Article

Project Management

November 19, 2026

Agile methodologies in academic research project management: bibliometric evidence

José Luiz Bott Neto; Henrique Martins Rocha

DOI: 10.22167/2675-6528-202603846

Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The use of agile methodologies has expanded beyond software development, reaching the context of scientific research, characterized by uncertainties, iterativity, and a constant need for adaptation. The research analyzed scientific production related to the application of agile methodologies in the management of academic research projects, identified evidence reported in the selected studies, and proposed a conceptual framework for agile management that integrated elements of Scrum and Kanban, adapted to this context. The methodology was based on a bibliometric survey conducted in the Scopus database, which analyzed 72 documents published between 2007 and 2025 using the Bibliometrix (R) package. Complementarily, a qualitative analysis of 22 documents selected after a screening process and full-text availability was conducted. The results indicated a recent growth in publications and a still heterogeneous thematic structure. Among the analyzed studies, needs related to adaptation in the face of scientific uncertainty, collaboration among researchers, transparency of activities, progress monitoring, and knowledge management were identified. Based on this evidence, a conceptual framework for agile management was proposed that integrated elements of Scrum and Kanban, adapted to academic research projects.

Keywords: Bibliometrics; Academic Project Management; Kanban; Agile Methodologies; Scrum.

1. Introduction

The growing complexity of scientific research projects has amplified the challenges related to their planning, execution, and monitoring. Unlike traditional projects, where scopes, requirements, and deliverables can be defined with relative precision from the initial stages, academic research is characterized by high levels of uncertainty, progressive knowledge generation, and a frequent need for adaptation due to experimental discoveries, unexpected results, and hypothesis reformulations (Hansen et al., 2022; Hidalgo, 2019; Kuchta and Skowron, 2016). In this context, overly rigid management models can hinder the research teams’ ability to respond to the changes inherent in the scientific process.

In addition to challenges related to uncertainty, academic research projects often involve multidisciplinary teams, multiple institutions, different funding sources, and diverse stakeholders, such as supervisors, funding agencies, institutional partners, and potential users of the generated results (Bayona et al., 2018b; Hansen et al., 2022; Hidalgo, 2019; Ota, 2010; Riedl et al., 2024). The coordination of these activities requires mechanisms that favor collaboration, transparency, continuous communication, and systematic monitoring of project progress. The absence of these mechanisms can contribute to delays, rework, integration difficulties among researchers, and loss of knowledge produced during the research execution (Guillot et al., 2017; Hansen et al., 2022; Muszyńska, 2017; Piedrahita et al., 2023).

In this scenario, agile methodologies have attracted growing interest as an alternative to support the management of projects characterized by dynamic environments and high levels of uncertainty. Based on the principles of the Agile Manifesto (Manifesto for Agile Software Development, 2001), these approaches emphasize continuous adaptation, incremental deliveries, short planning and review cycles, collaboration among participants, and frequent incorporation of feedback. Initially developed for the software context, agile methodologies have come to be applied in different organizational sectors, demonstrating potential to increase flexibility, responsiveness to change, and process transparency (Carvalho and Rabechini, 2018; Gumiński et al., 2023; Gunasekaran et al., 2019).

However, their transposition to contexts other than software development does not necessarily occur directly, as different organizational environments present specific objectives, processes, and ways of generating value, demanding adaptations of the originally proposed practices. Among the most widespread approaches, Scrum and Kanban stand out. Scrum structures work in iterative and incremental cycles, promoting continuous inspection of results and frequent adaptation of planning (Schwaber and Sutherland, 2020; Sutherland, 2016). Kanban, in turn, emphasizes the visualization of the workflow, the identification of bottlenecks, and the continuous improvement of processes (Anderson and Carmichael, 2016; Deunizio, 2020). Together, these approaches present characteristics potentially compatible with the dynamics of scientific research, marked by progressive learning, the need for experimentation, and constant review of project directions (Ota, 2010; Som de Cerff et al., 2018). This potential compatibility, however, does not eliminate the need to adapt agile practices to the specific characteristics of scientific activity.

Despite this potential, the application of agile methodologies in the management of academic research projects remains scattered in the literature. Studies report experiences of adapting Scrum, Kanban, and other agile practices to specific scientific contexts, but without evidence of a widely consolidated model capable of guiding their systematic adoption (Hansen et al., 2022; Hidalgo, 2019; Piedrahita et al., 2023). Consequently, researchers and managers have limited references on which practices have been employed, what benefits have been observed, what challenges remain, and what adaptations are necessary to align agile principles with the particularities of academic research.

