Article

Poli Usp Pro

November 19, 2026

Project management in the development cycle and opaque shielding reviews in civilian vehicles

Pedro Oliveira Trindade; Henrique Martins Rocha

DOI: 10.22167/2675-6528-202603828

Article derived from a Final Course Work (TCC), with content based on the student’s original work and adapted to the editorial format of the E&S Magazine with the support of the ResumeAI tool, an artificial intelligence solution developed by Instituto Pecege for textual synthesis and organization.

Summary

The civil vehicle armor sector in Brazil showed growth, but the development engineering of a company in São Paulo faced challenges with informal processes, lack of performance indicators, and inadequate control in ballistic project management. This study aimed to increase efficiency, reduce the number of revisions per vehicle, and speed up the development of new projects. The research, of an applied, exploratory, and descriptive nature, used diagnostic and control instruments. Management tools were implemented and workflows were restructured, including SWOT analysis, flowcharts, Work Breakdown Structure (WBS), integrated management spreadsheet, Kanban board, Standard Operating Procedures (SOPs), checklists, and lessons learned record. Data were collected from vehicles developed and revised between January 2024 and December 2025. The results indicated an improvement in the sector’s managerial maturity, with a 16% reduction in monthly revision requests for current projects and a 26% reduction in average requests per project for newly developed vehicles. The total time for new project development decreased by 17%, and the total workload was reduced by 45%. It was concluded that the application of project management concepts and tools optimized operational efficiency, reduced rework, and provided greater control and predictability to development and revision activities, establishing a solid foundation for the organization’s future growth.

Keywords: shielding; development; optimization; revisions.

1. Introduction

The civil automotive armoring market in Brazil has shown expressive growth in recent years, driven by the increasing demand for asset and personal security. In 2023, the production of armored vehicles reached approximately 29.3 thousand units, representing a 13% increase compared to the 25.9 thousand units registered in 2022 (Forbes, 2024). This scenario consolidates the country as one of the largest global markets in the sector, with a fleet of over 340 thousand armored vehicles.

The present study was conducted in a leading company in the civil vehicle armoring segment, headquartered in São Paulo. The company, which employs approximately 1200 employees distributed across various Brazilian cities, produces an average of 500 armored vehicles per month, with a projection of reaching 700 monthly units by 2026. The organization develops tailor-made projects for each vehicle brand and model, considering their structural characteristics, vulnerable points, mass distribution, and mechanical limitations, in compliance with Brazilian regulations and certifying standards.

Vehicle armoring consists of applying ballistic protection to the original structure of the automobile. According to Candido (2019), the effectiveness of armoring depends on the integration of transparent and opaque solutions that absorb, dissipate, or prevent the penetration of projectiles, ensuring the integrity of the passenger compartment and the safety of the occupants. For the opaque parts, materials such as stainless steel from the 300 series, multilayer aramid composites, and ultra-high molecular weight polyethylene, known as Tensylon, are used. The latter, for example, is 80% lighter than steel and contributes to structural efficiency and mass reduction. Brazilian legislation permits ballistic protection level III-A, which resists projectiles from 9 mm pistols and .44 Magnum revolvers (Decree No. 3.665/2000). The sector is regulated by norms from ABNT and the Brazilian Army, including NBR 15000:2005, NBR 16218:2013, Ordinances No. 94-COLOG/2019 and 55-COLOG/2017, in addition to ISO 9001:2015 certification.

However, the company’s development engineering, responsible for coordinating the modeling, vectorization, and review of opaque ballistic projects, faced significant challenges. It was found that activities were often conducted informally, without adequate records, performance indicators, or structured managerial control and mapping. This reality resulted in low standardization of workflows, limited integration between stages, and a lack of performance metrics.

The absence of formalized processes directly impacted the traceability of information, the quality of deliverables, the dissemination of knowledge, and the consistency of projects. Such deficiencies generated rework, a high number of revisions in recently released projects, and difficulties in controlling deliverables, deadlines, and resources. The complexity of managing technical information was accentuated by the dynamics of an increasingly competitive market (Rolim, 2019) and the need for mass customization (Machado and Moraes, 2008), which demands flexibility and operational efficiency. Despite the relevance of the topic, Candido and Kaminski (2019) point to the limited amount of research focused on the management of the development and revision of opaque parts in the shielding sector.

