Executive Mba In Leadership And Management
November 23, 2026
Improvements in the efficiency of a secondary biological sludge drying plant
Andrei Barban Do Patrocínio; Felipe Carvalhal
DOI: 10.22167/2675-6528-202603805
Article derived from a Course Conclusion Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.
Summary
The management of industrial solid waste, especially secondary biological sludge, represented an operational and strategic challenge for a company in the pulp and paper sector. A secondary biological sludge drying plant, installed to meet environmental requirements and reduce costs, operated with low efficiency and high unavailability. The objective of this study was to evaluate and propose a set of actions to increase the operational availability of the plant, ensure the integral processing of the generated sludge, and reduce treatment and transportation costs, in addition to mitigating environmental risks. To this end, an analysis of the root causes of low efficiency was carried out, using tools such as the cause-and-effect diagram (Ishikawa) and the “5 whys” analysis, and hypotheses were tested to identify the most impactful factors. Three main root causes were identified: addition of low-load effluent to the process, absence of a dedicated maintenance team, and lower consistency of dewatered sludge. The proposed countermeasures, which included the cessation of effluent addition, the hiring of a maintenance team, and tests with polymers, presented a monthly implementation cost of R$ 35,000.00. An annual reduction in operating expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 was estimated, in addition to a 25% reduction in operational unavailability. It was concluded that the proposed measures are viable, quick to implement, and capable of ensuring the integral processing of secondary biological sludge, strengthening the company’s ESG strategy and ensuring environmental compliance.
Keywords: Operational costs; Operational efficiency; ESG; Biological sludge; Sludge drying.
1. Introduction
In the pulp and paper sector, the treatment of industrial solid waste presents operational and strategic challenges in the globalized business scenario. Companies have focused on sustainable production and continuous improvement of operational efficiency, adopting management practices based on the circular economy. These practices include recirculation, reuse, treatment, and adequate final disposal of the generated waste, replacing the linear production model with processes that value resource reuse.
The pulp market is significant, with the Food and Agriculture Organization of the United Nations (2025) estimating a global production between 180 and 190 million tons of air-dried base pulp in 2025. Fortune Business Insights (2025) projects an annual growth of approximately 1.7% between 2025 and 2035. The production of bleached eucalyptus pulp by the Kraft process generates solid waste, such as primary and secondary biological sludge, from the biological effluent treatment station. This waste, with complex physico-chemical composition, low solids consistency, and high moisture content, presents challenges for its treatment and adequate disposal, with secondary sludge commonly being sent for natural composting in industrial landfills.
The company in question produced about 215 tons per day of secondary biological sludge, with a dry solids consistency of approximately 11%. This sludge was transported for disposal and natural decomposition in an outdoor composting area. However, in mid-2016, the National Environment Council (CONAMA) determined the closure of this area by the end of 2020.
To meet CONAMA’s requirements, a physical-chemical treatment unit for the residue, using mechanical dewatering and thermal drying processes, was installed at the manufacturing plant, with operations commencing in September 2020. This initiative also aimed to improve the factory’s energy efficiency by utilizing the enthalpy of exhaust gases from power boilers for drying the biological sludge. However, the secondary biological sludge drying plant did not achieve the initially predicted performance, exhibiting high operational unavailability.
This situation required the maintenance of the previous process for dewatering excess sludge, using old equipment, and subsequent transport to a contracted private landfill. This measure generated unforeseen additional operational costs in waste treatment. Furthermore, modifications in other industrial processes resulted in increased biological sludge generation and changes in its physicochemical characteristics, negatively impacting the solid consistency of the dewatered sludge and the plant’s processing capacity. The unforeseen additional costs in the treatment process of this residual reached the order of R$ 4,800,000.00 annually, related to front-end loader rental contracts, polymer acquisition, transport, and disposal of excess residual to landfill.
The main impact was the reduction in operational efficiency of the drying plant, the overloading of critical equipment, and the need to keep old equipment in operation. There was also an increase in transportation and landfill disposal costs, greater exposure to environmental and regulatory risks, and dependence on corrective maintenance. The operational availability of rotating equipment was also below expectations, around 80%, due to the wear of moving components caused by the presence of organic and inorganic abrasive compounds in the industrial sludge. Additionally, there was a potential risk of environmental contamination, caused by the overflow of excess biological sludge from the thickening tanks and inadvertent sending of this residue to the water bodies adjacent to the factory through the underground river network.
