Process Optimization in the Animal Nutrition Industry
Luis Felipe Duarte Casagrande; Camila Zaguetto
DOI: 10.22167/2675-6528-202603840
Article derived from a Final Course Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.
Summary
Brazilian livestock farming has shown great economic relevance, driving the animal nutrition industry to develop technologies to maintain productivity. However, the need to increase efficiency and reduce waste motivated the application of optimization methodologies. A case study was conducted in an animal nutrition manufacturing plant located in Goianira, with the objective of mapping bottlenecks in the production process and reducing variations in cycle time between batches, which caused waiting periods and loss of productivity. To this end, the Lean Manufacturing methodology was applied, analyzing the stages of storage, weighing (automatic and manual), mixing, and bagging. Operational availability and cycle time indicators were established, with systematic recording of mixer downtimes exceeding five minutes. The analyses were conducted using the PDCA cycle, employing tools such as the Ishikawa diagram, 5 Whys, and 5W2H to identify causes and define action plans. The improvement actions implemented in manual dosing and in reducing setup times resulted in a 9.5% increase in plant productivity. Specifically, the average cycle time reached 5.1 minutes and operational availability 68.7%, exceeding the targets of 5.2 minutes and 68%, respectively. It was concluded that the application of the PDCA methodology was successful, promoting the reduction of cycle time and the increase of operational availability, which enabled a production increase of 9.5%, equivalent to approximately 35 tons per day. The project also fostered a culture of “ownership” among employees.
Keywords: Efficiency; Process management; Continuous improvement.
1. Introduction
Brazilian livestock farming plays an economically significant role, contributing over 20% to the country’s Gross Domestic Product (GDP). Brazil has established itself as the world’s largest exporter of beef since 2005, as indicated by Marafon et al. (2020).
In this scenario, the animal health and nutrition industry actively follows the growth of beef cattle farming, developing and implementing supplementation technologies aimed at maintaining animal productivity throughout the year. Among the technologies employed, mineral, protein, and energy supplements stand out, which are essential for optimizing the nutritional performance of the animals (Alonso et al., 2014).
The growing demand for meat requires the animal nutrition industry to continuously improve the efficiency of its processes and minimize waste. To achieve this increase in efficiency, the Lean Manufacturing methodology has been widely adopted. This approach focuses on the elimination of all types of waste and the development of activities that add value to the customer (Saadet et al., 2023).
The application of Lean Manufacturing is particularly relevant in the animal feed sector, which deals with high-cost raw materials and high nutritional sensitivity. The implementation of Lean practices contributes directly to the reduction of waste, rework, and formulation errors. Tools such as 5S and Poka-Yoke, for example, promote greater standardization, agility in operations, and prevention of failures that could compromise the quality and integrity of the final product (Ukey et al., 2021).
Furthermore, the Lean methodology strengthens employee safety and ergonomics, reducing risks and increasing productivity. As a result, companies can achieve lower operational costs, greater process reliability, and a culture of continuous improvement, crucial elements for competitiveness and sustainability in the animal nutrition market (Ukey et al., 2021).
In the context of an animal nutrition manufacturing plant located in Goianira/GO, which has a specialized line for high-concentration raw material feed and growing demand, the need to optimize production processes was observed. The central problem lies in the existence of bottlenecks in the process and significant variations in cycle time between batches, resulting in waiting periods and productivity losses.
The justification for this study is based on the urgency to increase productive efficiency and reduce waste, aligning with the goals of cost reduction and better utilization of existing plant resources. Thus, the work aims to map the process and reduce variations in the production cycle time (time between one batch and another) that cause idle time waste through Lean tools.
2. Material and Methods
The present study was characterized as a research of an applied nature, with a case study methodological approach. The central objective was to map the production process and reduce variations in production cycle time, which generated waste of waiting time, through the application of Lean Manufacturing tools. The research was conducted in an animal nutrition manufacturing plant located in Goianira/GO, which operates with a line specialized in high-raw-material-concentration foods.
