 13, with a 26.47% discount, was also disqualified due to the inadequacy of its CAT. These cases illustrate the fragility in the relationship between the planning of acquisition requirements and their application during the conduct of the bidding process, according to the perspective of Procurement Management from the PMBOK (PMI, 2017), where the planning stage is crucial for defining the qualification criteria.

The presence of companies without real execution conditions in the bidding phase, even if subsequently disqualified, distorted the competitive dynamic. By submitting aggressive bids, these companies pressured prices to artificially low levels, leading other bidders to adjust their offers in response to technically unsustainable competition. This phenomenon resulted in a “false economy”, where bids with discounts significantly higher than 25% of the reference value did not generate effective public cost reduction, but rather increased contractual risks, such as delays, abandonment of work, and the need for re-contracting and administrative rework.

Process 2

The second process analyzed, for the construction of the headquarters of the Municipal Health Secretariat in Senador Firmino, was also an electronic bidding with phase inversion. The reference value of the tender was R$ 485,812.82. The winning bid, for R$ 347,000.00, represented a discount of 28.57% compared to the value estimated by public administration. As in the first case, this process also showed a pattern of proposals with aggressive discounts, indicating the presence of potentially unfeasible offers.

The analysis of the proposals revealed that more than one company offered a discount greater than 25% of the reference value of the work, which reinforces the pattern of risk of infeasibility. The competitive dynamic, by allowing the participation of companies without prior qualification, resulted in an increase in administrative diligence and process slowness. The verification of documentation and the qualification of bidders, which should have been smoother stages, became bottlenecks due to the need to analyze and justify proposals with values well below market.

In this tender, five companies were disqualified or eliminated. Supplier 12, with a 28.57% discount, was disqualified for not presenting the updated proposal and the feasibility declaration. Supplier 11, with a 28.39% discount, was disqualified due to irregularities in the corporate structure and absence of proof of business continuity. Supplier 10, with a 23.86% discount, was disqualified for not presenting a technical responsibility certificate issued by CREA/CAU, with the registration of the responsible technician. Supplier 9, with a 21.80% discount, was disqualified for not sending the requested documents within the deadline. Supplier 8, with a 20.73% discount, was disqualified for presenting an expired federal regularity certificate.

The occurrence of multiple disqualifications and debarments, even after the bidding phase, reaffirms the perception that phase inversion can compromise the efficiency and quality of contracting. The participation of companies that do not meet the technical, economic, or legal qualification requirements in the competitive phase generates administrative rework and prolongs the total time of the bidding process. This dynamic, instead of promoting agility, contributes to slowness and uncertainty regarding the effective contracting of a qualified supplier, negatively impacting Procurement Management (PMI, 2017).

Process 3

The third bidding process examined, concerning street paving in Ibitipoca, in the municipality of Lima Duarte, presented a distinct approach. With a reference value of R$ 1,523,227.41, this tender adopted prior bidder qualification, meaning the qualification phase preceded the bidding phase. The winning bid was R$ 1,489,000.00, resulting in a 2.25% discount compared to the reference value. This percentage difference, significantly smaller compared to previous processes, suggests a more balanced competitive environment and bids more aligned with market values.

The prior qualification allowed for effective filtering of companies, ensuring that only bidders with adequate technical capacity, fiscal regularity, and economic qualification participated in the bidding phase. Initially, nine companies participated in the process. After the qualification stage, five companies were disqualified for various reasons. Supplier 5 did not prove the minimum technical capacity for the item “Soil Subgrade Regularization and Compaction”. Supplier 6 did not prove operational technical qualification in items of greater relevance. Supplier 7 did not prove the required operational and professional technical qualification.

Furthermore, Supplier 8 presented an expired federal regularity certificate, and Supplier 9 did not present economic qualification as required in the Requirements, submitting only the balance sheet and trial balance for 2025. The high number of disqualifications at this initial stage reinforces the importance of qualification as a filtering mechanism. By being carried out beforehand, this step contributed to the formation of a more equitable competitive environment, reducing the influence of proposals that would not be technically and contractually sustainable, avoiding the price distortion observed in other cases.

