October 27, 2026
Quality management system structuring for asset reliability in mineral processing
Larissa Cristina Camilo da Silva; Lorena Hernández Mastrapa
DOI: 10.22167/2675-6528-202601055
Article prepared by the ResumeAI tool, an artificial intelligence solution developed by the Pecege Institute focused on synthesis and writing.
Summary
The growing complexity of industrial systems and the need for productive efficiency have made the operational reliability of assets a critical factor in the mining sector. It was identified that an iron ore processing plant faced reliability challenges, with physical availability and production below targets since 2019, due to the absence of a structured quality management system. The objective was to propose and apply a structured quality management system to increase the operational reliability of equipment, reduce recurring failures, and enhance the physical availability of industrial assets. The research was characterized as applied, with a mixed approach and a single case study, using historical operation and maintenance data. Performance indicators were collected and analyzed, and a technical diagnosis of critical assets was carried out. Reliability engineering tools were applied, such as FMEA, root cause analysis, Ishikawa Diagram, 5 Whys, and RAM analysis, and the analysis was structured based on the PDCA cycle. An action plan was implemented with structural interventions, procedure review, and standardization of practices. The results showed improvement in the operational stability of assets, reduction in the recurrence of failures, and evolution of maintenance performance indicators, with physical availability exceeding 95.7%, corrective maintenance hours reduced, MTBF increasing to 19.4h, and MTTR decreasing. It was concluded that the integrated application of quality and reliability tools strengthened maintenance management and increased operational efficiency, with the potential for replication in other industrial contexts.
Keywords: Failure analysis; Maintenance engineering; Performance indicators; Industrial maintenance; Continuous improvement.
1. Introduction
The growing complexity of modern industrial systems and the incessant demand for productive efficiency have elevated the operational reliability of assets to a critical level for global competitiveness, especially in capital-intensive sectors such as mining. Reliability, defined as the probability of an item adequately performing its function over time under established operational and environmental conditions (Fogliatto and Ribeiro, 2011; Leemis, 2009), transcends mere functionality, encompassing aspects of performance, safety, and environmental preservation, always with a focus on cost-benefit optimization (Moubray, 1997; Siqueira, 2009; Wang and Hwang, 2004). In a scenario where the costs and complexity of industrial systems are ever-increasing, reliability emerges as an essential efficiency parameter that must be carefully specified and managed (Lafraia, 2011).
Reliability engineering, therefore, plays a fundamental role by providing a robust framework for predicting and mitigating failures, optimizing the lifecycle of industrial assets. It integrates diverse practices and methodologies to enhance decision-making and reduce losses, culminating in approaches such as Reliability-Centered Maintenance (RCM), which combines multiple maintenance strategies adapted to each piece of equipment, considering its specific failure modes (Smith, 2011; Rocha, 2019). Analytical tools such as Failure Mode and Effects Analysis (FMEA), Root Cause Analysis (RCA), Ishikawa Diagram, and the five Whys technique are employed to identify, evaluate, and prioritize potential failure modes, correlating their causes, effects, and impacts on equipment performance. The application of these practices allows for the analysis of equipment efficiency, seeking to improve performance through increased availability, quality, and performance, aligned with the company’s maintenance strategies (Aguiar, 2018).
In this context, an iron ore processing plant, located in the Quadrilátero Ferrífero in Minas Gerais, with an annual production budget of five million tons, faced significant challenges. Since 2019, the plant had consistently shown physical availability and production below targets, indicating a gap in the quality and reliability management of its assets. Historical production analysis, for example, revealed that between 2019 and 2024, actual production remained below budget, with a notable deviation in 2024, when 4.3 million tons were produced against a target of 5.6 million tons, representing a difference of approximately 23%. The physical availability (PA) of assets also proved to be below targets for most of the period, ranging between 85.7% and 90.7% in one year of analysis, against targets close to 93%. Corrective maintenance hours (CMH) were high and volatile, with peaks such as 61.5 hours in April and 73.9 hours in May 2025, significantly exceeding monthly targets of thirty to thirty-three hours. The Mean Time Between Failures (MTBF) remained below the target of seventeen hours, reaching minimum values such as 13.2 hours and 13.6 hours, indicating a high frequency of failures. In parallel, the Mean Time To Repair (MTTR) exceeded the target of 1.6 hours, reaching 3.4 hours, reflecting difficulties in interventions. These empirical data demonstrate a negative reliability cycle, characterized by a high frequency of failures, a high volume of corrective maintenance, low availability, and inefficient interventions, pointing to a predominantly reactive maintenance regime and the absence of a structured Quality Management system.