The unit of analysis consisted of the plant’s production line, which is structured in stages that occur simultaneously. The batch in production is divided into 2-ton batches, which move through different phases of the process. The analyzed stages included silo storage, manual weighing, automatic dosing, manual dosing, mixing, and bagging, each composed of sub-stages involving operators and machines.
For silo storage, the observed sub-steps were the transport of macro raw material in big bags via forklifts, the suspension of raw material by hoists, the cutting of the packaging above a hopper, and the transport of the product by redlers and elevators to the destination silo. In manual weighing, operators received the formulas, separated the micro raw materials, and performed the weighing and pallet assembly according to the sequence of use.
Automatic dosing involved receiving the formulas by the system, programming the dosage of macro raw materials, and checking and monitoring the process. For manual dosing, the sub-steps consisted of receiving the assembled weighings, checking the sequence, and adding the product as indicated on a handheld computer. The mixing stage comprised transporting the raw materials to the mixer, mixing for a programmed time, transporting the product, and cleaning the line.
Finally, the bagging stage included opening the silo, adjusting the bagging machine, bagging and palletizing, storing the pallets, and releasing the batch via the system, with verification of its physical compliance. The analysis of these stages aimed to identify points for optimization and waste reduction, according to the principles of the Lean Manufacturing methodology.
To optimize the process and reduce waste, operational availability (OA) and cycle time indicators were measured. A systematic record of all mixer downtimes exceeding five minutes was carried out, which were justified by the responsible operator to maintain a history. A database was established to record downtime, reason, and observations, serving as the basis for calculations.
Operational availability (OA) was calculated by the ratio between the total time minus unscheduled downtimes and the total time minus scheduled downtimes. The cycle time was determined by the average of the first and third quartiles (Q1 and Q3) of the mixer cycles, i.e., the time between its discharges. This measure, known as midhinge (Tukey, 1977), was employed to obtain a mean less sensitive to outliers.
The data analysis was conducted through the PDCA cycle (Plan-Do-Check-Act), a management method structured in the steps of planning, doing, checking, and acting. Daily meetings were held to discuss the previous day’s indicators and define corrective actions for any non-compliance with the established goals for operational availability and cycle time indicators.
In the planning stage, to investigate the root cause of the problems, the Ishikawa Diagram, 5 Whys (5WQs), and brainstorming with a multidisciplinary team were used. In the execution stage, the 5W2H tool was employed to outline the action plans. The checking stage verified the effectiveness of the planned actions, and the action stage involved monitoring through audits and standardization through standard operating procedures (SOPs).
3. Results and Discussion
The application of the Lean Manufacturing methodology, as outlined in the introduction, revealed several bottlenecks and opportunities for improvement in the production process of the animal feed plant in Goianira. The initial analysis of cycle times, one of the key indicators of the study, showed that some products demanded up to six minutes per batch to be processed, representing an excessive time and an undesirable variation that impacted overall productivity. This initial finding underscored the urgency of intervention to optimize the workflow and reduce waiting time waste, aligning with the central objective of the research.
To deepen the understanding of the underlying causes of these high cycle times, a brainstorming session was conducted with a multidisciplinary team, resulting in the creation of an Ishikawa diagram. This diagram identified the root causes distributed across different categories. In the “Manpower” dimension, it was found that the manual dosing operator performed other activities while waiting for the conference release and did not have an assistant, which fragmented their attention and prolonged the waiting time. Additionally, the difficulty in dosing large volumes in five minutes contributed to inefficiency.
In the “Material” category, a high volume of manual dosing was identified, which in itself already represented an operational challenge. A more detailed analysis, using the 5 Whys, revealed that it was not possible to dose some raw materials via automatic dosers, and that the dosing hopper had space for only one person to operate. These physical and operational limitations imposed significant restrictions on the agility of the process, requiring a manual approach that was inherently slower and more susceptible to variations.
Still delving into the root causes, the investigation indicated that the manual dosage conference was performed only after the automatic dosage, creating a sequence of steps that generated waiting. This process logic, although perhaps conceived to ensure precision, resulted in a longer cycle time and required the operator to organize the area while waiting. The standard condition of the supplements, which was not detailed, was also mentioned as a contributing factor, suggesting that the intrinsic characteristics of the inputs could influence the complexity of the dosage.