The difference between the reference value and the discounts applied in this process, with a maximum discount of 2.25%, demonstrates that prior qualification restricts participation in the competitive phase to companies effectively capable of executing the object. This dynamic results in more consistent proposals aligned with market values, significantly minimizing the risk of non-executability. The conduct of procurements, from the PMBOK perspective (PMI, 2017), is optimized when the planning of requirements and supplier qualification are rigorously applied before the price competition, ensuring that the most advantageous proposal is also the most feasible.

The comparison between the three processes, as summarized, reveals that the order of the phases of the bidding process directly influences the quality of competition and the efficiency of the tender. In processes 1 and 2, where qualification occurred after the bidding phase, a larger number of participants (16 and 12, respectively) and a high number of disqualifications (4 and 5) were observed. Furthermore, the duration of these processes was considerably longer (49 and 34 days), and the average discounts were significant (69.57% and 28.57%), indicating the influence of unqualified companies on price formation.

In contrast, Process 3, which adopted prior qualification, presented a smaller number of participants (9), but with a disqualification rate (5) that occurred before the bidding phase, filtering out competitors. The duration was significantly shorter (13 days), and the highest discount recorded was only 2.25%. This difference highlights that prior qualification contributed to greater competitive balance, with proposals more aligned with market values, resulting in better performance and greater procedural agility, in accordance with the principles of administrative efficiency and project management (PMI, 2017).

The results indicate that increasing competitiveness, when not accompanied by effective mechanisms for prior qualification of bidders, can result in only apparent competition, compromising the efficiency and quality of the procurement. The comparative analysis of cases demonstrated that the prior evaluation of qualification requirements, especially regarding objects of greater technical complexity, can facilitate the competitive phase among suppliers truly qualified for the execution of the object. The implementation of the processes of planning, conducting, and controlling procurements, according to the PMBOK, is fundamental to understanding the bidding process as an integral part of the management of a public works project.

In summary, the research showed that phase inversion, by allowing companies without prior qualification to participate in the bidding phase, favored the submission of aggressive proposals, generating distortions in price formation, increased delays, and risks of non-executability. On the other hand, the adoption of prior qualification contributed to greater competitive balance and better adherence of proposals to market values, resulting in more efficient processes with a lower risk of contractual failures. The effectiveness of Law no. 14.133/2021 (Brazil, 2021) therefore depends on how it is applied, making it crucial to consider the complexity of the object in defining the order of the phases of the bidding process to ensure the selection of the most advantageous and feasible proposal.

4. Conclusion

This study analyzed the management of public works acquisitions in the state of Minas Gerais, through electronic bidding, focusing on the participation of companies without technical capacity in the bidding phase and their impacts on efficiency and price formation in bidding processes. It was found that the inversion of phases, by allowing the participation of bidders without prior qualification, favored the submission of excessively aggressive proposals. This dynamic generated significant distortions in price formation, increased the slowness of processes, and raised the risks of contractual non-executability, resulting in a “false economy” that compromised the effectiveness of contracting. In contrast, it was observed that the adoption of prior qualification contributed to a more balanced competitive environment, with proposals more aligned with market values, and to greater agility and efficiency in the contests.

The main contribution of this study lies in demonstrating that the effectiveness of Law no. 14.133/2021 is intrinsically linked to how its provisions are applied, especially regarding the order of the bidding process phases. It is suggested that the complexity of the object is fundamental for defining the sequence of qualification and bidding, aiming to ensure the selection of the most advantageous and feasible proposal. As a limitation, it should be noted that the analyzed sample, restricted to small municipalities in Minas Gerais, may influence the generalization of the findings. For future studies, it is recommended to expand the sample to other contexts and investigate additional factors that impact the efficiency of public procurement, such as the qualification of public agents and the use of technological tools to support proposal analysis.