Faced with this scenario, the management of the biological sludge treatment plant ceased to be an auxiliary operation and became a strategic theme, fundamental to the sustainability of the business. The need to meet environmental requirements and reduce unforeseen operational costs, as well as the strengthening of the company’s commitment to sustainability and the circular economy, justify the relevance of this study. Thus, the present work aimed to evaluate and implement a set of actions and measures to increase the operational availability of the drying plant, ensure the integral processing of the total volume of secondary biological sludge generated in the manufacturing unit, reduce daily transport costs of this residue to private landfills by at least 30%, and maintain the levels of volatile suspended solids in the aeration tanks of the biological effluent treatment station below 2,500 mg l-1.
2. Material and Methods
The present study was characterized as a Business Case, with an applied nature and a descriptive and evaluative methodological approach. The objective was to investigate the causes of the low operational availability of a secondary biological sludge drying plant and to propose actions to optimize its performance, reduce costs, and mitigate environmental risks, as outlined in the introduction. The research focused on the analysis of a specific operational problem in a manufacturing unit in the pulp and paper sector.
The unit of empirical analysis was the secondary biological sludge drying plant, located at the biological effluent treatment plant (ETB) of the manufacturing unit. The operational data analyzed covered the monthly average flow rates of thickened biological sludge in 2017 and 2022, the consistency of dewatered sludge in 2022 and during performance tests from October 2020, and the average operational availability of the presses and the dryer between January 2023 and February 2025.
To identify the factors contributing to the low operational availability of critical equipment, a situation analysis was performed. Brainstorming was used to identify possible causes, which were organized and classified in a cause-and-effect (Ishikawa) diagram. This diagram allowed the analysis to be structured into categories such as method, machine, labor, environment, raw material, and measurement.
Subsequently, the hypotheses identified in the cause-and-effect diagram were subjected to a hypothesis test. This procedure involved on-site checks, analysis of pertinent documents, and evaluation of operational evidence to determine the probability of each cause. Of the sixteen possible causes listed, eleven were considered probable, while the others were classified as unlikely, based on the collected information.
After hypothesis testing, the “5 whys” analysis technique was used to deepen the investigation and identify the root causes of the low operational availability problem. This technique allowed unfolding each probable cause into a sequence of questions, seeking the fundamental origin of the problem, aiding in the understanding of interrelationships and in the identification of critical intervention points.
The impact assessment of each root cause on the operational availability of the manufacturing assets was carried out over an approximate period of six months. The total hours that critical equipment remained inoperative were measured, in relation to the total available hours (24 hours a day), correlating this data with each root cause. The results were presented in a Pareto diagram, which ranked the factors with the greatest impact on operational unavailability.
Operational data were collected from the plant control system, recording the downtime periods of the dewatering presses and the sludge dryer. For the cost analysis, the values from the polymer acquisition invoices, front-end loader rental contracts, transportation, and disposal of residue in a private landfill were used. The consistency of the dewatered sludge was measured in percent dry solids (DS), and the flow rate in cubic meters per hour (m³ h⁻¹).
The proposed countermeasures were detailed in an action plan, specifying the actions to be implemented, the responsible parties, the deadlines, and the execution locations. This plan included procedural maneuvers in the ETB, hiring a dedicated maintenance team, and operational tests with polymers to optimize the consistency of dewatered sludge. The feasibility of the proposals was evaluated considering the implementation cost and the potential for reducing operational and maintenance expenses.
For monitoring the success of the implemented solutions, a set of key performance indicators (KPIs) was defined. These included operational cost, maintenance cost, operational unavailability, and total treated sludge volume. Data collection and analysis methods, frequency (monthly), and responsible parties were established to ensure continuous evaluation and compliance with strategic objectives.
3. Results and Discussion
The analysis of the operational situation of the secondary biological sludge drying plant revealed a performance below expectations, with significant impacts on the operational, environmental, and financial sustainability of the factory. Initially designed to process 1,065 tons per day of sludge with a consistency of 2.5% dry solids (DS), the unit faced challenges arising from modifications in other industrial processes. These changes resulted in an approximate 20% increase in biological sludge generation and alterations in its physicochemical characteristics, compromising the effective processing capacity and the operational safety margin of the system.
The minimum performance parameters established for dewatered sludge were 21.5% DS and for dry sludge 90% DS. However, the reduced consistency of the dewatered sludge, which remained at an average of 19.5% DS in 2022, in contrast to the average of 24.6% DS observed in the 2020 performance tests, substantially increased the amount of water sent to the thermal dryer. This scenario compromised the plant’s operational efficiency, overloaded critical equipment, and required the maintenance of old equipment, generating additional costs for transportation and landfill disposal in the order of R$ 4,800,000.00 annually.