Based on these identified root causes, corrective actions were defined using the 5W2H tool, aiming to reduce cycle time. One of the proposed actions was the increase of the dosing hopper, allowing two operators to work simultaneously in the manual dosing area. This measure, to be implemented in March 2026 by the project team, would involve adapting the structure through plates and welding, with the objective of optimizing space and work capacity, reducing waiting time and increasing the efficiency of manual dosing.
Another crucial action was the alteration of the manual dosage verification logic. The proposal was to invert the sequence of steps in the logic within the automation program, also planned for March 2026 and to be executed by a programmer. The intention was to allow the operator to confirm the verification and be free to perform other activities if necessary, eliminating the idle time and waiting generated by the previous sequence. These direct interventions in the dosage and verification processes aimed to address the most critical points contributing to the high cycle time, as identified by the Ishikawa diagram.
In addition to cycle time analysis, the study also focused on evaluating the operational availability (OA) of the production line. It was found that setup time, specifically cleaning time between batches, represented a significant waste. The analysis revealed an inverse correlation: on days with a larger quantity of processed batches, operational availability tended to be lower. This pattern indicated that the frequency and duration of setups were a limiting factor for the plant’s production capacity, especially during periods of high demand.
The setup time, defined as eight minutes, corresponded to the period during which the transport equipment remained on to clear possible traces of the previous batch on the line. To mitigate this waste, a second Ishikawa diagram was developed, focusing on operational availability. The root causes identified included performing setup between batches of the same product, the constant speed of the drag conveyor and the bucket elevator, and the limitation of batches with up to forty-four tons. These factors contributed to the large number of daily setups and the consequent impact on OA.
In the “Labor” category, the planning of repeated products during the week by the PPC was pointed out as a cause, suggesting that scheduling could be optimized to reduce the need for setups. In “Measure”, it was found that the equipment cleaning time was longer than necessary for some products, indicating a lack of standardization and optimization in cleaning procedures. The absence of a safety definition to avoid interdictions in case of deviation in one of the batches was also a relevant factor, as it prevented the use of equipment linked to automation.
The analysis of the 5 Whys for operational availability revealed that there was a probability of contact between two batches without adequate cleaning, which led to the need for shutdowns. The equipment did not have frequency inverters, and the history of shutdowns was high. Order fulfillment was done within three business days after the customer’s request, and some products had higher fluidity, which complicated the process. These complex root causes required a multifaceted approach to be resolved, ranging from technological infrastructure to order management and product characteristics.
To address the causes of low operational availability, several actions were proposed through the 5W2H. One of the actions was the installation of frequency inverters on the equipment, connecting them to the motors to allow speed control via the automation system. This measure, to be implemented in April 2026 by the projects team, aimed to reduce setup time by allowing the equipment to operate at varied speeds, optimizing the cleaning and transport of waste between batches, especially when empty.
Another important action was the application of a logic to increase equipment speed when empty, integrated into the automation program. This action, also planned for April 2026 and assigned to a programmer, would complement the installation of frequency inverters, ensuring that the system could intelligently manage equipment operation. The objective was to reduce setup time and cycle time, directly contributing to increased operational availability by minimizing line downtime.
Additionally, it was proposed to analyze the current history of interdictions and, if low, to exclude the batch size limit. This action, to be carried out in March 2026 by the quality manager, aimed to reduce the quantity of batches and setups per day, optimizing the weekly production planning. The review of quality procedures and data update would be crucial to sustain this change, ensuring that production flexibility did not compromise product safety or quality. Communication and discussion between teams would be fundamental for the success of this implementation.
Finally, a strategic action was the increase in order fulfillment to five business days, instead of the previous three days. This measure, to be implemented in March 2026 by the commercial team, aimed to provide more robust weekly production planning that was less susceptible to interruptions. By extending the fulfillment deadline, the company would gain greater flexibility to group batches, reduce setup frequency, and optimize production sequencing, positively impacting operational availability and overall plant efficiency.