This scenario highlights a gap related not only to the application of agile methodologies in scientific projects, but also to the integration, within a coherent management framework, of the different practices and needs reported in a scattered manner in the literature. This gap becomes particularly relevant given the growing demand for greater efficiency in the use of research resources, reduction of delays, strengthening of scientific collaboration, and increased adaptability of projects to the uncertainties inherent in the knowledge generation process.

Furthermore, several authors highlight that models originally developed for software development do not fully contemplate specific requirements of scientific research, such as knowledge management, documentation of learnings, monitoring of academic indicators, and management of experimental risks (Bayona et al., 2018b; Piccirillo et al., 2022). The limitations observed in the direct application of these approaches therefore suggest challenges to their adoption in academic environments, especially when the original practices are not adapted to the characteristics of scientific research. Understanding how the scientific literature has addressed this theme can contribute both to the advancement of academic knowledge and to the improvement of management practices used by researchers, research groups, and scientific institutions.

Given this context, this study aimed to analyze the scientific production related to the application of agile methodologies in the management of academic research projects, identify evidence reported in the selected studies, and propose a conceptual framework for agile management that integrated elements of Scrum and Kanban, adapted to this context.

2. Material and Methods

This study was characterized as exploratory and descriptive research, employing a mixed methodological approach. A bibliometric survey was conducted, based on the analysis of scientific metadata, which was complemented by a qualitative analysis of the selected studies. The central objective was to characterize the scientific production on the topic, identify its evolution and thematic structure, and synthesize the evidence related to the application of agile methodologies in the management of academic research projects.

Data collection was conducted in the Scopus database, recognized for its multidisciplinary scope. The search was performed on March 15, 2026, covering all indexing fields (“All Fields”). The following combination of terms was used: ((Agile OR Scrum OR Kanban) AND (“academic research management” OR “scientific research management” OR “research project management”)).

The search strategy combined terms related to agile approaches with expressions referring to research and research project management. The temporal scope of the search was from 2007 to 2025, considering only full years and without restrictions on document type. 72 documents were retrieved, including 32 articles, 26 conference papers, seven book chapters, four reviews, two books, and one record classified as retracted.

The metadata of these 72 documents were exported from the Scopus database in BibTeX format. These data were fully used for the bibliometric analysis stage. There was no manipulation or exclusion of records in this initial phase, ensuring the representativeness of the corpus retrieved for subsequent analyses.

The bibliometric analysis was performed with the aid of the Bibliometrix package, implemented in the R language, through its Biblioshiny interface (Aria and Cuccurullo, 2017). Indicators such as the temporal evolution of publications, the geographical distribution of scientific production, the most productive authors, publication sources, citations, and keywords were evaluated.

For the conceptual structure analysis, the keywords provided by the authors themselves (“author’s keywords”) were used, without any manual term normalization. A co-occurrence network was built, considering a minimum frequency of two occurrences and using the Louvain algorithm for clustering. The metrics of “betweenness”, “closeness”, and “PageRank” were analyzed to characterize the position of the terms in the network.

The thematic map was elaborated with the same frequency and grouping criteria, using unigrams (n-gram = 1), without applying “stemming” and with a community repulsion parameter of 0.5. The themes were positioned according to their centrality and density. Before the analyses, author names were standardized to confirm identities and avoid variations.

After the bibliometric stage, the retrieved documents were screened to select studies adhering to the research scope. Initially, the titles and abstracts of the 72 documents from Scopus were read. Studies that addressed the application of agile methodologies or practices in the context of academic or scientific research project management were considered potentially eligible.

In this screening stage, 46 documents were excluded for not adhering to the defined scope. For the remaining 26 documents, the full text was sought in institutional databases, scientific journals, academic repositories, and specialized search engines. It was not possible to obtain the full text of four studies, resulting in 22 documents for full reading and qualitative analysis.

The qualitative analysis of the 22 selected documents consisted of identifying and synthesizing the evidence related to the application of agile methodologies and practices in academic research projects. The benefits, challenges, and recommendations reported by the authors were observed. The evidence was grouped by thematic similarity to support the discussion of results and the proposition of the conceptual framework.

A formal instrument was not applied to assess the methodological quality of the included studies, which constitutes a limitation of the research. Based on the synthesized evidence, a conceptual framework for agile management was proposed, integrating elements of Scrum and Kanban, adapted to the particularities of academic research projects, according to the study’s objective.

3. Results and Discussion

The analysis of scientific production on agile methodologies in academic research project management revealed a rising field of study, but still in an early stage of consolidation. 72 documents published between 2007 and 2025 were identified, with the first record in 2007. Production remained limited in the initial years, but showed sharp growth in the most recent period, reaching the highest number of publications in 2025, with thirteen documents, followed by 2022 and 2023, with nine publications each. This expansion is corroborated by the annual growth rate of 15.31% observed in the period, indicating a growing interest from the scientific community in applying agile approaches to the academic context.