The operational unavailability of rotating equipment, such as the dewatering system presses and the dryer, also proved to be a critical factor. In the period between January 2023 and February 2025, actual availability frequently fell below the 80% target, with many months recording values below 70% and, in some cases, below 40%. This low availability was attributed to the high wear of moving components, caused by the presence of abrasive organic and inorganic compounds in the industrial sludge, negatively impacting asset reliability indicators and increasing operational and maintenance costs.
The elevation of volatile suspended solids (VSS) in the biological reactors of the biological wastewater treatment plant (BWTP) also reflected inefficiency in sludge processing. The need to control these levels to mitigate environmental impacts led to the continued transport of excess sludge to private landfills, generating unforeseen expenses. The management of the biological sludge treatment plant, therefore, transcended the operational sphere and became a strategic issue, essential for the sustainability of the business and for meeting environmental requirements.
Analysis of Factors of Low Operational Availability
To identify the root causes of the low operational availability of the plant’s critical equipment, a structured approach was employed. Initially, a brainstorming session was conducted to identify possible causes, which were then organized into a cause-and-effect diagram, known as Ishikawa. This diagram allowed for the classification of causes into categories such as method, machine, labor, environment, material, and measurement, providing a comprehensive and structured view of the problem.
Subsequently, sixteen hypotheses identified in the cause-and-effect diagram were subjected to a hypothesis test, which involved on-site checks, document analysis, and evidence. Of this total, eleven hypotheses were considered probable, while the others were judged improbable. Among the probable hypotheses, the addition of fibers in the biological sludge, the presence of sand and wood residues in the effluent, the significant wear of components, and the lack of spare parts stood out, indicating the complexity of the factors contributing to the inefficiency.
To deepen the investigation and identify the root causes, the “5 whys” technique was applied to the probable hypotheses. This systematic analysis allowed us to uncover the deepest origins of the problem of low operational availability. As a result, five main root causes were identified that directly impacted the plant’s efficiency: the addition of low-load effluent in the drying process, the inadequate design of rotating equipment, the lower consistency of dewatered sludge solids, the long delivery times and high costs of imported spare parts, and the lack of a specific maintenance team.
The impact assessment of each of these root causes on the operational availability of the manufacturing assets was carried out over a six-month period, quantifying the inoperative hours of the equipment in relation to the total available hours. This analysis allowed for the comparison and measurement of the relevance of each factor. The resulting Pareto diagram showed that three fundamental causes were responsible for almost 90% of the unavailability of critical assets in the drying plant, highlighting the need to focus corrective actions on these specific points.
The most impactful cause, accounting for 63.3% of unavailability, was the addition of low-load effluent in the biological sludge drying process. Although this practice aimed to improve dewatering efficiency, the presence of inorganic elements, such as sand, and organic elements, such as wood and bark residues, in this effluent caused significant wear and tear on equipment components. This factor, therefore, not only failed to improve efficiency but also significantly contributed to asset degradation and operational interruptions.
Secondly, the lack of a specific maintenance team accounted for 14.5% of operational downtime. The absence of dedicated professionals for preventive and emergency maintenance of critical equipment resulted in a reduction of the mean time between failures and a decrease in the plant’s production capacity. This gap in the maintenance structure compromised asset reliability and increased the system’s vulnerability to unexpected interruptions, requiring more frequent and costly corrective interventions.
Finally, the lower solids consistency of the dewatered sludge contributed 11.2% to the unavailability. The low consistency directly impacted the dryer’s efficiency, limiting the sludge flow rate that could be processed. Consequently, a larger amount of residual sludge had to be sent to private landfills to help control the total suspended solids levels in the biological wastewater treatment plant. This condition not only increased disposal costs but also overloaded the waste treatment system.
Proposed Countermeasures and Expected Benefits
Given the identified root causes, strategic and low-cost countermeasures were proposed, aiming to increase the plant’s operational availability and ensure the complete processing of secondary biological sludge. The first action, of immediate and no-cost implementation, consisted of stopping the addition of low-load effluent in the biological sludge drying process. This procedural maneuver at the ETB is justified by the reduction of equipment wear and the increase in operational availability, mitigating the root cause responsible for approximately 60% of the unavailability.