Given the scenario of low operational reliability and the negative impacts on the productivity of the iron ore processing plant, it becomes imperative to develop and apply a systematic approach to improve asset management. The absence of process standardization, structural limitations, and weaknesses in maintenance routines were identified as systemic causes that demand a structured, rather than merely corrective, intervention. Therefore, the present work is justified by the need to propose and apply a structured quality management system that allows for increased operational reliability of the equipment in an iron ore processing plant, contributing to the reduction of recurring failures and the elevation of the physical availability of industrial assets.
2. Material and Methods
The present study was characterized as a research of an applied nature, aiming to improve the operational reliability of an iron ore processing plant. A mixed methodological approach was adopted, combining qualitative and quantitative elements for a comprehensive analysis of the problem. This choice allowed for the integration of the objectivity of performance indicators with the understanding of operational perceptions, providing a more complete view of the phenomena investigated (Creswell and Clark, 2010; Creswell, 2016). The research was conducted in the form of a single case study, which enabled an in-depth investigation of a real situation and its specific operational context (Gil, 2017).
The research was developed in a Brazilian iron ore extraction and processing company, located in the Iron Quadrangle, in Minas Gerais. The unit of analysis consisted of a processing plant with an annual production capacity of five million tons, whose operations are marked by high technical complexity and high asset demands. The study considered historical performance data of the plant in the period from 2019 to 2025 to identify failure patterns. For the detailed quantitative analysis, the main scope was the twelve-month operational cycle, from July 2024 to June 2025.
Due to the case study nature, there was no definition of population or sample in the traditional statistical sense. The investigation focused on the critical assets of the processing plant, identified by their relevance to production and impact on physical availability. The equipment selection criteria were based on the analysis of historical maintenance and operation data, which allowed the identification of the main offenders, i.e., those assets that significantly contributed to downtime and production losses. This approach directed efforts to the points of greatest criticality.
Data collection was performed using historical plant performance information, covering the period from 2019 to 2025. Secondary data on corrective maintenance were gathered from corporate systems, technical reports, and indicator databases. The main indicators collected included Mean Time Between Failures (MTBF), Mean Time To Repair (MTTR), Physical Availability (DF), and Corrective Maintenance Hours (HMC). Additionally, inspection records, operational loss reports, photographs, and structural evidence were analyzed to identify failure patterns and improvement opportunities.
As supporting material and for the contextualization of the processes, internal normative documents of the company, called PNR (Normative Standards), were used. These documents, developed and updated by the Operational Excellence area, provided the guidelines for the actions of the different sectors and professionals involved in operational and maintenance routines. The structuring of the work followed an approach organized in sequential steps, based on the PDCA cycle (Plan, Do, Check, Act), which integrated the diagnosis, planning, execution, and verification of results, ensuring a systematic methodology for quality and reliability management.
The work development followed a structure organized in sequential steps, according to the study’s methodological flowchart. Initially, historical operation and maintenance data were collected and processed. Subsequently, a technical diagnosis of critical assets was carried out, identifying recurring failures and limitations. Later, reliability engineering tools were applied for in-depth analysis. Based on these results, improvement actions were planned and developed, which were validated and monitored. Finally, the impact of the interventions on the plant’s performance indicators was evaluated.
The first stage consisted of data collection, focusing on the plant’s performance history between 2019 and 2025 to identify failure patterns and event recurrence. For quantitative analysis, the period from July 2024 to June 2025 was the main focus, ensuring consistency and representativeness. Subsequently, this data was processed and analyzed, using the PDCA cycle to organize problem identification and action definition. The technical diagnosis of critical assets was then conducted, focusing on the identification of recurring failures, structural degradation, and operational limitations.