The evolution of citations, however, showed a distinct behavior from the volume of publications. The highest average number of citations per article was recorded in 2019, with 33.6 citations, followed by 2007, with 22.0, and 2016, with 15.7. Although the recent growth in production has not yet translated into a proportionally higher citation impact, this observation should be interpreted considering the exposure time of the works. More recent publications naturally have a shorter period to accumulate citations, which can influence the observed average.

The geographical distribution of scientific production revealed the participation of several countries. China, India, Italy, the United States, and Spain presented the largest numbers of documents, considering the country of the corresponding author. It was observed that part of the publications associated with China, the United States, and Spain involve international collaboration, while, among the countries with a smaller number of documents, publications developed exclusively in international collaboration were also identified. These findings indicate that the production on the topic is not restricted to isolated national contexts but has a global character.

The analysis of production over time, considering the countries associated with the authorship of publications, and not just the country of the corresponding author, offers a complementary perspective. The United States, China, Australia, Brazil, and Peru concentrate the largest production in this indicator, with particularly evident growth in recent years. The difference between the distribution by country of the corresponding author and the distribution by country of authorship arises from the participation of researchers from the same country as co-authors in works whose corresponding author is linked to another nation.

The citation pattern also diverged from the quantitative distribution of production. Spain presented the highest total number of citations, with 133, and the highest average number of citations per article, with 44.3, followed by Italy, with 64 citations and an average of 16.0, and by China, with 39 citations and an average of 4.9. In contrast, the United States, despite being among the countries with the highest participation in production, presented only 12 citations. This dissociation between productivity and citations suggests that the bibliometric impact of the corpus is concentrated in specific works, and not necessarily in the countries with the largest volume of publications.

Although authors linked to European countries, such as Spain and Italy, show prominence in citation impact, the distribution of production does not evidence an exclusively European concentration. China, India, and the United States also rank among the countries with the highest participation, indicating the geographical diversity of the retrieved literature. The European prominence may be associated with the impact of specific works and certain authors, such as Enric Senabre Hidalgo, who accounts for 128 out of the 133 citations attributed to Spanish production in the analyzed corpus.

Among the identified authors, Enric Senabre Hidalgo demonstrated particular relevance for the scope of this study, not only due to the higher number of citations but also due to the thematic adherence of his production. His 2019 work addresses the adaptation of Scrum principles and practices to the management of research projects, considering characteristics such as uncertainty, interdisciplinarity, and the need for continuous adaptation throughout the project. This contribution by Hidalgo is fundamental to understanding the high impact of citations associated with Spain and evidences the existence of a space for approaches that integrate different needs in the literature.

Together, the bibliometric indicators revealed a relatively recent literature, with growth in production, international participation, and authorship distribution among different researchers. However, citation impact proved to be more concentrated in certain authors and works. This panorama highlights that the production on agile methodologies applied to academic research project management remains heterogeneous, making it relevant to examine how the main themes are structured and related in the literature, which was addressed in the thematic structure analysis.

Thematic structure

The bibliometric analysis also allowed us to examine the thematic structure of the corpus through the authors’ keywords. The co-occurrence network was used to identify the relationships between the most frequent terms and their organization into clusters. The term “project management” occupied a central position in the network, presenting the highest values of *betweenness* (3.0) and *PageRank* (0.192), which indicates its importance in articulating the terms present in the corpus and establishes it as one of the main axes of thematic organization of the analyzed literature.

The remaining terms were distributed in relatively disconnected clusters. One cluster concentrated terms associated with “project management” and “systematic literature review”. Another grouping brought together terms related to “scrum”, “modeling”, and “simulation”. The third cluster showed greater proximity between “scientific research” and “agile development”. The limited connection between these groupings indicates a relatively fragmented thematic structure in the analyzed corpus, suggesting that discussions on agile management in research are not yet fully integrated.

The thematic map complemented the network analysis by positioning the keyword clusters according to their centrality and density. The cluster represented by “project management”, associated with “blockchain” and “systematic literature review”, was situated among the basic themes, characterized by high centrality and lower density. This positioning, along with the centrality of “project management” in the co-occurrence network, highlights its transversal nature in the corpus’s thematic structure, acting as a fundamental pillar for discussion.

The cluster formed by “scrum”, “modeling”, and “simulation” was classified among the driving themes, characterized by high centrality and density. This result indicates a well-developed internal thematic grouping connected to the other themes in the corpus. Similarly, “agile management”, associated with “sustainability”, also positioned itself in this quadrant, reinforcing the idea that these approaches are active and well-established within the field of study.

