Reduction of setup time in die-cutting machine through the SMED methodology

Roberto Ferruci Neto; Jocieli Francisco Da Silva

DOI: 10.22167/2675-6528-202603818

Article derived from a Final Course Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The reduction of setup times represents a crucial strategy for improving productivity and operational availability in industrial processes. A study evaluated the application of the SMED (Single Minute Exchange of Die) methodology to reduce the setup time of a die-cutting machine in a packaging industry in Jaú, São Paulo. The research was characterized as an applied case study, with a qualitative and quantitative approach. Data collection involved direct observation of the production process, photographic records, recordings, and timing of setup activities. Five setups were analyzed before and five after the recovery and use of a die turner, originally supplied by the manufacturer and which was inoperative. The results indicated a 32.85% reduction in average setup time. The main improvement came from the recovery and use of the die turner, which allowed for the advance preparation of tools and reduced replacement time during setup. This optimization recovered approximately 35.9 productive hours per month, corresponding to an additional potential capacity of about 179,500 sheets per month. It was concluded that the SMED methodology was effective in reducing setup times, contributing to the increase in the operational availability of the studied machine.

Keywords: Operational availability; Operational efficiency; Lean Manufacturing; Industrial productivity; Quick tool change.

1. Introduction

The growing competitiveness of industrial markets drives organizations to seek continuous improvements in their production processes. The focus lies on cost reduction, increased productivity, and higher levels of customer service. In a scenario marked by high demand variability, increasingly shorter product life cycles, and a growing need for customization, operational flexibility emerges as an essential strategic factor for business sustainability (Slack, Brandon-Jones, Johnston, 2022).

One of the approaches to increasing productivity consists of reducing setup times. Shingo (2000) defines setup as the set of activities necessary to prepare equipment for the manufacturing of a new product. The longer the time required to perform these activities, the lower the available production capacity and the greater the impact on the organization’s operational costs.

Moura and Banzato (1996) emphasize that production processes characterized by frequent tool changes and production shifts are particularly influenced by setup times on equipment productivity. In the packaging sector, the segment to which the company analyzed in this study belongs, efficient management of preparation times is crucial for the operational efficiency of the production system. Sugai, McIntosh, and Novaski (2007) reinforce that environments with a high frequency of adjustments and operational changes present greater potential for gains with the application of the SMED methodology.

In this context, the SMED (Single Minute Exchange of Die) methodology, developed by Shigeo Shingo within the scope of the Toyota Production System, has become one of the main tools for reducing setup times. The method is based on separating activities into internal setup, which requires the machine to be stopped, and external setup, which can be performed with the equipment in operation, promoting the conversion of internal to external activities (Shingo, 2000).

The reduction of setup times is intrinsically linked to the principles of the Toyota Production System, which seeks the systematic elimination of waste and the maximization of the utilization of productive resources (Ohno, 1997). Liker (2005) highlights that the continuous improvement of operational processes is a pillar of productive excellence, and the reduction of non-value-adding activities is fundamental to the efficiency of manufacturing systems. Previous studies demonstrate that the application of SMED provides significant gains related to increased equipment availability, reduction of operational waste, and improvement of productive performance (Moura and Banzato, 1996; Sugai, McIntosh and Novaski, 2007; Cardoso, 2013).

In the packaging sector, the diversity of manufactured products results in frequent production changes and tool changes, making setup time management a critical factor for productive performance. The central problem of this study lies in identifying improvement opportunities in a die-cutting machine, where setup activities were predominantly internal and demanded excessive time. It was observed that a die turner, originally supplied by the machine manufacturer, was disassembled and not in operational use. The recovery and use of this existing resource represented a significant opportunity to optimize the setup process, without the need for new investments, justifying the relevance of the research.

Given this scenario, the present work aimed to evaluate the application of the SMED (Single Minute Exchange of Die) methodology in reducing the setup time of a die-cutting machine used in a packaging industry located in the municipality of Jaú, in the interior of the State of São Paulo.

2. Material and Methods

This research was characterized as a single case study, of an applied nature, developed in a real industrial environment. The objective was to understand in detail the setup activities of a specific machine, identify improvement opportunities, and evaluate the results of applying the SMED (Single Minute Exchange of Die) methodology. The methodological approach adopted was mixed, combining qualitative and quantitative elements for a comprehensive analysis of the phenomenon studied.

The qualitative approach was used for the analysis of operational activities and identification of improvement opportunities in the setup process. The quantitative approach was used for conducting time studies and for the objective evaluation of the results achieved after the implementation of the proposed improvements. The study was carried out in a company in the packaging sector, located in Jaú, São Paulo.