Bibliographic References

Alves, A.P.G. 2021. A evolução histórica das licitações e o atual processo de compras públicas em situação de emergência no Brasil. Regen: Revista de Gestão, Economia e Negócios 1 (2): 40-60.

Bll Compras. 2026. Bll Compras | A maior plataforma de licitações do país. Disponível em: <https://bll.org.br>. Acesso em: 21 Ago. 2026.

Brasil. 1993. Lei n. 8.666, de 21 de junho de 1993. Lei de Licitações e Contratos Administrativos. Brasília, DF, Brasil.

Brasil. 2021. Lei n. 14.133, de 1º de abril de 2021. Lei de Licitações e Contratos Administrativos. Brasília, DF, Brasil.

Di Pietro, M.S.Z. 2020. Direito administrativo. 33ed. Forense, Rio de Janeiro, RJ, Brasil.

Gil, A.C. 2010. Como elaborar projetos de pesquisa. 5ed. Atlas, São Paulo, SP, Brasil.

Gil, A.C. 2017. Métodos e técnicas de pesquisa social. 6ed. Atlas, São Paulo, SP, Brasil.

Licitar Digital. 2026. Licitar Digital: a plataforma de compras públicas mais inovadora do Brasil. Disponível em: <https://licitar.digital>. Acesso em: 21 Ago. 2026.

Mascena, E. 2017. Licitação conceito e finalidade. Disponível em: <https://www.jusbrasil.com.br/artigos/licitacao-conceito-e-finalidade/437367557/licitacao-conceito-e-finalidade>. Acesso em: 14 mar. 2022.

Project Management Institute [PMI]. 2017. Guia do Conhecimento em Gerenciamento de Projetos (Guia PMBOK). 6ed. Project Management Institute, Newton Square, Pennsylvania, Estados Unidos da América.

Toledo, F.A. 2021. Algumas das principais mudanças da nova Lei de Licitações. Consultor Jurídico. Disponível em: <https://www.conjur.com.br/2021-out-03/toledo-algumas-principais-mudancas-lei-licitacoes/>. Acesso em: 18 mar. 2025.

Tribunal de Contas da União [TCU]. 2014. Obras Públicas: recomendações básicas para a contratação e fiscalização de obras de edificações públicas. 4ed. Brasília, DF, Brasil. p. 9.

Yin, R.K. 2015. Estudo de caso: Planejamento e métodos. 5ed. Bookman, Porto Alegre, RS, Brasil.

Article originating from the Final Course Project of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

November 17, 2026

Detection and Diagnosis of Diseases in Corn and Rice in Mozambique with Deep Learning

Mozambican agriculture depends on corn and rice, fundamental crops for food security, but their productivity is strongly affected by phytosanitary diseases, whose early and accurate identification remains a challenge in resource-limited contexts. The study aimed to develop and compare Deep Learning-based models for the automatic detection and diagnosis of diseases in corn and rice leaves in Mozambique. Three approaches were used: a classic Convolutional Neural Network (CNN) developed from scratch, and two transfer learning models, ResNet50 and MobileNetV2. The dataset consisted of images from public databases and collected in the field, which underwent cleaning, balancing, and artificial augmentation steps. The models were trained and evaluated with standard performance metrics, including accuracy, precision, recall, F1-score, Log Loss, and Cohen’s Kappa. The classic CNN presented the best overall performance, with 94% precision, recall, and F1-score, and 93% accuracy and Cohen’s Kappa. MobileNetV2 achieved 91% F1-score and 90% accuracy, standing out for its lower Log Loss (0.30) and training time (6h32min59s). ResNet50 reached 80% F1-score and 79% accuracy. It was concluded that Deep Learning techniques have high potential to support phytopathological diagnosis in real agricultural contexts, contributing to faster and more accurate decisions in the management of corn and rice diseases.

Keywords: Deep learning; Rice; Plant diseases; Corn; Computer vision.