Among the niche themes, groupings associated with “agile methodology” and “knowledge management”, as well as “management” and “PMBOK” were found. These themes indicate greater internal development, but less connection with other themes, suggesting that they are more specialized and less integrated into the general discussion. In turn, the groupings associated with “scientific research” and “agile development”, as well as “agile project management” and “agile”, were situated among emerging or declining themes, with less internal development and integration.

This positioning of the terms “scientific research”, “agile development” and “agile project management” in the quadrant of emerging or declining themes does not allow, in isolation, to determine whether they correspond to expanding or retracting themes. The term “distributed team” appeared among the basic themes, indicating a greater connection with the other themes, although it presents less internal development. Together, the co-occurrence network and the thematic map show an expanding literature, but with limited thematic articulation between agile management and the specific context of scientific research.

Despite the recent growth in publications, the literature still shows limited thematic articulation between agile management and the specific context of scientific research. This thematic fragmentation, combined with the growth in production, underpinned the qualitative stage of the study, in which the application forms of agile practices, their benefits, challenges, and adaptation possibilities to the management of academic research projects were examined, seeking to identify recurring needs and existing gaps.

Evidence from the literature and implications for research project management

The qualitative analysis of the 22 selected documents allowed for the identification of recurring aspects related to academic research projects and the implications of applying agile methodologies. Unlike traditional projects, scientific research is characterized by high levels of uncertainty, incremental knowledge production, and a frequent need to reformulate hypotheses, methods, or experimental strategies (Kuchta and Skowron, 2016; Nuseibah et al., 2017). This dynamic demands more adaptable management approaches, as overly rigid models limit teams’ responsiveness to unexpected discoveries and changes in direction (Hidalgo, 2019; Hansen et al., 2022).

In this context, the application of agile principles and practices has proven favorable in certain scientific research contexts. Som de Cerff et al. (2018) verified that the use of Scrum in research projects favors the progressive generation of tangible results through short work cycles and intense multidisciplinary collaboration. Ota (2010) observed that iterative and incremental deliveries allow for continuous alignment of scientific objectives and practical needs, increasing project progress transparency, which is essential in high-uncertainty environments.

Hansen et al. (2022) highlight that periodic retrospectives and incremental learning mechanisms help teams to better incorporate continuous improvements into their work processes. Similarly, Piedrahita et al. (2023) identified that short-duration *Sprints* enhance teams’ responsiveness to technical uncertainties and changes in direction. These findings suggest that Scrum-associated practices, such as short planning cycles, frequent reviews, and periodic retrospectives, foster greater adaptability in teams facing technical and scientific uncertainties, allowing for the continuous incorporation of new learnings into planning.

Another recurring aspect in the analyzed studies refers to the collaboration between researchers and the need for mechanisms that favor the sharing of the produced knowledge. Research projects often involve multidisciplinary teams, distinct laboratories, partner institutions, and different interest groups. In these contexts, continuous communication is fundamental for aligning participants, coordinating activities, and integrating results (Guillot et al., 2017; Hansen et al., 2022).

Hidalgo (2019) emphasizes that interdisciplinary scientific initiatives demand flexibility and a continuous learning stance, while Muszyńska (2017) argues that efficient communication and networking patterns are critical factors for team performance. Complementarily, Piedrahita et al. (2023) observe that research groups rely on agile coordination mechanisms and a shared purpose to sustain collaborative work. Thus, agile practices can contribute to increasing the transparency of activities, strengthening interaction among researchers, and improving team coordination, crucial aspects for the success of complex projects.

Beyond collaboration, some of the analyzed studies highlight the importance of continuous monitoring of research activities. Unlike projects of an operational nature, where progress can be measured primarily by completed deliverables, scientific projects require constant tracking of experiments, analyses, reviews, and intermediate results. Bayona et al. (2018b) argue that planning and monitoring mechanisms are fundamental to ensure alignment between the produced results and the institutional objectives of the research.

Lin et al. (2013) found that digitizing management processes facilitates the tracking of resources, funding, and project progress milestones. Yan et al. (2020) highlight that computerized systems favor the distributed monitoring of activities and progress reports, while Zeng (2022a; 2022b) concludes that digital platforms for research management can increase administrative efficiency and reduce operational costs. In this context, visual tools and computerized systems can increase traceability and facilitate progress monitoring, while workflow visualization, characteristic of Kanban, can assist in identifying bottlenecks and optimizing processes.