The empirical object of the research was an automatic die-cutting machine, model Bobst Autoplaten SP 130-E, a strategic equipment for die-cutting operations of paperboard packaging. Data collection occurred directly in the company’s production environment during the first semester of 2026. The collection instruments included direct observation, photographic records, recordings with a mobile phone, and a manual stopwatch.

The SMED methodology, developed by Shigeo Shingo (2000), was applied in five main stages. Initially, a detailed observation of the existing setup process was carried out, recording all activities performed by the operational teams during production changes. This survey allowed for a comprehensive understanding of the workflow and current operational practices.

In the second stage, each setup activity was timed individually to identify its percentage participation in the total preparation time. The third stage involved classifying activities into internal setup, which requires the machine to be stopped, and external setup, which can be performed while the equipment is in operation. This distinction was fundamental to identifying opportunities for converting internal activities to external ones.

The fourth stage involved the implementation of improvements, focusing on the use of a die turner for the advanced preparation of the cutting and creasing knives. Previously, the die knife replacement was carried out with the aid of a mechanical hoist, requiring downtime for the machine. With the recovery and use of the die turner, some internal activities could be prepared in advance, reducing the equipment’s downtime.

The fifth and final stage of the SMED methodology consisted of evaluating the results. After the improvement was implemented, new time measurements were taken to compare the initial condition with the final condition of the setup process. This procedure allowed quantifying the effectiveness of the intervention and verifying the reduction achieved in setup times.

A total of ten setups were observed and timed, five under the condition prior to the improvement and five after the recovery and use of the matrix turner. The observations involved two distinct productive teams, composed of an operator, a helper, and a preparer. Two setups were monitored in Shift A and three setups in Shift B.

The recorded activities included the removal and installation of the die knife, the shims, the verification of cutting conditions, the operational adjustments, and the release of the machine for the start of production. For data analysis, time study tables were developed that allowed quantifying the time of each activity and its participation in the total setup time.

From the time-study tables, the activities with the greatest potential for reduction were identified. The analysis technique involved comparing the average setup times before and after the intervention, according to the principles of the SMED methodology (Shingo, 2000).

3. Results and Discussion

The application of the SMED (Single Minute Exchange of Die) methodology on the Bobst SP 130-E cutting and creasing machine, in a packaging industry, demonstrated significant results in optimizing setup times. The study evaluated the process before and after the implementation of improvements, focusing on the recovery and utilization of a die turner. The findings revealed a reduction of 32.85% in the average setup time, directly impacting the operational availability and production capacity of the equipment, according to Shingo’s principles (2000) which aim at waste elimination.

Initial Diagnosis of the Setup Process

The initial analysis of the setup process on the Bobst SP 130-E die-cutting machine revealed that all preparation activities were performed with the equipment stopped, characterizing a predominantly internal setup. This scenario directly impacted the machine’s operational availability, according to the principles of the SMED methodology which seeks to convert internal activities into external ones (Shingo, 2000). Detailed observation allowed the identification of the steps that most contributed to the equipment’s total downtime.

The time analyses performed quantified the participation of each activity in the total preparation time. It was found that the removal of the previous master knife and the installation of the new tool, together, consumed approximately 20 minutes, representing 33.4% of the total setup time. This block of activities, by requiring the machine to be stopped, was configured as a primary opportunity for optimization. The complexity and time demanded by these operations indicated the need for an intervention focused on their simplification and streamlining.

Another critical point identified during the observations was the time required for the tool’s makeready. The makeready activities for the blades and the second makeready summed up to approximately 33 minutes, corresponding to more than half of the total preparation time. Although these operations are inherent to the characteristics of the die-cutting process and, for the most part, must be performed with the machine stopped, their significant duration highlighted the importance of future analyses to identify possible optimizations, even within the scope of internal setup.

Application of the Proposed Improvement

The SMED methodology advocates for the distinction between internal setup, which requires the machine to be stopped, and external setup, which can be performed with the equipment in operation (Shingo, 2000). The initial process analysis revealed that the main opportunity for improvement lay in converting internal activities related to die replacement to external setup. Previously, this operation was performed with the aid of a mechanical hoist, demanding significant time and keeping the machine inoperative.

The implemented improvement consisted of the recovery and use of a die turner, a device originally supplied by the machine manufacturer that was disassembled and unused. This feature allowed for the advance preparation of the tool for the next job while the machine was still in production, transforming an internal activity into an external one. The reintroduction of the die turner substantially optimized the changeover, making it faster and more organized, and aligning with Shingo’s (2000) principles on the anticipation of activities.