After the diagnosis, failure analysis and reliability tools were applied complementarily. FMEA (Failure Mode and Effects Analysis) was used to prioritize failure modes, while RCA (Root Cause Analysis), Ishikawa Diagram, and the 5 Whys technique deepened the cause analysis. RAM (Reliability, Availability and Maintainability) analysis quantified asset reliability. Based on these results, a structured action plan was developed, containing deadlines, responsible parties, and resources, using project management tools such as the WBS (Work Breakdown Structure) and macro schedule (PMI, 2017).
The planned actions were implemented in the field, covering maintenance improvements, structural interventions, operational adjustments, and standardization of procedures. During this phase, technical inspections, photographic records, and systematic monitoring of interventions were carried out to ensure traceability and compliance with the plan. The validation and monitoring of improvements occurred through continuous follow-up and weekly and monthly meetings with the teams, verifying adherence to the plan and the behavior of indicators. Finally, the results were evaluated by comparing the indicators from the base period with those obtained after the implementation of the improvements.
The data analysis was structured based on the PDCA cycle, integrating diagnosis, planning, execution, and verification. The period from July 2024 to June 2025 was adopted for the consolidation of indicators and prioritization of failures, ensuring comparability and analytical consistency. The calculation criteria for the main performance indicators, such as MTBF, MTTR, DF, and HMC, were defined and standardized. This standardization was crucial to ensure reliability in evaluating asset performance over the studied period and for the comparative analysis of the obtained results.
To classify and prioritize failure modes, tools from reliability engineering and quality management were applied. FMEA (Failure Mode and Effects Analysis) was employed to identify, evaluate, and prioritize potential failure modes, correlating their causes, effects, and impacts on equipment performance. RCA (Root Cause Analysis) mapped the fundamental causes of failures, structuring cause-and-effect relationships. The 5 Whys and Ishikawa Diagram tools complemented the analysis, facilitating the identification of relationships between technical, human, and operational factors. RAM (Reliability, Availability and Maintainability) analysis quantified the reliability, availability, and maintainability of the assets.
The study acknowledged some methodological limitations inherent to its nature. Reliance on historical data, while essential for trend analysis, may be subject to potential inconsistencies in the company’s operational records. Furthermore, the time required for the full maturation of implemented actions and the consolidation of their effects on performance indicators was identified as a factor that could influence the perception of long-term results. These aspects were considered in the interpretation of the findings, without, however, compromising the validity of the methodology applied for the proposed objectives.
3. Results and Discussion
The results and subsequent discussion detail the analysis of the iron ore processing plant’s operational performance, focusing on identifying failure patterns, applying reliability tools, and evaluating the impact of implemented improvements. The base period for the analysis comprised July 2024 to June 2025, with results compared to the period after the implementation of reliability practices, aiming to quantify the gains in asset reliability, physical availability, and plant operational efficiency. The systematic approach, guided by the PDCA cycle, allowed for an in-depth understanding of the root causes of problems and the structuring of a robust action plan, as recommended by Creswell (2016) for case studies integrating qualitative and quantitative data.
The historical analysis of the plant’s production, covering the period from 2019 to 2024, revealed a scenario of recurrent failure to meet established targets. Specifically in 2024, the actual production of 4.3 million tons (Mt) fell significantly below the budgeted target of 5.6 Mt, representing a deviation of approximately 23%. This data, as illustrated in Figure 1, underscores the persistence of operational and structural limitations that compromised the plant’s production capacity over time. Such a discrepancy between planned and actual results not only impacts the company’s profitability but also signals a systemic failure in reliability management, which transcends specific events and requires structural intervention. The inability to meet production targets, even in a high-demand sector like iron ore, corroborates the premise that operational reliability is a critical pillar for competitiveness, as emphasized by Moubray (1997) and Siqueira (2009). The persistence of this deviation over several years indicates that the existing maintenance and operation strategies were insufficient to deal with the complexity and demands of the assets, resulting in continuous production losses and performance below the plant’s potential.