Despite the reported benefits, the analyzed studies also point out important limitations in the direct application of traditional agile *frameworks* to the academic context. Bayona et al. (2018b) observe that research institutions often face difficulties in aligning results and deliverables with their strategic objectives. Hansen et al. (2022) identify that differences in agenda, priorities, and ways of working between academia and industry can hinder the transformation of scientific results into applicable innovations, which demands specific adaptations.

Piedrahita et al. (2023) emphasize that scientific research involves specific requirements, such as student training and formal knowledge dissemination, which are not fully contemplated by conventional agile *frameworks*. Furthermore, Tavares et al. (2019) argue that Scrum does not establish explicit mechanisms for risk management, causing this activity to occur implicitly, which can represent a limitation in highly complex projects. Together, the analyzed studies point to needs related to the management of produced knowledge, documentation of learnings, project monitoring, and risk management, indicating the need to adapt management practices to the particularities of scientific research.

Among the recovered and analyzed studies, mainly applications or adaptations of Scrum and other management practices to specific contexts were identified. Hidalgo (2019) argues that, although these adaptations show promising results, the management of scientific projects still constitutes an evolving field, marked by high complexity and interdisciplinarity. The synthesis of the evidence identified in the literature, including findings related to benefits, challenges, and recommendations, was grouped by thematic similarity, allowing for the organization of recurring aspects related to adaptation to scientific uncertainty, collaboration among researchers, transparency of activities, progress monitoring, knowledge management, and interaction with stakeholders.

The results presented indicate that, among the analyzed studies, the needs for mechanisms capable of fostering continuous adaptation, interdisciplinary collaboration, transparency of activities, systematic monitoring, and knowledge management are recurrent. However, it is observed that these elements are normally addressed in isolation or adapted to specific contexts, with no model having been identified in the analyzed corpus that integrates them comprehensively and is specifically aimed at managing academic research projects. This opportunity for integration, identified from the analyzed studies, underpins the proposition of the conceptual agile management *framework* presented in the following section, designed to integrate these needs into a unique management structure adapted to the particularities of scientific research.

Proposal of an agile management *framework* for academic research projects

Based on the identified evidence, a conceptual *framework* for agile management is proposed, structured to support the planning, execution, monitoring, and continuous learning in research projects. The proposal combines elements of Scrum, focused on iterative and adaptive project management, with visual activity management through a Kanban-inspired board, aimed at workflow tracking and activity transparency. This *framework* seeks to offer an integrated approach that meets the specific needs of the academic environment, as discussed in the literature.

The proposed *framework* is composed of an integrated set of elements and artifacts, including the Research *Backlog*, *Sprint* Planning, Research *Sprint*, Follow-up Meetings, Kanban Board, *Sprint* Review, *Sprint* Retrospective, and Knowledge Repository. These components work together to create a continuous management cycle, allowing for flexibility and adaptability, which are essential characteristics for scientific research. The integration of these elements aims to optimize coordination and communication within research teams.

The Research *Backlog* represents the dynamic set of activities, objectives, experiments, analyses, deliverables, and project requirements. Unlike the traditional software development *backlog*, items can include a wide range of research tasks, such as literature review, experimental planning, trial execution, data analysis, manuscript writing, technical report preparation, funding proposal submission, and intellectual property filings. This *backlog* should remain dynamic throughout the project execution, allowing for the inclusion, removal, or reordering of activities as new scientific results are obtained or priorities change.

The *Sprint* Planning constitutes the event that initiates each work cycle. In this stage, the Responsible Researcher and the Research Team select, from the items present in the Research *Backlog*, the priority activities to be executed during the *Sprint*. The selection considers scientific objectives, resource availability, technical dependencies, and identified risks. The result of this process is the definition of the set of activities that will compose the Research *Sprint*, ensuring that the focus is on the most relevant and feasible tasks for the period.

A Research *Sprint* corresponds to a work cycle with a previously defined duration, for which a period between two and four weeks is proposed. During each *Sprint*, the team executes the set of priority activities selected from the Research *Backlog*. At the end of each cycle, a tangible result is expected to be generated, which can take different forms depending on the nature of the research, including experimental results, datasets, completed analyses, technical reports, prototypes, preliminary versions of articles, or scientific documentation produced. This approach seeks to allow the continuous incorporation of learnings obtained during the project and to favor adaptation in the face of directional changes inherent in scientific research.

Inspired by Scrum daily meetings, the Follow-up Meetings aim to promote alignment among project participants, identify impediments, and track the progress of activities. Considering the characteristics of academic research groups, it is proposed to hold these meetings weekly, seeking to reconcile project monitoring with experimental and scientific production activities. During the meetings, participants should present completed activities, ongoing activities, difficulties encountered, and planned actions for the next period, fostering communication and problem-solving.