The use of the die turner reduced the dependence on the mechanical hoist for the movement and positioning of the die, which previously required approximately 20 minutes of machine downtime. With the new approach, a considerable part of the die preparation activities could be carried out outside the equipment’s downtime, directly impacting operational availability. This strategy corroborates the discussions by Sugai, McIntosh, and Novaski (2007) on the effectiveness of advance preparation in reducing setup times.

Results Obtained After Applying SMED

After the implementation of the improvement and the reintroduction of the matrix turner, new measurements were taken to evaluate the impact on setup time. The distribution of activities was significantly altered. The matrix removal and placement step, which previously consumed 20 minutes, was drastically reduced to just 1 minute, also including the passing of an initial sheet. This conversion of internal to external time represented a substantial gain in process efficiency.

The blade paving activities and the second paving maintained their times, totaling 33 minutes, however, their percentage participation in the total setup time increased from 55% to 82.5% due to the reduction of the other stages. This reinforces that, although the improvement focused on the matrix change, the paving activities remain the largest component of the internal setup time and can be the subject of future optimization analyses, without diminishing the relevance of the improvement already implemented.

The comparison of average setup times, based on five measurements before and five after the improvement, demonstrated an expressive reduction. The average setup time decreased from 59.66 minutes to 40.06 minutes. This difference of 19.60 minutes per setup represents a percentage reduction of 32.85%, confirming the effectiveness of applying the SMED methodology in the studied context and the capacity for optimizing existing processes.

This result is in line with Shingo’s (2000) principles, which emphasize waste elimination and anticipation of activities as pillars for reducing setup times. The improvement not only decreased machine downtime but also optimized the sequence of operations, making the process smoother and less prone to prolonged interruptions, which is crucial for equipment availability and production flexibility.

Impact on Productivity and Operational Availability

The reduction of 19.60 minutes in the average setup time per production change generated a direct and measurable impact on the operational availability of the die-cutting machine. Considering an average of five setups performed per day, the company recovered approximately 98 productive minutes daily. This time recovery, without the need for new equipment investments, represents a significant gain for the organization’s production capacity.

In a monthly projection, considering 22 working days of operation, the accumulated gain reaches 2,156 minutes, which is equivalent to approximately 35.9 additional hours of productive availability per month. This increase in available time for production is a direct reflection of the successful application of the SMED methodology, which transforms previously unproductive periods into value-added time, as highlighted by Shingo (2000).

With an average observed productivity of 5,000 sheets per hour, the 35.9 productive hours recovered monthly translate into an additional potential capacity of approximately 179,500 sheets per month. This increase in production capacity, using the same resources and production structure, corroborates the studies by Moura and Banzato (1996), which indicate the reduction of setup times as an effective means of increasing the utilization of installed capacity.

Beyond operational gains, the improvement demonstrated a relevant economic impact. Considering the average marketing value of R$ 3.00 per sheet produced, the additional capacity of 179,500 sheets per month represents a potential additional revenue of approximately R$ 538,500.00 per month. In an annual projection, maintaining the observed operational conditions, this potential reaches about R$ 6,462,000.00.

It is important to emphasize that these economic values represent an estimate based on the full utilization of recovered capacity. However, they highlight the magnitude of financial benefits that can be obtained by optimizing setup times, reinforcing the strategic importance of the SMED methodology. Sugai, McIntosh, and Novaski (2007) and Cardoso (2013) also highlight that the economic gains associated with SMED primarily derive from increased effective equipment utilization and the elimination of operational waste.

The main improvement, the recovery and use of the matrix turner, allowed the reduction of setup time to be achieved without the need for changes in the machine’s operating speed or the acquisition of new equipment. This finding reinforces Shingo’s (2000) principle on identifying and eliminating waste through better utilization of existing resources, maximizing efficiency without additional investments and demonstrating the viability of low-cost, high-impact improvements.

In summary, the application of the SMED methodology to the die-cutting machine resulted in a significant reduction of 32.85% in the average setup time, decreasing from 59.66 to 40.06 minutes. This optimization was mainly driven by the recovery and use of the die-turner, which allowed the conversion of internal activities into external ones and the advance preparation of tools. The results demonstrate a substantial increase in operational availability, with the recovery of 35.9 productive hours per month and an additional capacity of 179,500 sheets, positively impacting the industry’s productivity and revenue potential, and confirming the effectiveness of SMED in packaging production environments.