Source: Original research results
Figure 1. Production tracking
The observation that the reliability problem was not isolated but systemic was reinforced by the high incidence of corrective failures, predominantly concentrated in the crushing and screening systems. This concentration of failures in specific areas of the plant is a classic indicator of chronic problems, often associated with low maturity in reliability management. The literature on industrial maintenance, as presented by Lafraia (2011), points out that the predominance of corrective maintenance is a symptom of reactive management, where interventions occur only after failure, resulting in higher costs, longer downtime, and lower equipment availability. In the context of the plant studied, this translated into failure recurrence patterns that were intrinsically linked to operational conditions, structural weaknesses of the equipment, and, notably, inadequate or inconsistent maintenance practices. The lack of a proactive and predictive approach to maintenance, which would anticipate and mitigate these failures, perpetuated a vicious cycle of interruptions and emergency repairs, compromising the stability and efficiency of production.
The loss profile, developed based on the period from July 2024 to June 2025, utilized the Pareto principle to identify the main offenders in terms of downtime and production impact. As evidenced in Figure 2, a significant portion of the downtime was concentrated in a reduced number of equipment. This finding is fundamental, as it directs analysis and intervention efforts towards the most critical assets, maximizing the return on maintenance investment. The application of the Pareto principle, which suggests that 80% of problems are caused by 20% of the causes, is a consolidated practice in quality and reliability management, allowing maintenance teams to focus their limited resources where they will have the greatest impact (Aguiar, 2018). In the case of the processing plant, the identification of these “offenders” allowed technical diagnosis and reliability tools to be applied surgically, avoiding the dispersion of efforts on equipment with lower impact. Prioritization based on historical loss data is a crucial step in transitioning from reactive maintenance to a more strategic and efficient approach.
Source: Original research results
Figure 2. Plant loss profile from July 2024 to June 2025
The complementary analysis, performed using the Jack Knife technique, reinforced the criticality of the equipment identified by Pareto, demonstrating that these assets not only presented a high frequency of failures but also required a long repair time (MTTR). Figure 3 illustrates this concentration of operational criticality, where specific equipment stands out for its low reliability and maintainability. The Jack Knife technique, by correlating failure frequency with repair time, offers a more complete view of criticality, as equipment that fails frequently and takes a long time to repair has a disproportionately greater impact on plant availability. This result is consistent with Smith’s (2011) view, which highlights the importance of integrating multiple metrics for effective decision-making in reliability. The practical implications of this finding are clear: improvement actions should focus not only on reducing the occurrence of failures in these assets but also on optimizing repair processes, whether through standardization, training, or improving access and tools, aiming to minimize downtime and restore productive capacity as quickly as possible.
Source: Original research results
Figure 3. Jack Knife of the plant in the period from July 2024 to June 2025
The consolidation of performance indicators in the base period (July 2024 to June 2025) confirmed a scenario of low operational reliability. The plant’s Physical Availability (PA) showed consistently lower performance than the established targets, which were around 93%. Actual values ranged from 85.7% in July 2024 to 90.7% in June 2025, as detailed in Figure 4. This recurring deviation from the PA target is a critical indicator of the system’s structural inability to sustain adequate levels of continuous operation. Low physical availability directly impacts production capacity and, consequently, the company’s profitability, aligning with concerns raised by Wang and Hwang (2004) about the need to optimize availability to ensure competitiveness. The persistence of PA below the target suggests that the causes of failures were not being adequately addressed, or that the interventions carried out were not effective enough to reverse the situation, reinforcing the need for a more structured and comprehensive approach to reliability management.
Source: Original research results
Figure 4. DF carried out in the period from July 2024 to June 2025
Corrective Maintenance Hours (CMH) showed high and volatile values throughout the base period, with notable peaks in April (61.5h) and May 2025 (73.9h), significantly exceeding the monthly targets which ranged between 30 and 33h. Figure 5 clearly illustrates this behavior, which is a strong indication of predominantly reactive maintenance. A high volume of CMH means that most maintenance resources are being used to fix failures that have already occurred, rather than preventing them. This approach is inherently inefficient, as corrective failures are generally more costly, cause unplanned interruptions, and can lead to secondary damage to other equipment components (Lafraia, 2011). The volatility of CMH also suggests a lack of control and predictability in maintenance operations, hindering resource planning and team optimization. To reverse this situation, it would be imperative to implement more robust predictive and preventive maintenance strategies, such as condition-based inspections and planned maintenance, in order to reduce reliance on corrective interventions and stabilize plant performance.