The Kanban board is the main visual mechanism for project tracking. All activities selected for the *Sprint* must be registered and tracked through columns representing the workflow. A basic configuration may include the stages: Planned, In progress, In review, and Done. Depending on the project’s characteristics, new stages can be added, such as Experiment, Validation, Writing, or Submission. The use of the board aims to increase the visibility and transparency of activities, facilitate their tracking, and support team coordination, making project progress clear to all involved.

At the end of each *Sprint*, a *Sprint* Review meeting is held to evaluate the results produced. In this stage, the objectives achieved, the difficulties encountered, the risks identified, and the possible adjustments needed for the next cycle are analyzed. When applicable, advisors, project coordinators, institutional partners, or representatives of funding agencies may participate in this stage, providing *feedback* and contributing to the direction of future activities. This periodic review is crucial to ensure that the project remains aligned with scientific objectives and *stakeholder* expectations.

The *Sprint* Retrospective is held after the *Sprint* Review and aims to reflect on the work process adopted by the team. In this stage, good practices, difficulties faced, and opportunities for improvement for subsequent cycles are identified, promoting continuous improvement of project management. This component is fundamental for organizational learning and for adapting agile methodologies to the particularities of each research project, ensuring that the team can evolve and optimize its work processes over time.

One of the differentials of the proposed *framework* is the explicit incorporation of knowledge management mechanisms. All results, decisions, learnings, difficulties encountered, and solutions developed must be recorded in a Knowledge Repository shared by the team. This component seeks to minimize knowledge losses due to student and researcher turnover, in addition to facilitating knowledge transfer between different project members, ensuring that the intellectual capital generated is preserved and accessible for future investigations.

Together, the elements of the *framework* act in an integrated way in a continuous cycle of planning, execution, monitoring, and learning. The Research *Backlog* guides the definition of activities for each *Sprint*, while the Review Meetings and the Kanban Board support progress monitoring and activity visualization. At the end of each cycle, the *Sprint* Review incorporates the results obtained and *stakeholder* *feedback*, providing input for the planning of subsequent iterations. In parallel, the Knowledge Repository records the learnings and results generated, contributing to the preservation and dissemination of the knowledge produced throughout the project.

The presented *framework* is conceptual in nature and was developed from the synthesis of evidence identified in the analyzed studies. Its application and effectiveness were not empirically evaluated in this work, which constitutes a limitation of the study. However, the proposal offers an integrated structure that addresses the recurring needs of academic research project management, such as adaptation to uncertainty, collaboration among researchers, transparency of activities, progress monitoring, and knowledge management, responding to the objective of proposing a model adapted to this context.

4. Conclusion

This study aimed to analyze the scientific production related to the application of agile methodologies in academic research project management, identify evidence reported in the selected studies, and propose a conceptual framework for agile management adapted to this context. Through a bibliometric survey, a recent growth in publications on the topic was observed, although the thematic structure still showed heterogeneity and limited articulation between agile management and the scientific research context. The qualitative analysis of the selected documents identified recurring needs in research projects, such as adaptation to scientific uncertainty, collaboration among researchers, transparency of activities, progress monitoring, and knowledge management. Based on this evidence, a conceptual framework for agile management was proposed, integrating elements of Scrum and Kanban, designed to meet these specific needs of the academic environment.

The main contribution of this work lies in the systematization of the evidence identified in the literature and in the proposition of a conceptual model that integrates agile practices for the management of academic research projects. The framework offers an initial reference for researchers and managers, seeking to support planning, activity monitoring, adaptation to changes, interaction among participants, and preservation of the knowledge produced. However, the framework is conceptual in nature and was not empirically evaluated in this study, which constitutes a limitation. It is therefore suggested that future investigations evaluate the application and effectiveness of the framework in real projects, examining its effects on the coordination of activities, team collaboration, knowledge management, and the scientific results produced.

Bibliographic References

Bayona, S.; Bustamante, J.; Saboya, N. 2018b. PMBOK as a reference model for academic research management. In: International Conference on Applied Human Factors and Ergonomics, 2018. Anais… Advances in Intelligent Systems and Computing 745: 863–876.

Hansen, I.E.; Mork, O.J.; Welo, T.; Ringen, G. 2022. Bridging the Valley of Death: can Agile principles be applied in industry-academia research and innovation projects? Journal of the Knowledge Economy 13(4): 3172–3194.

Hidalgo, E.S. 2019. Adapting the Scrum framework for agile project management in science: case study of a distributed research initiative. Heliyon 5(3): e01447.

Kuchta, D.; Skowron, D. 2016. Classification of R&D projects and selection of R&D project management concept. R&D Management 46(5): 831–841.