Given this scenario, the adequate structuring of processes, the implementation of controls, and the continuous improvement of operational efficiency have become imperatives for the organization’s competitiveness (Barbosa, 2019; Zambruski, 2008). This study therefore seeks to contribute to the managerial maturity of the sector by applying project management concepts and tools. The objective of this work is to identify opportunities, implement managerial tools, standardize activities, increase efficiency, reduce the number of revisions per vehicle, and expedite the development of new projects in the development and opaque shielding revision cycle for civilian vehicles.

2. Material and Methods

The present study was characterized as a research of an applied, exploratory, and descriptive nature, with an initially qualitative approach. The investigation was conducted in a leading company in the civil vehicle armor segment, located in the city of São Paulo. The empirical object of the research consisted of vehicles developed and revised by the company’s development engineering. Data collection occurred in the period between January 2024 and December 2025, covering the complete cycle of opaque ballistic projects.

The unit of analysis involved the organization’s development engineering team, responsible for coordinating the modeling, vectorization, and review of opaque ballistic projects. This team was composed of 21 professionals, distributed as 14 shielding technicians, two shielding specialists, six design drafters, and one manager. The participants were involved in the diagnostic, implementation, and monitoring stages of the proposed tools and processes.

To understand the scenario and identify improvement opportunities, diagnostic and control instruments were employed. Initially, a structural analysis of the company’s internal and external environment was carried out by developing a SWOT matrix. Complementarily, the Gemba philosophy was applied, which involved direct observation of operations in the field to identify unmapped problems, and the Kaizen concept, for the continuous implementation of corrective and preventive actions.

The workflow structuring was carried out by modeling internal scenarios through flowcharts, which defined the request and execution activities for reviews. A Work Breakdown Structure (WBS) was developed to detail the development process activities and organize the deliverables. For project management and monitoring, an integrated management spreadsheet was used, organized into review modules, development, and a visual dashboard.

Complementarily, an online visual management panel, based on the Kanban methodology, was implemented to promote project status transparency. Standard Operating Procedures (SOPs) were developed to guide the vectorization, coding, and development of opaque parts, in addition to technical scopes to standardize the application of ballistic materials. Checklists were also created for development, project verification, and revision requests, ensuring activity consistency.

Field data collection included in-person monitoring with photographic recording during vehicle disassembly, storing the images in project folders. Project information was reorganized and standardized on the corporate Microsoft SharePoint platform, optimizing document management. A Bill of Materials (BOM) was prepared in Excel format for recording parts by project and material, with manual and automated data entry.

The data analysis was performed based on concepts of project management and continuous improvement. Process mapping was used to define key performance indicators (KPIs), which allowed for the evaluation of average development time, number of revisions per vehicle, total work effort in man-hours, release deadline, volume of monthly requests, and their incidence per manufacturer. The integrated management spreadsheet and the dashboard were central tools for this analysis.

To enhance knowledge management, a lessons learned spreadsheet was implemented, filled through bi-weekly team meetings, following a process similar to brainstorming. The modeling team was redistributed into groups, based on a versatility matrix, to optimize knowledge dissemination. No specific ethical considerations, such as Informed Consent Form (TCLE) or confidentiality agreements, were identified as explicitly described in the original TCC for collaborator participation.

3. Results and Discussion

This study focused on the restructuring of project management in the development and revision cycle of opaque armor in civilian vehicles, applying improvements based on hybrid management concepts. The implemented actions aimed to optimize control, communication, and decision-making, crucial elements for a sector that, despite growth, faced challenges of informality and lack of standardization. The initial analysis revealed an organization with strong technical and productive capacity, but with significant opportunities for improvement in areas such as knowledge management and revision control, as identified by the SWOT matrix.

The SWOT matrix, used as a diagnostic tool, showed that although the company possesses robust technical expertise and specialized professionals in ballistic solutions, there were notable weaknesses. Knowledge was concentrated among a few employees, revisions were recurrent in existing projects, and internal communication was limited. Furthermore, the use of management tools was low and the organizational environment excessively rigid. These points highlighted the need for intervention to improve the efficiency and adaptability of development engineering.

The opportunities identified by the SWOT analysis included the continuous growth in demand for armored vehicles and the possibility of strengthening a process management culture. The company could also capitalize on the technical subsidies coming from the feedback of automotive manufacturers’ engineering. However, the armoring sector faces threats such as high competitiveness, constant technological evolution, fluctuations in the prices of strategic inputs, and the influence of the political-economic scenario, which reinforced the urgency of improving internal processes to maintain competitiveness.