After the successful implementation of the actions identified, the performance indicator measurements continued, revealing significant improvements. The average cycle time was reduced to 5.1 minutes in May 2026, exceeding the established target of 5.2 minutes. Simultaneously, operational availability reached 68.7%, also exceeding the target of 68%. These results demonstrate the effectiveness of the interventions based on the Lean Manufacturing methodology and the PDCA cycle, which allowed for the identification and resolution of bottlenecks in the production process.
The achievement and surpassing of cycle time and operational availability targets resulted in an approximate 9.5% increase in plant productivity compared to previous months. This increment represents an additional production of about 35 tons daily, evidencing the tangible impact of the implemented improvements. The reduction in cycle time variations and the increase in operational availability contributed directly to the optimization of the production flow and the minimization of waiting time waste, as per the study’s objective.
As part of the “Act” stage of the PDCA cycle, all implemented changes were recorded in Standard Operating Procedures (SOPs), ensuring the traceability and standardization of new practices. Indicators continued to be monitored daily, reinforcing the culture of continuous improvement in the plant. This constant monitoring ensures that the main bottlenecks are continuously analyzed and corrected, promoting an environment of continuous and sustainable optimization, as advocated by the Lean philosophy (Ukey et al., 2021).
Beyond the quantitative gains in productivity and efficiency, the project also fostered a culture of “ownership” among employees. The daily discussion of performance and quality indicators encouraged employees to feel responsible and motivated to identify and resolve bottlenecks that impacted the production line’s productivity. This cultural shift is a significant outcome, as it transforms the team into active agents of continuous improvement, a fundamental pillar of Lean Manufacturing (Saadet et al., 2023), contributing to the sustainability of the achieved results and the plant’s ability to adapt to future challenges.
4. Conclusion
The present study aimed to map the production process of an animal nutrition plant and reduce variations in cycle time, which generated waiting time waste. To this end, the Lean Manufacturing methodology was applied, which allowed identifying bottlenecks in the manual dosing and setup time stages. It was found that the initial cycle time, which reached six minutes per batch, was excessive and that operational availability was negatively impacted by the frequency and duration of cleaning setups. Through root cause analysis, problems were identified such as space limitation in the dosing hopper, the sequence of manual verification, and the constant speed of transport equipment. The implemented improvement actions, such as changing the verification logic and installing frequency inverters, were crucial for optimizing the workflow.
As a result of the interventions, the average cycle time was reduced to 5.1 minutes, exceeding the target of 5.2 minutes, and operational availability reached 68.7%, exceeding the target of 68%. These advances culminated in a 9.5% increase in plant productivity, equivalent to an additional production of approximately 35 tons per day. The study’s main practical contribution lies in the tangible optimization of processes, with the reduction of waste and the increase of production capacity. Furthermore, the project fostered a culture of “ownership” among employees, promoting engagement in the identification and continuous resolution of bottlenecks. The changes were standardized in Standard Operating Procedures, and daily monitoring of indicators will be maintained, ensuring the sustainability of results and the continuity of the improvement cycle in the plant.
Bibliographic References
Alonso, M., Moraes, E., Pina, D., Pereira, D., Mombach, M., Gimenez, B., & Wruck, F. 2014. Suplementação concentrada para bovinos de corte em sistema de integração. Revista Brasileira de Saúde e Produção Animal 15(2): 339-349.
Marafon, A. L., Barbosa, A., dos Santos, R. L., de Brito, T. L., Fernandes, F. H., & da Silva, R. L. (2020). O crescimento das exportações de carne bovina para economia brasileira. FIMCA 7(3): 37-38.
Saad, S., Bahadori, R., Bhovar, C., & Zhang, H. (2024). Industry 4.0 and Lean Manufacturing a systematic review of the state-of-the-art literature and key recommendations for future research. International Journal of Lean Six Sigma 15(5): 997-1024.
Tukey, J. W. 1977. Exploratory data analysis. Addison-Wesley Publishing Company, Reading, MA, USA.
Ukey, P., Deshmukh, A., & Arora, A. (2021). Imprementation of Lean tools in apparel industry for improving productivity. Proceedings on Engineering Sciences 3(2): 241-246.