Ota, M. 2010. Scrum in research. Czech Technical University in Prague, Prague, República Tcheca. Disponível em: http://www.scruminresearch.org. Acesso em: 20 jun. 2026.

Article originating from the Final Course Work of the Specialization in Project Management at POLI USP PRO

To learn more about the course, click here.

You may also like

Project Management

November 19, 2026

Integrated Software for Operational Communication and Control: Practical Evidence in a Medium-Sized Company

The study analyzed the impacts of the lack of integration between commercial and operational modules of an integrated management software (ERP/CRM) in a medium-sized company in the mechanical engineering sector. The main objective was to evaluate practical evidence of communication and operational control optimization, identify bottlenecks, and formulate improvement proposals. A qualitative-quantitative approach was adopted through a single case study with documentary research, based on the extraction and filtering of historical task records from the Bitrix24 software and statistical correlation analysis between workload and allocated team. Based on the diagnosis, an action plan structured in the 5W2H tool was developed. The results revealed that 54.4% of the registered tasks consisted of duplicate, test, or practically useless records, generated by manual insertion during the scope transition between commercial CRM and engineering. It was also demonstrated that the increase in the commercial team linearly accompanied the growth of inefficient tasks, polluting the database and masking the organization’s real productive capacity. It was concluded that the automation of workflows and native integration between modules are essential to mitigate operational and financial risks, providing replicable guidelines for data governance in small and medium-sized enterprises.

Keywords: System Customization; Enterprise Resource Planning (ERP); Task Management; Management Software.

Project Management

November 19, 2026

Supervised learning in voltammetric quantification with electrochemical sensors

The application of supervised learning in the voltammetric quantification of paraquat in artificial urine was evaluated. The study aimed to quantitatively assess the predictive performance of supervised learning models compared to a univariate “baseline”, preserving independence between devices in the training and testing sets. The research was conducted as an applied case study, processing data from four physical devices, each evaluated under a blank condition and six paraquat concentration levels, totaling 28 square wave voltammetry (SWV) curves. A computational “pipeline” integrated automated file reading, organization of curves into current-potential matrices, generation of potential maps, and device-specific blank correction. Five approaches were considered: conventional univariate calibration, predictive univariate “baseline”, partial least squares (PLS) regression, support vector regression (SVR), and random forest (RF). Predictive evaluation was performed using device-grouped cross-validation. PLS showed the best predictive performance for curves from a device not used in training, with an R² of 0.7981. RF exhibited intermediate performance, while SVR and the predictive univariate “baseline” showed inferior and similar performance between themselves. It was concluded that a compact multivariate representation of the voltammetric profile was more favorable for inter-device prediction than increasing model flexibility under the studied conditions. Grouped validation preserved independence, but the limited number of devices restricts the generalization of results.

Keywords: Supervised learning; Paraquat; PLS; Electrochemical sensors; Square wave voltammetry.

Project Management

November 19, 2026

Improvement of Inventory Management via Lean Six Sigma: Study in the Paper Industry

Organizations seek methodologies to reduce waste, increase efficiency, and become more competitive, promoting sustainable improvements in their processes. In this context, the study aimed to apply the Lean Six Sigma methodology, through the DMAIC cycle, to improve inventory management in a company in the paper industry manufacturing pneumatic hoses, aiming to increase the accuracy between physical and systemic inventories and improve the visual management of parts storage. The research was developed from the collection and analysis of data extracted from the company’s ERP system. Tools such as SIPOC, Ishikawa Diagram, and 5 Whys were used to define and identify the root cause of the problem. As improvement proposals, a Digital Kanban system and an adaptation of the Two-Bin system, called the Three-Bin System, were implemented, in addition to the development of standardized operating procedures and the establishment of control mechanisms. The results demonstrated a significant improvement in inventory accuracy, raising the lowest identified index from 28% to 80%, and detected discrepancies between systemic and physical records equivalent to R$ 134,335.53. It was concluded that the application of Lean Six Sigma, combined with Project Management, represented an effective approach for conducting operational improvement projects, contributed to increased reliability of inventory information, to the improvement of material control processes, and to the strengthening of the organization’s operational management.

Keywords: Inventory accuracy; DMAIC; Visual management.