Before the implementation of improvements, the development and review process was characterized by excessive reliance on individual knowledge and the absence of clear standards. Review requests arrived through multiple channels, without structured control, and vectorization was carried out individually. This informality resulted in low information traceability, lack of integration between the development, disassembly, and inspection stages, and inconsistency in updating and structuring projects managed via Trello and spreadsheets.

The lack of performance indicators and technical validation focal points, coupled with the absence of standardized procedures for development and release, contributed to a scenario of frequent rework. Newly released projects presented a high number of revisions, impacting the organization of information and hindering the control of deliverables, deadlines, and resources. This situation compromised quality and operational efficiency, making the process vulnerable to errors and inconsistencies, which demanded a systematic approach for optimization.

The improvements began with the creation of detailed flowcharts to standardize the processes for requesting and releasing revisions. The workflow for requesting a revision clearly defined the responsibilities between departments, from identifying the need to inclusion in the revision queue. This process began to involve expert evaluation, formalization of changes through templates or technical files, registration for approval, and digitalization by designers, ensuring that requests were evaluated, compiled, and documented in a structured manner.

The flow for review release established responsibilities, sequential activities, and rigorous validation criteria. Vectorization checks, fit optimization, data consistency, and technical document updates were incorporated. The adoption of a technical review by another designer, known as *double-check*, and the validation of information consistency ensured that the steps were followed, from the identification of the need to the final release for production and suppliers, promoting greater control and quality in deliveries.

The development and implementation of a Work Breakdown Structure (WBS) for new project development was fundamental to structuring the modeling and release activities. The decomposition of the project into clear stages – input, disassembly, 2D modeling, 2D vectorization, procurement, installation, and release – provided visibility into the executed activities, their responsible parties, and the planned deadlines for each phase. This structure allowed the manager to plan activities, monitor progress, and anticipate potential deviations, contributing to more effective and organized management.

For the monitoring of activities, an integrated spreadsheet was developed that consolidated strategic and operational data of projects in development and review. The tool, based on the mapped flowcharts, is organized into tabs for review requests, projects in development, and a visual indicator dashboard. This centralization of information, filled manually by the manager and automatically by formulas, allowed for monitoring service orders, project status, schedules, and relevant occurrences, reducing dependence on subjective perceptions and optimizing decision-making.

Complementing the spreadsheet, an online visual management dashboard, based on the *kanban* methodology, was made available to all sector employees. This dashboard, displayed on a strategic TV, provided transparency on the *status* of ongoing projects, allowing the team to organize internally to meet demands. This visual tool facilitated communication and alignment among those involved, promoting a culture of collaboration and visibility on the progress of activities.

The implementation of a versatility matrix allowed the manager to map the collaborators’ competencies and capabilities, considering individual *hard skills* and *soft skills*. This tool was crucial for distributing activities more efficiently, reducing bottlenecks, and mitigating the concentration of knowledge in a few professionals. The operational flexibility of the team and the improvement of technical knowledge contributed to raising the quality of deliverables and enhancing coexistence among employees, strengthening the sector’s collective capacity.

On-site monitoring with photographic records during vehicle disassembly was implemented, improving the information available for mold development. The images are stored in the project folder, serving as a repository to clarify doubts during mold elaboration. This practice, combined with direct consultation with the professionals involved and on-site verification with original parts, increased the assertiveness of decisions and reduced the need for additional disassemblies and inspections, optimizing time and reducing waste.

The Bill of Materials (BOM) was optimized for maximum automation in its population, serving as a reference for the release of drawing files (DWG) and project assembly. The files for each project were reorganized and standardized into folders on SharePoint, following a defined template. This restructuring reduced the time spent searching for information, contributed to data traceability, and facilitated the execution of development and review activities, eliminating excessive subfolder creation and simplifying navigation.

Checklists were created based on opportunities identified during supplier visits, external audits, and throughout the work. The first checklist, regarding development, separated the installation stages and included responsible parties and completion dates, ensuring that all necessary parts were modeled and delivered together. The second, for project verification, supported the critical analysis of vehicles under development, validating constructive features and opaque components, monitoring assembly, and approving the project.