November 17, 2026

Artificial intelligence in accounting operational routines and financial efficiency

The incorporation of Artificial Intelligence (AI) and automation tools has reconfigured the routines of Brazilian accounting offices, impacting productivity, error mitigation, and financial efficiency. These impacts were analyzed in a small accounting firm, specialized in serving service providers in the medical field in São Caetano do Sul, São Paulo. The research adopted a qualitative approach, with a single case study design and incorporated units of analysis. Data were collected through a structured questionnaire, applied via Google Forms between January and February 2026, to five professionals in the operational structure of the firm in a census survey. The treatment followed content analysis with a priori and emergent categories. All respondents declared the use of automated tools or tools with AI resources. The perception of reduced execution time, decreased operational errors, rework, and better use of the team’s time converged in 80% of affirmative responses and 20% partial responses. The most benefited activities were bank reconciliation, import of fiscal documents, and tax assessment, with visible gains on typing errors, duplicate entries, and incorrect classification. Human intervention remained indispensable in tax planning, scenario analysis, and verification of ancillary obligations. The overall evaluation of AI’s contribution was predominantly favorable, with moderation linked to the complexity of fiscal regulations.

Keywords: Content analysis; Process automation; Accounting 4.0; Small business; Digital transformation.

November 17, 2026

Factors influencing schedule management in sewage treatment plant “retrofit” projects

Projects involving “retrofit” in Sewage Treatment Plants (STP) are characterized by high complexity, operational restrictions, and multiple technical interfaces. The study analyzed the perception of the professionals involved regarding the management and adherence to deadlines in “retrofit” projects for sewage treatment plants, considering technical, operational, and organizational factors. The research was characterized as an applied study, with a quali-quantitative approach, designed as a field survey. Data analysis was performed using descriptive statistics and qualitative categorization, employing SWOT, risk matrix (Probability x Impact), and 5W2H action plan tools. The results indicated a high perception of clarity (77.8%) and realism of deadlines (100% agreement), evidencing consistent initial planning. However, 77.7% of respondents pointed out that rework and scope changes directly impacted deadline adherence. The integration between engineering, manufacturing, and Production Planning and Control (PPC) showed an intermediate evaluation (77.7% partial/total agreement), indicating fragility in interfunctional coordination. The risk matrix highlighted as critical: scope changes, operational limitations of the STP, and technical complexity, all with a high level. As a central improvement, the standardization of scope change control, analysis, and approval was proposed, aiming to reduce rework and increase schedule predictability.

Keywords: Performance; Integration; Planning; Rework; Risk.

November 17, 2026

B2C Acquisition in diagnostic medicine: strategic partnerships with specialized medical offices

The diagnostic medicine sector in Brazil operates with high dependence on health plan providers, which limits the financial autonomy of service providers. This study proposed and analyzed a direct patient acquisition model (B2C) for a highly complex diagnostic medicine institution, structured through partnerships with Oncology and Cardiology practices and operationalized by a personalized customer service called concierge. The investigation adopted a mixed-methods approach in three phases: a field survey with a structured questionnaire applied to 87 patients, mapping of the operational flow using “Service Blueprint”, and analysis of the conversion rate from 312 medical referrals registered in the pilot project. The results indicated that trust in medical referral achieved 92.0% agreement, establishing itself as the main factor for adherence. The convenience of performing the exam on the same day reached 78.2%, and the willingness to pay directly was 55.2%, with polarization associated with the predominance of health plan users. The “Service Blueprint” identified three critical points in the transitions between stages of the patient journey. The overall conversion rate was 51.0%, with superior performance in Oncology (58.2%) compared to Cardiology (45.0%), and the greatest loss was concentrated in the acceptance and scheduling stage (28.3%). It was concluded that the model demonstrated possible operational viability and indications of patient acceptance, conditioned by price transparency and a reduction in the interval between consultation and approach by the concierge.