Source: Original research results
Figure 5. HMC carried out in the period from July 2024 to June 2025
The Mean Time Between Failures (MTBF) consistently remained below the target of 17h for most of the base period, reaching minimum values such as 13.2h in September 2024 and 13.6h in April 2025, as shown in Figure 6. A low MTBF indicates a high frequency of failures, which, combined with high HMC, reinforces the reactive nature of maintenance and the low reliability of assets. The recurrence of failures at short intervals not only interrupts production but also generates continuous wear on equipment and maintenance teams, who find themselves constantly involved in emergency repairs. This situation is a significant challenge for reliability management, as the low predictability of failures hinders the planning of preventive maintenance shutdowns and the optimization of spare parts inventory. Improving MTBF requires an in-depth analysis of the root causes of failures, the implementation of design or operational modifications that increase equipment robustness, and the adoption of a proactive maintenance program aimed at extending component lifespan and reducing the probability of unexpected failures.
Source: Original research results
Figure 6. Actual MTBF in the period from July 2024 to June 2025
In parallel, the Mean Time To Repair (MTTR) showed values above the target of 1.6h, reaching up to 3.4h in June 2025, as illustrated in Figure 7. A high MTTR reflects difficulties in executing maintenance interventions, indicating that repair processes are inefficient or that there are bottlenecks in resource availability, such as parts, tools, or qualified labor. Inefficiency in repairs exacerbates the impact of failures, as it prolongs equipment downtime and, consequently, production losses. This scenario is particularly problematic in ore processing plants, where the technical complexity of assets and high operational demands require quick and effective interventions. The literature on maintainability, as discussed by Smith (2011), highlights that optimizing MTTR is as crucial as improving MTBF for overall system availability. Practical implications include the need to standardize repair procedures, invest in training and team development, optimize the layout of maintenance areas, ensure the availability of critical spare parts, and possibly revise equipment design to facilitate maintainability.
Source: Original research results
Figure 7. MTTR performed in the period from July 2024 to June 2025
The integrated analysis of these indicators (low MTBF, high HMC, low DF, and high MTTR) reveals a negative reliability cycle, characteristic of systems operating in a predominantly corrective maintenance regime. This behavior is a direct reflection of the lack of a proactive maintenance strategy and the absence of a structured quality and reliability management system. Moubray (1997) and Lafraia (2011) argue that the predominance of corrective maintenance not only increases operational costs but also compromises safety, product quality, and environmental sustainability. Structuring the analysis based on the Plan-Do-Check-Act (PDCA) cycle was crucial to address this problem systematically, allowing for the identification, prioritization, and treatment of failures based on their root causes, in alignment with the principles of reliability engineering, which advocate for continuous improvement and action at the source of problems. This methodology provides a framework for transforming a reactive environment into a proactive one, where decisions are data-driven and improvement is a continuous process.
The technical diagnosis of critical assets revealed that the predominant failures were associated with premature component wear, fastening failures, structural misalignments, and access limitations for maintenance activities. These findings point to problems that go beyond natural equipment wear, suggesting systemic causes. Screening equipment, in particular, stood out as the main offenders, with a high recurrence of structural and operational failures that directly impacted the continuity of the production process. Figure 8, the plant’s bottleneck map, summarizes these critical points, showing where the most impactful failures occurred. The presence of fastening failures and misalignments, for example, may indicate problems in assembly or component quality, while access limitations for maintenance suggest deficiencies in design or intervention ergonomics. Siqueira (2009) emphasizes that the absence of standardization and process control are critical factors for reducing reliability, which corroborates the findings of gaps in procedure standardization and the low quality of field interventions.
Source: Original research results
Figure 8. Bottlenecks map
The application of reliability engineering tools was fundamental to deepen the technical diagnosis and structure the decision-making process. FMEA (Failure Mode and Effects Analysis) was used to identify, evaluate, and prioritize potential failure modes, correlating their causes, effects, and impacts on equipment performance. Figure 9 presents a detailed example of FMEA for the inclined vibrating screen, highlighting the severity, occurrence, and detection of each failure mode, and calculating the RPN (Risk Priority Number) to guide the most effective preventive actions. Prioritization based on RPN allows resources to be allocated to failure modes that represent the greatest risk to the operation, ensuring that interventions are focused and efficient. This systematic approach is crucial for proactive reliability management, as it allows problems to be anticipated and preventive measures to be implemented before failures occur, minimizing downtime and maintenance costs (Rocha, 2019).