The third *checklist*, intended for revision requests, standardized the process of opening, validating, and approving requests, ensuring that all stages of the proposed workflow were consistently met. This allowed for control over the changes made and contributed to the traceability of revisions, ensuring that modifications were properly documented and approved. The implementation of these *checklists* superseded internal documentation, guiding revision requests, vehicle-based development, and critical analysis for project release.

A lessons learned document was implemented to compile technical knowledge, management definitions, and observations from the production process. Filled out through a process similar to brainstorming in bi-weekly meetings, this record transformed tacit knowledge into documented and accessible information. This reference base is fundamental for preserving critical knowledge, even with team changes, and for guiding the execution of development and review, strengthening organizational knowledge management.

Standard Operating Procedures (SOP) were implemented and disseminated, establishing clear guidelines for executing, controlling, and validating development cycle activities and reviews. These SOPs, developed based on process diagnostics and best management practices, were accompanied by semi-annual training. Additionally, technical scopes were reviewed and improved, defining prototype development and standardizing the application of ballistic materials, ensuring clarity in specifications and consistency in activity execution.

The proposed methods established an integrated, process-oriented management structure supported by performance indicators, allowing for activity control, transparent information, and assertive decision-making. This approach provides favorable conditions for maintaining implemented improvements, reducing dependence on individual knowledge, and building a standardized, collaborative organizational environment adaptable to future demands. The modeling team was redistributed into groups of three professionals, with one person responsible for validating and passing on the molds, optimizing manufacturing and ensuring the completeness of molds per vehicle.

The consolidated analysis of performance indicators demonstrated that the implemented improvements produced positive effects on the sector’s quality, productivity, and efficiency. For ongoing projects, the monthly average of revision requests decreased by 16%, from 90.7 units in 2024 to 76.4 units in 2025. Revision releases also decreased by 12%, from 76.4 to 67.3 units, and the average waiting time for release reduced by 3%, from 46.9 to 45.7 days. These data indicate a lower need for corrections and rework, a smoother process, and a greater capacity to handle demands.

In monitoring the reviews for newly developed vehicles, in the 180-day period after project release, the average number of requests per project decreased by 26%, from 5.5 in 2024 to 4.0 in 2025. This result suggests an increase in the quality of developed projects and greater assertiveness in initial deliveries. Although the average time between requests increased by 169% and the release time by 323%, this apparent loss of performance should be interpreted in the context of the expressive reduction in requests.

The interpretation of the request and release deadlines, which increased significantly, indicates that revisions began to occur at more advanced and mature stages of development. This resulted in the reduction of successive correction cycles and contributed to greater technical stability of the projects, as requests started to be analyzed by impact and priority. This strategic approach, although it lengthens individual response time, optimizes the overall process by focusing on more significant and less frequent interventions.

The development indicators for new projects also corroborated the hypothesis of improvement. There was a 15% reduction in the volume of vehicles developed, from 47 in 2024 to 40 in 2025. The average time for modeling per vehicle reduced by 3%, from 5.9 to 5.7 days, and the vectorization time decreased by 37%, from 4.1 to 2.6 days. The total development time fell by 17%, from 10 to 8.3 days, and the total workload per project significantly reduced by 45%, from 480 to 266 hours, even with the modeling team being reduced by 40%.

These quantitative results demonstrate significant gains in operational efficiency, with reduced waste and better utilization of available resources. The development process has become more stable and aligned with the principles of continuous improvement and performance optimization. The decrease in workload and total development time, even with fewer collaborators in modeling, indicates a substantial increase in productivity and process quality, reflecting the effectiveness of the implemented tools and methodologies.

According to the organizational maturity levels proposed by Barbosa (2019), the company evolved from an initial stage, characterized by informality and dependence on individual knowledge, to a more organized scenario. A transition was observed to a level where flows are formalized, responsibilities are defined, records are centralized, and integration between the involved areas is greater. This evolution in managerial maturity is an indicator of the sustainability of the implemented improvements and the organization’s capacity to deal with future challenges.

The application of project management principles, as advocated by the PMBOK (PMI, 2021), was fundamental, especially in the areas of quality, communications, resources, and knowledge management. Adherence to agile management, focusing on individual interactions, functional solutions, and rapid response to change, also proved effective. The combination of traditional and agile approaches, or hybrid management, demonstrated particular effectiveness in engineering environments with high variability and adaptation needs, such as the vehicle armor sector.