The second proposed countermeasure was the hiring of a specific maintenance team for the critical assets of the drying plant. With an implementation deadline of two months and an estimated monthly cost of R$ 25,000.00, this dedicated team aims to increase the operational availability of the assets. The presence of specialized professionals in preventive and corrective maintenance will contribute to reducing the average equipment failure time, optimizing the plant’s production capacity and minimizing dependence on emergency maintenance.
The third action involved the evaluation of polymers to increase the consistency of dewatered sludge, with a six-month deadline for testing and a monthly cost of R$ 10,000.00. This measure seeks to optimize the dewatering stage, resulting in sludge with a higher dry solids content before thermal drying. By improving consistency, it is expected to increase the dryer’s efficiency, reduce the volume of water to be evaporated, and consequently, decrease the amount of residual sludge sent to private landfills, positively impacting transportation and disposal costs.
The recommended solutions present a relatively simple implementation degree and reduced associated costs, especially when compared to the annual expenses of R$ 4,800,000.00 that were being generated with the treatment, handling, and transport of excess sludge to external and private landfills. The total implementation cost of the countermeasures, estimated at R$ 35,000.00 per month, is significantly lower than the expected benefits, demonstrating the economic feasibility of the proposals.
The tangible benefits expected from the implementation of these measures are substantial. An annual reduction in operational expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00 is estimated, in addition to a 25% reduction in the operational unavailability of the drying plant. This improvement in equipment efficiency and reliability will directly contribute to meeting the objectives of cost reduction and sludge processing optimization.
Beyond financial and operational gains, the implementation of countermeasures will bring intangible benefits aligned with the company’s sustainability and circular economy strategy. The reduction of industrial waste generation, compliance with environmental targets, and mitigation of regulatory risks strengthen the organization’s commitment to ESG (Environmental, Social, and Governance) principles. Ensuring the complete processing of secondary biological sludge also avoids the potential risk of environmental contamination of water bodies adjacent to the factory, reinforcing the company’s environmental responsibility.
The monitoring of the success of the implemented solutions will be carried out through performance indicators (KPIs) aligned with the strategic objectives of the project. These include a 30% reduction in operational cost and maintenance cost, maintaining operational unavailability below 20% (i.e., availability above 80%), and ensuring that the old belt presses are not operating, indicating the comprehensive treatment of sludge in the new plant. The collection and analysis of this data, on a monthly basis, will allow for the evaluation of the effectiveness of actions and ensure the sustainability of the achieved results.
4. Conclusion
This study aimed to evaluate and propose a set of actions to increase the operational availability of a secondary biological sludge drying plant, aiming to ensure the integral processing of the generated sludge, reduce treatment and transportation costs, and mitigate environmental risks. It was found that the plant operated with low efficiency and high unavailability, impacting the operational, environmental, and financial sustainability of the factory. The root cause analysis revealed that the addition of low-load effluent to the drying process, the absence of a dedicated maintenance team, and the lower consistency of the dewatered sludge were the main factors responsible for this condition. It was identified that the consistency of the dewatered sludge remained below expectations, resulting in equipment overload and significant additional annual costs for transportation and landfill disposal.
Based on these findings, a set of strategic and low-cost countermeasures was proposed, which included halting the addition of low-load effluent to the process, hiring a dedicated maintenance team, and evaluating polymers to optimize the consistency of dewatered sludge. The implementation of these actions, with an estimated monthly cost of R$ 35,000.00, projects an annual reduction in operational expenses of up to R$ 1,800,000.00 and maintenance costs of R$ 600,000.00, in addition to a 25% decrease in operational unavailability. The study’s main contribution lies in proposing a viable and rapidly implementable action plan, capable of ensuring the complete processing of secondary biological sludge, strengthening the company’s ESG strategy, and guaranteeing environmental compliance, thus avoiding potential contamination risks.
Bibliographic References
Food and Agriculture Organization of the United Nations [FAO]. 2025. Forest product statistics. Disponível em: Data | Forest Products Statistics | Food and Agriculture Organization of the United Nations. Acesso em: 29, novembro, 2025.
Fortune Business Insights [FBI]. 2025. Visão Geral do Tamanho do Mercado de Celulose e Papel. Disponível em: https://www.fortunebusinessinsights.com/pt/pulp-and-paper-market-103447. Acesso em 20 Nov. 2025.
Article originating from the Final Course Work of the Specialization in Executive Leadership and Management of the MBA USP/Esalq
To learn more about the course, click here and access the MBX Academy platform