4. Conclusion

This study evaluated the application of the SMED (Single Minute Exchange of Die) methodology in reducing the setup time of a die-cutting machine in a packaging industry. It was found that the implementation of the methodology resulted in a 32.85% reduction in average setup time, from 59.66 minutes to 40.06 minutes. This optimization was mainly achieved by recovering and utilizing a die turner, an existing device that allowed for the advance preparation of tools and the conversion of setup activities from internal to external. Consequently, approximately 35.9 productive hours per month were recovered, which translated into an additional potential capacity of about 179,500 sheets per month. This practical and managerial improvement demonstrates the effectiveness of SMED in maximizing the utilization of already available resources, generating significant additional revenue potential for the organization.

Despite the operational and economic gains observed, the study has limitations inherent to its methodological design, having been carried out on a single machine and in a single industrial unit. This specificity restricts the generalization of the results to other productive contexts. For future research, it is suggested to apply the SMED methodology to other company equipment, as well as to evaluate its impacts on complementary operational performance indicators, aiming to broaden the knowledge about the benefits of reducing setup times in various industrial environments.

Bibliographic References

CARDOSO, A. L. Redução de tempo de setup: aplicação prática da metodologia SMED. São Paulo: Blucher, 2013.

LIKER, J. K. O modelo Toyota: 14 princípios de gestão do maior fabricante do mundo. Porto Alegre: Bookman, 2005.

MOURA, R. A.; BANZATO, J. M. Redução do tempo de setup: troca rápida de ferramentas e ajustes. São Paulo: IMAM, 1996.

OHNO, T. O Sistema Toyota de Produção: além da produção em larga escala. Porto Alegre: Bookman, 1997.

SHINGO, S. Sistema Toyota de Produção: do ponto de vista da engenharia de produção. Porto Alegre: Bookman, 2000.

SLACK, N.; BRANDON-JONES, A.; JOHNSTON, R. Administração da produção. 9. ed. São Paulo: Atlas, 2022.

SUGAI, M.; McINTOSH, R. I.; NOVASKI, O. Metodologia SMED: fundamentos e aplicações na redução de setup. International Journal of Production Research, v. 45, n. 20, p. 4623-4641, 2007.

Article originating from the Final Course Project of the Specialization in Business Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Poli Usp Pro

November 19, 2026

Intelligent Model for Organizational Leadership applied to the management of remote multidisciplinary teams

The expansion of remote work and technological advancements have intensified the challenges in managing and allocating multidisciplinary teams, making Artificial Intelligence a strategic resource for optimizing decision-making processes in distributed environments. The study aimed to analyze how Artificial Intelligence can optimize the allocation of multidisciplinary teams in remote work, considering technical, interpersonal, and emotional dimensions. A mixed methodological approach was adopted, including a field survey with a structured questionnaire and semi-structured interviews with managers. Data were analyzed using descriptive statistics and content analysis. The results revealed four analytical propositions, highlighting the contradiction between the high relevance of the teams’ emotional climate and the low perceived ability of leaders to identify it remotely. Based on these findings, Design Thinking principles were applied to conceive and validate a conceptual prototype, the Intelligent Model for Organizational Leadership (MILO). MILO was tested with managers through a usability test, achieving an average score of 88 points on the scale used. The discoveries contributed to the understanding of the role of Artificial Intelligence in managing remote multidisciplinary teams and provided practical subsidies for the responsible adoption of this technology in organizational contexts.

Keywords: Design Thinking; Artificial Intelligence; Innovation; Decision Support Systems; Decision Making.

Poli Usp Pro

November 19, 2026

Operational competitiveness of the Manaus Industrial Pole (PIM): productive verticalization, technological dependence and strategic sustainability

This study investigated how productive verticalization strategies and technological internalization mechanisms condition the competitive sustainability of the Manaus Industrial Pole (PIM), given the paradox between its geographical isolation, high fiscal cost, and role in regional development. The objective was to analyze, from the perspective of Production Engineering, how the verticalization decisions and technological absorption processes of PIM companies respond to the logistical and institutional constraints of the Amazonian ecosystem. Applied, descriptive, and qualitative research was conducted, supported by descriptive quantitative analysis. A literature review, documentary research, and a semi-structured electronic questionnaire applied to nine specialists were combined. The quantitative data were exploratory, and the open-ended responses were treated by content analysis, with documentary triangulation. The results indicated logistics as the main bottleneck for 88.9% of respondents and an average of 3.78 for tax incentives on a four-point scale. Bioeconomy did not materialize as an operational reality, obtaining the lowest average (2.44) in converting environmental assets into competitive advantage. It was found that verticalization in PIM is an adaptive response to logistical constraints, rather than a strategic choice for endogenous capabilities, maintaining the pole as an assembly platform dependent on fiscal differential. It was concluded that the pole’s competitive sustainability is high in the short term but conditional, in the long term, on the transition to an innovative ecosystem with the densification of local production chains. The study contributed by articulating verticalization, logistical risk, and technological dependence as analytical categories of PIM’s competitiveness.