The results corroborate the principles of ISO 9001:2015 and strengthen the Quality Management System (QMS), which emphasize process standardization, evidence-based management, continuous improvement, the use of performance indicators, and the implementation of traceability mechanisms. The application of these concepts contributed to organizing customized demands, reducing rework, and promoting greater integration among the involved areas, aligning with the concepts of mass customization discussed by Machado and Moraes (2008).

Adherence to the principles of Simultaneous Engineering, as highlighted by Santos (1995), was another relevant point, especially regarding multidisciplinary integration and the execution of parallel activities. The early involvement of the areas involved in the production process reduced the occurrence of rework and late design changes, which normally impact costs and deadlines. The adoption of collaborative practices during development allowed for greater alignment between customer requirements, production constraints, and project objectives, resulting in gains in efficiency, schedule control, and risk reduction.

In summary, the integration of project management practices provided relevant gains in productivity, predictability, communication, and process reliability. The implemented improvements created a solid foundation to sustain the organization’s future growth in the face of project complexity and the growing demand of the automotive shielding market. The optimization of operational efficiency, reduction of rework, and greater predictability of development and review activities were achieved, directly responding to the study’s objective of improving the sector’s managerial maturity.

4. Conclusion

The present study sought to identify opportunities, implement management tools, standardize activities, increase efficiency, reduce the number of revisions per vehicle, and expedite the development of new projects in the opaque shielding cycle for civilian vehicles. It was observed that the company’s development engineering operated with informal processes, absence of indicators, and limited management control, resulting in rework and difficulties in managing ballistic projects. To reverse this scenario, a set of project management tools and methodologies was implemented, including flowcharts, Work Breakdown Structure (WBS), an integrated management spreadsheet, Kanban board, Standard Operating Procedures (SOPs), and checklists. These interventions resulted in significant gains in operational efficiency and quality. A reduction of 16% in monthly revision requests for ongoing projects and 26% in average requests per project for newly developed vehicles was observed. Additionally, the total time for developing new projects decreased by 17%, and the total workload per project was reduced by 45%, even with the restructuring of the modeling team.

The application of project management concepts, with a hybrid approach that combined predictive and agile practices, optimized operational efficiency, reduced rework, and provided greater control and predictability to development and review activities. This initiative promoted an evolution in the sector’s managerial maturity, aligning with the principles of ISO 9001:2015 and Concurrent Engineering, and established a solid foundation for the organization’s future growth. As a suggestion for future studies, it is recommended to deepen the application of agile methodologies and expand the use of monitoring tools to other areas of the organization. It is also suggested to create standardized project libraries and reusable modules, in addition to continuous team training to formalize technical knowledge, aiming to further improve the sector’s productivity and adaptability to market demands.

Bibliographic References

ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS (ABNT). NBR 15000:2005 – Sistema de gestão da qualidade – Diretrizes para a implementação de um sistema de gestão da qualidade. Rio de Janeiro: ABNT, 2005.

ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS (ABNT). NBR 16218:2013 – Gestão da qualidade – Diretrizes para o gerenciamento de projetos. Rio de Janeiro: ABNT, 2013.

BARBOSA, Frederico Celestino (org.). Gestão da produção em foco: uma abordagem holística. Uberlândia: Editora Conhecimento Livre, 2019.

BRASIL. Decreto nº 3.665, de 20 de novembro de 2000. Art. 18. Diário Oficial da União, Brasília, DF, 20 nov. 2000. Seção 1, p. 20.

BRASIL. Portaria nº 94-COLOG, de 15 de outubro de 2019. Estabelece diretrizes para o controle e gestão do transporte rodoviário de cargas. Brasília, 2019.

CANDIDO, Guido Muzio; KAMINSKI, Paulo Carlos. Uso de ferramentas de inovação na engenharia automotiva no processo de blindagem veicular civil com base no programa Rota 2030 no Brasil. In: 12º CONGRESSO BRASILEIRO DE INOVAÇÃO E GESTÃO DE DESENVOLVIMENTO DO PRODUTO, 12., 11 a 13 set. 2019, Brasília. Anais do 12° Congresso Brasileiro de Inovação e Gestão de Desenvolvimento do Produto. Brasília: Universidade de Brasília, 2019. p. 45-67. Disponível em: https://www.cbigd.org.br/anais. Acesso em: 29 abr. 2025.