Project Management

November 19, 2026

Maturity Level in Project Management in a Small Family Business

A study analyzed the project management maturity level of a small family business, operating in the electronic equipment and information technology sectors in Blumenau-SC. The objective was to propose guidelines for the improvement of its organizational processes and the evolution of this maturity level. The research was characterized as a single case study, with a qualiquantitative approach, and used the Project Management Maturity Model (Prado-MMGP). The theoretical foundation addressed the specific challenges of family Micro and Small Enterprises, marked by informality and decision-making centralization. The results indicated a maturity index of 2.0, adhering to Level 2 (Known), revealing low methodological and structural formalization. A paradox was identified: the coexistence of low formal maturity with high project success rates, attributed to the low complexity of the portfolio and the strong involvement of senior management. However, it was found that the current model compromised scalability and future predictability. Based on the diagnosis, a SWOT matrix and a Strategic Plan for Maturity Evolution were developed, with an 18-month horizon, focused on the seven competence dimensions of the Prado model. The plan prioritized low-cost, high-impact actions, seeking to balance formalization and agility, aiming to raise the maturity index to 2.8 and ensure business sustainability in the face of expected growth in the project portfolio.

Keywords: Family Business; Project Management; Project Management Maturity Index; Prado-MMGP Model; Small Businesses.

Project Management

November 19, 2026

Lean Construction Tools in industrial retrofit for conversion into logistics warehouses

An analysis of the application of Lean Construction tools in an industrial retrofit project, aimed at converting an old factory into a logistics warehouse complex in the city of São Paulo, was carried out. The objective was to investigate how these tools could improve planning, operational coordination, production flow control, and project management, facing challenges of multiple work fronts, interdependencies between disciplines, logistical constraints, and pressure for delivery deadlines. The methodology employed a comparative case study, of a mixed nature, between two industrial retrofit projects executed by the same construction company. One of the projects systematically applied tools such as Last Planner System (LPS), Line of Balance, Kanban, Visual Management (5S), and Daily Huddles, while the other served as a reference. Data collection involved direct observation, document analysis, and performance indicators, such as Percent Plan Complete (PPC). The results demonstrated significant improvements in planning reliability, operational coordination, and activity sequencing. A reduction in conflicts between teams and a decrease in the deadlines for critical activities were observed in the project that used Lean tools, compared to the reference project. The application of these tools also strengthened project management practices in areas such as scheduling, communication, quality, and knowledge management. It was concluded that the integrated use of Lean Construction tools increased activity predictability, reduced waste, improved decision-making, and promoted more efficient management in industrial retrofit projects, contributing to the literature on the application of Lean in retrofit projects.

Keywords: Logistics warehouses; Construction management; Lean Construction; Industrial retrofit.

Project Management

November 19, 2026

Success factors in the transition of managers in infrastructure projects in Brazil

Infrastructure projects are characterized by their technical, organizational, and institutional complexity, demanding coordination among multiple stakeholders. Given the growing turnover in the labor market, understanding the factors that contribute to success in the transition of managers in these ventures has become essential. The study aimed to identify the success factors in the transition of managers in infrastructure projects in Brazil. For this purpose, a quantitative approach was adopted, with a field survey design. A structured questionnaire was applied to professionals working on infrastructure projects, assessing the perception of the impact of different factors on the success of the transition using a Likert scale. 100 valid responses were analyzed. The results indicated greater relevance of factors related to the new manager’s competencies, the institutionalization of management, and knowledge management and project documentation. Structured succession planning, institutional articulation, and top management support showed less relative prominence. It was observed that respondents in management positions attributed higher ratings with less variability compared to team members. It was concluded that elements more directly linked to project execution tend to assume a central role in the perception of transition success.

Keywords: Civil construction; Project continuity; Project management; Managerial succession.

Project Management

November 19, 2026

Earned value management of projects in companies with low data maturity

The monitoring of projects in medium-sized industrial companies with low data maturity represents a significant challenge, as the absence of structured tools compromises decision-making based on indicators. An integrated solution for project monitoring was developed, consisting of a data entry interface in Microsoft Excel and a dashboard in Microsoft Power BI, based on the Earned Value Management methodology. The solution was designed to offer cost, schedule, and operational efficiency indicators without the need to acquire commercial project management software. The research was characterized as a single case study, with an applied approach, conducted in a medium-sized multinational company manufacturing industrial machinery and equipment. Secondary data were extracted from ten projects executed between 2023 and 2026, covering costs, hours, and lifecycle milestone dates. The interface was automated by VBA macros, and the dashboard was organized with a portfolio view and individual project analysis. To objectively estimate physical progress, the weighted milestones technique was adopted. The results demonstrated that the solution generated performance indicators, allowing for the identification of deviations such as actual costs exceeding the approved budget by approximately 76% and delays of up to 118 days, in addition to enabling the monitoring of indicator evolution throughout execution. It was concluded that the solution is replicable as a proof of concept for organizations in similar contexts.

Keywords: Business Intelligence; Performance indicators; Weighted milestones; Small and medium-sized enterprises; Power BI.