Source: Original research results
Figure 9. FMEA
Root Cause Analysis (RCA), complemented by the Ishikawa Diagram (Figure 10) and the 5 Whys technique (Figure 11), showed that a large part of the failures were associated with systemic causes, not just the natural degradation of equipment. Factors such as the absence of assembly standardization, failures in inspection processes, and design limitations were identified as the root causes of the problems. The Ishikawa Diagram, or fishbone diagram, allowed for mapping the cause-and-effect relationships between technical, operational, human, method, material, machine, measurement, and environmental factors, providing a holistic view of the origins of the failures. The 5 Whys technique, in turn, deepened the investigation, repeatedly asking “why” a failure occurred until the fundamental cause was reached, avoiding treating only the symptoms. This approach is crucial for definitively eliminating the origins of problems, rather than merely mitigating their effects, aligning with the philosophy of reliability engineering which seeks continuous improvement and the elimination of recurring failures (Moubray, 1997).
Source: Original research results
Figure 10. Ishikawa diagram
Source: Original research results
Figure 11. 5 Whys
The RAM (Reliability, Availability and Maintainability) analysis confirmed the concentration of losses in specific assets, directing maintenance efforts towards the equipment with the greatest impact on plant availability, as presented in Figure 12. This quantification of asset reliability, availability, and maintainability is essential for strategic decision-making, allowing management to allocate resources optimally. The identification of assets with lower RAM enables engineering and maintenance teams to develop specific action plans for each, whether through design improvements, revision of maintenance procedures, or investment in monitoring technologies. The RAM analysis results reinforced the need for structured action on the root causes of failures, as advocated by reliability engineering (Lafraia, 2011), which argues that improving reliability is not an isolated event, but a continuous and integrated process involving all stages of the asset lifecycle.
Source: Original research results
Figure 12. RAM Analysis
Based on the in-depth diagnosis, a structured action plan was developed, targeting the main identified offenders. This plan, detailed in Figure 13, included 126 actions, comprising structural interventions, revision of operational and maintenance procedures, and standardization of inspection and assembly practices. The implementation of such a comprehensive action plan reflects the complexity of the identified problems and the need for a multifaceted approach to reliability improvement. The actions were divided into structural and routine, considering the criticality and impact of each, which allowed for a phased and prioritized implementation. The use of project management tools, such as the Work Breakdown Structure (WBS) and the macro schedule, according to PMBOK guidelines (PMI, 2017), ensured alignment between stages, control of deadlines and resources, and systematic monitoring of actions. This systematic approach is fundamental to the success of complex reliability improvement projects, as it ensures that all stakeholders are aligned and that progress is closely monitored.
Source: Original research results
Figure 13. Action plan
The Work Breakdown Structure (WBS), presented in Figure 14, was an essential tool for the systematic monitoring of activities, ensuring alignment between the involved areas and greater control over deadlines, resources, and action execution. The WBS breaks down the project into smaller, manageable deliverables, facilitating the assignment of responsibilities and progress monitoring. This detailed planning contributed to greater organization and effectiveness in the execution of improvements, minimizing risks and optimizing resource allocation. Project management, according to PMI (2017), is a pillar for the successful implementation of improvement initiatives, especially in complex industrial environments where coordination between different teams and disciplines is crucial. The clarity in defining the steps, responsibilities, and deadlines, provided by the WBS, was a determining factor for the efficient execution of the action plan and for achieving the expected results.
Source: Original research results
Figure 14. Project breakdown structure
The implementation of improvements resulted in the correction of structural deviations, adaptation of access for maintenance, revision of procedures, and strengthening of inspection routines, as exemplified in Figure 15. These practical interventions had a direct impact on reducing variability in maintenance interventions and improving the quality of field executions. The correction of structural deviations, for example, increases equipment robustness and reduces the probability of recurring failures. The adaptation of access for maintenance facilitates interventions, reducing MTTR and improving team safety. The review and standardization of procedures ensure that activities are carried out consistently and effectively, minimizing errors and rework. Furthermore, the integration between maintenance, operation, and engineering areas contributed to greater effectiveness in implementing actions, highlighting the importance of multidisciplinary action for increasing asset reliability. This collaboration between teams is fundamental to ensuring that solutions are comprehensive and consider all operational and technical perspectives.