EXÉRCITO BRASILEIRO. Comando Logístico. Portaria nº 55, de 5 de junho de 2017. Aprova normas para o exercício de atividades com veículos automotores blindados e blindagens balísticas. Diário Oficial da União, Brasília, DF, 5 jun. 2017. Seção 1, p. 10.

FORBES. Brasil bate novo recorde com 30 mil carros blindados em 2023. Forbes Brasil, 19 mar. 2024. Disponível em: <https://forbes.com.br/forbeslife/forbes-motors/2024/03/brasil-bate-novo-recorde-com-30-mil-carros-blindados-em-2023/>. Acesso em: 23 abr. 2025, às 19:55.

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO). ISO 9001:2015 – Quality management systems – Requirements. Geneva: International Organization for Standardization, 2015.

MACHADO, André Gustavo Carvalho; MORAES, Walter Fernando Araújo de. Estratégias de customização em massa implementadas por empresas brasileiras. Produção, São Paulo, v. 18, n. 1, p. 170-183, jan./abr. 2008.

PROJECT MANAGEMENT INSTITUTE (PMI). Guia do conhecimento em gerenciamento de projetos (Guia PMBOK). 7. ed. Pennsylvania: Project Management Institute, 2021.

ROLIM, Zionam E. L.; OLIVEIRA, Rafael R. de; OLIVEIRA, Helio M. de. Industrial concentration of the Brazilian automobile market and positioning in the world market. arXiv, 2019.

SANTOS, José Paulo Alves dos. O projeto do produto em ambiente de engenharia simultânea. 1995. Dissertação (Mestrado em Engenharia Mecânica) – Escola de Engenharia de São Carlos, Universidade de São Paulo, São Carlos, 1995.

ZAMBRUSKI, Michael S. A standard for enterprise project management. Boca Raton: CRC Press, 2008. (ESI International Project Management Series).

Article originating from the Final Course Work of the Specialization in Project Management of the MBA USP/Esalq

To learn more about the course, click here and access the MBX Academy platform

You may also like

Poli Usp Pro

November 19, 2026

Intelligent Model for Organizational Leadership applied to the management of remote multidisciplinary teams

The expansion of remote work and technological advancements have intensified the challenges in managing and allocating multidisciplinary teams, making Artificial Intelligence a strategic resource for optimizing decision-making processes in distributed environments. The study aimed to analyze how Artificial Intelligence can optimize the allocation of multidisciplinary teams in remote work, considering technical, interpersonal, and emotional dimensions. A mixed methodological approach was adopted, including a field survey with a structured questionnaire and semi-structured interviews with managers. Data were analyzed using descriptive statistics and content analysis. The results revealed four analytical propositions, highlighting the contradiction between the high relevance of the teams’ emotional climate and the low perceived ability of leaders to identify it remotely. Based on these findings, Design Thinking principles were applied to conceive and validate a conceptual prototype, the Intelligent Model for Organizational Leadership (MILO). MILO was tested with managers through a usability test, achieving an average score of 88 points on the scale used. The discoveries contributed to the understanding of the role of Artificial Intelligence in managing remote multidisciplinary teams and provided practical subsidies for the responsible adoption of this technology in organizational contexts.

Keywords: Design Thinking; Artificial Intelligence; Innovation; Decision Support Systems; Decision Making.

Poli Usp Pro

November 19, 2026

Reduction of setup time in die-cutting machine through the SMED methodology

The reduction of setup times represents a crucial strategy for improving productivity and operational availability in industrial processes. A study evaluated the application of the SMED (Single Minute Exchange of Die) methodology in reducing the setup time of a die-cutting machine in a packaging industry in Jaú, São Paulo. The research was characterized as an applied case study, with a qualitative and quantitative approach. Data collection involved direct observation of the production process, photographic records, recordings, and timing of setup activities. Five setups were analyzed before and five after the recovery and use of a die-turner, originally supplied by the manufacturer and which was inoperative. The results indicated a 32.85% reduction in average setup time. The main improvement came from the recovery and use of the die-turner, which allowed for the advance preparation of tools and reduced replacement time during setup. This optimization recovered approximately 35.9 productive hours per month, corresponding to an additional potential capacity of about 179,500 sheets per month. It was concluded that the SMED methodology was effective in reducing setup times, contributing to the increase in the operational availability of the studied machine.

Keywords: Operational availability; Operational efficiency; Lean Manufacturing; Industrial productivity; Quick tool change.