Keywords: Absorption capacity; Supply chain; Regional development; Logistical risk; Manaus Free Trade Zone.

Poli Usp Pro

November 19, 2026

Project management in the development cycle and opaque shielding reviews in civilian vehicles

The civil vehicle armor sector in Brazil showed growth, but the development engineering of a company in São Paulo faced challenges with informal processes, lack of performance indicators, and inadequate control in ballistic project management. This study aimed to increase efficiency, reduce the number of revisions per vehicle, and streamline the development of new projects. The research, of an applied, exploratory, and descriptive nature, used diagnostic and control instruments. Management tools were implemented and workflows were restructured, including SWOT analysis, flowcharts, Work Breakdown Structure (WBS), integrated management spreadsheet, Kanban board, Standard Operating Procedures (SOPs), checklists, and lessons learned record. Data were collected from vehicles developed and revised between January 2024 and December 2025. The results indicated an improvement in the sector’s managerial maturity, with a 16% reduction in monthly revision requests for ongoing projects and a 26% reduction in average requests per project for newly developed vehicles. The total time for new project development decreased by 17%, and the total workload was reduced by 45%. It was concluded that the application of project management concepts and tools optimized operational efficiency, reduced rework, and provided greater control and predictability to development and revision activities, establishing a solid foundation for the organization’s future growth.

Keywords: armor; development; optimization; revisions.

Poli Usp Pro

November 19, 2026

Analysis of historical MDVR data for operational risk monitoring in cargo fleets

The growth of road freight transport in Brazil generated millions of behavioral alert records by embedded systems Mobile Digital Video Recorder (MDVR) and Driver Monitoring System (DMS), increasing the complexity of fleet safety management. This study analyzed a historical database of 29.07 million alerts, from 14,709 devices over nine months of operation (August 2025 to April 2026), with the objective of monitoring fleet operational risk. To this end, an open-source analytical platform in Python (Flask and DuckDB) was developed, which integrated the data processing pipeline and analysis methods. A Weighted Risk Index was constructed with severity weights derived by the Analytic Hierarchy Process (Consistency Ratio of 0.0088). The fleet was segmented into risk profiles using the K-Means algorithm, and anomaly detection employed Z-score and Isolation Forest. Temporal analysis used STL decomposition and linear regression. The results indicated a predominance of alerts associated with fatigue. Segmentation isolated a group of 363 critical risk devices (2.5% of the fleet) for intervention prioritization, and automatic detection signaled 399 devices with atypical operation patterns. Temporal analysis revealed strong weekly seasonality and an increasing trend in alert volume. The viability of an open-source analytical solution to support operational safety management in road freight transport fleets was demonstrated.

Keywords: Behavioral analysis; Driver Monitoring System; Business intelligence; Road safety; Embedded systems.

Poli Usp Pro

November 19, 2026

Application of the Shapley Method for KPI Variation Decomposition

The evaluation of changes in Key Performance Indicators (KPIs) is fundamental for business management, but traditional decomposition methods, such as Oaxaca and Blinder, often present disadvantages in the allocation of variations and in the communication of results. Aiming to overcome these limitations, the Shapley method was applied to explain KPI variations between periods, verifying its capacity to produce additive and path-independent decompositions. The research was conducted as a simulated case study/analytical experiment, evaluating the stability and additivity of the Shapley method’s solutions in profitability scenarios of a fictitious retail operation. Quantitative simulations were used, enriching a Kaggle transactional database with artificial instances and implementing the calculation of dimension contribution to margin variations between two quarters. The tools employed were Microsoft Excel and Python (Jupyter Notebook), with libraries such as numpy/pandas and itertools. The results revealed an increase in average margin between the analyzed quarters, driven mainly by changes in commission pricing and sales category mix. The Shapley method proved suitable for decomposing KPI variations, generating additive, symmetric, efficient, and path-independent analytical solutions. It was concluded that the Shapley method offers a robust approach to profitability analysis, allowing for a direct and intuitive evaluation of the impacts attributed to business drivers, which facilitates the optimization of managerial strategies.