Source: Original research results
Figure 15. Implementation of improvements
The continuous monitoring of the implemented actions, as illustrated in Figure 16, showed greater adherence to established standards and improved governance of maintenance activities. Weekly meetings with the technical team and monthly meetings with managers allowed for adjustments in the adopted strategies, ensuring greater effectiveness in the implementation of improvements. The validation of actions was carried out through the monitoring of performance indicators and the verification of the reduction in the recurrence of failures in critical assets. The evolution of actions was systematically tracked, demonstrating that not only the implementation but also the sustainability of the improvements were decisive for the results obtained. Figure 16, which shows the status of the 126 planned actions (42 completed, 84 in progress, 0 overdue), reflects the team’s commitment to the plan and the effectiveness of the monitoring system. This validation and monitoring process is an essential component of the PDCA cycle, ensuring that actions are effective and that deviations are promptly corrected, promoting continuous reliability improvement.
Source: Original research results
Figure 16. Tracking of improvements
The evaluation of the results, comparing the indicators from the base period with those obtained after the implementation of improvements began (from July 2025), showed significant gains in asset reliability and the plant’s operational performance. Physical Availability (DF) showed a notable evolution, moving from levels below 90% to values consistently above the target, reaching up to 95.7% in November 2025. Figure 17 illustrates this substantial improvement, with the “Actual” line surpassing the “Target” line and demonstrating a growth trend. This increase in DF is one of the most impactful results, as it means the plant was available to operate for a significantly longer period, contributing directly to increased production and overall efficiency. Exceeding the DF targets indicates that the structural interventions, standardization of procedures, and strengthening of inspection routines were effective in mitigating the root causes of failures and optimizing asset performance.
Source: Original research results
Figure 17. DF performed after the start of the implementation of the improvements
Corrective Maintenance Hours (CMH) showed a relevant and consistent reduction, stabilizing at or below targets after July 2025, as shown in Figure 18. This decrease in CMH volume is a strong indicator of a successful transition from a reactive to a more proactive and planned maintenance approach. The reduction in CMH not only lowers direct maintenance costs but also minimizes unplanned production interruptions, increasing operational predictability. The stabilization of CMH at lower levels reflects the effectiveness of improvement actions in preventing failures and optimizing preventive and predictive maintenance plans. This result corroborates the literature advocating the importance of strategic maintenance management for operational efficiency (Lafraia, 2011), showing that investment in reliability tools and process standardization can generate significant returns in terms of cost reduction and increased availability.
Source: Original research results
Figure 18. HMC performed after the start of the implementation of improvements
The Mean Time Between Failures (MTBF) showed a progressive increase, surpassing the target of 17h and reaching values such as 19.4h in October 2025 and 19.1h in February 2026, as illustrated in Figure 19. This increase in MTBF is one of the clearest indicators of the reduction in failure frequency and the increase in asset reliability. A higher MTBF means that equipment is operating for longer periods without interruptions, which translates into greater operational stability and a reduced need for corrective interventions. The continuous improvement of MTBF reflects the effectiveness of the actions implemented in eliminating the root causes of failures, whether through design improvements, standardization of assembly procedures, or optimization of inspection routines. This result is in line with the principles of reliability engineering, which aim to maximize asset operating time and minimize the probability of unexpected failures (Moubray, 1997).
Source: Original research results
Figure 19. Actual MTBF after the start of the implementation of improvements
In parallel, the Mean Time To Repair (MTTR) showed a consistent reduction, approaching or falling below the target, evidencing greater efficiency in maintenance interventions, as demonstrated in Figure 20. The decrease in MTTR means that when a failure occurs, the time required to restore the equipment to its operational condition is significantly shorter. This improvement is crucial for minimizing the impact of failures on production and for optimizing the use of maintenance resources. The reduction in MTTR can be attributed to several factors, such as the standardization of repair procedures, the training and qualification of teams, improved availability of spare parts, and optimization of maintenance access. The combination of increasing MTBF with decreasing MTTR results in a substantial increase in the physical availability of assets, confirming the effectiveness of the applied methodology in improving the maintainability and overall plant efficiency.