Poli Usp Pro

November 19, 2026

Operational competitiveness of the Manaus Industrial Pole (PIM): productive verticalization, technological dependence and strategic sustainability

This study investigated how productive verticalization strategies and technological internalization mechanisms condition the competitive sustainability of the Manaus Industrial Pole (PIM), given the paradox between its geographical isolation, high fiscal cost, and role in regional development. The objective was to analyze, from the perspective of Production Engineering, how the verticalization decisions and technological absorption processes of PIM companies respond to the logistical and institutional constraints of the Amazonian ecosystem. Applied, descriptive, and qualitative research was conducted, supported by descriptive quantitative analysis. A literature review, documentary research, and a semi-structured electronic questionnaire applied to nine specialists were combined. The quantitative data were exploratory, and the open-ended responses were treated by content analysis, with documentary triangulation. The results indicated logistics as the main bottleneck for 88.9% of respondents and an average of 3.78 for tax incentives on a four-point scale. Bioeconomy did not materialize as an operational reality, obtaining the lowest average (2.44) in converting environmental assets into competitive advantage. It was found that verticalization in PIM is an adaptive response to logistical constraints, rather than a strategic choice for endogenous capabilities, maintaining the pole as an assembly platform dependent on fiscal differential. It was concluded that the pole’s competitive sustainability is high in the short term but conditional, in the long term, on the transition to an innovative ecosystem with the densification of local production chains. The study contributed by articulating verticalization, logistical risk, and technological dependence as analytical categories of PIM’s competitiveness.

Keywords: Absorption capacity; Supply chain; Regional development; Logistical risk; Manaus Free Trade Zone.

Poli Usp Pro

November 19, 2026

Analysis of historical MDVR data for operational risk monitoring in cargo fleets

The growth of road freight transport in Brazil generated millions of behavioral alert records by embedded systems Mobile Digital Video Recorder (MDVR) and Driver Monitoring System (DMS), increasing the complexity of fleet safety management. This study analyzed a historical database of 29.07 million alerts, from 14,709 devices over nine months of operation (August 2025 to April 2026), with the objective of monitoring fleet operational risk. To this end, an open-source analytical platform in Python (Flask and DuckDB) was developed, which integrated the data processing pipeline and analysis methods. A Weighted Risk Index was constructed with severity weights derived by the Analytic Hierarchy Process (Consistency Ratio of 0.0088). The fleet was segmented into risk profiles using the K-Means algorithm, and anomaly detection employed Z-score and Isolation Forest. Temporal analysis used STL decomposition and linear regression. The results indicated a predominance of alerts associated with fatigue. Segmentation isolated a group of 363 critical risk devices (2.5% of the fleet) for intervention prioritization, and automatic detection signaled 399 devices with atypical operation patterns. Temporal analysis revealed strong weekly seasonality and an increasing trend in alert volume. The viability of an open-source analytical solution to support operational safety management in road freight transport fleets was demonstrated.

Keywords: Behavioral analysis; Driver Monitoring System; Business intelligence; Road safety; Embedded systems.

Poli Usp Pro

November 19, 2026

Application of the Shapley Method for KPI Variation Decomposition

The evaluation of changes in Key Performance Indicators (KPIs) is fundamental for business management, but traditional decomposition methods, such as Oaxaca and Blinder, often present disadvantages in the allocation of variations and in the communication of results. Aiming to overcome these limitations, the Shapley method was applied to explain KPI variations between periods, verifying its capacity to produce additive and path-independent decompositions. The research was conducted as a simulated case study/analytical experiment, evaluating the stability and additivity of the Shapley method’s solutions in profitability scenarios of a fictitious retail operation. Quantitative simulations were used, enriching a Kaggle transactional database with artificial instances and implementing the calculation of dimension contribution to margin variations between two quarters. The tools employed were Microsoft Excel and Python (Jupyter Notebook), with libraries such as numpy/pandas and itertools. The results revealed an increase in average margin between the analyzed quarters, driven mainly by changes in commission pricing and sales category mix. The Shapley method proved suitable for decomposing KPI variations, generating additive, symmetric, efficient, and path-independent analytical solutions. It was concluded that the Shapley method offers a robust approach to profitability analysis, allowing for a direct and intuitive evaluation of the impacts attributed to business drivers, which facilitates the optimization of managerial strategies.

Keywords: Profitability analysis; Marginal contribution; Business management; KPI; Shapley.