Keywords: Direct payment; Patient journey; Supplementary health; Concierge service; Conversion rate.

November 17, 2026

The role of the school manager in promoting an inclusive culture: leadership and educational policies

The research analyzed the school manager’s performance in promoting an inclusive culture, considering the need to transform legal guidelines and pedagogical foundations into effective institutional practices. It was assumed that school inclusion requires planning, organization, and strategic leadership in the school’s daily operations. A qualitative approach of an applied nature was adopted, developed in three complementary stages: documentary analysis of Brazilian legislation on inclusive education, bibliographic review on school leadership and management, and data systematization using management tools such as SWOT analysis and the PDCA cycle. The results indicated that the school management’s performance directly influenced the consolidation of inclusive environments, especially in the organization of processes, continuous team training, and strengthening of a collaborative institutional culture respectful of diversity. Structural, pedagogical, and relational challenges that demanded planned interventions were also identified. Finally, a Practical Guide for School Managers was developed, with guidelines, protocols, and operational orientations for decision-making and the organization of inclusive processes. It was concluded that the construction of an inclusive culture depended on the management’s ability to articulate public policies, pedagogical practices, and institutional processes, consolidating inclusion as a permanent commitment in the school context.

Keywords: educational accessibility; educational equity; participatory management; strategic planning; institutional processes.

November 17, 2026

An AI artifact based on Design Thinking to support the elicitation of software requirements from user needs

The development of software oriented to user needs frequently faces challenges in requirements elicitation, stemming from ambiguities in natural language and communication failures. Given this, an intelligent artifact integrating Design Thinking and Artificial Intelligence was proposed and validated, focusing on the Empathy and Definition stages, to support the collection, interpretation, and structuring of user needs. The research, of an applied, qualitative, and exploratory nature, conducted a Proof of Concept in a controlled environment, employing hypothetical scenarios. The artifact operated through guided natural language interviews, organizing information into elements such as pain points, context, and impact, and generating traceable problem syntheses. The results indicated that the system organized unstructured reports, reduced ambiguities, and preserved the meaning of the original information in most cases. The ability to reorganize logically in complex scenarios was also observed, although with limitations in separating multiple problems and dependence on instructions. It was concluded that the artifact has potential as a support for requirements elicitation, improving the clarity and structuring of information, but requires supervision and contextual control.

Keywords: Design Thinking; Requirements Elicitation; Requirements Engineering; Artificial Intelligence; Natural Language Processing.

November 17, 2026

The Extinction of the Monophasic Tax System in the Pharmaceutical Industry in Light of the Tax Reform

The consumption Tax Reform, established by Constitutional Amendment No. 132/2023, introduced structural changes to the Brazilian tax system, with the replacement of the Social Integration Program (PIS) and the Social Security Financing Contribution (COFINS) by the Contribution on Goods and Services (CBS), in a dual Value Added Tax (VAT) model. The objective was to analyze the impacts of the extinction of the single-stage system on the pharmaceutical industry, in light of the new regulatory design and its economic and legal effects. A qualitative, exploratory research was conducted through a case study and documentary analysis of legislation and specialized doctrine. It was examined whether the end of the single-stage system would imply a relevant increase in the tax burden for the sector. The results indicated that, although the formal overcoming of the single-stage system has occurred, the material exemption of medicines has been preserved, mainly due to the application of reduced rates of 60% and, in certain cases, a zero rate of the Tax on Goods and Services (IBS) and CBS. The change in model may cause occasional variations in revenue collection, without characterizing a structural increase in the tax burden, tending towards neutrality over time. It was preliminarily concluded that the Tax Reform reorganized the taxation technique in the pharmaceutical industry, replacing a concentrated regime with more transparent exemption mechanisms. This approach proved compatible with the principles of neutrality, full non-cumulativeness, and fiscality, maintaining tax protection for essential medicines and aligning fiscal policy with the fundamental right to health.

Keywords: CBS; COFINS; IBS; Dual VAT; PIS.