Source: Original research results
Figure 20. MTTR after the start of the implementation of improvements
In summary, the results obtained indicate a reversal of the initial scenario of low operational reliability to a state of greater stability and efficiency. The reduction of failures, the increase in reliability, and greater operational stability are clear evidence of the success of the applied methodology. These findings are in full alignment with the principles of reliability engineering, which postulate that structured action on root causes, process standardization, and the use of analytical tools contribute directly to the increase of operational reliability and the efficiency of industrial systems (Moubray, 1997; Lafraia, 2011). The transition from a reactive to a proactive and predictive maintenance culture not only optimizes costs and resource utilization but also strengthens operational safety and production sustainability.
Despite the positive results, it is important to acknowledge the methodological limitations inherent in the study. The reliance on historical data, while essential for trend analysis and the identification of failure patterns, may be subject to potential inconsistencies in the company’s operational records. The quality of the input data is a critical factor for the validity of reliability analyses, and any inaccuracies can influence the perception of the results. Furthermore, the time required for the full maturation of implemented actions and the consolidation of their effects on performance indicators was identified as a factor that may influence the perception of long-term results. Reliability is a continuous process, and the full benefits of a quality and reliability management system may take time to fully manifest. However, even considering these limitations, the results demonstrate the potential for replicating the methodology in other areas of the plant and in industrial systems with similar characteristics, offering a robust model for improving reliability in complex industrial contexts. The adaptability and flexibility of the methodology, based on the PDCA cycle, allow it to be adjusted to different operational realities, ensuring its applicability and effectiveness in various scenarios.
4. Conclusion
It is concluded that the objective was achieved by proposing and applying a structured quality management system that resulted in increased operational reliability of the equipment in an iron ore processing plant. The methodology employed, based on the PDCA cycle and the integration of reliability engineering tools such as FMEA, RCA, and RAM analysis, proved effective in reducing recurring failures and increasing the physical availability of industrial assets. Performance indicators, such as Physical Availability (DF), Corrective Maintenance Hours (HMC), Mean Time Between Failures (MTBF), and Mean Time To Repair (MTTR), showed significant improvements, reversing the initial scenario of low performance to a state of greater operational stability and efficiency. This transition reflects the strengthening of maintenance management and the consolidation of a proactive culture in the plant.
However, it is essential to acknowledge the limitations of the present study, which include reliance on historical data, potentially subject to inconsistencies in operational records, and the time required for the full maturation of implemented actions, whose effects may consolidate more comprehensively in the long term. For future studies, it is suggested to replicate this methodology in other plants or sectors of the same company, in order to validate its adaptability and effectiveness in different contexts. Additionally, it is recommended to deepen the cost-benefit analysis of the implemented interventions and explore the integration of Industry 4.0 technologies, such as advanced sensing and artificial intelligence, to further enhance predictive maintenance and asset reliability management.
Bibliographic References
Aguiar, R.G. (2018). *Elaboração de um aplicativo que visa a otimização da manutenção centrada na confiabilidade*. Trabalho de Conclusão de Curso (
Fogliatto, F.S.; Ribeiro, J.L.D. (2011). Confiabilidade e manutenção industrial. Rio de Janeiro: Elsevier.
Lafraia, J.R.B. (2011). Manual de confiabilidade, mantenabilidade e disponibilidade (4. ed.). Rio de Janeiro: Qualitymark.
Leemis, L.M. (2009). Reliability: probabilistic models and statistical methods (2. ed.). Upper Saddle River, NJ: Prentice Hall.
Moubray, J. (1997). Reliability-Centered Maintenance (2. ed.). New York, NY: Industrial Press.
Rocha, H.M. (2019). Confiabilidade. Rio de Janeiro: Fundação Cecierj.
Siqueira, I.P. (2009). Manutenção centrada na confiabilidade: manual de implementação. Rio de Janeiro: Qualitymark.
Smith, D.J. (2011). Reliability, Maintainability and Risk: Practical methods for engineers (8. ed.). Oxford: Butterworth-Heinemann.
Wang, H.; Hwang, B. (2004). Reliability-centered maintenance: a case study. *Journal of Quality in Maintenance Engineering*, 10(2), 134-145.